Loading...
HomeMy WebLinkAbout20140929 Ver 1_Application_20140828 Pre-Construction Notification (PCN) Form A. Applicant Information 1. Processing 1a. Type(s) of approval sought from the Corps: Section 404 Permit Section 10 Permit 1b. Specify Nationwide Permit (NWP) number: 33 or General Permit (GP) number: 1c. Has the NWP or GP number been verified by the Corps? Yes No 1d. Type(s) of approval sought from the DWQ (check all that apply): 401 Water Quality Certification – Regular Non-404 Jurisdictional General Permit 401 Water Quality Certification – Express Riparian Buffer Authorization 1e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: Yes No For the record only for Corps Permit: Yes No 1f. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in-lieu fee program. Yes No 1g. Is the project located in any of NC’s twenty coastal counties. If yes, answer 1h below. Yes No 1h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? Yes No 2. Project Information 2a. Name of project: Replacement of Bridge no. 27 over US 29-64-70/I-85 Business Loop on NC 8 (Winston Rd.) 2b. County: Davidson 2c. Nearest municipality / town: Lexington 2d. Subdivision name: not applicable 2e. NCDOT only, T.I.P. or state project no: B-3159 3. Owner Information 3a. Name(s) on Recorded Deed: North Carolina Department of Transportation 3b. Deed Book and Page No. not applicable 3c. Responsible Party (for LLC if applicable): not applicable 3d. Street address: 1598 Mail Service Center 3e. City, state, zip: Raleigh, NC 27699-1598 3f. Telephone no.: (919) 707-6129 3g. Fax no.: (919) 212-5785 3h. Email address: aejames2@ncdot.gov Office Use Only: Corps action ID no. _____________ DWQ project no. _______________ Form Version 1.4 January 2009 1 4. Applicant Information (if different from owner) 4a. Applicant is: Agent Other, specify: 4b. Name: not applicable 4c. Business name (if applicable): 4d. Street address: 4e. City, state, zip: 4f. Telephone no.: 4g. Fax no.: 4h. Email address: 5. Agent/Consultant Information (if applicable) 5a. Name: not applicable 5b. Business name (if applicable): 5c. Street address: 5d. City, state, zip: 5e. Telephone no.: 5f. Fax no.: 5g. Email address: 2 B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): not applicable 1b. Site coordinates (in decimal degrees): Latitude: 35.780468 Longitude: - 80.259998 (DD.DDDDDD) (-DD.DDDDDD) 1c. Property size: 7.0 acres 2. Surface Waters 2a. Name of nearest body of water (stream, river, etc.) to proposed project: Michael Branch 2b. Water Quality Classification of nearest receiving water: C 2c. River basin: Yadkin-Pee Dee 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: Land use in the project vicinity consists primarily of commercial development and industry, with some residential development and thin forested areas along stream channels. 3b. List the total estimated acreage of all existing wetlands on the property: 0.0 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 607 3d. Explain the purpose of the proposed project: To replace a structurally deficient and functionally obsolete bridge. 3e. Describe the overall project in detail, including the type of equipment to be used: The project involves replacing a 176-foot bridge with a 150-foot, 2-span bridge on the existing alignment with traffic maintained on-site by phased construction. The project will also involve the replacement of a pipe carrying a perennial stream away from the bridge itself. Standard road building equipment, such as trucks, dozers, and cranes will be used. 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project (including all prior phases) in the past? Comments: Perennial stream only water resource in project area; therefore, no JD was requested. Yes No Unknown 4b. If the Corps made the jurisdictional determination, what type of determination was made? Preliminary Final 4c. If yes, who delineated the jurisdictional areas? Name (if known): Agency/Consultant Company: Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 5. Project History 5a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? Yes No Unknown 5b. If yes, explain in detail according to “help file” instructions. 6. Future Project Plans 6a. Is this a phased project? Yes No 6b. If yes, explain. 3 C. Proposed Impacts Inventory 1. Impacts Summary 1a. Which sections were completed below for your project (check all that apply): Wetlands Streams - tributaries Buffers Open Waters Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. Wetland impact number – Permanent (P) or Temporary (T) 2b. Type of impact 2c. Type of wetland (if known) 2d. Forested 2e. Type of jurisdiction 2f. Area of impact (acres) Site 1 P T Choose One Yes No Corps DWQ Site 2 P T Choose One Yes No Corps DWQ Site 3 P T Choose One Yes No Corps DWQ Site 4 P T Choose One Yes No Corps DWQ Site 5 P T Choose One Yes No Corps DWQ Site 6 P T Choose One Yes No Corps DWQ 2g. Total wetland impacts X Permanent X Temporary 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. Stream impact number - Permanent (P) or Temporary (T) 3b. Type of impact 3c. Stream name 3d. Perennial (PER) or intermitte nt (INT)? 3e. Type of jurisdiction (Corps - 404, 10 DWQ – non-404, other) 3f. Average stream width (feet) 3g. Impact length (linear feet) Site 1 P T Fill UT to Michael Branch PER INT Corps DWQ 10 18 Site 2 P T PER INT Corps DWQ Site 3 P T PER INT Corps DWQ Site 4 P T PER INT Corps DWQ Site 5 P T PER INT Corps DWQ Site 6 P T PER INT Corps DWQ 3h. Total stream and tributary impacts 0 Perm 18 Temp 4 3i. Comments: 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 4a. Open water impact number – Permanent (P) or Temporary (T) 4b. Name of waterbody (if applicable) 4c. Type of impact 4d. Waterbody type 4e. Area of impact (acres) O1 P T O2 P T O3 P T O4 P T 4f. Total open water impacts X Permanent X Temporary 4g. Comments: 5. Pond or Lake Construction If pond or lake construction proposed, then complete the chart below. 5a. Pond ID number 5b. Proposed use or purpose of pond 5c. Wetland Impacts (acres) 5d. Stream Impacts (feet) 5e. Upland (acres) Flooded Filled Excavated Flo ode d Filled Excavated Flooded P1 P2 5f. Total 5g. Comments: 5h. Is a dam high hazard permit required? Yes No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 5 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. 6a. Project is in which protected basin? Neuse Tar-Pamlico Other: Catawba Randleman 6b. Buffer impact number – Permanent (P) or Temporary (T) 6c. Reason for impact 6d. Stream name 6e. Buffer mitigation required? 6f. Zone 1 impact (square feet) 6g. Zone 2 impact (square feet) B1 P T Yes No B2 P T Yes No B3 P T Yes No 6h. Total buffer impacts 6i. Comments: 6 D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. Proposed pipe end wall will be placed at the same location as the existing pipe, thereby avoiding permanent impacts; no deck drains on proposed bridge. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. NCDOT Best Management Practices for Bridge Demolition, Removal and Construction will be followed, as well as those for Sedimentation and Erosion Control. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? Yes No If no, explain: Impacts are temporary 2b. If yes, mitigation is required by (check all that apply): DWQ Corps 2c. If yes, which mitigation option will be used for this project? Mitigation bank Payment to in-lieu fee program Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: not applicable 3b. Credits Purchased (attach receipt and letter) Type Quantity 3c. Comments: 4. Complete if Making a Payment to In-lieu Fee Program 4a. Approval letter from in-lieu fee program is attached. Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: warm cool cold 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non-riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. 7 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) – required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? Yes No 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. Zone 6c. Reason for impact 6d. Total impact (square feet) Multiplier 6e. Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund). 6h. Comments: 8 E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? Yes No 1b. If yes, then is a diffuse flow plan included? If not, explain why. Comments: Yes No 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? N/A 2b. Does this project require a Stormwater Management Plan? Yes No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: See attached permit drawings. 2e. Who will be responsible for the review of the Stormwater Management Plan? Certified Local Government DWQ Stormwater Program DWQ 401 Unit 3. Certified Local Government Stormwater Review 3a. In which local government’s jurisdiction is this project? not applicable 3b. Which of the following locally-implemented stormwater management programs apply (check all that apply): Phase II NSW USMP Water Supply Watershed Other: 3c. Has the approved Stormwater Management Plan with proof of approval been attached? Yes No 4. DWQ Stormwater Program Review 4a. Which of the following state-implemented stormwater management programs apply (check all that apply): Coastal counties HQW ORW Session Law 2006-246 Other: 4b. Has the approved Stormwater Management Plan with proof of approval been attached? Yes No n/a 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? Yes No 5b. Have all of the 401 Unit submittal requirements been met? Yes No 9 F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land? Yes No 1b. If you answered “yes” to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina) Environmental Policy Act (NEPA/SEPA)? Yes No 1c. If you answered “yes” to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval letter.) Comments: Yes No 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, or Riparian Buffer Rules (15A NCAC 2B .0200)? Yes No 2b. Is this an after-the-fact permit application? Yes No 2c. If you answered “yes” to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in additional development, which could impact nearby downstream water quality? Yes No 3b. If you answered “yes” to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered “no,” provide a short narrative description. Due to the minimal transportation impact resulting from this bridge replacement, this project will neither influence nearby land uses nor stimulate growth. Therefore, a detailed indirect or cumulative effects study will not be necessary. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. not applicable 10 (V e r s i o n 1 . 2 ; R e l e a s e d J u l y 2 0 1 2 ) B3 1 5 9 Co u n t y ( i e s ) : Da v i d s o n Page 1of 1 Pr o j e c t T y p e : Da t e : Ph o n e : Ph o n e : Em a i l : Em a i l : Co u n t y ( i e s ) : CA M A C o u n t y ? De s i g n / F u t u r e : Ex i s t i n g : Pr o p o s e d P r o j e c t Ex i s t i n g S i t e Pr o j e c t L e n g t h ( l i n . M i l e s o r f e e t ) : Su r r o u n d i n g L a n d U s e : Co m m e r c i a l D e v e l o p m e n t , I n d u s t r i a l , s o m e R e s i d e n t i a l Development 0. 2 9 m i l e s Ri v e r B a s i n ( s ) : Pr i m a r y R e c e i v i n g W a t e r : Cl a s s C Bu f f e r R u l e s i n E f f e c t No n e Ot h e r S t r e a m C l a s s i f i c a t i o n : No N/ A NC D W Q S t r e a m I n d e x N o . : Ci t y / T o w n : 70 4 3 7 2 1 8 8 5 Hy d r a u l i c s U n i t Ad d r e s s : Le x i n g t o n , N C 19 1 9 7 0 7 6 7 5 5 Da v i d s o n Ra l e i g h , N C 2 7 6 1 0 Ad d r e s s : 90 0 W e s t T r a d e S t . S t e . 7 1 5 10 2 0 B i r c h R i d g e R d Ch a r l o t t e , N C 2 8 2 0 2 ed w a r d . v a n c e @ s t v i n c . c o m ac . Ge n e r a l P r o j e c t N a r r a t i v e : Ty p i c a l C r o s s S e c t i o n D e s c r i p t i o n : Re f e r e n c e s 23 9 0 0 ( 2 0 0 9 ) 4. 0 0 Av e r a g e D a i l y T r a f f i c ( v e h / h r / d a y ) : ac . Pr o j e c t B u i l t 6 U p o n A r e a ( a c . ) Lo c a l U r b a n h i g h w a y w i t h 2 1 2 ' t r a v e l l a n e s , 2 ' 6 " cu r b a n d g u t t e r w i t h 1 0 ' b e r m 28 , 6 0 0 ( 2 0 3 5 ) 4. 0 0 Lo c a l U r b a n h i g h w a y w i t h 2 1 2 ' t r a v e l l a n e s a n d r o a dside ditches. No r t h C a r o l i n a D e p a r t m e n t o f T r a n s p o r t a t i o n Hi g h w a y S t o r m w a t e r P r o g r a m S T O R M W A T E R M A N A G E M E N T P L A N FO R L I N E A R R O A D W A Y P R O J E C T S Ze r m a n B i l l , P E Br i d g e R e p l a c e m e n t Ge n e r a l P r o j e c t I n f o r m a t i o n 7/24/2014 Pr o j e c t / T I P N o . : NC D O T C o n t a c t : Pr o j e c t N o . : B3 1 5 9 Co n t r a c t o r / D e s i g n e r : ST V / R a l p h W h i t e h e a d A s s o c i a t e s bz e r m a n @ n c d o t . g o v Su p p l e m e n t a l : Pr i m a r y : Mi c h a e l B r a n c h Ya d k i n P e e D e e 12 1 1 3 3 NC D W Q S u r f a c e W a t e r C l a s s i f i c a t i o n f o r P r i m a r y R e c e iv i n g W a t e r Pr o j e c t D e s c r i p t i o n No n e 30 3 ( d ) I m p a i r m e n t s : RO A D W A Y D E S C R I P T I O N T h e N o r t h C a r o l i a n D e p a r t m e n t o f T r a n s p o r t a t i o n ( N C DO T ) p r o p o s e s t o r e p l a c e b r i d g e n u m b e r 2 7 o n N C 8 / U S 5 2 o v e r U S 2 9 $ 6 4 $ 7 0 / I $ 8 5 B u s i n e s s lo o p ( T I P B $ 3 1 5 9 ) i n D a v i d s o n C o u n t y . T h e t o t a l p r oj e c t l e n g t h i s 0 . 2 9 m i l e s . T h e p r o j e c t c r e a t e s t e m p o r a r y i m p a c t s t o a n U p p e r T r i b u t a r y o f M i c h a e l B r a n c h w h i c h i s l o c a t e d i n t h e Y a d k i n $ P e e D e e R i v e r B a s i n . T h e p r o j e c t d r a i n a g e s y s t e m c o n s i s ts o f d r o p i n l e t s a n d p i p e s t h a t d r a i n t o t h e ex i s t i n g J u r i s d i c t i o n a l S t r e a m E N V I R O N M E N T A L D E S C R I P T I O N T h e p r o j e c t i s l o c a t e d i n D a v i d s o n C o u n t y i n t h e Y a dk i n $ P e e D e e R i v e r B a s i n . T h e p r o j e c t c r e a t e s l e s s t h a n 0 . 0 1 a c r e s o f t e m p o r a r y impacts to M i c h a e l B r a n c h w h i c h i s c l a s s i f i e d a s a ‘ C ’ w a t e r . T h e r o a d w a y w o r k i s m i n i m i z e d a s m u c h a s p o s s i b l e to r e d u c e t h e p r o p o s e d i m p r i n t . The te m p o r a r y i m p a c t s a r e c a u s e d b y t h e p i p e o u t f a l l i n to t h e e x i s t i n g J u r i s d i c t i o n a l S t r e a m . T h e p r o p o s e d p i p e e n d w a l l w i l l b e p l a c e d a t t h e s a me lo c a t i o n a s t h e e x i s t i n g p i p e w h i c h o u t f a l l s i n t o a c o n c r e t e l i n e d c h a n n e l . B e c a u s e t h e e x i s t i n g c h a n ne l i s c o n c r e t e l i n e d , n o r i p r a p a p r o n i s p r o p o s e d . T h i s p r o j e c t o u t f a l l i s l o c a t e d w i t h i n a n e x i s t i n g re s i d e n t i a l a n d c o m m e r c i a l l y d e v e l o p e d a r e a w i t h v e r y l i t t l e o p e n s p a c e . T h e r e f o r e , n o p e r m anent BM P s a r e p r o p o s e d f o r t h i s p r o j e c t . INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS A R T MEN N A S O H DHV D T V = = = = = = % % MPH ADT ADT % * FUNC CLASS = 0 0 0 PROFILE (HORIZONTAL) PROJECT LENGTH RIGHT OF WAY DATE: LETTING DATE: STATE STATE PROJECT REFERENCE NO. STATE PROJ. NO.F. A. PROJ. NO.DESCRIPTION NO. TOTAL SHEETS N.C. SHEET 1 DESIGN DATA Prepared in the Office of: SIGNATURE: SIGNATURE: DIVISION OF HIGHWAYS PROJECT ENGINEER PROJECT DESIGN ENGINEER GRAPHIC SCALES PLANS PROFILE (VERTICAL) HYDRAULICS ENGINEER ENGINEER ROADWAY DESIGN LOCATION: TYPE OF WORK: 0 9 / 0 8 / 9 9 DIVISION OF HIGHWAYS STATE OF NORTH CAROLINA 0 00 7 / 14 / 2 0 14 R : \ H y d r a u li c s \ P E R M IT S _ E n v i o r n m e n t a l\ D r a w i n g s \ B 3 15 9 _ h y d _ p r m _ t s h . d g n c h i t k h m b 1000 Birch Ridge Dr., Raleigh NC, 27610 C O N T R A C T : T I P P R O J E C T : D E P T O F TRA SPORT T IO N T A TEOFN RT CAR O LI N A B - 3 15 9 DAVIDSON COUNTY SIGNALS & STRUCTURE 50 25 50 100 50 25 50 100 10 5 10 20 2009 2035 10 60 5 40 * TTST =2 DUAL 3 TONY HOUSER, PE BRUCE PAYNE, PE B-3159See Sheet 1-A For Index of Sheets VICINITY MAP 8 8 LEXINGTON 29 BYP 70 64 BUS 85 64 29 BYP 70 BUS 85 2012 STANDARD SPECIFICATIONS THIS PROJECT IS WITHIN THE CITY LIMITS OF LEXINGTON. LENGTH ROADWAY OF TIP PROJECT B-3159 = LENGTH STRUCTURE OF TIP PROJECT B-3159 = TOTAL LENGTH OF TIP PROJECT B-3159 = 0.030 MILES JUNE 20, 2014 BRIDGE NO. 27 OVER US 29-64-70 / I-85 BUS ON NC 8 / US 52 GRADING, DRAINAGE, PAVING, RETAINING WALL, 38331.1.1 STPNHS-0052(31)PE 23,900 28,600 ARTERIAL STATEWIDE TIER C E N T E R S T W -S RAILW AY MAIN ST PROJECT BEGIN PROJECT END 645 7 NSRS 2007NAD 83/TO I- 8 5 TO WELCOME T O T H O M A S VI L L E TO LEXINGTON -L- NC 8 / US 52 -L- NC 8 / US 52 - Y- US 29-64-70 / I-85 B US - Y- U S 29-64-70 / I-85 B U S 7T H ST 9TH ST 9TH ST W 6 TH ST - Y2 - - Y3- BEGIN TIP PROJECT B-3159 -L- STA. 7+75.00 -L- STA. 12+64.00 +/- BEGIN BRIDGE - Y7- PIE D M O N T D R / W HIT E S T WALL #1 RETAINING WALL #2 RETAINING JUNE 16, 2015 END TIP PROJECT B-3159 -L- STA. 23+00.00 0.289 MILES 0.259 MILES THIS IS A FULL CONTROL OF ACCESS PROJECT WITH ACCESS TO BE SHOWN ON THE PLANS. -L- STA 14+20.00 +/- END BRIDGE CLEARING ON THIS PROJECT SHOULD BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD III. SURFACE WATER IMPACTS PERMIT SHEET __ OF __ PERMIT DRAWING 1 4 - Y - S T A . 2 1 + 0 0 . 0 0 M A T C H L I N E S H E E T 4 - Y 3 - S T A . 1 0 + 9 8 . 0 0 M A T C H L I N E S H E E T 4 MATC H LIN E SHEET 4 -RPC - STA. 16 + 6 0 .0 0 HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO. 6 7 / 2 4 / 2 0 14 R : \ H y d r a u l i c s \ P E R M I T S _ E n v i o r n m e n t a l \ D r a w i n g s \ B 3 1 5 9 _ h y d _ p r m _ p s h _ 0 6 . d g n c h i t k h m b 8 / 1 7 / 9 9 DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION B-3159 N A D 8 3 / N S R S 2 0 0 7 NOTES: SEE SHEET 10 FOR -RPC- PROFILE SEE SHEET 11 FOR -Y3- PROFILE SE = EXIST PAVEMENT REMOVAL PAVED SHOULDER IN SURFACE WATER DENOTES TEMPORARY IMPACTS 100'0' GRAPHIC SCALE 100' LEGEND SHEET __ OF __ PERMIT DRAWING 2 4 US 29 / 70 BUS 85 -RPC- 10+00 15+00 20+00 PIs Sta 11+97.82 F Ls = 184.00' LT = 122.82' ST = 61.48' PI Sta 13+50.37 D L = 181.28' T = 91.37' R = 587.00' PIs Sta 15+01.75 F Ls = 184.00' LT = 122.82' ST = 61.48' 15+00 PI Sta 25+58.78 D L = 3,043.15' T = 1,558.78' R = 5,700.00' -Y- SE = .08 2 4 CHO RD ARBOR FOOT BRIDGE WOOD 12 " R C P 2 4 " C MP 1 S F D P O R T C A R G AND CONC STONE S T O N E 2X3 CULVERT 24" RCP BST VAR HT STONE STONE V A R HT S T ONE VA R HT S T O NE V A R H T STO N E 1 S F D INV=756.17' INV=758.79'INV=756.70' TOP=761.80' INV=760.34' INV=760.07' INV=762.80' TOP=769.39' INV=752.24' INV=750.86'INV=750.63' INV=750.37' TOP=755.34' INV=749.10' INV=746 .98' INV=747 .90' TOP=750 .13' INV=748 .46' TOP=752 .60' INV=744.46' INV=744 .72' INV=749.29'INV=748.84'TOP=754.83' INV=738.25' INV=750.52'TOP=753.12' INV=750.21' TOP=762.41'INV=758.01' INV=759.01' INV=760.00' TOP=762.66' INV=758.15' INV=758.10' INV=760.23' INV=760.45'TOP=762.08' TOP=766.04' INV=764.32' INV=764.39' INV=766.38' TOP=768.03' TOP=743.04' INV=748.33' HW 54" HAND MADE36" RCP TO PADCONC P A D C O N C TOP=762.81' TOP=761.40' TOP=762.77' TOP=752.61' TOP=751.21' TOP=752.64' TOP=755 .66' TOP=756.32' TOP=758.84' TOP=763.72' 18 " R C P 18 " R C P 12 " V C 12 " V C 18 " R C P FES 18" RCP 36" RCP 18 " R C P 18 " R C P 8" CLAY 8" CLAY 8" CLAY 8" CLAY 8" CLAY 8 " C L A Y 8" CLAY CONC CONC 2821 758.26 18 " R C P JB INV=756.22' INV=749.99' INV=748 .99' INV=747.55' INV=749.03' INV=753.90' INV=755.69' INV=748.64' TOP=758.26' INV=752.51' INV=754.84' IN INV=753.59' OUT 7TH ST 7TH ST MTL MTL CONC C O N C C U R B MTL CONC CONC CONC CONC C O NC C U R B H AME S S T 1 S F D 6 0 " BKGR TO SALISBURY 3 0 ' B S T 27' BST 17' BST CB CB DI DI DI DI DI DI DI DI CB CB EIP EIP EIP EIP BETTY B. CALLICUT AND WIFE BOBBY R. CALLICUT EIP EIP EIP EIP EXISTING R/W EXISTING R/W EXISTING R/W EXISTING R/W EX IST ING R /W EX IST ING R/W 45.00' EXIS T ING R / W EX IS T ING R / W EIP EIP EIP EIP EIP 12 " CMP 748.97 TOP PIPE= 749 .31 TOP P IPE= 4 5 .0 0 ' 2 6 0 . 0 0 ' EXISTING R/W VAR BST VAR BST VAR BST VAR BST US 29 / 70 BUS 85 SBL 24' BST US 29 / 70 BUS 85 NBL 24' BST B Y - 7 B Y - 8 -EY- 39 40 41 42 43 44 E OI 6"STL 16"DI 16" DI 16 "DI 16 "D I 1 6 " D I 4"DI 4 "D I EOI 6 "STL 6"STL 4 " P L 4"PL CONC CURB UNABLE TO LOCATE END 1 8 " R C P 1 8 " R C P MTL MTL MTL MTL MTL MTL CONC CURB INV=748.46' INV=744 .96' TOP=750 .70' 45 HW STONE STONE AND CONC DITCH 46 TO SALISBURY HIMWANTI KRISENLALL AND WIFE EDWIN KRISENLALL TERRY F. RUMFELT CECIL MAX RUMFELT DAVID R. RUMFELT, JR. VERL A. RUMFELT TERRY F. RUMFELT HOPE N. CRAVER AND WIFE TONY G. CRAVER ELEV=753.48' E=1627487 N=761273 BM#1 LINDA PURVIS AND WIFE RICHARD PURVIS JACK C. CHILDERS E O I W / CONC. CURBS VAR. CONC. 48" W W TUNNELPEDESTRIANABANDONED INV=781.65' INV=781.52' INV=778.01' INV=775.94'8" C MPENDS UNABLE TO LOCATE DIR. ONLY 12" C MP L O C ATE E N D U N A BLE T O DIR. O NL Y - E Y 1- DI OBTAIN INVERT UNABLE TO CB FILLED 63 64 65 66 8" H D PE 8" HDPE TOP=783.82' TOP=783.49' 48" CONC CONC TOP=777.72' 4' CROSS SECTION FOR DITCH 4' 9' 5 4 " W E L D E D S T E E L T R E N C H L E S S I N S T A L L A T I O N HW & FILL PLUG BDO HW RETAIN RE TA IN RETA IN R E T A I N 2GI-A 2GI-A 2GI-A 2GI-A 54" RCP-III 54" RCP-III 36" RCP-III 36" RCP-III 42" RCP-III TB JB w/MH 2GI-A JB w/MH & FILL PLUG 15 " RC P- III DI R E T AI N R E T AI N RETAIN REM O VE 18" RCP-III REPLACE DI REMOVE AND 3 0 " R C P - I I I ELB ELB P P P P P 4 2 " RC P- III 42" RCP-III F S 18" R C P-III 2GI-A 2GI-A FS DI REMOVE REPLACE DI REMOVE AND W/2 ELBOWS 18" CSP SEE DETAIL "B" BERM DITCH SITE 1 IN SURFACE WATERS TEMPORARY IMPACTS C C C C C C C C C C C C C F C F C C C F C C C F 740 740 740 7 4 5 745 745 745 745 745 745 7 5 0 750 750 7 50 750 750 750 750 750 750 750 750 755 755 755 755 755 755 7 5 5 755 755 755 755 755 755 755 760 760 760 760 760 760 760 760 760 760 760 760 760 7 6 0 765 765 765 765 765 765 765 765 765 765 765 765 765 765765 765 765 765 765 765 76 5 765 765 765 770770 770 770 770 770 770 770 775 775 775 775 780780 780 780 780 785 US 29 / 70 BUS 85 -RPC- 10+00 15+00 20+00 PIs Sta 11+97.82 F Ls = 184.00' LT = 122.82' ST = 61.48' PI Sta 13+50.37 D L = 181.28' T = 91.37' R = 587.00' PIs Sta 15+01.75 F Ls = 184.00' LT = 122.82' ST = 61.48' 15+00 PI Sta 25+58.78 D L = 3,043.15' T = 1,558.78' R = 5,700.00' -Y- SE = .08 2 4 CHO RD ARBOR FOOT BRIDGE WOOD 12 " R C P 2 4 " C MP 1 S F D P O R T C A R G AND CONC STONE S T O N E 2X3 CULVERT 24" RCP BST VAR HT STONE STONE V A R HT S T ONE VA R HT S T O NE V A R H T STO N E 1 S F D INV=756.17' INV=758.79'INV=756.70' TOP=761.80' INV=760.34' INV=760.07' INV=762.80' TOP=769.39' INV=752.24' INV=750.86'INV=750.63' INV=750.37' TOP=755.34' INV=749.10' INV=746 .98' INV=747 .90' TOP=750 .13' INV=748 .46' TOP=752 .60' INV=744.46' INV=744 .72' INV=749.29'INV=748.84'TOP=754.83' INV=738.25' INV=750.52'TOP=753.12' INV=750.21' TOP=762.41'INV=758.01' INV=759.01' INV=760.00' TOP=762.66' INV=758.15' INV=758.10' INV=760.23' INV=760.45'TOP=762.08' TOP=766.04' INV=764.32' INV=764.39' INV=766.38' TOP=768.03' TOP=743.04' INV=748.33' HW 54" HAND MADE36" RCP TO PADCONC P A D C O N C TOP=762.81' TOP=761.40' TOP=762.77' TOP=752.61' TOP=751.21' TOP=752.64' TOP=755 .66' TOP=756.32' TOP=758.84' TOP=763.72' 18 " R C P 18 " R C P 12 " V C 12 " V C 18 " R C P FES 18" RCP 36" RCP 18 " R C P 18 " R C P 8" CLAY 8" CLAY 8" CLAY 8" CLAY 8" CLAY 8 " C L A Y 8" CLAY CONC CONC 2821 758.26 18 " R C P JB INV=756.22' INV=749.99' INV=748 .99' INV=747.55' INV=749.03' INV=753.90' INV=755.69' INV=748.64' TOP=758.26' INV=752.51' INV=754.84' IN INV=753.59' OUT 7TH ST 7TH ST MTL MTL CONC C O N C C U R B MTL CONC CONC CONC CONC C O NC C U R B H AME S S T 1 S F D 6 0 " BKGR TO SALISBURY 3 0 ' B S T 27' BST 17' BST CB CB DI DI DI DI DI DI DI DI CB CB EIP EIP EIP EIP BETTY B. CALLICUT AND WIFE BOBBY R. CALLICUT EIP EIP EIP EIP EXISTING R/W EXISTING R/W EXISTING R/W EXISTING R/W EX IST ING R /W EX IST ING R/W 45.00' EXIS T ING R / W EX IS T ING R / W EIP EIP EIP EIP EIP 12 " CMP 748.97 TOP PIPE= 749 .31 TOP P IPE= 4 5 .0 0 ' 2 6 0 . 0 0 ' EXISTING R/W VAR BST VAR BST VAR BST VAR BST US 29 / 70 BUS 85 SBL 24' BST US 29 / 70 BUS 85 NBL 24' BST B Y - 7 B Y - 8 -EY- 39 40 41 42 43 44 E OI 6"STL 16"DI 16" DI 16 "DI 16 "D I 1 6 " D I 4"DI 4 "D I EOI 6 "STL 6"STL 4 " P L 4"PL CONC CURB UNABLE TO LOCATE END 1 8 " R C P 1 8 " R C P MTL MTL MTL MTL MTL MTL CONC CURB INV=748.46' INV=744 .96' TOP=750 .70' 45 HW STONE STONE AND CONC DITCH 46 TO SALISBURY HIMWANTI KRISENLALL AND WIFE EDWIN KRISENLALL TERRY F. RUMFELT CECIL MAX RUMFELT DAVID R. RUMFELT, JR. VERL A. RUMFELT TERRY F. RUMFELT HOPE N. CRAVER AND WIFE TONY G. CRAVER ELEV=753.48' E=1627487 N=761273 BM#1 LINDA PURVIS AND WIFE RICHARD PURVIS JACK C. CHILDERS E O I W / CONC. CURBS VAR. CONC. 48" W W TUNNELPEDESTRIANABANDONED INV=781.65' INV=781.52' INV=778.01' INV=775.94'8" C MPENDS UNABLE TO LOCATE DIR. ONLY 12" C MP L O C ATE E N D U N A BLE T O DIR. O NL Y - E Y 1- DI OBTAIN INVERT UNABLE TO CB FILLED 63 64 65 66 8" H D PE 8" HDPE TOP=783.82' TOP=783.49' 48" CONC CONC TOP=777.72' 4' CROSS SECTION FOR DITCH 4' 9' 5 4 " W E L D E D S T E E L T R E N C H L E S S I N S T A L L A T I O N HW & FILL PLUG BDO HW RETAIN RE TA IN RETA IN R E T A I N 2GI-A 2GI-A 2GI-A 2GI-A 54" RCP-III 54" RCP-III 36" RCP-III 36" RCP-III 42" RCP-III TB JB w/MH 2GI-A JB w/MH & FILL PLUG 15 " RC P- III DI R E T AI N R E T AI N RETAIN REM O VE 18" RCP-III REPLACE DI REMOVE AND 3 0 " R C P - I I I ELB ELB P P P P P 4 2 " RC P- III 42" RCP-III F S 18" R C P-III 2GI-A 2GI-A FS DI REMOVE REPLACE DI REMOVE AND W/2 ELBOWS 18" CSP SEE DETAIL "B" BERM DITCH SITE 1 IN SURFACE WATERS TEMPORARY IMPACTS - Y - S T A . 2 1 + 0 0 . 0 0 M A T C H L I N E S H E E T 4 - Y 3 - S T A . 1 0 + 9 8 . 0 0 M A T C H L I N E S H E E T 4 MATC H LIN E SHEET 4 -RPC - STA. 16 + 6 0 .0 0 HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO. 7 / 2 4 / 2 0 14 R : \ H y d r a u l i c s \ P E R M I T S _ E n v i o r n m e n t a l \ D r a w i n g s \ B 3 1 5 9 _ h y d _ p r m _ p s h _ 0 6 a . d g n c h i t k h m b 8 / 1 7 / 9 9 DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION B-3159 N A D 8 3 / N S R S 2 0 0 7 NOTES: SEE SHEET 10 FOR -RPC- PROFILE SEE SHEET 11 FOR -Y3- PROFILE SE = EXIST PAVEMENT REMOVAL PAVED SHOULDER LEGEND 100'0' GRAPHIC SCALE 100' SHEET __ OF __ PERMIT DRAWING 3 4 6a IN SURFACE WATER DENOTES TEMPORARY IMPACTS C C C C C C C C C C C C C F C F C C C F C C C F US 29 / 70 BUS 85 15+00 20+00 15+00 4 2X3 CULVERT 24" RCP VAR HT STONE STONE V A R HT S T O N E V A R H T S T O N E 1 S F D INV=756.17' INV=758.79' TOP=761.80' INV=760.34' INV=760.07' INV=752.24' INV=750.86'INV=750.63' INV=750.37' TOP=755.34' INV=749.10' INV=746 .98 ' INV=747 .90 ' TOP=750 .13 ' INV=744.46' INV=744 .72' INV=750.21' TOP=762.41'INV=758.01' INV=759.01' INV=760.00' TOP=762.66' INV=758.15' INV=758.10' INV=760.23' INV=760.45'TOP=762.08' TOP=766.04' INV=764.32' INV=764.39' INV=766.38' TOP=768.03' TOP=743.04' INV=748.33' HW 54" HAND MADE36" RCP TO PADCONC P A D C O N C TOP=762.81' TOP=761.40' TOP=762.77' TOP=752.61' TOP=751.21' TOP=752.64' TOP=755 .66' TOP=756.32' TOP=758.84' 18 " R C P 18 " R C P 12 " V C 12 " V C 18 " R C P FES 18" RCP 36" RCP 8" CLAY 8" CLAY 8" CLAY 8" CLAY 8" CLAY 8 " C L A Y 8" CLAY 1 8 " R C P JB INV=749.99' INV=748 .99' INV=747.55' INV=749.03' INV=753.90' INV=755.69' INV=748.64' INV=754.84' IN INV=753.59' OUT 7TH ST 7TH ST MTL MTL C O N C C U R B MTL CONC CONC CONC CONC C O N C C U R B H AME S S T 1 S F D 6 0 " B KGR TO SALISBURY 3 0 ' B S T 27' BST 17' BST CB CB DI DI DI DI DI EIP BETTY B. CALLICUT AND WIFE BOBBY R. CALLICUT EIP EXISTING R/W EXISTING R/W EX IST ING R /W EX IST ING R /W 45 .00' E X IS T IN G R / W E X IS T IN G R / W EIP EIP EIP EIP EIP 12 " C MP 748.97 TOP PIPE= 749 .31 TOP P IPE= 4 5 .0 0 ' 2 6 0 . 0 0 ' EXISTING R/W VAR BST VAR BST VAR BST VAR BST US 29 / 70 BUS 85 SBL 24' BST US 29 / 70 BUS 85 NBL 24' BST B Y - 8 -EY- 39 40 41 42 43 44 E OI 6"STL 16"DI 16" DI 16 "D I 16 "D I 1 6 " D I 4"DI EOI 6 "STL 6"STL 4 " P L 4"PL UNABLE TO LOCATE END MTL MTL MTL MTL CONC CURB INV=744 .96' TOP=750 .70 ' 45 HW STONE STONE AND CONC DITCH 46 HIMWANTI KRISENLALL AND WIFE EDWIN KRISENLALL ELEV=753.48' E=1627487 N=761273 BM#1 LINDA PURVIS AND WIFE RICHARD PURVIS 48" W W TUNNELPEDESTRIANABANDONED 63 4' CROSS SECTION FOR DITCH 4' 9' 5 4 " W E L D E D S T E E L T R E N C H L E S S I N S T A L L A T I O N HW & FILL PLUG BDO HW R E T A I N R E T A I N 2GI-A 2GI-A 2GI-A 2GI-A 54" RCP-III 54" RCP-III 36" RCP-III 36" RCP-III 42" RCP-III TB JB w/MH JB w/MH & FILL PLUG 15 " RC P - III DI RETAIN REM O VE REPLACE DI REMOVE AND 3 0 " R C P - I I I ELB ELB P P P P 4 2 " RC P- III 42" RCP-III F S 18" R C P-III 2GI-A DI REMOVE REPLACE DI REMOVE AND W/2 ELBOWS 18" CSP SITE 1 IN SURFACE WATERS TEMPORARY IMPACTS 0' LEGEND GRAPHIC SCALE SHEET __ OF __ PERMIT DRAWING 4 4 - Y - S T A . 2 1 + 0 0 . 0 0 M A T C H L I N E S H E E T 4 - Y 3 - S T A . 1 0 + 9 8 . 0 0 M A T C H L I N E S H E E T 4 MATC H LIN E SHEET 4 -RPC - STA. 16 + 6 0 .0 0 HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO. Site 1 7 / 2 4 / 2 0 14 R : \ H y d r a u l i c s \ P E R M I T S _ E n v i o r n m e n t a l \ D r a w i n g s \ B 3 1 5 9 _ h y d _ p r m _ p s h _ s i t e 1 . d g n c h i t k h m b 8 / 1 7 / 9 9 DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION B-3159 N A D 8 3 / N S R S 2 0 0 7 NOTES: SEE SHEET 10 FOR -RPC- PROFILE SEE SHEET 11 FOR -Y3- PROFILE PAVEMENT REMOVAL PAVED SHOULDER 50'50' IN SURFACE WATER DENOTES TEMPORARY IMPACTS C C C C C F C F C C C F F Ha n d Ex i s t i n g Existing Pe r m a n e n t T e m p . E x c a v a t i o n M e c h a n i z e d C l e a r i n g P e r m a n e n t T e m p . C h a n n e l C h a n n e l N a t u r a l Si t e S t a t i o n S t r u c t u r e F i l l I n F i l l I n i n C l e a r i n g i n S W S W I m p a c t s I m p a c t s S t r e a m No . ( F r o m / T o ) S i z e / T y p e W e t l a n d s W e t l a n d s W e t l a n d s i n W e t l a n d s W e t l a n d s i m p a c t s i m p a c t s P e r m a n e n t T e m p . D e s i g n (a c ) ( a c ) ( a c ) ( a c ) ( a c ) ( a c ) ( a c ) ( f t ) ( f t ) ( f t ) 1 (Y ( 1 6 + 1 7 t o 1 6 + 3 5 54 " R C P <0 . 0 1 1 8 TO T A L S : <0 . 0 1 1 8 AT N R e v i s e d 3 / 3 1 / 0 5 7/24/2014 W E T L A N D P E R M I T I M P A C T S U M M A R Y SU R F A C E W A T E R I M P A C T S WE T L A N D I M P A C T S DAVIDSON COUNTY NC D E P A R T M E N T O F T R A N S P O R T A T I O N DI V I S I O N O F H I G H W A Y S TIP B3159 Bridge No. 27 DO NOT USE FOR CONSTRUCTIONPRELIMINARY PLANS A R T M ENNASOH D H V D T V ====== %%M P H A D T A D T % * F U N C C L A S S = 0 0 0 P R O F I L E ( H O R I Z O N T A L ) P R O J E C T L E N G T H R I G H T O F W A Y D A T E : L E T T I N G D A T E : STATESTATE PROJECT REFERENCE NO.STATE PROJ. NO.F. A. PROJ. NO.DESCRIPTIONNO.TOTAL SHEETS N.C.SHEET1 D E S I G N D A T A P r e p a r e d i n t h e O f f i c e o f : SIGNATURE:SIGNATURE: D I V I S I O N O F H I G H W A Y S PROJECT ENGINEER PROJECT DESIGN ENGINEER G R A P H I C S C A L E S P L A N S P R O F I L E ( V E R T I C A L ) HYDRAULICS ENGINEER ENGINEERROADWAY DESIGN L O C A T I O N : T Y P E O F W O R K : 09/08/99 D I V I S I O N O F H I G H W A Y S S T A T E O F N O R T H C A R O L I N A 0 00 30-JUN-2014 13:57 R:\Roadway\Proj\B3159_Rdy_tsh.dgn $$$$USERNAME$$$$ 1 0 0 0 B i r c h R i d g e D r . , R a l e i g h N C , 2 7 6 1 0 CONTRACT: C203587TIP PROJECT: DEP T OFTRASPORTTIONTATEOFNRTCAROLINA B-3159 D A V I D S O N C O U N T Y S I G N A L S & S T R U C T U R E 5 0 2 5 5 0 1 0 0 5 0 2 5 5 0 1 0 0 1 0 5 1 0 2 0 2 0 0 9 2 0 3 5 1 0 6 0 5 4 0 * T T S T = 2 D U A L 3 TONY HOUSER, PE BRUCE PAYNE, PEB-3159 S e e S h e e t 1 - A F o r I n d e x o f S h e e t s V I C I N I T Y M A P 8 8 L E X I N G T O N 2 9 B Y P 7 0 6 4 B U S 8 5 6 4 2 9 B Y P 7 0 B U S 8 5 2 0 1 2 S T A N D A R D S P E C I F I C A T I O N S T H I S P R O J E C T I S W I T H I N T H E C I T Y L I M I T S O F L E X I N G T O N . L E N G T H R O A D W A Y O F T I P P R O J E C T B - 3 1 5 9 = L E N G T H S T R U C T U R E O F T I P P R O J E C T B - 3 1 5 9 = T O T A L L E N G T H O F T I P P R O J E C T B - 3 1 5 9 = G R A D I N G , D R A I N A G E , P A V I N G , R E T A I N I N G W A L L , 38331.1.1STPNHS-0052(31)PE 2 3 , 9 0 0 2 8 , 6 0 0 A R T E R I A L S T A T E W I D E T I E R CENTER ST W- S R AI L W A Y M A I N S T P R O J E C T B E G I N P R O J E C T E N D 645 7 TO I-85 TO WELCOME TO THO M ASVILLE TO LEXINGTON -L- NC 8 / US 52 -L- NC 8 / US 52 -Y- U S 29-64-70 / I-85 BU S -Y- US 29-64-70 / I-85 BUS 7TH ST 9TH ST 9TH ST W 6TH ST -Y2- -Y 3 - B E G I N T I P P R O J E C T B - 3 1 5 9 - L - S T A . 7 + 7 5 . 0 0 -Y7- PIEDM O NT DR / W HITE ST W A L L # 1 R E T A I N I N G WALL #2RETAINING J U N E 1 6 , 2 0 1 5 END TIP PROJECT B-3159-L- STA. 23+00.00 0 . 2 8 9 M I L E S 0 . 2 6 1 M I L E S T H I S I S A F U L L C O N T R O L O F A C C E S S P R O J E C T W I T H A C C E S S T O B E S H O W N O N T H E P L A N S . C L E A R I N G O N T H I S P R O J E C T S H O U L D B E P E R F O R M E D T O T H E L I M I T S E S T A B L I S H E D B Y M E T H O D I I I . 0 . 0 2 8 M I L E S J U N E 3 0 , 2 0 1 4 STPNHS-0052(31)38331.2.FRU1R/W, UTL B R I D G E N O . 2 7 O V E R U S 2 9 - 6 4 - 7 0 / I - 8 5 B U S L O O P O N N C 8 / U S 5 2 - L - S T A . 1 2 + 6 6 . 9 7 B E G I N B R I D G E -L- STA 14+16.47END BRIDGE 2784.66 1788.31 4786.98 INV=781.65’INV=781.52’ INV=778.01’ CB CB CB CB OBTAIN INVERT UNABLE TO CB FILLED 8" HDPE 8" HDPE NSRS 2007NAD 83/ E x i s t i n g E d g e o f P a v e m e n t E x i s t i n g C u r b P r o p o s e d S l o p e S t a k e s C u t P r o p o s e d S l o p e S t a k e s F i l l E x i s t i n g M e t a l G u a r d r a i l E x i s t i n g C a b l e G u i d e r a i l P r o p o s e d G u a r d r a i l E q u a l i t y S y m b o l P a v e m e n t R e m o v a l B a s e l i n e C o n t r o l P o i n t R I G H T O F W A Y : E x i s t i n g R i g h t o f W a y M a r k e r E x i s t i n g R i g h t o f W a y L i n e h E x i s t i n g C o n t r o l o f A c c e s s P r o p o s e d C o n t r o l o f A c c e s s P r o p o s e d R i g h t o f W a y L i n e C F E x i s t i n g E a s e m e n t L i n e P r o p o s e d T e m p o r a r y C o n s t r u c t i o n E a s e m e n t P r o p o s e d T e m p o r a r y D r a i n a g e E a s e m e n t P r o p o s e d P e r m a n e n t D r a i n a g e E a s e m e n t P r o p o s e d P e r m a n e n t U t i l i t y E a s e m e n t H Y D R O L O G Y : S t r e a m o r B o d y o f W a t e r H y d r o , P o o l o r R e s e r v o i r F l o w A r r o w D i s a p p e a r i n g S t r e a m S p r i n g ; z v W K P r o p o s e d L a t e r a l , T a i l , H e a d D i t c h F a l s e S u m p P r o p o s e d C a b l e G u i d e r a i l M A J O R : B r i d g e , T u n n e l o r B o x C u l v e r t B r i d g e W i n g W a l l , H e a d W a l l a n d E n d W a l l M I N O R : H e a d a n d E n d W a l l P i p e C u l v e r t F o o t b r i d g e P a v e d D i t c h G u t t e r U T I L I T I E S : R O A D S A N D R E L A T E D F E A T U R E S : E x i s t i n g P o w e r P o l e P r o p o s e d P o w e r P o l e P U / G P o w e r C a b l e H a n d H o l e P o w e r M a n h o l e P o w e r L i n e T o w e r P o w e r T r a n s f o r m e r E x i s t i n g J o i n t U s e P o l e P r o p o s e d J o i n t U s e P o l e E x i s t i n g T e l e p h o n e P o l e P r o p o s e d T e l e p h o n e P o l e T e l e p h o n e M a n h o l e T e l e p h o n e B o o t h T e l e p h o n e P e d e s t a l U / G T e l e p h o n e C a b l e H a n d H o l e R }Tp Q l e ]/b H - F r a m e P o l e OO P O W E R : T E L E P H O N E : T e l e p h o n e C e l l T o w e r R e c o r d e d U / G P o w e r L i n e R e c o r d e d U / G T e l e p h o n e C a b l e D e s i g n a t e d U / G T e l e p h o n e C a b l e ( S . U . E . * ) R e c o r d e d U / G T e l e p h o n e C o n d u i t D e s i g n a t e d U / G T e l e p h o n e C o n d u i t ( S . U . E . * ) R e c o r d e d U / G F i b e r O p t i c s C a b l e WATER:Water Manhole Water Meter Water Valve Water Hydrant Recorded U/G Water Line4IHa TV:TV Satellite Dish TV Pedestal TV Tower U/G TV Cable Hand Hole Recorded U/G TV Cable Recorded U/G Fiber Optic Cable Designated U/G Fiber Optic Cable (S.U.E.*)r|I]GAS:Gas Valve Gas Meter Recorded U/G Gas Linenc SANITARY SEWER:Sanitary Sewer Manhole Sanitary Sewer Cleanout U/G Sanitary Sewer Line Recorded SS Forced Main Line Designated SS Forced Main Line (S.U.E.*)d oA/G Water Above Ground Gas LineA/G GasAbove Ground Water Line Above Ground Sanitary SewerA/G Sanitary Sewer MISCELLANEOUS:Utility PoleO F S 3Utility Pole with Base Utility Located Object Utility Traffic Signal Box Utility Unknown U/G Line ?CONC CONC WW vv D r a i n a g e B o x : C a t c h B a s i n , D I o r J B S t o r m S e w e r S t o r m S e w e r M a n h o l e m U/G Tank; Water, Gas, Oil A/G Tank; Water, Gas, Oil B O U N D A R I E S A N D P R O P E R T Y : S t a t e L i n e C o u n t y L i n e T o w n s h i p L i n e C i t y L i n e R e s e r v a t i o n L i n e P r o p e r t y L i n e E x i s t i n g I r o n P i n P r o p e r t y C o r n e r P r o p e r t y M o n u m e n t E x i s t i n g F e n c e L i n e P r o p o s e d W o v e n W i r e F e n c e P r o p o s e d C h a i n L i n k F e n c e P r o p o s e d B a r b e d W i r e F e n c e g F 1 2 3 E x i s t i n g W e t l a n d B o u n d a r y P r o p o s e d W e t l a n d B o u n d a r y E x i s t i n g E n d a n g e r e d A n i m a l B o u n d a r y E x i s t i n g E n d a n g e r e d P l a n t B o u n d a r y B U I L D I N G S A N D O T H E R C U L T U R E : A r e a O u t l i n e G a s P u m p V e n t o r U / G T a n k C a p C h u r c h S c h o o l D a m S i g n S m a l l M i n e W e l l V MWWS x F o u n d a t i o n S B u i l d i n g y y V E G E T A T I O N : S i n g l e T r e e X Y Vineyard S i n g l e S h r u b H e d g e W o o d s L i n e O r c h a r d V i n e y a r d R A I L R O A D S : S t a n d a r d G a u g e R R S i g n a l M i l e p o s t S w i t c h R R A b a n d o n e d R R D i s m a n t l e d S FL O W D e s i g n a t e d U / G P o w e r L i n e ( S . U . E . * ) D e s i g n a t e d U / G F i b e r O p t i c s C a b l e ( S . U . E . * ) Designated U/G Water Line (S.U.E.*)Designated U/G TV Cable (S.U.E.*)Designated U/G Gas Line (S.U.E.*)U/G Test Hole (S.U.E.*) * S . U . E . = S u b s u r f a c e U t i l i t y E n g i n e e r i n g W L B E I PB E C M CONC HW CB C S X T R A N S P O R T A T I O N M I L E P O S T 3 5 S W I T C H C e m e t e r y E X I S T I N G S T R U C T U R E S : P a r c e l / S e q u e n c e N u m b e r E AATUR End of InformationE.O.I. N o t e : N o t t o S c a l e SHEET NO.PROJECT REFERENCE NO.1B B-3159 Abandoned According to Utility Records W L B E A B E P B R W R W R W C A E T D E P D E P U E S P P T T TC TC T FO T FOWWTVTVTV FO TV FO G G SS FSS FSS ?UTL J u r i s d i c t i o n a l S t r e a m J S 12/05/11 B u f f e r Z o n e 1 B u f f e r Z o n e 2 B Z 1 B Z 2 W e t l a n d P r o p o s e d P e r m a n e n t E a s e m e n t w i t h I r o n P i n a n d C a p M a r k e r P r o p o s e d T e m p o r a r y U t i l i t y E a s e m e n t T U E I r o n P i n a n d C a p M a r k e r P r o p o s e d R i g h t o f W a y L i n e w i t h D U E P r o p o s e d P e r m a n e n t D r a i n a g e / U t i l i t y E a s e m e n t A U E P r o p o s e d A e r i a l U t i l i t y E a s e m e n t C R P r o p o s e d C u r b R a m p S T A T E O F N O R T H C A R O L I N A D I V I S I O N O F H I G H W A Y S C O N V E N T I O N A L P L A N S H E E T S Y M B O L S Underground Storage Tank, Approx. Loc.Geoenvironmental BoringUST K n o w n S o i l C o n t a m i n a t i o n : A r e a o r S i t e P o t e n t i a l S o i l C o n t a m i n a t i o n : A r e a o r S i t e C o n c r e t e o r G r a n i t e R / W M a r k e r P r o p o s e d R i g h t o f W a y L i n e w i t h C A C o n c r e t e C / A M a r k e r P r o p o s e d C o n t r o l o f A c c e s s L i n e w i t h I N D I C A T E S G E ODETIC CONTROL MONUMENTS USED OR SET FOR HORIZONTAL PROJECT CONTROL B Y T H E N C D O T L O C A T I O N A N D S U R V E Y S U N I T . P R O J E C T C O N T ROL ESTABLISHED USING GLOBAL POSITIONING SYSTEM. N O T E S : 1 . T H E C O N T R O L D A T A F O R T H I S P R O J E C T C A N B E F O U N D E L E C T R O N I C A L L Y B Y S E L E C T I N G P R O J E C T C O N T R O L D A T A A T : T H E F I L E S T O B E F O U N D A R E A S F O L L O W S : S I T E C A L I B R A T I O N I N F O R M A T I O N H A S N O T B E E N P R O V I D E D F O R T H I S P R O J E C T . I F F U R T H E R I N F O R M A T I O N I S N E E D E D , P L E A S E C O N T A C T T H E L O C A T I O N A N D S U R V E Y S U N I T . H T T P S : / / C O N N E C T . N C D O T . G O V / R E S O U R C E S / L O C A T I O N / PROJECT REFERENCE NO.Location and SurveysSHEET NO.1CB-3159 S U R V E Y C O N T R O L S H E E T B - 3 1 5 9 N O T E : D R A W I N G N O T T O S C A L E - L - P O T S t a . 7 + 0 0 . 0 0 - L - P O T S T A 7 + 7 5 .0 0 B E G I N T IP P R O J E C T B - 3 15 9 - Y 2 - P O T S t a . 1 0 + 0 0 . 0 0 B E G I N C O N S T R U C T I O N - Y 2 - P O T S t a . 1 2 + 3 6 . 0 6 , 1 4 ’ R T - L - P O T S t a . 1 0 + 0 0 . 0 0 - Y 2 - P C S t a . 1 0 + 7 0 . 0 7 - Y 2 - P T S t a . 1 2 + 0 7 . 2 5 T O L E X IN G T O N D O WN T O WNWIN S T O N R O A D / N C 8 - R P C - P O T S t a . 2 1 + 2 2 . 0 8 - L - P O T S t A . 1 0 + 0 0 . 0 0 - R P C - P T S t a . 1 9 + 0 8 . 9 6 - R P C - P C S t a . 1 7 + 3 6 . 2 8 - L P C - P O T S t a . 1 0 + 0 0 . 0 0 - Y - P O C S t a . 2 6 + 1 0 . 0 0 , 3 6 . 0 0 ’ R T - L P C - P C S t a . 1 0 + 1 0 . 0 0 - L P C - P O T S t a . 1 7 + 9 1 . 4 3 - L - P O T S t a . 1 0 + 2 8 . 0 0 TO THOMASVILLE TO WINSTON-SALEM TO SALISBURY - L P C - C S S t a . 1 5 + 1 6 . 8 9 - L P C - C S S t a . 1 1 + 5 2 . 1 0 - L P C - S C S t a . 1 3 + 3 6 . 1 0 - L P C - S T S t a . 1 7 + 0 0 . 8 9 US 29/70 BUS 85 SBL US 29/70 BUS 85 NBL M A TC H LIN E S H EET 1E MATCHLINE SHEET 1E M A TC H LIN E SH EET 1D M A T C H LI N E S H E E T 1 D M A T C H L I N E S H E E T 1 D - Y 3 - P C S t a . 1 1 + 3 5 . 0 0 - L P A - P C S t a . 1 0 + 0 0 . 0 0 - Y - P O C S t a . 2 4 + 5 0 . 0 0 , 3 6 . 0 0 ’ L T - L P A - C S S t a . 1 0 + 0 4 . 6 4 B 3 1 5 9 _ L S _ C O N T R O L . T X T D A T U M D E S C R I P T I O N T H E L O C A L I Z E D C O O R D I N A T E S Y S T E M D E V E L O P E D F O R T H I S P R O J E C T I S B A S E D O N T H E S T A T E P L A N E C O O R D I N A T E S E S T A B L I S H E D B Y N C D O T F O R M O N U M E N T " B - 3 1 5 9 - 1 " N O R T H I N G : 7 6 0 8 0 4 . 9 6 6 0 ( f t ) E A S T I N G : 1 6 2 8 5 2 3 . 3 4 1 0 ( f t ) E L E V A T I O N : 7 8 8 . 3 1 ( f t ) T H E A V E R A G E C O M B I N E D G R I D F A C T O R U S E D O N T H I S P R O J E C T ( G R O U N D T O G R I D ) I S : 0 . 9 9 9 8 9 1 4 T H E N . C . L A M B E R T G R I D B E A R I N G A N D L O C A L I Z E D H O R I Z O N T A L G R O U N D D I S T A N C E F R O M " B - 3 1 5 9 - 1 " T O - L - S T A T I O N 7 + 7 5 . 0 0 I S A L L L I N E A R D I M E N S I O N S A R E L O C A L I Z E D H O R I Z O N T A L D I S T A N C E S V E R T I C A L D A T U M U S E D I S N A V D 8 8 E L E V . = 7 9 6 . 9 1 ’ E = 1 6 2 8 4 8 8 . 8 4 8 4 N = 7 6 0 2 6 8 . 4 8 3 7 B L - 3 E L E V . = 7 8 8 . 3 1 ’ E = 1 6 2 8 5 2 3 . 3 4 1 0 N = 7 6 0 8 0 4 . 9 6 6 0 G P S B 3 1 5 9 - 1 E L E V . = 7 8 6 . 9 8 ’ E = 1 6 2 8 4 9 9 . 4 1 9 5 N = 7 6 1 4 1 5 . 7 9 7 8 B L - 4 ELEV.=784.66’E=1628431.8280N=762013.9240GPS B3159-2 ELEV.=799.93’E=1628475.7350N=762533.8835BL-5 - L P A - P O T S t a . 1 9 + 3 5 . 7 7 - L - P O T S t a . 1 6 + 9 7 . 6 7 - L P A - S R S S t a . 1 1 + 8 8 . 6 4 - L P A - S T S t a . 1 8 + 4 2 . 9 5 - L P A - S C S t a . 1 3 + 7 2 . 6 4 - L P A - C S S t a . 1 6 + 5 8 . 9 5 - Y 3 - P R C S t a . 1 4 + 1 1 . 9 9 - Y 3 - P T S t a . 1 6 + 4 1 . 5 2 -L- PRC Sta. 19+28.79 - L - P C S t a . 1 8 + 0 0 . 0 0 - Y 3 - P O T S t a . 1 6 + 5 5 . 3 4 -L- PC Sta. 21+43.74-Y6- POT Sta. 10+00.00 -Y6- POT STA. 11+62.64BEGIN CONSTRUCTION -L- PT Sta. 21+93.58 -L- POT Sta. 24+17.95 -Y5- POT Sta. 12+31.44-Y5- POT STA. 10+87.20END CONSTRUCTION-Y5- POT Sta. 10+00.00-L- POC Sta. 21+48.19-Y6- POT Sta. 12+33.87-L- POC Sta. 21+50.95 -L- PT Sta. 20+64.72-L- POT STA 21+00.00END GRADE - R P A - P O T S t a . 2 1 + 9 1 . 5 3 - L - P O T S t a . 1 7 + 2 5 . 6 7 - R P A - P T S t a . 2 0 + 6 3 . 2 8 - L - POT Sta. 17+11.67 -L- POT STA. 23+00.000END TIP PROJECT NC GRID NAD 83/NSRS 2007 W I T H N A D 8 3 / N S R S 2 0 0 7 S T A T E P L A N E G R I D C O O R D I N A T E S O F PROJECT REFERENCE NO.Location and SurveysSHEET NO.B-3159 S U R V E Y C O N T R O L S H E E T B - 3 1 5 9 N O T E : D R A W I N G N O T T O S C A L E DATUM DESCRIPTION THE LOCALIZED COORDINATE SYSTEM DEVELOPED FOR THIS PROJECT IS BASED ON THE STATE PLANE COORDINATES ESTABLISHED BY NCDOT FOR MONUMENT "B-3159-1"NORTHING: 760804.9660(ft) EASTING: 1628523.3410(ft)ELEVATION: 788.31(ft)THE AVERAGE COMBINED GRID FACTOR USED ON THIS PROJECT (GROUND TO GRID) IS: 0.9998914 THE N.C. LAMBERT GRID BEARING AND LOCALIZED HORIZONTAL GROUND DISTANCE FROM "B-3159-1" TO -L- STATION 7+75.00 IS ALL LINEAR DIMENSIONS ARE LOCALIZED HORIZONTAL DISTANCES VERTICAL DATUM USED IS NAVD 88 I N D I C A T E S GEODETIC CONTROL MONUMENTS USED OR SET FOR HORIZONTAL PROJECT CONTROL B Y T H E N C D O T L O C A T I O N A N D S U R V E Y S U N I T . P R O J E C T C ONTROL ESTABLISHED USING GLOBAL POSITIONING SYSTEM. N O T E S : 1 . T H E C O N T R O L D A T A F O R T H I S P R O J E C T C A N B E F O U N D E L E C T R O N I C A L L Y B Y S E L E C T I N G P R O J E C T C O N T R O L D A T A A T : T H E F I L E S T O B E F O U N D A R E A S F O L L O W S : S I T E C A L I B R A T I O N I N F O R M A T I O N H A S N O T B E E N P R O V I D E D F O R T H I S P R O J E C T . I F F U R T H E R I N F O R M A T I O N I S N E E D E D , P L E A S E C O N T A C T T H E L O C A T I O N A N D S U R V E Y S U N I T . H T T P S : / / C O N N E C T . N C D O T . G O V / R E S O U R C E S / L O C A T I O N / B 3 1 5 9 _ L S _ C O N T R O L . T X T 1D M A TC H LIN E SH EET 1C M A T C H L I N E S H E E T 1 C M A T C H L I N E S H E E T 1 C - Y - P C S t a . 1 0 + 0 0 . 0 0 - Y - P O C S t a . 1 1 + 5 0 . 0 0 B E G I N C O N S T R U C T I O N - R P C - P O T S t a . 1 0 + 0 0 . 0 0 , 3 6 . 0 0 ’ R T - Y - P O C S t a . 1 4 + 5 0 . 0 0 US 29 / 70 BUS 85 NBL US 29 / 70 BUS 85 SBL - R P C - T S S t a . 1 0 + 7 5 . 0 0 - R P C - S C S t a . 1 2 + 5 9 . 0 0 - R P C - C S S t a . 1 4 + 4 0 . 2 8 - R P C - S T S t a . 1 6 + 2 4 . 2 8 - Y 3 - P O T S t a . 1 0 + 0 0 . 0 0 B E G I N C O N S T R U C T I O N E L E V . = 7 5 5 . 5 1 ’ E = 1 6 2 6 9 2 5 . 9 8 8 1 N = 7 6 1 0 7 4 . 4 6 4 5 B Y - 7 E L E V = 7 5 3 . 4 8 ’ E = 1 6 2 7 4 8 7 N = 7 6 1 2 7 3 B M # 1 E L E V . = 7 6 5 . 9 6 ’ E = 16 2 7 9 11. 5 3 8 4 N = 7 6 13 16 . 7 2 9 6 B Y - 8 TO SALISBURY NC GRID NAD 83/NSRS 2007 WITH NAD 83/NSRS 2007 STATE PLANE GRID COORDINATES OF PROJECT REFERENCE NO.Location and SurveysSHEET NO.B-3159 S U R V E Y C O N T R O L S H E E T B - 3 1 5 9 N O T E : D R A W I N G N O T T O S C A L E DATUM DESCRIPTION THE LOCALIZED COORDINATE SYSTEM DEVELOPED FOR THIS PROJECT IS BASED ON THE STATE PLANE COORDINATES ESTABLISHED BY NCDOT FOR MONUMENT "B-3159-1"NORTHING: 760804.9660(ft) EASTING: 1628523.3410(ft)ELEVATION: 788.31(ft)THE AVERAGE COMBINED GRID FACTOR USED ON THIS PROJECT (GROUND TO GRID) IS: 0.9998914 THE N.C. LAMBERT GRID BEARING AND LOCALIZED HORIZONTAL GROUND DISTANCE FROM "B-3159-1" TO -L- STATION 7+75.00 IS ALL LINEAR DIMENSIONS ARE LOCALIZED HORIZONTAL DISTANCES VERTICAL DATUM USED IS NAVD 88 I N D I C A T E S GEODETIC CONTROL MONUMENTS USED OR SET FOR HORIZONTAL PROJECT CONTROL B Y T H E N C D O T L O C A T I O N A N D S U R V E Y S U N I T . P R O J E C T CONTROL ESTABLISHED USING GLOBAL POSITIONING SYSTEM. 1 . T H E C O N T R O L D A T A F O R T H I S P R O J E C T C A N B E F O U N D E L E C T R O N I C A L L Y B Y S E L E C T I N G P R O J E C T C O N T R O L D A T A A T : T H E F I L E S T O B E F O U N D A R E A S F O L L O W S : S I T E C A L I B R A T I O N I N F O R M A T I O N H A S N O T B E E N P R O V I D E D F O R T H I S P R O J E C T . I F F U R T H E R I N F O R M A T I O N I S N E E D E D , P L E A S E C O N T A C T T H E L O C A T I O N A N D S U R V E Y S U N I T . H T T P S : / / C O N N E C T . N C D O T . G O V / R E S O U R C E S / L O C A T I O N / B 3 1 5 9 _ L S _ C O N T R O L . T X T N O T E S : 1E M A TC H LIN E S H EET 1C M ATCHLINE SHEET 1C US 29/70 BUS 85 NBL TO THOMASVILLE US 29/70 BUS 85 SBL - R P A - P C S t a . 1 6 + 8 4 . 6 7 - R P A - S T S t a . 1 5 + 7 2 . 6 7 - Y 7 - P O T S t a . 1 8 + 5 3 . 5 7 E N D C O N S T R U C T I O N - Y 7 - P T S t a . 1 8 + 0 2 . 2 3 - R P A - S C S t a . 1 2 + 5 9 . 0 0 - Y 7 - P C S t a . 1 3 + 9 7 . 9 5 - R P A - T S S t a . 1 0 + 7 5 . 0 0 - R P A - P O T S t a . 1 0 + 0 0 . 0 0 , 3 6 . 0 0 ’ L T - Y - P O C S t a . 3 6 + 0 0 . 0 0 - Y 7 - P O T S t a . 1 0 + 0 0 . 0 0 B E G I N C O N S T R U C T I O N - Y - P O C S t a . 3 9 + 0 0 . 0 0 E N D C O N S T R U C T I O N - Y - P T S t a . 4 0 + 4 3 . 1 5 - R P A - C S S t a . 1 3 + 8 8 . 6 7 E L E V . = 7 7 7 . 4 1 ’ E = 1 6 2 9 2 2 4 . 6 7 8 3 N = 7 6 1 2 5 4 . 4 9 3 9 B Y - 9 E L E V . = 7 8 7 . 0 3 ’ E = 1 6 3 0 0 5 6 . 2 3 4 0 N = 7 6 1 1 1 7 . 4 6 7 1 B Y - 1 0 E L E V = 7 8 1 . 5 9 ’ E = 1 6 3 0 1 2 2 N = 7 6 1 2 8 8 B M # 2 NC GRID NAD 83/NSRS 2007 WITH NAD 83/NSRS 2007 STATE PLANE GRID COORDINATES OF PROJECT REFERENCE NO.Location and SurveysSHEET NO.B-3159 S U R V E Y C O N T R O L S H E E T B - 3 1 5 9 N O T E : D R A W I N G N O T T O S C A L E DATUM DESCRIPTION THE LOCALIZED COORDINATE SYSTEM DEVELOPED FOR THIS PROJECT IS BASED ON THE STATE PLANE COORDINATES ESTABLISHED BY NCDOT FOR MONUMENT "B-3159-1"NORTHING: 760804.9660(ft) EASTING: 1628523.3410(ft)ELEVATION: 788.31(ft)THE AVERAGE COMBINED GRID FACTOR USED ON THIS PROJECT (GROUND TO GRID) IS: 0.9998914 THE N.C. LAMBERT GRID BEARING AND LOCALIZED HORIZONTAL GROUND DISTANCE FROM "B-3159-1" TO -L- STATION 7+75.00 IS ALL LINEAR DIMENSIONS ARE LOCALIZED HORIZONTAL DISTANCES VERTICAL DATUM USED IS NAVD 88 I N D I C A T E S GEODETIC CONTROL MONUMENTS USED OR SET FOR HORIZONTAL PROJECT CONTROL B Y T H E N C D O T L O C A T I O N A N D S U R V E Y S U N I T . P R O J E C T CONTROL ESTABLISHED USING GLOBAL POSITIONING SYSTEM. 1 . T H E C O N T R O L D A T A F O R T H I S P R O J E C T C A N B E F O U N D E L E C T R O N I C A L L Y B Y S E L E C T I N G P R O J E C T C O N T R O L D A T A A T : T H E F I L E S T O B E F O U N D A R E A S F O L L O W S : S I T E C A L I B R A T I O N I N F O R M A T I O N H A S N O T B E E N P R O V I D E D F O R T H I S P R O J E C T . I F F U R T H E R I N F O R M A T I O N I S N E E D E D , P L E A S E C O N T A C T T H E L O C A T I O N A N D S U R V E Y S U N I T . H T T P S : / / C O N N E C T . N C D O T . G O V / R E S O U R C E S / L O C A T I O N / B 3 1 5 9 _ L S _ C O N T R O L . T X T N O T E S : 1F 5 7 6 2 5 3 3 . 8 8 3 5 1 6 2 8 4 7 5 . 7 3 5 0 7 9 9 . 9 3 O U T S I D E P R O J E C T L I M I T S 2 7 6 2 0 1 3 . 9 2 4 0 1 6 2 8 4 3 1 . 8 2 8 0 7 8 4 . 6 6 2 0 + 4 3 . 3 8 2 5 . 9 3 L T 4 7 6 1 4 1 5 . 7 9 7 8 1 6 2 8 4 9 9 . 4 1 9 5 7 8 6 . 9 8 1 4 + 4 0 . 1 8 8 . 7 0 L T 1 7 6 0 8 0 4 . 9 6 6 0 1 6 2 8 5 2 3 . 3 4 1 0 7 8 8 . 3 1 8 + 2 8 . 8 9 4 . 7 6 L T 3 7 6 0 2 6 8 . 4 8 3 7 1 6 2 8 4 8 8 . 8 4 8 4 7 9 6 . 9 1 O U T S I D E P R O J E C T L I M I T S - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - P O I N T D E S C . N O R T H E A S T E L E V A T I O N L S T A T I O N O F F S E T B L * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * B L - 3 S 0 6 0 3 ’ 2 0 . 1 0 " W D i s t 4 1 0 . 5 9 ’ L S T A T I O N 7 + 0 0 . 0 0 N 7 6 0 2 6 8 E 1 6 2 8 4 8 9 B M 3 E L E V A T I O N = 7 9 6 . 9 1 ’ * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * B L - 5 N 0 1 4 4 ’ 1 0 . 8 3 " W D i s t 1 8 5 8 . 5 5 ’ L S T A T I O N 7 + 0 0 . 0 0 N 7 6 2 5 3 4 E 1 6 2 8 4 7 6 B M 4 E L E V A T I O N = 7 9 9 . 9 3 ’ * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * B Y - 7 S 8 8 0 2 ’ 4 9 . 2 8 " W D i s t 3 0 7 5 . 5 8 ’ Y S T A T I O N 4 0 + 4 3 . 0 0 N 7 6 1 0 7 5 E 1 6 2 6 9 2 6 B M 5 E L E V A T I O N = 7 5 5 . 5 1 ’ * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * B O U N D O A K B E T W E E N 7 T H S T . A N D U S 2 9 / 7 0 S . R / R S P I K E S E T I N R O O T O F F O R K E D W I L L O W Y S T A T I O N 1 5 + 2 9 . 0 0 8 7 ’ L E F T N 7 6 1 2 7 3 E 1 6 2 7 4 8 7 B M 1 E L E V A T I O N = 7 5 3 . 4 8 ’ * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * U N I O N 1 8 9 0 ) S O U T H O F S T A T E E M P L O Y E E ’ S C R E D I T O A K O N N . S I D E O F P I E D M O N T D R . ( S R R / R S P I K E S E T I N R O O T O F 3 6 " 3 F O R K E D N 4 6 0 2 ’ 3 8 . 0 6 " E D i s t 1 5 5 . 8 6 ’ Y S T A T I O N 4 0 + 4 3 . 0 0 N 7 6 1 2 8 8 E 1 6 3 0 1 1 2 B M 2 E L E V A T I O N = 7 8 1 . 5 9 ’ * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * 1 0 7 6 1 1 1 7 . 4 6 7 1 1 6 3 0 0 5 6 . 2 3 4 0 7 8 7 . 0 3 O U T S I D E P R O J E C T L I M I T S 9 7 6 1 2 5 4 . 4 9 3 9 1 6 2 9 2 2 4 . 6 7 8 3 7 7 7 . 4 1 3 2 + 6 2 . 0 4 4 6 . 2 5 R T 4 7 6 1 4 1 5 . 7 9 7 8 1 6 2 8 4 9 9 . 4 1 9 5 7 8 6 . 9 8 2 5 + 3 6 . 0 7 9 8 . 5 2 L T 8 7 6 1 3 1 6 . 7 2 9 6 1 6 2 7 9 1 1 . 5 3 8 4 7 6 5 . 9 6 1 9 + 4 9 . 1 6 5 3 . 8 3 L T 7 7 6 1 0 7 4 . 4 6 4 5 1 6 2 6 9 2 5 . 9 8 8 1 7 5 5 . 5 1 O U T S I D E P R O J E C T L I M I T S - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - P O I N T D E S C . N O R T H E A S T E L E V A T I O N Y S T A T I O N O F F S E T B Y WITH NAD 83/NSRS 2007 STATE PLANE GRID COORDINATES OF HYDRAULICSROADWAY DESIGN ENGINEERENGINEER R/W SHEET NO.SHEET NO.PROJECT REFERENCE NO.2B-3159 30-JUN-2014 13:58 R:\Roadway\Proj\B3159_Rdy_psh_typ_02.dgn $$$$USERNAME$$$$8/17/99 DO NOT USE FOR CONSTRUCTIONPRELIMINARY PLANS -L- STA. 7+75.00 TO 8+00.00USE TYPICAL SECTION NO. 1HYDRAULICSROADWAY DESIGN ENGINEERENGINEER R/W SHEET NO.SHEET NO.PROJECT REFERENCE NO.2B-3159 30-JUN-2014 13:58 R:\Roadway\Proj\B3159_Rdy_psh_typ_02.dgn $$$$USERNAME$$$$8/17/99 DO NOT USE FOR CONSTRUCTIONPRELIMINARY PLANS MILL AS NEEDED.TO TIE TO EXISTING AT 7+75.00.FLOAT CROWN POINT AND WARP SUPERELEVATIONS NOTES:/// /// /// /// U MIN.MIN.MIN.Detail Showing Method of WedgingC1C2D1D2E3E34""212CL-L- (NC 8 WINSTON ROAD) CL 0 . 0 2 3 6 ’ E X I S T I N G 1 ’ G R A D E P O I N T 5 ’ V A R SEE X-SECTIONS 2:1 MAX GROUNDEXISTING GROUNDEXISTING 0 . 0 2 T Y P I C A L S E C T I O N N O . 1 4: 1 V A R S E E X- S E C TI O N S 2:1 M A X VA R SEE X-SEC TIO N S 2:1 M A X G R O U N D E X I S T I N G G R O U N D E X I S T I N G 1 2 ’ 0 . 0 86 ’ 6 " - L - ( N C 8 W I N S T O N R O A D ) G R A D E T O T H I S L I N E V A R S E E X-SECTIONS2:1 MAX T C 1 MIN.4" W E 2 D 1 6 ’ R 1 6 " 6 " S 1 4 " ( F I N A L P A V E M E N T D E S I G N J A N U A R Y 3 1 , 2 0 1 4 ) ( R E V I S E D M A Y 2 2 , 2 0 1 4 ) "212 2 ’ V 2 E 3 N O T E : P A V E M E N T E D G E S L O P E S A R E 1 : 1 U N L E S S S H O W N O T H E R W I S E . W V A R I A B L E D E P T H A S P H A L T P A V E M E N T ( S E E W E D G I N G D E T A I L ) . U E X I S T I N G P A V E M E N T T E A R T H M A T E R I A L P A V E M E N T S C H E D U L E J P R O P . 1 0 " A G G R E G A T E B A S E C O U R S E R 2 1 ’ - 6 " C O N C R E T E C U R B A N D G U T T E R R 1 2 ’ - 6 " C O N C R E T E C U R B A N D G U T T E R P R O P . V A R . D E P T H A S P H A L T C O N C R E T E S U R F A C E C O U R S E , T Y P E S 9 . 5 B , A T A N A V E R A G E R A T E O F 1 1 2 L B S . P E R S Q . Y D . P E R 1 " D E P T H T O B E P L A C E D I N L A Y E R S N O T T O E X C E E D 2 " I N D E P T H . C 2 4 " C O N C R E T E S I D E W A L K SP P R I M E C O A T P R O P . A P P R O X . 4 " A S P H A L T C O N C R E T E I N T E R M E D I A T E C O U R S E , D 1 T Y P E I 1 9 . 0 B , A T A N A V E R A G E R A T E O F 4 5 6 L B S . P E R S Q . Y D . P R O P . V A R . D E P T H A S P H A L T C O N C R E T E I N T E R M E D I A T E C O U R S E , D 2 G R E A T E R T H A N 4 " I N D E P T H . T Y P E I 1 9 . 0 B , A T A N A V E R A G E R A T E O F 1 1 4 L B S . P E R S Q . Y D . P E R 1 " D E P T H T O B E P L A C E D I N L A Y E R S N O T L E S S T H A N 2 " O R P R O P . V A R . D E P T H A S P H A L T C O N C R E T E I N T E R M E D I A T E C O U R S E , D 4 G R E A T E R T H A N 4 " I N D E P T H . T Y P E I 1 9 . 0 C , A T A N A V E R A G E R A T E O F 1 1 4 L B S . P E R S Q . Y D . P E R 1 " D E P T H T O B E P L A C E D I N L A Y E R S N O T L E S S T H A N 2 " O R P R O P . A P P R O X . 3 " A S P H A L T C O N C R E T E I N T E R M E D I A T E C O U R S E , D 3 T Y P E I 1 9 . 0 C , A T A N A V E R A G E R A T E O F 3 4 2 L B S . P E R S Q . Y D . A T A N A V E R A G E R A T E O F 5 1 3 L B S . P E R S Q . Y D . P R O P . A P P R O X . 4 . 5 " A S P H A L T C O N C R E T E B A S E C O U R S E , T Y P E B 2 5 . 0 B , E 1 A T A N A V E R A G E R A T E O F 3 9 9 L B S . P E R S Q . Y D . I N E A C H O F T W O L A Y E R S . P R O P . A P P R O X . 7 " A S P H A L T C O N C R E T E B A S E C O U R S E , T Y P E B 2 5 . 0 B , E 2 P R O P . V A R . D E P T H A S P H A L T C O N C R E T E B A S E C O U R S E , T Y P E B 2 5 . 0 B , A T A N A V E R A G E R A T E O F 1 1 4 L B S . P E R S Q . Y D . P E R 1 " D E P T H . T O T H A N 4 " I N D E P T H . B E P L A C E D I N L A Y E R S N O T G R E A T E R T H A N 5 " I N D E P T H O R L E S S E 3 A T A N A V E R A G E R A T E O F 5 9 8 . 5 L B S . P E R S Q . Y D . I N E A C H O F T W O L A Y E R S . P R O P . A P P R O X . 1 0 . 5 " A S P H A L T C O N C R E T E B A S E C O U R S E , T Y P E B 2 5 . 0 C , E 4 P R O P . V A R . D E P T H A S P H A L T C O N C R E T E B A S E C O U R S E , T Y P E B 2 5 . 0 C , A T A N A V E R A G E R A T E O F 1 1 4 L B S . P E R S Q . Y D . P E R 1 " D E P T H . T O T H A N 4 " I N D E P T H . B E P L A C E D I N L A Y E R S N O T G R E A T E R T H A N 5 " I N D E P T H O R L E S S E 5 C 1 P R O P . A P P R O X . 3 " A S P H A L T C O N C R E T E S U R F A C E C O U R S E , T Y P E S 9 . 5 B , A T A N A V E R A G E R A T E O F 1 6 8 L B S . P E R S Q . Y D . I N E A C H O F T W O L A Y E R S . C 3 P R O P . A P P R O X . 3 " A S P H A L T C O N C R E T E S U R F A C E C O U R S E , T Y P E S 9 . 5 C , A T A N A V E R A G E R A T E O F 1 6 8 L B S . P E R S Q . Y D . I N E A C H O F T W O L A Y E R S . V 1 3 " M I L L I N G V 2 V A R I A B L E D E P T H M I L L I N G HYDRAULICSROADWAY DESIGN ENGINEERENGINEER R/W SHEET NO.SHEET NO.PROJECT REFERENCE NO. 30-JUN-2014 13:58 R:\Roadway\Proj\B3159_Rdy_psh_typ_02a.dgn $$$$USERNAME$$$$8/17/99 DO NOT USE FOR CONSTRUCTIONPRELIMINARY PLANS S E E P L A N S F O R T U R N L A N E S A N D T A P E R S . N O T E S : * * 2 2 ’ 0 . 0 2 0 . 0 2 0 . 0 2 V A R S E E X- S E C TI O N S 2:1 M A X G R O U N D E X I S T I N G VAR SEE X-SECTIONS2:1 MAX GROUNDEXISTING 0.02 0 . 0 2 0.02 1 0 ’ 2 ’ 4 ’ L A N E B I K E 2 4 ’ 2 4 ’ 4’LANEBIKE 2’10’ CL G R A D E P O I N T G R A D E T O T H I S L I N E 6" 6 " 1 4 ’ W / G R 14’ W/GR 6 " 5 ’ V A R . 4 ’ - 6 " 6 " T O 5’VAR.4’-6"6" TO 6" T Y P I C A L S E C T I O N N O . 3 U S E T Y P I C A L S E C T I O N N O . 3 * 2 2 ’ G R A D E T O T H I S L I N E E X I S T I N G - V A R I E S R E D U C E 1 2 ’ L A N E S T O 1 1 ’ L A N E S L E F T A N D R I G H T . - L - S T A . 1 9 + 6 4 . 7 2 T O 2 0 + 6 4 . 7 2 HYDRAULICSROADWAY DESIGN ENGINEERENGINEER R/W SHEET NO.SHEET NO.PROJECT REFERENCE NO.2-AB-3159 30-JUN-2014 13:58 R:\Roadway\Proj\B3159_Rdy_psh_typ_02a.dgn $$$$USERNAME$$$$8/17/99 DO NOT USE FOR CONSTRUCTIONPRELIMINARY PLANS CL 0 . 0 2 2 4 ’ - L - S T A . 8 + 0 0 . 0 0 T O 1 0 + 0 0 . 0 0 E X I S T I N G G R A D E P O I N T T Y P I C A L S E C T I O N N O . 2 U S E T Y P I C A L S E C T I O N N O . 2 1 ’ 1 0 ’ 4 ’ - 6 " 6 " T O V A R . 5 ’ V A R S E E X- S E C TI O N S 2:1 M A X G R O U N D E X I S T I N G 6 " 0 . 0 2 6 " 2 ’ 4 ’ B I K E L A N E 0 . 0 2 V A R I E S 2 2 ’ T O 2 8 ’ V A R I E S 0 ’ T O 2 6 ’ MATCH TO -Y2- - L - S T A . 1 0 + 0 0 . 0 0 T O 1 1 + 5 0 . 0 0 - L - S T A . 1 8 + 5 0 . 0 0 T O 2 1 + 0 0 . 0 0 ** 1 2 ’ ** - L - S T A . 2 0 + 1 0 . 0 0 T O 2 1 + 0 0 . 0 0 - L - ( N C 8 W I N S T O N R O A D ) - L - ( N C 8 W I N S T O N R O A D ) V A R SEE X-SEC TIO N S 2:1 M A X G R O U N D E X I S T I N G G R O U N D E X I S T I N G V A R SEE X-SEC TIO N S 2:1 M A X VAR SEE X-SECTIONS2:1 MAXGROUNDEXISTING V A R I E S 0 ’ T O 6 ’ - 6 " 0 . 0 2 1 0 ’ 2 ’ 1 4 ’ W / G R 6 " 5 ’ V A R . 4 ’ - 6 " 6 " T O 6 " V A R S E E X - S E C T I O N S 2 : 1 M A X 2 ’ D E T A I L N O . 1 T Y P I C A L S E C T I O N N O . 3 U S E D E T A I L N O . 1 W I T H L T : - L - S T A . 1 8 + 5 0 . 0 0 T O S T A . 1 9 + 2 0 . 0 0 L T : - L - S T A . 1 9 + 7 8 . 0 0 T O S T A . 2 1 + 0 0 . 0 0 * V A R . 1 5 ’ T O 1 9 ’ * 8 ’ 1 ’ U U U D1 E2 R 1 R1 R 1R 1 T T T T S S S S T E 2 D 1 D 1 E 2 C 1 C 1 C1 E 3 D 1 R 1 G R A D E T O T H I S L I N E W W W 1 4 " 1 4 " 1 4 " 0 . 0 2 * * S E E P L A N S F O R T U R N L A N E S A N D T A P E R S . N O T E S : M A Y N E E D T O W A R P F O R P R O P E R T I E T O - Y 2 - . E 3 E 3 E3 EDGE OF -L- PAVEMENT EDGE OF PARKING LOT C 1 WWEDGINGUEXISTING PVMNTTEARTH MATERIALC13" S9.5B J10" ABC R12’-6" C & G R21’-6" C & G S4" SIDEWALKC2VAR. S9.5B D14" I19.0B D2VAR. I19.0B E3VAR. B25.0BE27" B25.0BPPRIME COATC33" S9.5C D33" I19.0C E14.5" B25.0B E410.5" B25.0CD4VAR. I19.0CE5VAR. B25.0C V13" MILLING V2MILLINGVAR. DEPTH HYDRAULICSROADWAY DESIGN ENGINEERENGINEER R/W SHEET NO.SHEET NO.PROJECT REFERENCE NO. 30-JUN-2014 13:58 R:\Roadway\Proj\B3159_Rdy_psh_typ_02b.dgn $$$$USERNAME$$$$8/17/99 DO NOT USE FOR CONSTRUCTIONPRELIMINARY PLANS 0 . 0 2 0 . 0 2 0 . 0 2 V A R S E E X- S E C TI O N S 2:1 M A X G R O U N D E X I S T I N G VAR SEE X-SECTIONS2:1 MAX GROUNDEXISTING 0.02 0 . 0 2 0 . 0 2 1 0 ’ 2 ’ 4 ’ L A N E B I K E 2 4 ’ 2 4 ’ 4 ’ L A N E B I K E 2’10’ CL G R A D E P O I N T G R A D E T O T H I S L I N E 6" 6 " 1 4 ’ W / G R 14’ W/GR 6 " 5 ’ V A R . 4 ’ - 6 " 6 " T O 5’VAR.4’-6"6" TO 6"SEE PLANS FOR TURN LANES AND TAPERS.NOTES: T Y P I C A L S E C T I O N N O . 4 USE TYPICAL SECTION NO. 4HYDRAULICSROADWAY DESIGN ENGINEERENGINEER R/W SHEET NO.SHEET NO.PROJECT REFERENCE NO.2-BB-3159 30-JUN-2014 13:58 R:\Roadway\Proj\B3159_Rdy_psh_typ_02b.dgn $$$$USERNAME$$$$8/17/99 DO NOT USE FOR CONSTRUCTIONPRELIMINARY PLANS 0 . 0 2 2 4 ’ E X I S T I N G T Y P I C A L S E C T I O N N O . 6 1 ’ 1 0 ’ 4 ’ - 6 " 6 " T O V A R . 5 ’ V A R SEE X-SEC TIO N S 2:1 M A X G R O U N D E X I S T I N G 6 " 0 . 0 2 6 " 2 ’ 0 . 0 2 MATCH TO -L- CL CL G R A D E P O I N T U S E T Y P I C A L S E C T I O N N O . 6 - Y 2 - S T A . 1 0 + 5 3 . 1 3 T O 1 2 + 3 6 . 1 4 V A R I E S 0 ’ T O 4 5 ’ V A R I E S 0 ’ T O 1 2 ’ G R A D E P O I N T E X I S T I N G CL T Y P I C A L S E C T I O N N O . 5 M I L L A S N E E D E D . L O C A T I O N S T O T I E - Y 2 - G R A D E T O - L - G R A D E . S U P E R E L E V A T I O N S F L O A T I N V A R I A B L E W I D T H S E E P L A N S F O R T U R N L A N E S A N D T A P E R S . N O T E S : -L- STA. 11+50.00 TO 12+66.97 (BEGIN BRIDGE)-L- STA. 14+16.47 (END BRIDGE) TO 18+50.00 E X I S T E X I S T U S E T Y P I C A L S E C T I O N N O . 5 - L - S T A . 2 1 + 0 0 . 0 0 T O 2 3 + 0 0 . 0 0 - L - ( N C 8 W I N S T O N R O A D ) - L - ( N C 8 W I N S T O N R O A D ) G R A D E T O T H I S L I N E - Y 2 - ( N B N C 8 / W E S T 6 T H S T ) V A R SEE X-SEC TIO N S 2:1 M A X G R O U N D E X I S T I N G GROUNDEXISTING VAR SEE X-SECTIONS2:1 MAX G R O U N D E X I S T I N G V A R S E E X- S E C TI O N S 2:1 M A X V A R I E S 0 ’ T O 6 ’ - 6 " C U R B & G U T T E R A N D E X I S T I N G L A N E C O N F I G U R A T I O N . M I L L A N D O V E R L A Y A S N E E D E D T O A C H I E V E P R O P E R T I E I N W I T H E X I S T I N G N O T E : 0 . 0 2 1 0 ’ 2 ’ 1 4 ’ W / G R 6 " 5 ’ V A R . 4 ’ - 6 " 6 " T O V A R S E E X- S E C T I O N S 2 : 1 M A X 2 ’ V A R . 1 9 ’ T O 2 2 ’ - 6 " D E T A I L N O . 2 T Y P I C A L S E C T I O N N O . 4 U S E D E T A I L N O . 2 W I T H L T : - L - S T A . 1 8 + 0 0 . 0 0 T O 1 8 + 5 0 . 0 0 U U U U C 1 C 1 D 1 D 1 E 2 E 2 R 1 R 1 R 1 R1 T S S D 1 S T T S C 1 C 1 E 2 R 1 T 6 " E 3 T C 1 C 1 1 4 " 1 4 " V 2 V 2 G R A D E P O I N T 1 2 ’ W E 3 E 3 EDGE OF -L- PAVEMENT EDGE OF PARKING LOT C 1 D 1 EDGE OF PARKING LOT 1 ’ E 3 WWEDGINGUEXISTING PVMNTTEARTH MATERIALC13" S9.5B J10" ABC R12’-6" C & G R21’-6" C & G S4" SIDEWALKC2VAR. S9.5B D14" I19.0B D2VAR. I19.0B E3VAR. B25.0BE27" B25.0BPPRIME COATC33" S9.5C D33" I19.0C E14.5" B25.0B E410.5" B25.0CD4VAR. I19.0CE5VAR. B25.0C V13" MILLING V2MILLINGVAR. DEPTH HYDRAULICSROADWAY DESIGN ENGINEERENGINEER R/W SHEET NO.SHEET NO.PROJECT REFERENCE NO.2-CB-3159 30-JUN-2014 13:58 R:\Roadway\Proj\B3159_Rdy_psh_typ_02c.dgn $$$$USERNAME$$$$8/17/99 DO NOT USE FOR CONSTRUCTIONPRELIMINARY PLANSHYDRAULICSROADWAY DESIGN ENGINEERENGINEER R/W SHEET NO.SHEET NO.PROJECT REFERENCE NO.2-CB-3159 30-JUN-2014 13:58 R:\Roadway\Proj\B3159_Rdy_psh_typ_02c.dgn $$$$USERNAME$$$$8/17/99 DO NOT USE FOR CONSTRUCTIONPRELIMINARY PLANS EXIST CL - Y - ( U S 2 9 - 6 4 - 7 0 / I - 8 5 B U S ) 2 5 ’ E X I S T E X I S T E X I S T 6 ’ 6 ’ 2 ’ P S 2 ’ P S AUXILARY LANE0’ TO 12’ 4’ TO 10’ PS HINGE POINT 2:1 6:14:16:1 SLOPEHINGE POINT FOR FILLS FOR CUTS SEE X-SECTIONSVARIABLE 0.02 0.02 12’ (15’ W/GR)15’ A U X I L A R Y L A N E 0 ’ T O 1 2 ’ 4 ’ T O 1 0 ’ P S HINGE POINT 2:1 6 :1 4 :1 6 : 1 S L O P E HINGE POINT FOR FILLS FOR CUTS S E E X - S E C T I O N S V A R I A B L E 0 . 0 2 0 . 0 2 1 2 ’ ( 1 5 ’ W / G R ) 1 5 ’ 0.02 19.5’ PS 18’ G R A D E T O T H I S L I N E GRADE TO THIS LINE T Y P I C A L S E C T I O N N O . 8 USE TYPICAL SECTION NO. 8 DETAIL NO. 3 T Y P I C A L S E C T I O N N O . 8 U S E D E T A I L N O . 3 W I T H -Y- STA. 11+50.00 TO STA. 39+00.00 0 . 0 2 3 6 ’ E X I S T I N G T Y P I C A L S E C T I O N N O . 7 1 ’ 1 0 ’ 4 ’ - 6 " 6 " T O V A R . 5 ’ VA R SEE X-SEC TIO N S 2:1 M A X G R O U N D E X I S T I N G 6 " 0 . 0 2 6 " 2 ’ 0 . 0 2 CL USE TYPICAL SECTION NO. 7 -Y2- STA. 10+00.00 TO 10+53.13 G R A D E P O I N T MILL AS NEEDED.NOTES: 1 ’ 1 0 ’ 4 ’ - 6 " 6 " T O V A R . 5 ’ V A R S E E X- S E C TI O N S 2:1 M A X G R O U N D E X I S T I N G 6 " 0 . 0 2 6 " 2 ’ - Y 2 - ( N B N C 8 / W E S T 6 T H S T ) VA R SEE X-SEC TIO N S 2:1 M A X G R O U N D E X I S T I N G G R O U N D E X I S T I N G V A R S E E X- S E C TI O N S 2:1 M A X * 2 4 ’ ( E X I S T I N G ) * 2 4 ’ ( E X I S T I N G ) TIE TO EXISTING (SEE X-SECTIONS).TAPER IN SHOULDER AND DITCH WIDTH TO FROM -Y- STA. 34+20.00 TO 37+20.00 RTNOTES:6’ 6 ’ U U U U C 3 D 3 E 4 C3D3 E4 C3D3 E5 R 1 R 1 T S D 1 T S G R A D E T O T H I S L I N E D 1 E 2 C 1 C 3 C 3 C 1 W W E 2 T T 1 4 " EDGE OF AUXILARY LANE 0 . 0 2 1 9 . 5 ’ P S 1 8 ’ D E T A I L N O . 3 C 3 D 3 E 5 EDGE OF AUXILARY LANE 1 4 " 1 6 . 5 " 16.5" 1 6 . 5 " 16.5" E 3 E 3 2:1 M A X V 2 V2 2:1 MAX *MILL AND REPLACE AT SAME DEPTH -3" RETAINING WALL RETAINING WALL L T : - Y - S T A . 2 4 + 8 7 . 0 0 T O 2 6 + 3 5 . 6 7 R T : - Y - S T A . 2 4 + 3 9 . 0 0 T O 2 6 + 3 7 . 3 8 WWEDGINGUEXISTING PVMNTTEARTH MATERIALC13" S9.5B J10" ABC R12’-6" C & G R21’-6" C & G S4" SIDEWALKC2VAR. S9.5B D14" I19.0B D2VAR. I19.0B E3VAR. B25.0BE27" B25.0BPPRIME COATC33" S9.5C D33" I19.0C E14.5" B25.0B E410.5" B25.0CD4VAR. I19.0CE5VAR. B25.0C V13" MILLING V2MILLINGVAR. DEPTH HYDRAULICSROADWAY DESIGN ENGINEERENGINEER R/W SHEET NO.SHEET NO.PROJECT REFERENCE NO.2-DB-3159 30-JUN-2014 13:58 R:\Roadway\Proj\B3159_Rdy_psh_typ_02d.dgn $$$$USERNAME$$$$8/17/99 DO NOT USE FOR CONSTRUCTIONPRELIMINARY PLANS HINGE POINT 2:1 6 :1 4 :1 6 : 1 HINGE POINT FOR FILLS FOR CUTS VAR 2:16:1 GROUNDEXISTING GROUNDEXISTING G R O U N D E X I S T I N G CL 1 2 ’ 1 0 ’ 8 ’ 4 ’ 4 ’ 4 ’ 0 . 0 2 0 . 0 2 0 . 0 2 0 .0 8 0 . 0 8 0 . 0 2 1 6 ’ G R A D E T O T H I S L I N E 1 2 ’ ( 1 5 ’ W / G R ) 1 4 ’ ( 1 7 ’ W / G R ) USE TYPICAL SECTION NO. 10 T Y P I C A L S E C T I O N N O . 1 0 -RPC- STA. 10+00.00 TO STA. 20+71.61 T Y P I C A L S E C T I O N N O . 1 1 USE TYPICAL SECTION NO. 11 -LPC- STA. 10+00.00 TO STA. 17+41.46-LPA- STA. 10+00.00 TO STA. 19+05.77 HINGE POINT 2:1 6:1 4 : 1 6 :1 FOR CUTS GROUNDEXISTING 1 2 ’ 8 ’ 4 ’ 9 ’ 0 . 0 2 0 .0 8 0 . 0 2 1 2 ’ ( 1 5 ’ W / G R ) 1 2 ’ 2 1 ’ 0 . 0 2 1 4 ’ 0 . 0 2 2 ’ V A R 2:1 6 : 1 G R O U N D E X I S T I N G G R O U N D E X I S T I N G HINGE POINT FOR FILLS CL - L P C - - L P A - G R A D E T O T H I S L I N E G R A D E P O I N T G R A D E P O I N T 6 ’ 6 ’ C 1 D 1 C 1 D 1 E 1 T R 1 T T T F D P S F D P S F D P S 6 " 6 " E 1 1 2 ’ HINGE POINT 2:1 6 :1 4 :1 6 : 1 FOR CUTS G R O U N D E X I S T I N G CL 1 2 ’ 1 0 ’ 8 ’ 4 ’ 4 ’ 4 ’ 0 . 0 2 0 . 0 2 0 . 0 2 0 . 0 8 0 . 0 2 1 6 ’ G R A D E T O T H I S L I N E 1 2 ’ ( 1 5 ’ W / G R ) 1 4 ’ ( 1 7 ’ W / G R ) T Y P I C A L S E C T I O N N O . 9 G R A D E P O I N T 6 ’ C 1 D 1 T T F D P S F D P S 6 " 1 2 ’ - R P A - USE TYPICAL SECTION NO. 9 -RPA- STA. 15+72.67 TO STA. 21+61.41 0 .0 8 6 " GROUNDEXISTING 2:1 6 " 4 ’ 1 1 . 5 " 4 :1 E 1 1 2 ’ GROUNDEXISTING I N S E T 9 A - R P C - 1 1 . 5 " E 1 1 1 . 5 " 6 " 6 :1 4:1USE INSET 9AHYDRAULICSROADWAY DESIGN ENGINEERENGINEER R/W SHEET NO.SHEET NO.PROJECT REFERENCE NO.2-DB-3159 30-JUN-2014 13:58 R:\Roadway\Proj\B3159_Rdy_psh_typ_02d.dgn $$$$USERNAME$$$$8/17/99 DO NOT USE FOR CONSTRUCTIONPRELIMINARY PLANS G R O U N D E X I S T I N G G R O U N D E X I S T I N G STA. 15+72.67 RIGHT OF CENTERLINE-RPA- STA. 10+00.00 TO V A R 6 : 1 2:1 E 3 HINGE POINT FOR FILLS WWEDGINGUEXISTING PVMNTTEARTH MATERIALC13" S9.5B J10" ABC R12’-6" C & G R21’-6" C & G S4" SIDEWALKC2VAR. S9.5B D14" I19.0B D2VAR. I19.0B E3VAR. B25.0BE27" B25.0B PPRIME COATC33" S9.5C D33" I19.0C E14.5" B25.0B E410.5" B25.0CD4VAR. I19.0C E5VAR. B25.0C V13" MILLING MILLINGVAR. DEPTHV2 HYDRAULICSROADWAY DESIGN ENGINEERENGINEER R/W SHEET NO.SHEET NO.PROJECT REFERENCE NO.2-EB-3159 30-JUN-2014 13:58 R:\Roadway\Proj\B3159_Rdy_psh_typ_02e.dgn $$$$USERNAME$$$$8/17/99 DO NOT USE FOR CONSTRUCTIONPRELIMINARY PLANS 4 : 1 V A R S E E X- S E C TI O N S 2:1 M A X V A R SEE X-SEC TIO N S 2:1 M A X G R O U N D E X I S T I N G G R O U N D E X I S T I N G 6 ’ 0 . 0 2 0 . 0 8 0 . 0 2 2 ’ P S 8 ’ CL G R A D E T O T H I S L I N E T Y P I C A L S E C T I O N N O . 1 2 1 1 ’ 4 :1 VA R SEE X-SEC TIO N S 2:1 M A X V A R S E E X- S E C TI O N S 2:1 M A X G R O U N D E X I S T I N G G R O U N D E X I S T I N G 6 ’ 0 . 0 2 0 .0 8 0 . 0 2 2 ’ P S 8 ’ 1 1 ’ ( 9 ’ W / G R ) ( 9 ’ W / G R ) - Y 3 - ( 7 T H S T R E E T ) USE TYPICAL SECTION NO. 12 -Y3- STA. 10+00.00 TO STA. 16+09.98 4 : 1 V A R S E E X- S E C TI O N S 2:1 M A X V A R SEE X-SEC TIO N S 2:1 M A X G R O U N D E X I S T I N G G R O U N D E X I S T I N G 4 ’ 0 . 0 2 0 . 0 8 8 ’ CL G R A D E T O T H I S L I N E T Y P I C A L S E C T I O N N O . 1 3 1 0 ’ 4 :1 VA R SEE X-SEC TIO N S 2:1 M A X V A R S E E X- S E C TI O N S 2:1 M A X G R O U N D E X I S T I N G G R O U N D E X I S T I N G 4 ’ 0 . 0 2 0 .0 8 8 ’ 1 0 ’ USE TYPICAL SECTION NO. 13 -Y7- STA. 10+00.00 TO STA. 18+53.57 - Y 7 - ( P I E D M O N T D R I V E / W H I T E S T R E E T ) ( 7 ’ W / G R ) ( 7 ’ W / G R ) HYDRAULICSROADWAY DESIGN ENGINEERENGINEER R/W SHEET NO.SHEET NO.PROJECT REFERENCE NO.2-EB-3159 30-JUN-2014 13:58 R:\Roadway\Proj\B3159_Rdy_psh_typ_02e.dgn $$$$USERNAME$$$$8/17/99 DO NOT USE FOR CONSTRUCTIONPRELIMINARY PLANS G R A D E P O I N T G R A D E P O I N T C 1 J C 1 J C 1 J C 1 J T T P P 1 3 " 1 3 " T 6 " 6 " 6 " 6 " T WWEDGINGUEXISTING PVMNTTEARTH MATERIALC13" S9.5B J10" ABC R12’-6" C & G R21’-6" C & G S4" SIDEWALKC2VAR. S9.5B D14" I19.0B D2VAR. I19.0B E3VAR. B25.0BE27" B25.0B PPRIME COATC33" S9.5C D33" I19.0C E14.5" B25.0B E410.5" B25.0CD4VAR. I19.0C E5VAR. B25.0C V13" MILLING MILLINGVAR. DEPTHV2 HYDRAULICSROADWAY DESIGN ENGINEERENGINEER R/W SHEET NO.SHEET NO.PROJECT REFERENCE NO.2-FB-3159 30-JUN-2014 13:58 R:\Roadway\Proj\B3159_Rdy_psh_typ_02f.dgn $$$$USERNAME$$$$8/17/99 DO NOT USE FOR CONSTRUCTIONPRELIMINARY PLANSHYDRAULICSROADWAY DESIGN ENGINEERENGINEER R/W SHEET NO.SHEET NO.PROJECT REFERENCE NO.2-FB-3159 30-JUN-2014 13:58 R:\Roadway\Proj\B3159_Rdy_psh_typ_02f.dgn $$$$USERNAME$$$$8/17/99 DO NOT USE FOR CONSTRUCTIONPRELIMINARY PLANS CL 5’-6"WALKSIDE 2’4’LANEBIKE 1 2 ’ - 0 " 1 2 ’ - 0 " G R A D E P O I N T 1 5 ’ - 0 " 1 2 ’ - 0 " 1 2 ’ - 0 " 5 ’ - 6 " W A L K S I D E 2 ’ 4 ’ L A N E B I K E 8’ D E S I G N D A T A - L - - Y - 2 0 0 9 A D T 2 0 3 5 A D T D H V ( % ) D ( % ) D U A L ( % ) T T S T ( % ) V ( M P H ) F U N C C L A S S S I N G L E F A C E D P R E C A S T C O N C R E T E B A R R I E R ( S E E S T D . 8 5 7 . 0 1 ) T O A C C O M M O D A T E F U T U R E L A N E 2 3 , 9 0 0 2 8 , 6 0 0 23 4 0 A R T E R I A L 1 0 6 0 2 4 , 2 0 0 3 6 , 4 0 0 761 0 6 0 6 0 F R E E W A Y ** * SEE SHEET 2-C FOR -Y- TYPICAL SECTIONSEE SHEET 2-B FOR -L- TYPICAL SECTIONSEE SHEET 4 FOR PLAN VIEWNOTES: - L - ( N C 8 ) S T R U C T U R E O V E R - Y - ( U S 2 9 - 6 4 - 7 0 / I - 8 5 B U S ) EXIST 2 4 ’ 24’ E X I S T 0.02 A U X I L A R Y L A N E 0 . 0 2 0 . 0 2 CL - Y - ( U S 2 9 - 6 4 - 7 0 / I - 8 5 B U S ) 1 2 ’ 1 9 ’ - 6 " P S ** 1 8 ’ - 0 " * AUXILARY LANE 0.02 12’19’-6" PS**18’-0"* * * 0 . 0 2 0 . 0 2 1 2 ’ - 6 " 1 2 ’ - 6 " 68’ 6 8 ’ D E T A I L O F R O A D W A Y U N D E R P R O P O S E D S T R U C T U R E - L - ( N C 8 W I N S T O N R O A D ) R E C O M M E N D A T I O N S S T R U C T U R E SEE SHEET 2-GPHASINGCONSTRUCTIONDUE TO 4 ’ M I N I M U M V E R T I C A L C L E A R A N C E = 1 6 ’ - 6 " S K E W A N G L E = 8 9 3 7 ’ 4 9 . 9 8 " O CL - L P C - CL-LPA- R E T A I N I N G W A L L D E T E R M I N E D B Y G E O T E C H N I C A L E N G I N E E R I N G U N I T 1 ’ - 2 " 1’-2" 9 8 ’ - 0 " " R A I L T O R A I L 8 7 ’ C L E A R R O A D W A Y - L - S T A . 1 2 + 6 6 . 9 7 T O - L - S T A . 1 4 + 1 6 . 4 7 HYDRAULICSROADWAY DESIGN ENGINEERENGINEER R/W SHEET NO.SHEET NO.PROJECT REFERENCE NO.2-GB-3159 30-JUN-2014 13:58 R:\Roadway\Proj\B3159_Rdy_psh_typ_02g.dgn $$$$USERNAME$$$$8/17/99 DO NOT USE FOR CONSTRUCTIONPRELIMINARY PLANS 1 1 ’ - 0 " 1 1 ’ - 0 " 1 1 ’ - 0 " 4 ’ - 0 " 4 ’ - 0 " 4 7 ’ - 3 " CL 3 7 ’ - 0 " 2 ’ - 0 " 2 ’ - 0 " - L - " 21 1 ’ - 1 " 21 1 ’ - 1 G R A D E P O I N T CL - L - CL - L - CL - L - G R A D E P O I N T 4 5 ’ - 6 " 5’-6" 1 0 ’ 1 1 ’ - 0 " 1 1 ’ - 0 " 1 1 ’ - 0 " 4 ’ - 0 " 4 ’ - 0 " 4 7 ’ - 3 " 3 7 ’ - 0 " 2 ’ - 0 " 2 ’ - 0 " " 21 1 ’ - 1 G R A D E P O I N T 1 0 ’ " 21 1 ’ - 1 M A I N T A I N 3 L A N E S D U R I N G C O N S T R U C T I O N WALKSIDE 4 5 ’ - 6 " 5 ’ - 0 " 1 1 ’ - 0 " 1 1 ’ - 0 " 5’-6" 2 ’ 11’-0"WALKSIDE 2’ P H A S E 1 C O N S T R U C T I O N M A I N T A I N 3 L A N E S D U R I N G C O N S T R U C T I O N P H A S E 2 C O N S T R U C T I O N 5 2 ’ - 6 " G R A D E P O I N T 5’-6"WALKSIDE 2’4’LANEBIKE 1 2 ’ - 0 " 1 2 ’ - 0 " G R A D E P O I N T 1 5 ’ - 0 " 1 2 ’ - 0 " 1 2 ’ - 0 " 5 ’ - 6 " W A L K S I D E 2 ’ 4 ’ L A N E B I K E 9 8 ’ - 0 " " R A I L T O R A I L 1 ’ 5 ’ - 6 " W A L K S I D E 8’HYDRAULICSROADWAY DESIGN ENGINEERENGINEER R/W SHEET NO.SHEET NO.PROJECT REFERENCE NO.2-GB-3159 30-JUN-2014 13:58 R:\Roadway\Proj\B3159_Rdy_psh_typ_02g.dgn $$$$USERNAME$$$$8/17/99 DO NOT USE FOR CONSTRUCTIONPRELIMINARY PLANS F O R B R I D G E P H A S E C O N S T R U C T I O N 4 ’ 30-JUN-2014 13:58 R:\Roadway\Proj\B3159_Rdy_dtl_02H.dgn $$$$USERNAME$$$$ HYDRAULICSROADWAY DESIGN ENGINEERENGINEER R/W SHEET NO. 5/14/99 SHEET NO.PROJECT REFERENCE NO.2-HB-3159 1 0 + 0 0 R = 3 5 ’ R = 1 5 ’ R = 1 5 ’ T A P E R 5 0 ’ 1 0 0 ’ L A N E T A P E R +25.00 O F F S E T L E F T 1 5 0 ’ - L - -RPC- -LPC- R = 4 ’ R = 4 ’ R = 2 3 8 ’ - Y2- +75.00 1 5 + 0 0 20+00 33’11’4’ 4’ 24’15’ T A P E R 5 0 ’ 1 0 0 ’ L A N E T A P E R + 9 7. 5 0 + 3 7. 5 0 2 6 5 ’ L A N E S H I F T L T - L - -Y 3- -LPA- -RPA- -Y6--Y5- + 0 1 . 5 0 +09.93 +64.7215+0002 02 12’-Y--L-12’98’5’-6"5’-6"(SEE PLAN SHEET 4)DETAIL SHOWING BRIDGE & PAVEMENT RELATIONSHIP R=1’+78.00 +97.80 R = 1 ’ + 4 5 .0 0 + 5 4 .0 0 R = 6 . 7 5 ’ I N T E R S E C T I O N D E T A I L ( S E E P L A N S H E E T 4 ) I N T E R S E C T I O N D E T A I L ( S E E P L A N S H E E T 4 ) 24’4’ 36’ 24’4’ 4 2 ’ +90.00 87’ F TO F 6 . 8 5 ’ +75.00 +76.00 +78.00 4’ 24’4’ 12’24’ -L- STA 12+66.97BEGIN BRIDGE +78.00 24’24’15’12’4’ 4’ 4’ +00.00 4’ +48.50 +14.25 + 3 4 . 5 0 +37.50 100’ LANE TAPER SHIFT & LATERALLANE TAPER100’ 12’ + 4 4 . 5 0 +64.00 4 0 0 ’ L A N E S H I F T DO NOT USE FOR CONSTRUCTIONPRELIMINARY PLANS N O T E : D R A W I N G S N O T T O S C A L E 4’ R = 6 . 5 ’ I S L A N D M O N O L I T H I C I S L A N D M O N O L I T H I C R = 4 ’ R = 4 ’ R=60’R=45’ R = 1 ’ R = 8 ’ +26.50 36’ + 3 8 . 5 0 +58.50 + 4 3 .5 0 +66.50 02 R = 3 0 ’ R = 1 0 ’ R=10’R=30’GRAU 350 TL-3 TYPE-IIITYPE-III GRAU 350 TL-3TYPE-III WEST 6T H ST N C 8 / U S 5 2 I S L A N D M O N O L I T H I C I S L A N D M O N O L I T H I C NC8/US52 7TH ST N C 8 / U S 5 2 9TH ST9TH ST S I D E W A L K S I D E W A L K S I D E W A L K S I D E W A L K S I D E W A L K C & G 2 ’ - 6 " C & G 2 ’ - 6 " C & G 2 ’ - 6 " C & G 2 ’ - 6 " C & G 2 ’ - 6 " C & G 2 ’ - 6 " C & G 2 ’ - 6 " S I D E W A L K C & G 2 ’ - 6 " S I D E W A L K SIDEWALK C & G 2 ’ - 6 " S I D E W A L K C & G 2 ’ - 6 " SIDEWALK C&G2’-6" C & G 2 ’ - 6 " TYPE-III-L- STA 14+15.47APPROACH SLABBEGIN PAVED SHOULDERS / ISLANDS SIDEWALK - Y - S T A . 2 4 + 3 9 . 0 0 B E G I N B A R R I E R B E G I N R E T A I N I N G W A L L # 1 / -Y- STA. 24+42.00BEGIN BARRIERBEGIN RETAINING WALL #2 /-L- STA 14+40.47END APPROACH SLAB - L - S T A 1 2 + 4 2 . 9 7 B E G I N A P P R O A C H S L A B - Y - S T A . 2 6 + 3 7 . 3 8 E N D B A R R I E R E N D R E T A I N I N G W A L L # 1 / -Y- STA. 26+35.67END BARRIEREND RETAINING WALL #2 /-L- STA 12+67.97END APPROACH SLAB -L- STA 14+16.47END BRIDGE CHAIN LINK FENCE48" BLACK VINYL F E N C E A L O N G T O P O F W A L L 4 8 " B L A C K V I N Y L C H A I N L I N K FENCE ALONG TOP OF WALL48" BLACK VINYL CHAIN LINKFENCE ALONG TOP OF WALL48" BLACK VINYL CHAIN LINK F E N C E A L O N G T O P O F W A L L 4 8 " B L A C K V I N Y L C H A I N L I N K HYDRAULICSROADWAY DESIGN ENGINEERENGINEER R/W SHEET NO.SHEET NO.PROJECT REFERENCE NO.2-IB-3159 30-JUN-2014 13:58 R:\Roadway\Proj\B3159_Rdy_dtl_02I.dgn $$$$USERNAME$$$$8/17/99 DO NOT USE FOR CONSTRUCTIONPRELIMINARY PLANS - Y - U S 2 9 - 6 4 - 7 0 / I - 8 5 B U S -Y- US29-64-70 / I-85 BUS - Y 3 - 7 T H S T -RPA - - LP A - -Y7- PIEDMONT DR / WHITE ST -L- NC 8 / US 52 -L- NC 8 / US 52 -LP C - - RP C - -Y2- - Y5 - E 9 TH S T - Y6 - W 9 TH S T A C SP SP S H E A R P O I N T D I A G R A M NOTES:SEE SHEETS 4, 6 & 7 FOR INTERCHANGE DESIGNSPSPSPSP S P S P S P S P SP S P S P S P S P S P 10+00 15 15 + 0 0 2 0 + 0 0 2 5 + 0 0 30+00 35+0015+00 2 0 + 0 0 15+ 00 2 0 + 0 0 15+00 15+00 15+00 5+00 10+00 15+00 20+00 NAD 83/ NSRS 20070’(ENGLISH)50’100’25’50’ R E M O V E J B S E E D E T A I L " B " B E R M D I T C H S E E D E T A I L A S P E C I A L L A T E R A L V D I T C H REMOVE CBREMOVE DIREMOVE CB REMOVE CB R E M O V E D I SEE DETAIL "C"BEHIND RETAINING WALL CONCRETE DITCH C B R E M O V E 2 G I R E M O V E R E M O V E 2 G I S l o p e F i l l D B 4" G R O U N D N A T U R A L W A L L R E T A I N I N G BR E A K E R B O N D DIREMOVE REVISIONS HYDRAULICSROADWAY DESIGN ENGINEERENGINEER R/W SHEET NO.SHEET NO.PROJECT REFERENCE NO. 4 26-JUN-2014 14:41 R:\Roadway\Proj\B3159_Rdy_psh_04.dgn $$$$USERNAME$$$$8/17/99 DO NOT USE FOR CONSTRUCTIONPRELIMINARY PLANSB-3159 M A TC H LIN E SH EET 6 -R PC - STA . 16+ 60.00 -RPA- STA. 17+00.00MATCHLINE SHEET 7 M A TC H LIN E S H EET 7 - Y- S TA . 2 9 + 5 0 .0 0 - Y - S T A . 2 1 + 0 0 . 0 0 M A T C H L I N E S H E E T 6 - Y 3 - S T A . 1 0 + 98.00 M A T C H L I N E S HEET 6 M ATCHLIN E SHEET 5 -L- STA. 20+00.00 N O T E S : B R I D G E A P P R O A C H S L A B S P A V E M E N T R E M O V A L S E E S H E E T 9 F O R - R P A - P R O F I L E S E E S H E E T 8 F O R - L - P R O F I L E S E E S H E E T 9 F O R - L P A - P R O F I L E S E E S H E E T 1 0 F O R - R P C - P R O F I L E S E E S H E E T 1 0 F O R - L P C - P R O F I L E S E E S H E E T S - 1 - S - ? F O R S T R U C T U R E S P L A N S S E E S H E E T W - 1 - W - ? F O R W A L L P L A N S S E E S H E E T 4 A F O R C U R V E A N D T R A F F I C D A T A P A I N T S T R I P I N G S E E S H E E T 2 - H F O R B R I D G E D E T A I L S E E S H E E T 2 - H F O R I N T E R S E C T I O N D E T A I L S P A V E D S H O U L D E R S / I S L A N D S S I D E W A L K 5/20/14 (ESM) DESIGN REVISION - CHANGED TYPICAL 12’ STANDARD ARTERIAL DITCH TO EXPRESSWAY GUTTER ON -RPA- FROM STA 15+72.67 TO 20+50.00 RT. 11/20/13 (AEV) DESIGN REVISION - REMOVED RETAINING WALL #3 FROM ALONG -Y-. FROM STA 15+72.67 TO 21+00.00 RIGHT OF CENTERLINE. 6/3/14 (RLC) DESIGN REVISION - EXTENDED THE LENGTH OF RETAINING WALLS #1 & #2 ALONG US 29-64-70/I-85 (-Y-). REVISED THE DITCH ALONG -RPA- ALLIED WENCO INTERNATIONAL, INC.DB 952 PG 1301PB 5 PG 21 PB 5 PG 25DB 648 PG 21TROUBLEFIELDand SARAH S.BRAXTON E.PB 5 PG 25DB 507 PG 744BETTY E FRITTSJOHN MILTON FRITTSPB 5 PG 25DB 1758 PG 318LEROY LEETHOMAS VIVIAN E. BROADWAY DB 514 PG 359 PB 5 PG 25DB 1340 PG 233RHONDA B. MILLER PB 5 PG 34 12 876159 -L- POC Sta. 17+11.67 15-Y3- POT Sta. 16+55.34-Y3- PRC Sta. 14+11.99-Y3- PC Sta. 11+35.00 -Y3- PT Sta. 16+41.52 T Y P E - I I I T Y P E - I I I T Y P E - I I I T Y P E - I I I 25+00 G R A U 3 5 0 T L - 3 G R A U 3 5 0 T L - 3 GRAU 350 TL-3 20+00 20+00 15+00 - L P A - C S S t a . 1 0 + 0 4 . 6 4 - L P A - S R S S t a . 1 1 + 8 8 . 6 4 - L P A - S T S t a . 1 8 + 4 2 . 9 5 -LPA- CS Sta. 16+58.95-LPA- SC Sta. 13+72.64-RPA- PT Sta. 20+63.28 - R P C - P C S t a . 1 7 + 3 6 . 2 8 - R P C - P T S t a . 1 9 + 0 8 . 9 6 - L - P O T S t a . 7 + 0 0 . 0 0 15+00 - L P C - C S S t a . 1 5 + 1 6 . 8 9 - L P C - S C S t a . 1 3 + 3 6 . 1 0 - L P C - S T S t a . 1 7 + 0 0 . 8 9 - L P C - C S S t a . 1 1 + 5 2 . 1 0 - L P C - P C S t a . 1 0 + 1 0 . 0 0 - L P C - P O T S t a . 1 7 + 9 1 . 4 3 - L - P O T S t a . 1 0 + 2 8 . 0 0 - R P C - P O T S t a . 2 1 + 2 2 . 0 8 - L - P O T S t A . 1 0 + 0 0 . 0 0 - L P C - P O T S t a . 1 0 + 0 0 . 0 0 - Y - P O C S t a . 2 6 + 1 0 . 0 0 , 3 6 . 0 0 ’ R T -LPA- PC Sta. 10+00.00 - Y - P O C S t a . 2 4 + 5 0 . 0 0 , 3 6 . 0 0 ’ L T -RPA- POT Sta. 21+91.53-L- POT Sta. 17+25.67-L- PRC Sta. 19+28.79-L- PC Sta. 18+00.00 - L P A - P O T S t a . 1 9 + 3 5 . 7 7 - L - P O T S t a . 1 6 + 9 7 . 6 7 050607080807060504030201000102 0 2 0 3 0 4 0 5 0 6 0 7 08 0807060504030201000102 0 2 0 3 0 4 0 5 0 6 07 08 0 20 30 40 5 06 0 708 04 02 03 05 06 0 7 0 8 0 5 0 4 0 3 0 2 0 1 0 60 70 8 02 0201 0300040105 EX - Y 2 - P T S t a . 1 2 + 0 7 . 2 5 - Y 2 - P C S t a . 1 0 + 7 0 . 0 7 - Y 2 - P O T S t a . 1 2 + 3 6 . 0 6 , 1 4 ’ R T - L - P O T S t a . 1 0 + 0 0 . 0 0 02 EX 02 02 0203020100010202010001 0 8 0 7 0 6 0 5 0 4 0 3 0 2 0807060504 03 02 010001 02030 30 2 000001010101 - L - P O T S T A 7 + 7 5 .0 0 B E G I N T I P P R O J E C T B - 3 15 9 - Y 2 - P O T S t a . 1 0 + 0 0 . 0 0 B E G I N C O N S T R U C T I O N I N C 2 0’ +30.00R = 5 0 ’ R = 5 5 ’ R = 3 0 ’ R = 3 0 ’ R=45’R=60’R=45’R=75’ -Y- -Y- 4’ P S 16’ TAPER100’ LANETAPER100’ LANE+5 0.0 0 + 0 8 .2 8 2 3 ’ IN C 23’ INC 23’INC + 6 9 .9 6 - LP C - 2 1’ 2’ 4’ PS 23’ INC 10 ’ P S 1 2 ’ 1 2 ’ 2 2 ’ 23’INC -Y3- 7TH ST 23’INC 22’18’INC+01.99 +69.99 P S 1 2 ’ 1 0 ’ P S 23’ INC + 3 4 . 6 4 1 2 ’ 21’2’24’23’INC+3 3.6723’INC+61.670220’INC 24’ 02 02 24’ 24’15’ 02 02 02 2’ PS2’ PS 2 ’ P S 4’ P S 2 ’ P S 0 2 0 2 +98.00 50’ TYPE-III TYPE-III TYPE-III TYPE-III 8 ’ P S 8 ’ P S 8 ’ P S 8 ’ P S CR C R C R C R C R C R C R C R C R CR CRCR CRCRCRCRCRCR - Y - S T A . 2 4 + 8 7 . 0 0 B E G I N B A R R I E R - Y - S T A . 2 4 + 8 7 . 0 0 B E G I N B A R R I E R - Y - S T A . 2 5 + 9 5 . 0 0 E N D B A R R I E R - Y - S T A . 2 5 + 9 5 . 0 0END BARRIER + 9 8 . 10 +1.33+08.79 R = 3 5 ’ A C MILL AND OVERLAY MILL AND OVERLAY MILL AND OVERLAY MILL AND OVERLAY C R O V E R L A Y M I L L A N D C R 24’ 15’ 02 4 ’ TA P E R50’ CR CRR=10’EX. CurbTie to - L - P O T S t a . 1 3 + 4 1 . 7 2 - Y - P O C S t a . 2 5 + 4 4 . 0 0 \ = 8 9 3 7 ’ 4 9 . 9 8 " 1 0 + 0 0 15+0020+00 PS4’20’INC P S 4 ’ PS4’23’INC+81.95EX. CurbTie to EX. CurbTie to 4’ PSAT-1 AT-1 AT-1AT-1 8:1 TAPER 8:1 TAPER TYPE-III TYPE-III GRAU 350 TL-3 GRAU 350 TL-3 G RAU 3 5 0 TL-3 1 3 4 5 678 910111213 E X R / W EX R/W E X R / W 42.00’ RTEX R/W 1 0 5 . 0 0 ’ R T 9 3 . 0 0 ’ R T 4 0 . 0 0 ’ R T -L- 19+28.79 - R P C - 1 7 + 3 6 . 2 8 - R P C - 1 9 + 0 8 . 9 6 - R P C - 2 0 + 1 9 . 0 0 - L - 8 + 5 3 . 8 1 - L - 7 + 6 5 . 0 0 - L - 8 + 0 0 . 0 4 E X R / W - L - 7 + 8 3 . 7 8 - Y 2 - 1 1 + 9 6 . 0 0 -Y3- 12+51.19 -L- 19+17.07 E N D C / A E X . R / W 1 0 . 0 0 ’ R T 1 0 . 0 0 ’ R T - L - 7 + 6 7 . 5 1 - L - 7 + 6 8 . 1 5 - L - 8 + 1 0 . 6 3 - L - 8 + 1 0 . 6 3 E X . R / W E X . R / W - Y 2 - 1 0 + 7 0 . 0 7 - Y 2 - 1 1 + 9 2 . 4 7 - Y 2 - 1 2 + 1 1 . 4 1 E X . R / W END C/A E X R / W CHORD F E N C E C H A I N L I N K B L A C K V I N Y L E N D 4 8 " FENCECHAIN LINKBLACK VINYLEND 48" B E G I N C / A F E N C E C H A I N L I N K B L A C K V I N Y L B E G I N 4 8 " E X . R / W - Y - 2 8 + 4 6 . 9 5 - L - 6 + 8 4 . 8 0 4 0 . 8 7 ’ L T 4 0 . 8 7 ’ R T 7 3 . 0 4 ’ R T 2 0 . 0 0 ’ R T -L- 18+01.78 - L - 7 + 9 7 . 0 3 - L - 7 + 5 8 . 8 3 - R P C - 2 0 + 1 9 . 0 0 1 1 3 . 0 0 ’ R T - R P C - 1 9 + 0 8 . 9 6 1 1 2 . 0 0 ’ R T - R P C - 1 7 + 3 6 . 2 8 1 2 5 . 0 0 ’ R T -L- 19+28.79 62.00’ RT -L- 18+37.00 42.00’ RT -RPA- 20+63.28 100.00’ RT -RPA- 20+63.28 70.00’ RT 2 E X R / W EX R / W EX R/W-L- 19+28.73 70.00’ LT EX . R / W -L- 18+58.00 62.00’ RT EX . R / W - Y 2 - 1 0 + 7 0 . 0 7 4 0 . 0 0 ’ R T - L - 1 0 + 4 0 . 1 8 1 4 4 . 4 5 ’ R T - L - 1 0 + 5 2 . 5 3 - Y - 2 7 + 7 1 . 0 7 EX . R / W -L- 19+87.00 PROP PUE-L- 17+90.00 EX R/W CHORD 2 7 15 1 8 " W E LD E D S TE E L I N S TA LLA T I O N T R E N C H LE S S REMOVE REMOVE RETAIN REM O VE 18" RCP III C B C B C B C B C B CB CBCBCBCBCBCBCBCBDI CB C B C B A d j . D I CLASS ’B’ RIP RAPEST. 3 TONS 10 SY GEOTEXTILE RETAIN REMOVE& FI L L P L U G & FILL PLUG & FILL PLUG REMOVE RETAIN R E T AI N & FILL PLUG & FILLPLUG REMOVE REMOVE 18 " W ELD ED S TEEL IN S TA LLA TIO N TREN C H LES S CBREMOVE A d j . C B R E M O V E 0 4 1 5 0 4 1 8 0426 0433 0 4 0 1 0 4 0 2 0 4 0 3 0 4 0 4 0 4 0 7 0 4 0 8 0 4 0 9 0 4 1 1 0 4 1 2 0 4 1 4 0 4 1 6 0 4 1 7 0 4 1 9 0 4 2 0 0 4 2 2 0 4 2 3 0 4 2 4 0 4 2 5 0 4 2 7 0 4 2 9 0 4 3 1 0 4 3 2 0434 0435 04360437 0439044304440445044604470448 0 4 4 9 0 4 5 0 0 4 5 1 0453 0 4 6 1 0 4 6 2 0 4 1 0 0 4 0 6 0 4 1 3 0 4 3 0 044004410442 2 G I - A 2 G I - A 2 G I - A 2 G I - A 2 G I - A 2 G I - A 2 G I - A 2 G I - A 2 G I - A 2 G I - A T B 2 G I T B 2 G I C B 36" RCP-III 36" RCP-III 18 " RC P-I I I 18 " RC P-III 30" RCP-III 30" RCP-III 30" RCP-III J B w / M H RC P- III 3 6 " 15" CSP 18" R CP-III C B D I D I 15" RCP-III 1 5 " R C P - I I I 15" RCP-III 36" RCP-III 36" RCP-III 36" RCP-III 18 " RC P - III 36" RCP-III 18" RCP-III C B CB 24" RCP-III 18" RCP-III 18" RCP-III 30" RCP-III 30" RCP-III 18" RCP-III 15" RCP-III 18" RCP-III 18" RCP-III RCP-III 15" w / M H T B J B RCP-III 18" C B 2 G I - A 36" RCP-III RE T A I N RE T A I N REMOVE & F ILL P L U G & F I LL P L U G REMOVE REM O VE RCP-III 18"REMOVE DI18" RCP-III 18" RCP-III 2 G I R E M O V E 15"ELB ELB ELB ELB ELB ELB P P P P P P P P P P P P P P P P P P 18" R C P-III 18" RCP-III F S 0 4 0 5 R C P - I I I 3 6 " R C P - I I I 1 5 " RCP-III 15" 0 4 6 0 2 G I T B 7 S Y F O R D R A I N A G E G E O T E X T I L E E S T . 2 T O N S R I P R A P C L A S S ’ B ’ F R O M C B C O N V J B w / M H w / M H J B 0 4 6 5 0 4 6 6 RC P- III 1 5 " 0 4 6 4 RC P - III 1 8 " 0 4 6 3 0 4 2 8 RCP-III 18" RCP-III 18" RCP-III 36" RCP-III 18" R C P-III 3 6"RCP-III 15" w / M H T B J B G D I 1 5 " R C P - I I I 15" RCP-III 18" CSPW/2 ELBOWS 18 " RC P - III 18" RCP-III 04702GI-AFS04692GI-A FS18" RCP-III D E T A I L A Flatter 6:1 or M i n . D = 1 . 0 F t . ( N o t t o S c a l e ) S P E C I A L L A T E R A L ’ V ’ D I T C H G r o u n d N a t u r a l 6 . 0 ’ 4:1 D VARIABLE F R O M S T A . - R P C - 1 8 + 5 0 . 0 0 T O S T A . - R P C - 1 9 + 5 0 . 0 0 R T D E T A I L C C O N C R E T E D I T C H B E H I N D R E T A I N I N G W A L L ~ SEIR A V 1:2 ( N o t t o S c a l e ) B = 0 ’ D = 1 . 0 ’ F R O M S T A . - Y - 2 4 + 4 2 T O S T A . 2 6 + 3 5 . 6 7 L T F R O M S T A . - Y - 2 4 + 3 9 T O S T A . 2 6 + 3 7 . 3 8 R T D E T A I L B 2 . 5 ’ 5 . 0 ’ M i n . D = 1 . 0 F t . V A R. STAKE SLOPE 5 . 0 ’ D 2:1 LIMITS CLEARING ( N o t t o S c a l e ) B E R M D I T C H 5 . 0 ’ 1 0 . 0 ’ V . C . F R O M S T A . - R P C - 1 2 + 9 9 . 1 5 T O S T A . - R P C - 1 7 + 0 0 . 0 0 R T D D E = 7 1 5 C Y w / M H J B S E E D E T A I L " C " BEH IN D RETA IN IN G W A LL C O N C RETE D ITC H 36" RCP-III 0 4 2 1 w / M H T B J B 2GI-A P L U G & FI L L 30" RCP-III 30" RCP-III REM O VE 2 G I PLUG& FILL PLUG& FILLPLUG& FILLREMOVE CBPLUG& FILLPLUG& FILL 7 SY GEOTEXTILEEST. 2 TONSCLASS ’B’ RIP RAP JB POSSIBLE S JB TO POSSIBLE S 36" RCP 18" RCP 18" CM P 36" RCP 3 6 " R C P 36" RCP 24" RCP 12 " HD P E15" RCP 24" RCP 15" CMP 12" H D P E 12 " C MP 18" RC P 15" CMP 18 " RCP 1 5 " R C P 15 " R C P 1 5 " R C P 18" RCP 30" RCP 18" RCP15" RCP18" RCP18" RCP18" RCP8" CLAY8" CLAY 8 " C L A Y 8 " C L A Y 8" CLAY 8" C L A Y 8" CLAY C O N C A N D S T E E L WW WW RIP RAP 1 S F D VAR HT BLKW/ 3SBW72" CHLGATELTLTLTLTLTLTLTLTLTLTLTLTLTLTCARPORTMTL1 S F BUSCONCCONCBSTBSTSPIGOTWATERCONCCONCCONCSGLTLTW/LT72" WOODVAR HT BLKLTLTSCONCCONCSLTS8TH ST.WELLTEST SLTLTLTCONC1 S MAS BUSCONCSGATEMTL24" C&G24" C&G24" C&G LT72" MTLCONCCONCSLTCONC MTL MTL M TL CONC MTL 24" C&GCONC W ALL8’ BLK LT LT COMPRESSOR AIR PUMP DIESEL T A N K C A P S CONC CONC OIL RECYCLED 12 " HD P ED I D I LT LT LT DIESEL 1 @ 2000 GAL CAPS TANK B R E A T H E R BST BST BUS1 S M AS GR 2 4 " C O N C WA L L BUS 1 S MAS CONC C O N C C U R B S CONC 1 S F D 1 S B K D 9’ CONC 9’ CONC 36" CONC 2 S F D 72" CHL 1 S F D 1 S F D CAN MTL S GR CONC C O N C 3 0 " C & G 30" C&G 30" C&G 3 0 " C& G 4 8 " CON C GR GR CONC GR CONC CONC S C O N C S 5 4 " C O N C 54" CONC 36" CONC CONC CBCBCB CB CB CB CB DI DI DI DI 12" RCP12" RCP DI DI15" RCP15" RCP S DI DI S 4008’05" W N 70 25’14" E 223.27’ N 69 11’11" E 98.60’ SYLVIA S. M YERS CHARLES L. SW ICEGOOD DB 1253 PG 1985 N 0 2 1 2 ’ 4 7 " W 6 0 . 9 6 ’ N 0 1 4 3 ’ 2 6 " W 4 9 . 7 5 ’ N 3849’50" E 46.35’S 86 39’50" W 148.63’ S 89 24’30" W 154.77’ DB 764 PG 1180 PB 4 PG 68 S 4805’00" W 139.92’ EIP EIPS 17 5 6 ’10 " W 16 6 .15 ’ EIP EIP EIP EIP EIP E IP S 89 03’58" E 110.59’ EIP N 88 11’54" W 256.00’ EIPEIPN 85 25’50" W80.70’S 88 38’53" W161.37’EIPEIPEIPN 0139’38" W 149.53’N 0159’59" W75.37’N 88 04’34" E148.84’EIPEIPEIPEIPEIPEIP EIP EIP EIP EXISTING R/WEXISTING R/WEXISTING R/W EXISTING R/W EXISTING R/WEXISTING R /W JBTO POSSIBLE JBTO POSSIBLE 8 " HD P E D I D I S EIP B S T C U R B B S T C U R B SEASEMENTSIGN EIP GRV SEXISTING R/W EXISTING R/W -BY- BL-4 = GPS B3159-1 EIP - E L - -EY 1 - -E Y2- -E Y 3 - -EY4- S 88 37’51" E 32.81’ 0.88’EIP TO R/W 1.76’ EIP TO R/W SPIGOT VENT T C A B I N E T H H EOI T H H T T V E N T 1&1/4"STL 4 " S T L 6 " D I 3"STL 6 "S T L 8"DI6"STL2"STL 6"STL6"DI8"DI8"DI1&1/4"STL 16 "D I 4"STL 6 " D I 4 "P L 8 "DI 8"D I 8"D I 6"DI 4 " S T L A B A N D O N E D "PL "P L EOI ABANDONED DRIP 3/4"PL AATUR4"PL4"STL D U C T B A N K D U C T B A N K D U C T B A N K V E N T LT LT 48" CONC 8" CLAY30" C&GSCONC C U R BCONC CURB DI 8" CMP HULL-NORLEX, LLC DB 1821 PG 1896 PB 51 PG 61 PB 51 PG 61DB 1821 PG 1894NINTH STREET NORLEX, LLC DB 715 PG 191 PB 5 PG 21DB 1080 PG 1831 PB 5 PG 21 B I L L I E S . P A R K E R D B 1 2 7 7 P G 1 5 0 5 R I P P L E O I L C O M P A N Y , I N C . D B 1 9 1 4 P G 1 3 0 9 D B 4 4 9 P G 3 2 3 P B 11 P G 8 9 JBL PROPERTIES, LLC DB 1510 PG 469 D B 2 2 4 P G 4 7 7 D B 6 1 5 P G 4 4 4 P B 4 P G 6 8 D B 6 6 6 P G 8 2 0 M A R G I E L . S W I C E G O O D D B 3 5 4 P G 5 1 J A C K C . C H I L D E R S D B 1 0 0 9 P G 1 5 8 D B 9 0 8 P G 1 1 6 1 P B 1 4 P G 2 N 87 52’18" EN 0206’05" W50.00’N 0206’05" WN 0206’05" W49.83’N 0206’05" W50.00’DAVID TODD HUNTDB 1264 PG 1561PB 5 PG 34PB 5 PG 21DB 965 PG 1021DB 1831 PG 742PB 5 PG 21J H MANAGEMENT OF N.C., LLCDB 1844 PG 727PB 5 PG 21HAYES JEWELERS, INCDB 1198 PG 985PB 5 PG 21PB 5 PG 34 EIPEIPN 87 41’49" E150.00’24.55’N 87 41’49" E 149.71’50.07’49.15’N 87 52’18" E 149.14’N 87 52’18" E149.33’N 87 52’18" E149.52’N 88 09’57" E149.30’N 88 15’38" E150.17’EIPEIP N 87 57’36" E148.53’36" CONC 48" CHLG1 S F DGR GRSSSS48" CHLSS SS48" CHL1 S F D 48" CHL 48" CHLGRGR S 0110’14" E-EY7-T EOI 6"DI6"DI 2"STL2"STL2"STL EXISTING R/W EXISTING R/WEXISTING R/WEXISTING R/W 8" CLAY 8" CLAY12" RCPDIDI12" RCP12" RCP CB CB57LT 8TH ST. 8 2 .3 8 ’ - L - 8 + 9 4 .7 1 -Y- 28+46.95 127.83’ -Y-28+81.37127.90’-Y3-11+85.8823.01’ 18 0 .14 ’ + 2 2 .8 6 6 3 . 8 2 ’ + 2 9 . 6 2 2.83’+25.6662.22’+35.58 MARTHA LANNING HUNTDAVID GERALD HUNTMARTHA LANNING HUNTDAVID GERALD HUNT INGYUON HAOSOMKHUON HOA P H Y L L I S J . B A R K E R J O H N N Y L E E B A R K E R M A D E L I N E R . P A L M E R J O H N L . P A L M E R ELIZABETH P. HELMS JOHN BURTON HELMS S P I G O T C B J B T O P O S S I B L E J B T O P O S S I B L E LUCINA ROQUE-VENAVIDESJOSE JUAN-ROJASPORTCARMTL 1 788.31 4 786.98 48" CONC HAYES JEWELERS, INCDB 1063 PG 1658PB 5 PG 34 E N T E R P R I S E S , I N C . B O D D I E - N O E L L DAVID TODD HUNT DB 1206 PG 1215 PB 5 PG 34 8" CLAY C B BUS 1 S MAS C O N C 8 " DI C O N C 4 " P L E XIS TI N G R/ W CONC 4"P L W W #27 BRIDGE 3 6 " R C P 8" CLAY 8 " D I W W 15 " C M P R A P RIP 18 " RC P 12 " R C P 15" C M P B U S 1 S B L K C B 8"DI 24" C &G W/ 4 P U MPS MTL C A N OP Y 2 4 " C & G 36" CONC WALL 48" CONC 30" C &G 8 " C L A Y 3"STL SR 2205 W 6T H ST 1 @ 12000 GAL . 1 @ 6000 GAL . 8" CL A Y RAIL 48’ SPLIT 1.5 S F DEXISTING R/WEND UNKNOWN8" CLAY (DATUR)6"DI6"DI 2"STL 1 S F D1 S F D25.31’S 0110’14" E 48" CHL42" CONC12" CMPW/ 3 S BW72" CHL 1 S BK BUSTIMBERSCONC CURB VENT AATUR BUS1 S BK JBTO POSSIBLE F F F F F F FFF FFFC F F CC F FF FF F F F F F C F F F F F C C C C C F C C C F F F F F C C C C C C C C C C C C C C C C C C C C C C C CCC C CCCCCFFF C C FF C C C C C C FCCC C C C C C C CCF N A D 8 3 / N S R S 2 0 0 7 HYDRAULICSROADWAY DESIGN ENGINEERENGINEER R/W SHEET NO.SHEET NO.PROJECT REFERENCE NO.4A B-3159 26-JUN-2014 14:42 R:\Roadway\Proj\B3159_Rdy_psh_04a.dgn $$$$USERNAME$$$$8/17/99 DO NOT USE FOR CONSTRUCTIONPRELIMINARY PLANS - L - P I S t a 1 9 + 9 7 . 1 3 D L = 1 3 5 . 9 3 ’ T = 6 8 . 3 3 ’ R = 5 3 3 . 0 0 ’ - Y 2 - P I S t a 1 1 + 4 1 . 1 1 D L = 1 3 7 . 1 8 ’ T = 7 1 . 0 4 ’ S E = S E E P L A N S S E = S E E P L A N S R = 2 1 4 . 0 0 ’ S E = S E E P L A N S S E = E X I S T R = 5 , 7 0 0 . 0 0 ’ T = 1 , 5 5 8 . 7 8 ’ L = 3 , 0 4 3 . 1 5 ’ DP I S t a 2 5 + 5 8 . 7 8 - Y - R = 5 3 3 . 0 0 ’ T = 6 4 . 7 1 ’ L = 1 2 8 . 7 9 ’ P I S t a 1 8 + 6 4 . 7 1 D P I S t a 1 8 + 2 3 . 7 2 D L = 1 7 2 . 6 8 ’ T = 8 7 . 4 5 ’ R = 4 4 4 . 0 0 ’ S E = . 0 8 - R P C - - L P C - P I S t a 1 0 + 8 1 . 0 5 L = 1 4 2 . 1 0 ’ T = 7 1 . 0 5 ’ R = 5 , 6 6 3 . 4 8 ’ P I s S t a 1 2 + 7 7 . 7 6 F F L s = 1 8 4 . 0 0 ’ L T = 1 2 5 . 6 6 ’ S T = 6 6 . 5 1 ’ P I S t a 1 4 + 4 8 . 6 3 L = 1 8 0 . 7 9 ’ T = 1 1 2 . 5 3 ’ R = 1 2 0 . 0 0 ’ P I s S t a 1 5 + 8 1 . 8 8 F L s = 1 8 4 . 0 0 ’ L T = 1 2 6 . 6 7 ’ S T = 6 4 . 9 9 ’ S E = . 0 8 D D S E = . 0 8 P I S t a 1 0 + 0 2 . 3 2 T = 2 . 3 2 ’ R = 5 , 7 4 7 . 4 8 ’ S E = . 0 2 L = 4 . 6 4 ’ D L T = 1 2 2 . 6 7 ’ L s = 1 8 4 . 0 0 ’ FP I s S t a 1 0 + 6 5 . 9 7 S T = 6 1 . 3 3 ’ S T = 6 3 . 6 2 ’ L T = 1 2 5 . 1 7 ’ L s = 1 8 4 . 0 0 ’ P I s S t a 1 3 + 1 3 . 8 1 - L P A - F S E = . 0 8 R = 1 5 0 . 0 0 ’ T = 2 1 1 . 7 1 ’ L = 2 8 6 . 3 1 ’ P I S t a 1 5 + 8 4 . 3 5 D P I s S t a 1 7 + 2 2 . 5 7 L s = 1 8 4 . 0 0 ’ L T = 1 2 5 . 1 7 ’ S T = 6 3 . 6 2 ’ F D L = 2 7 6 . 9 9 ’ T = 1 5 2 . 7 8 ’ R = 2 6 4 . 0 0 ’ S E = . 0 8 P I S t a 1 2 + 8 7 . 7 8 - Y 3 - P I S t a 1 5 + 3 9 . 1 9 L = 2 2 9 . 5 3 ’ T = 1 2 7 . 2 0 ’ R = 2 1 4 . 0 0 ’ S E = S E E P L A N S D - R P A - P I S t a 1 8 + 8 6 . 3 5 L = 3 7 8 . 6 1 ’ T = 2 0 1 . 6 8 ’ R = 4 4 4 . 0 0 ’ S E = . 0 8 D T R A F F I C D A T A Y E A R 2 0 3 5 A D T Y E A R 2 0 0 9 A D T U S 5 2 / N C 8 U S 5 2 / N C 8 I-85 BUSINESS US 29-64-70 2 1 0 0 3 1 0 0 3 9 0 0 1 2 4 0 0 2 8 6 0 0 3 6 4 0 0 3 6 0 0 0 2 4 0 0 0 2 4 2 0 0 2 3 9 0 0 9 4 0 0 9 0 0 1 5 0 0 1 3 0 0 2 7 0 0 3 2 0 0 I-85 BUSINESS US 29-64-70 C B C L E A N O U T C B R E M O V E C B R E M O V E HYDRAULICSROADWAY DESIGN ENGINEERENGINEER R/W SHEET NO.SHEET NO.PROJECT REFERENCE NO. 26-JUN-2014 14:42 R:\Roadway\Proj\B3159_Rdy_psh_05.dgn $$$$USERNAME$$$$8/17/99 DO NOT USE FOR CONSTRUCTIONPRELIMINARY PLANSB-31595 M ATCHLIN E SHEET 4 -L- STA. 20+00.00 NOTES:SEE SHEET 8 FOR -L- PROFILE SEE SHEET 2-H FOR INTERSECTION DETAILISLANDSSIDEWALK - L - P O T S t a . 2 4 + 1 7 . 9 5 - Y 5 - P O T S t a . 1 0 + 0 0 . 0 0 - L - P O C S t a . 2 1 + 4 8 . 1 9 - Y 5 - P O T S t a . 1 2 + 3 1 . 4 4 - Y 6 - P O T S t a . 1 0 + 0 0 . 0 0 - L - P T S t a . 2 1 + 9 3 . 5 8 - L - P C S t a . 2 1 + 4 3 . 7 4 - Y 6 - P O T S t a . 1 2 + 3 3 . 8 7 - L - P O C S t a . 2 1 + 5 0 . 9 5 02 03 03 04 04 E X IS T EXIST E X I S T 2 0 ’ I N C - L - P O T S T A . 2 3 + 0 0 . 0 0 E N D T I P P R O J E C T - Y 6 - P O T S T A . 1 1 + 6 2 . 6 4 B E G I N C O N S T R U C T I O N - Y 5 - P O T S T A . 1 0 + 8 7 . 2 0 E N D C O N S T R U C T I O N -L-PI Sta 19+97.13 L = 135.93’T = 68.33’R = 533.00’PI Sta 21+68.66 D L = 49.84’T = 24.92’R = 3,000.00’D SE = SEE PLANSSE = SEE PLANS - L - P T S t a . 2 0 + 6 4 . 7 2 - L - P O T S T A 2 1 + 0 0 . 0 0 E N D G R A D E C R C R C R C R +44.72 2 0 + 0 0 E X . C u r b T i e t o 1 4 1 3 1 2 4 0 . 0 0 ’ L T 4 0 . 0 0 ’ L T E X R / W E X R / W - L - 2 0 + 6 4 . 7 2 4 0 . 0 0 ’ R T - L - 2 0 + 6 4 . 7 2 - L - 2 0 + 9 2 . 0 0 6 2 . 0 0 ’ R T - L - 2 0 + 9 6 . 0 8 4 8 . 0 0 ’ R T - L - 2 0 + 8 5 . 0 0 6 1 . 0 0 ’ L T 6 2 . 0 0 ’ R T - Y 5 - 1 0 + 8 5 . 0 0 - Y 6 - 1 1 + 5 0 . 0 0 C B T o J B C o n v . D I R E T A I N R E T A I N & F I L L P L U G REM O VE 0 5 0 4 0 5 0 6 0 5 0 7 0 5 0 5 0 5 0 1 0 5 0 2 0 5 0 3 0 5 0 8 1 8 " R C P - I I I 12 " RC P - III 1 8 " R C P - I I I & F I L L P L U G C B R E T A I N RETAIN C O L L A R C O L L A R P P P w / M H J B R C P - I V 1 5 " E X T E N D A N D C O L L A R RCP-III 18" 1 8 " R C P 1 5 " R C P 15" RCP 1 2 " R C P 1 5 " R C P 8 " C L A Y 8" CLAY 8" CLAY 8 " C L A Y CONC C O N C BST M T L P O S T S W / C H A I N S VAR HT BLK 3 0 ’ C & G 3 0 ’ C & G CONC CURB BST BST 9TH ST. BST BST BST S 72" MTL 48" MTL 24" STONE S WALL STONE GATE COLUMN STONE CONC CONC BST SOIL 3 0 " C & G 2 S MAS BUS 1 S F D 1 S F D 1 S F D 1 S F D 1 S F D 1 S F D 1 S F D G GR 72" WD 4 8 " W D CONC W/ LT GUY BST A L L E Y S 72" WD 36" CHL 54" STONE RET. WALL W. 9TH ST 72" STONE 7 2 " S T O N E 72" STONE 4 8 " C H L 4 8 " C H L 4 8 " C H L 2 4" C O N C 48" MTL 48" MTL WELL TEST MT L WELL TEST LT WELL TEST WELL TEST WELL TEST WELL TEST VALVE TANK CAPS C O N C W / 12 P U M P S M T L C A N O P Y A N D S IZ E S A T T A IN T A N K # U N A B L E T O 1 S B L K B U S WELL TEST SLT 60" CHL B S T 3 1’ B S T 30’ BST 31’ BST WI N S T O N R D . / N C 8 4 0 ’ B S T DI CB CB CB CB CB DI CB 48" CONC 1 5 " R C P 15 " R C P 1 5 " R C P 12" RCP EIP N 0 2 10 ’14 " E 2 9 8 .2 2 ’ EIP EIP EIP N 0 1 2 5 ’16 " E 118 .8 3 ’ N 0 0 5 8 ’ 2 7 " W 1 2 4 . 9 6 ’ N 86 48’26" E 99.59’ N 86 48’26" E 36.23’N 88 17’30" E 39.72’ N 88 17’30" E S 88 17’25" W S 88 17’21" W S 86 58’55" W 137.75’ S 86 58’44" W 136.81’ N 02 12’30" W 62.50’ 4.50’ N 88 02’06" E S 0143’42" E 12.40’ N 88 09’57" E 50.41’ N 88 09’57" E 150.00’EIPEIP EIP EIP N 88 03’58" E 150.00’ N 0 1 3 7 ’ 2 3 " W 1 7 5 . 0 0 ’ N 88 03’58" E EXISTING R/W EXISTING R/W EIP EIP EXISTING R/W EXISTING R/W 8.50’ 72" STONE 54" STONE RET. WALL CONC CONC C O N C 85.56’ 125.46’ 125.64’146.53’ 96.31’ EOI 2"STL6"DI 4 "S T L 4"STL 4" G A L V 6"DI 6"DI 6"DI 8 " D I 2 " S T L 2 " S T L 3/4"STL 2"STL 4"STL GATE 7 2 " W O O D T O WI N S T O N - S A L E M H A Y E S J E W L E R S , I N C . D B 9 5 8 P G 8 9 D B 1 0 1 5 P G 1 1 2 9 P B 5 P G 2 1 P B 8 P G 9 4 P A T R I C I A W . H A N N A H A N D W I F E G E O R G E V . H A N N A H D B 5 7 9 P G 8 1 D B 4 9 7 P G 1 8 4 E S T H E R S . F R E E M A N A N D W I F E R . T Y L E R F R E E M A N G E O R G E T O M M Y P L O T T D B 1 2 5 3 P G 1 9 8 1 H A Y E S J E W L E R S , I N C . D B 7 7 3 P G 6 0 8 P B 5 P G 2 1 N I N T H S T R E E T N O R L E X , L L C D B 1 8 2 1 P G 1 8 9 4 P B 5 1 P G 6 1 DB 952 PG 1301 PB 5 PG 21 HAYES JEWELERS, INC PB 5 PG 34 DB 1063 PG 1658 8 " C L A Y 3 0 . 0 0 ’ + 6 5 . 4 2 3 0 . 0 0 ’ + 7 7 . 2 5 3 0 . 0 0 ’ + 0 7 . 2 5 2 3 . 15 ’ + 15 . 4 7 2 2 .8 6 ’ + 3 3 .5 0 INTERNATIONAL, INC. ALLIED WENCO " P L E O I 8 " D I J B P O S S I B L E N 0 1 5 6 ’ 3 0 " W 107.00’ S 88 19’25" E 9 6 . 5 2 ’ EIP 1 S F D CB 18" RCP 12" RCP 12" RCP CB CB CB SHELTERED WORKSHOP, INC. DAVIDSON COUNTY DB 557 PG 603 PB 8 PG 94 EIP E X I S T I N G R / W E X IS T IN G R / W B R O A D S T . B R O A D S T . BETTY E FRITTS JOHN MILTON FRITTS DB 507 PG 744 PB 5 PG 25 TROUBLEFIELD and SARAH S. BRAXTON E. DB 648 PG 21 PB 5 PG 25 DRY CREEK PROPERTIES, INC. DB 1375 PG 1278 BETTY B. CALLICUT AND WIFE BOBBY R. CALLICUTT DB 627 PG 842 DB 639 PG 223 THOMAS P. MAUNEY DB 877 PG 101 DB 1375 PG 1278 DRY CREEK PROPERTIES, INC. W / C H A I N M T L P O S T S F C F F NAD 83/ NSRS 2007 TRAFFIC DATA YEAR 2035 ADTYEAR 2009 ADTUS 52 / NC 8 U S 5 2 / N C 8 1 5 0 05001000 2300500600 1 2 0 0 4 0 0 800 2 1 0 0 0 20700 2 5 6 0 0 2520018002200 2800WEST 9TH ST EAST 9TH ST - L - -L--Y6--Y5- HISTORIC PROPERTY H I S T O R I C P R O P E R T Y REPLACE DIREMOVE AND DIREMOVEREPLACE DIREMOVE AND -Y- STA. 21+00.00 MATCHLINE SHEET 4-Y3- STA. 10+98.00 MATCHLINE SHEET 4 MATCHLINE SHEET 4 -RPC- STA. 16+60.00HYDRAULICSROADWAY DESIGN ENGINEERENGINEER R/W SHEET NO.SHEET NO.PROJECT REFERENCE NO. 6 26-JUN-2014 14:42 R:\Roadway\Proj\B3159_Rdy_psh_06.dgn $$$$USERNAME$$$$8/17/99 DO NOT USE FOR CONSTRUCTIONPRELIMINARY PLANSB-3159 NOTES:SEE SHEET 10 FOR -RPC- PROFILE SEE SHEET 11 FOR -Y3- PROFILE S E = E X I S T PAVEMENT REMOVAL PAVED SHOULDER - R P C - 1 0 + 0 0 1 5 + 0 0 20+00 P I s S t a 1 1 + 9 7 . 8 2 F L s = 1 8 4 . 0 0 ’ L T = 1 2 2 . 8 2 ’ S T = 6 1 . 4 8 ’ P I S t a 1 3 + 5 0 . 3 7 D L = 1 8 1 . 2 8 ’ T = 9 1 . 3 7 ’ R = 5 8 7 . 0 0 ’ P I s S t a 1 5 + 0 1 . 7 5 F L s = 1 8 4 . 0 0 ’ L T = 1 2 2 . 8 2 ’ S T = 6 1 . 4 8 ’ 15+00 - Y - P C S t a . 1 0 + 0 0 . 0 0 - R P C - T S S t a . 1 0 + 7 5 . 0 0 - R P C - S C S t a . 1 2 + 5 9 . 0 0 -RPC- CS Sta. 14+40.28-RPC- ST Sta. 16+24.28 02 02 03 0405060708 0807 06 05 04 03 02 01 00 01 02020202010002010001 P I S t a 2 5 + 5 8 . 7 8 D L = 3 , 0 4 3 . 1 5 ’ T = 1 , 5 5 8 . 7 8 ’ R = 5 , 7 0 0 . 0 0 ’ - Y - S E = . 0 8 16’4’PS 4’PS23’INC23’INC 100’ LANE TAPER+60.00 - R P C - P O T S t a . 1 0 + 0 0 . 0 0 , 3 6 . 0 0 ’ R T - Y - P O C S t a . 1 4 + 5 0 . 0 0 10’PS2’PS 22’-Y--Y3- POT Sta. 10+00.00BEGIN CONSTRUCTION - Y - P O C S t a . 1 1 + 5 0 . 0 0 B E G I N C O N S T R U C T I O N GRAU 350 TL-3R=20’R=15’300’ TRANSITION WITH FLOWABLE FILL P L U G & F I L L 4’PS 12’02 - Y - S T A 1 6 + 7 5 . 0 0 T O E X I S T I N G T I E P R O P O S E D G U A R D R A I L EXIST EXIST MI L L A N D O V E R L A Y MILL AND OVERLAY+75.00 +362’PS - Y - S T A . 1 6 + 5 0 . 0 0 C H A I N L I N K F E N C E B L A C K V I N Y L B E G I N 4 8 " 24140.00’ LTEX R/W 95.00’ RT 95.00’ RT 115.00’ RT - Y - 1 4 + 5 0 . 0 0 - R P C - 1 1 + 2 5 . 0 0 -RPC- 12+59.00 -RPC- 14+40.28 -RPC- 16+24.28-Y- 19+97.00 BEGIN C/A CHAIN LINK FENCEBEGIN 48" BLACK VINYLEX R/W-RPC- 12+59.00 115.00’ RT -RPC- 14+40.28 115.00’ RT-RPC- 13+05.00 -RPC- 13+65.00115.00’ RT 115.00’ RT -RPC- 13+58.93 -RPC- 14+48.24EX R/W EX R/W-RPC- 16+24.28 135.00’ RT E X R / W CHORDCHORD 54" W ELDED STEEL TRENCHLESS IN STALLATIO NHW& FILLPLUG BDOHWRETAINRETAIN RETAIN RETAIN 06060607060906010604060306050610061106022GI-A2GI-A 2GI-A2GI-A54" RCP-III54" RCP-III36" RCP-III 36" RCP-III 42" RCP-IIITB JB w/MH 2GI-A JB w/MH & F I L L P L U G F O R D R A I N A G E 7 S Y G E O T E X T I L E E S T . 2 T O N S C L A S S ’ B ’ R I P R A P 15" RCP-III D I RETAIN RETAIN RETAIN REMOVE 0608 18" RCP-III 30" RCP-III ELB ELBPPP P P 42" RCP-III 42" RCP-IIIFS 18" RCP-III 2GI-A 2GI-AFS D E T A I L B 2 . 5 ’ 5 . 0 ’ M i n . D = 1 . 0 F t . V A R. STAKE SLOPE 5 . 0 ’ D 2:1 LIMITS CLEARING ( N o t t o S c a l e ) B E R M D I T C H 5 . 0 ’ 1 0 . 0 ’ V . C . D D E = 7 1 5 C Y 0 6 1 3 0 6 1 4 0615 0616W/2 ELBOWS18" CSP0617 SEE DETAIL "B"BERM DITCH F R O M S T A . - R P C - 1 2 + 9 9 . 1 5 T O S T A . - R P C - 1 7 + 0 0 . 0 0 R T A R B O R FOOT BRIDGE W O OD 12" RCP 24" CMP 1 S F D PORT CAR G A N D C O N C S T O N E STONE 2 X3 C UL VERT24" RCP B S T V A R H T S T O N E S T O N E VAR HT STONE VAR HT STONE VAR HT S T ONE 1 S F D I N V = 7 4 8 . 3 3 ’ HW 54" HAND MADE36" RCP TO PADCONC PADCONC 18" RCP 18" RCP 12" VC 12" VC 18" RCP FES18" RCP 36" RCP18" RCP18" RCP 8" CLAY 8" CLAY 8" CLAY 8 " C L A Y 8" CLAY 8" CLAY 8 " C L A Y C O N C C O N C 2821758.26 18" RCPJB M T L MTLCONCCONC CURB MTLCONCCONCCONCCONCCONC CURB 1 S F D 60" BK GR C B C B DI D I D I D I D I D I DIDI C B C B S 10 3 9 ’ 2 3 " W 2 1 . 1 0 ’ S 1110’22" W 121.30’ D B 1 2 0 5 P G 9 0 2 N 0148’12" E 69.51’ S 8 2 18 ’0 5 " E 7 0 .0 8 ’ S 7 9 0 0 ’0 1" E 2 8 2 .7 3 ’ N 5611’39" E 62.91’ N 6 2 0 1’3 9" E 5 2.0 5’ N 6 6 5 8’ 0 9 " E N 1 1 0 2 ’ 3 9 " E 1 9 . 9 1 ’ E I P E I P E I P E I P N 1106’44" E 126 .90’ S 7 8 4 7 ’4 9 " E 8 1.7 3 ’ N 1058’58" E 126 .63’ B E T T Y B . C A L L I C U T A N D W I F E B O B B Y R . C A L L I C U T D B 6 2 9 P G 8 7 S 7 8 47’49" E 8 7.00’ P B 8 P G 9 5 N 8828’51" W 490.29’ N 8 8 2 8 ’5 1" W 7 0 7 . 7 1 ’ EIPEIP E I P EIPEXISTING R/W E XI S T I N G R/ W E XIS TIN G R/ W E XI S T I N G R/ W E XIS T ING R / W E X IS T ING R / W 45.00’EXISTING R/W EXISTING R/W E I P E I P E I P E I P EIP 12 " CMP 45.00’ 260.00’EXISTING R/W U S 2 9 / 7 0 B U S 8 5 S B L 2 4 ’ B S T U S 2 9 / 7 0 B U S 8 5 N B L 2 4 ’ B S T BY-7 BY-8 41 EOI6"STL 16"DI16"DI16"DI 16"DI 16"DI4"DI 4"DI EOI 6 "S T L 6"STL 4"PL4"PL 18" RCP 18" RCP M T L M T L M T L M T L MTLMTLCONC CURB HWSTONE S T O N E A N D C O NC D IT C H H I M W A N T I K R I S E N L A L L A N D W I F E E D W I N K R I S E N L A L L T E R R Y F . R U M F E L T C E C I L M A X R U M F E L T D A V I D R . R U M F E L T , J R . V E R L A . R U M F E L T D B 6 1 5 P G 2 4 1 T E R R Y F . R U M F E L T D B 1 7 0 2 P G 1 8 1 H O P E N . C R A V E R A N D W I F E T O N Y G . C R A V E R D B 1 0 5 6 P G 1 0 1 2 L I N D A P U R V I S A N D W I F E R I C H A R D P U R V I S D B 6 4 7 P G 5 6 4 P B 8 P G 9 5 JACK C. CHILDERS DB 1009 PG 158 PB 14 PG 2DB 908 PG 1161EOI48" W W 160 .18’ 196 .94’ +17 .98 +27 .72 14 6 .14 ’ + 17 .6 5 117 .7 5 ’ + 7 1.2 6 TUNNELPEDESTRIANABANDONED 8" CMPENDSUNABLE TO LOCATEDIR. ONLY12" CMPLOCATE ENDUNABLE TODIR. ONLY DI 648" HDPE 8" HDPECONCHULL-NORFLEX, LLC DB 1821 PG 1896 PB 51 PG 61 . B O U N D 2 9 / 7 0 S U S B E T W E E N 7 T H S T . A N D O F F O R K E D W I L L O W O A K R / R S P I K E S E T I N R O O T 8 7 ’ L E F T - Y - S T A 1 5 + 2 9 . 0 0 B M # 1 8" CMPCCCCCCCC C C C C C F CFCCCFCCCFNAD 83/ NSRS 2007 REVISIONS HYDRAULICSROADWAY DESIGN ENGINEERENGINEER R/W SHEET NO.SHEET NO.PROJECT REFERENCE NO. 26-JUN-2014 14:42 R:\Roadway\Proj\B3159_Rdy_psh_07.dgn $$$$USERNAME$$$$8/17/99 DO NOT USE FOR CONSTRUCTIONPRELIMINARY PLANSB-3159 7 MATCHLINE SHEET 4 -Y- STA. 29+50.00- RP A- S TA. 1 7 + 0 0. 0 0 M A TCH LI N E S H EET 4 NOTES:SEE SHEET 9 FOR -RPA- PROFILE.SEE SHEET 11 FOR -Y7- PROFILE.PAVEMENT REMOVAL PAVED SHOULDER 11/20/13 (AEV) DESIGN REVISION - REMOVED RETAINING WALL #3 FROM ALONG -Y-. 5/20/14 (ESM) DESIGN REVISION - CHANGED TYPICAL 12’ STANDARD ARTERIAL DITCH TO EXPRESSWAY GUTTER ON -RPA- FROM STA 15+72.67 TO 20+50.00 RT. FROM STA 15+72.67 TO 21+00.00 RIGHT OF CENTERLINE. 6/3/14 (RLC) DESIGN REVISION - EXTENDED THE LENGTH OF RETAINING WALLS #1 & #2 ALONG US 29-64-70/I-85 (-Y-). REVISED THE DITCH ALONG -RPA- 15 16 176LEROY LEETHOMAS DB 1758 PG 318PB 5 PG 25 7 18DEBRA LANIERJAMES EARL LANIER DB 1805 PG 1273 PB 5 PG 34 19YIM CHAU WU TAMHEI H. TAM DB 1235 PG 948 PB 5 PG 34 21LAKETA S. PETERSON DB 1393 PG 1195PB 5 PG 34 TODD. J. SURRATT DB 2012 PG 2079PB 5 PG 34 EVERHART, IIIROBERT L.BETTY E FRITTSJOHN MILTON FRITTS DB 507 PG 744 PB 5 PG 25 VIVIAN E. BROADWAY DB 514 PG 359PB 5 PG 25 3 0 + 0 0 3 5 + 0 0 40+00 15+00 -Y- PT Sta. 40+43.15 - R P A - T S S t a . 1 0 + 7 5 . 0 0 - R P A - P C S t a . 1 6 + 8 4 . 6 7 - R P A - S T S t a . 1 5 + 7 2 . 6 7 - R P A - C S S t a . 1 3 + 8 8 . 6 7 - R P A - S C S t a . 1 2 + 5 9 . 0 0 0 0 02 02 03 04 05 06 07 08 08 0 7 0 6 0 5 0 4 0 3 0 2 0 1 0 1 0 2 0 3 0 4 0 5 P I S t a 1 6 + 3 7 . 4 9 D L = 4 0 4 . 2 9 ’ T = 2 3 9 . 5 4 ’ R = 3 0 0 . 0 0 ’ 15 + 0 0 - Y 7 - 0 6 0 5 0 4 0 30 3 0 2 E X I S T 06 05 04 03 02 02 02 02 02 01 01 02 00 02 02 12’ PS02 02 12’ PS 3 0 0 ’ L A N E T A P E R +20.00 -Y- POC Sta. 39+00.00END CONSTRUCTION - R P A - P O T S t a . 1 0 + 0 0 . 0 0 , 3 6 . 0 0 ’ L T - Y - P O C S t a . 3 6 + 0 0 . 0 0 10’PS - Y - 2 3 ’ IN C IN C23’ 4 ’ P S 4 ’ P S 16 ’ 16’ 4’ P S 4’ P STAPER 10 0 ’ LAN E TAPER 100’ LANE + 5 0.0 0 - R P A - P I s S t a 1 1 + 9 7 . 8 2 F L s = 1 8 4 . 0 0 ’ L T = 1 2 2 . 8 2 ’ S T = 6 1 . 4 8 ’ P I S t a 1 3 + 2 4 . 1 0 D L = 1 2 9 . 6 7 ’ T = 6 5 . 1 0 ’ R = 5 8 7 . 0 0 ’ P I s S t a 1 4 + 5 0 . 1 5 F L s = 1 8 4 . 0 0 ’ L T = 1 2 2 . 8 2 ’ S T = 6 1 . 4 8 ’ P I S t a 1 8 + 8 6 . 3 5 D L = 3 7 8 . 6 1 ’ T = 2 0 1 . 6 8 ’ R = 4 4 4 . 0 0 ’ P I S t a 2 5 + 5 8 . 7 8 D L = 3 , 0 4 3 . 1 5 ’ T = 1 , 5 5 8 . 7 8 ’ R = 5 , 7 0 0 . 0 0 ’ - Y - S E = . 0 8 S E = . 0 8 S E = . 0 6 EXIST-Y7- POT Sta. 10+00.00BEGIN CONSTRUCTION 20’ - Y 7 - P C S t a . 1 3 + 9 7 . 9 5 1 8 ’ I N C +90.28 REPAT ENAL ’051 + 00.00 TR & TL 2 0’ 3 0’ - Y 7 - P T S t a . 1 8 + 0 2 . 2 3 - Y 7 - P O T S t a . 1 8 + 5 3 . 5 7 E N D C O N S T R U C T I O N 18’ INC + 6 5. 9 0 A T - 1 -Y- STA 39+00.00EXISTING GUARDRAILTIE TO EXIST EXIST MILL AND OVERLAY M ILL A N D O V E R L A Y 4’ 4’ A T - 1 A T - 1 AT-1 AT-1 S E = E X I S T EXISTING FENCEREMOVE TO BE REMOVED T L - 2 G RAU 3 5 0 T L -2 G R A U 3 5 0 1 5 1 6 1 7 1 8 1 9 2 0 2 1 2 2 2 3 2 4 2 5 2 6 6 7 E X R / W E X R / W E X R / W E X R / W E X R / W E X R / W E X R / W E X R / W E X R / W E X R / W EX R/W 6 0 . 0 0 ’ R T 6 0 . 0 0 ’ R T 6 0 . 0 0 ’ R T 4 0 . 0 0 ’ R T EX R/W 1 4 5 . 0 0 ’ L T - Y - 3 4 + 4 9 . 0 0 - Y - 3 4 + 7 8 . 0 0 E X R / W 1 4 6 . 0 0 ’ R T E X R / W 1 4 6 . 0 0 ’ R T 1 1 8 . 0 0 ’ R T 6 4 . 0 0 ’ R T 4 0 . 0 0 ’ R T - Y - 3 4 + 5 8 . 6 9 - Y - 3 4 + 6 8 . 9 5 - Y - 2 9 + 8 6 . 0 1 - Y - 3 0 + 5 4 . 2 6 - Y - 3 1 + 0 6 . 0 5 - Y - 3 2 + 1 8 . 6 9 - Y - 3 3 + 1 0 . 3 2 - Y - 3 3 + 8 7 . 0 7 - Y - 3 4 + 5 8 . 6 3 - Y - 3 4 + 6 8 . 8 7 - Y - 3 6 + 1 4 . 8 2 - Y - 3 6 + 3 2 . 5 8 -Y- 39+10.48 - Y 7 - 1 8 + 5 1 . 4 8 - Y 7 - 1 8 + 0 2 . 2 3 - Y 7 - 1 3 + 9 7 . 9 5 - Y 7 - 1 2 + 8 5 . 0 0 - Y - 3 8 + 2 0 . 0 0 END C/A - R P A - 1 3 + 8 8 . 6 7 5 5 . 0 0 ’ R T - Y - 3 7 + 5 0 . 0 0 8 5 . 7 7 ’ L T - Y - 3 6 + 0 0 . 0 0 9 0 . 0 0 ’ L T - Y - 3 4 + 0 0 . 0 0 - Y - 3 3 + 5 0 . 0 0 1 0 6 . 0 0 ’ L T - Y 7 - 1 7 + 0 8 . 5 9 6 0 . 0 0 ’ L T - Y - 3 7 + 4 3 . 3 6 E X R / W - Y - 3 5 + 4 0 . 5 1 E X R / W CHAIN LINK FENCEBLACK VINYLEND 48" 9 9 . 0 0 ’ L T - Y 7 - 1 8 + 5 1 . 3 7 6 0 . 0 0 ’ L T - R P A - 1 6 + 0 6 . 3 8 1 0 0 . 0 0 ’ R T - R P A - 1 6 + 8 4 . 6 7 1 0 0 . 0 0 ’ R T - Y 7 - 1 3 + 5 5 . 0 0 - Y 7 - 1 3 + 0 4 . 0 0 - Y 7 - 1 2 + 3 5 . 0 0 1 4 6 . 0 0 ’ 1 4 6 . 0 0 ’ E N D C / A F E N C E C H A I N L I N K B L A C K V I N Y L E N D 4 8 " C H O RD C H O RD C H O RD C H O R D CHO RD - Y 7 - 1 8 + 0 2 . 2 3 6 0 . 0 0 ’ L T P R O P R / W - R P A - 1 6 + 8 4 . 6 7 7 0 . 0 0 ’ R T G RAD E TO D RA IN 36" WELDED STEEL INSTALLATION TRENCHLESS 3 6 " W ELD ED S TE EL IN S T A L L A T I O N T R E N C H L E S S F S F S & F I L L P L U G & F I L L P L U G & F I L L P L U G F S RETAIN RETAIN 0 7 0 1 0 7 0 2 0 7 0 3 0 7 0 4 0 7 0 5 0 7 0 6 0 7 0 7 0 7 0 9 0 7 1 0 0 7 1 1 0 7 1 2 0 7 0 8 2G I-A 2 G I-A 2 G I - A 2 G I - A 2 G I - A 2 G I - A 2 G I - A 2 G I - A 2 G I - A 2 G I - A 2 G I - N G 18 " RC P - I I I 36" RCP-III 3 6" RC P-III 1 8 " RC P -III 18" R C P-III 2 4" RC P-III 24" RCP-III 2 4 " RC P - I I I RETA IN FS P PP PP P P 18" RCP-III 3 0 S Y G E O T E X T I L E E S T . 1 5 T O N S C L A S S ’ I ’ R I P R A P B I L L B O A R D 12 " R C P 15 " R C P 12 " R C P 36" RCP 36" RCP 36" RCP 24" RCP 18" RCP24" RCP 8 " C L A Y 8 " C L A Y 8 " C LAY 8 " C L A Y 8" CLAY B A R R IE R B A R RIE R 1 8 " R C P C O N C C O N C C O N C G 48" CHL 4 8 " C H L 48" CHL 4 8 " C H L 72" CHL 4 8 " C H L 72" CHL 72" CHL 7 2 " C H L 4 8 " C H L C O N C P O L E F L A G G 1 S BK D CONC FOOT BRIDGE W/ CHL M T L M T L M T L M T L S G R V BARRIER CONC S 0645’41" W 129.40’ S 0645’41" W 130.00’ 10’ DRAINAGE EASEMENT S 0645’41" W 129.10’ S 0350’14" W 126.41’ NADIA SEENANAN ET UX RAJKUMAR DYAL SEENANAN DB 1144 PG 713 PB 11 PG 89 S 4 0 0 8’ 0 5" W 10 5. 5 3’S 3821’55" E114.00’S 5138’05" W124.69’S 3 8 2 1’ 5 5 " E 18 . 6 8 ’ S 0812’08" W 129.22’ S 20 59 ’31" W 131.23 ’S 5124’11" W126.40’ S 1139’11" W 46.80’ S 3421’49" E 150.00’ E I P E I P E I P N 0 2 18 ’ 11" W 2 5 . 0 0 ’ N 8 7 4 1’ 4 9 " E 8 0 . 0 0 ’ N 8 7 4 1’ 4 9 " E 7 0 . 0 0 ’ N 8 8 0 2 ’ 4 5 " E 2 4 . 7 2 ’ N 8 7 3 1’ 3 5 " E 10 2 . 8 0 ’ N 00 25’14" W 100.00’ E I P E I P E I P E I P E I P N 2 6 5 4 ’3 0 " E 6 2. 6 7 ’ S 8 4 4 0 ’ 5 3 " E 3 7 8 . 6 3 ’ N 2654’30" E 458.06’ E I P E I P E I P E I P E I P E I P E I P EXISTING R/W EXISTING R/W D I E I P E I P E I P EXISTING R/W EXISTING R/W N 8 7 5 9 ’ 0 7 " E 14 7 . 2 5 ’ N 8 8 16 ’ 2 9 " E 14 3 . 9 7 ’ 1 S B K D 1 S F D N 02 18’11" W 107.91’ N 02 18’11" W 115.27’ 2 . 0 0 ’ N 2 6 5 4 ’3 0 " E 19 7. 8 4 ’ N 00 25’14" W 65.27’ E X IS T IN G R / W EXISTING R/WEXISTING R/W E X I S T I N G R / W E X IS T IN G R / W U S 2 9 / 7 0 B U S 8 5 N . B O U N D 2 4 ’ B S T US 2 9 / 7 0 B U S 8 5 S . B O U N D 2 4 ’ B S T BY-9 BY-10 D I EOI 6"STL 6 " S T L 6"DI 6"DI E O I 2"STL 6"STL 6"CI 6"DI 3 / 4 " P L 3 / 4 " S T L 24" C&G24" C&G 48" CHLMTLMTLMTLCONC.DI D B 7 8 7 P G 9 6 3 P B 1 1 P G 8 9 G A R Y S . C O O P E R P B 1 1 P G 8 9 D B 1 3 4 1 P G 4 3 L A R R Y H I C K S P B 1 1 P G 8 9 P B 1 1 P G 8 9 D B 1 5 2 2 P G 1 8 5 5 J E F F E R Y V O N C A U D L E S A N D R A D A V I S D B 1 1 2 6 P G 9 5 8 P B 1 1 P G 8 9 P H Y L L I S J . B A R K E R A N D W I F E J O H N N Y L E E B A R K E R D B 4 4 9 P G 3 2 3 P B 1 1 P G 8 9 ELEV=781.59’E=1630122N=761288BM#2 N 02 09’45" W 150.15’ E I P E I P N 8 7 5 2 ’ 18 " E 7 5 . 0 1’ A X L E E I P E I P E I P E I P E I P 24.55’ N 02 38’37" W 24.55’24.55’ 2.18’ EIP TO R/W N 02 06’05" W 99.04’S 8 7 4 6 ’ 0 3 " W 14 9 . 9 7 ’ S 8 7 4 6 ’ 0 3 " W 14 9 . 5 3 ’ S 8 7 5 2 ’ 18 " W 14 9 . 4 3 ’ 1 S F D CONC 36" 1 S F D G R 36" CONC 1 S F D B S T CANOPY BST C O N C 1 S F D 4 8 " W D SS 48" CHL 7 2 " W D 7 2 " W D 1 S F D 4 8 " C O N C C O N C G R S S S S 4 8 " C H L G R 1 S F D W D EXISTING R/W EXISTING R/W 15 0 . 5 2 ’ N 8 8 11’ 0 0 " E 62.50’S 0149’00" E N 8 8 11’ 0 0 " E 15 0 . 18 ’ 98.80’S 0149’00" E E I P E I P E X I S T I N G R / W E X I S T I N G R / W C O N C 4 8 " 6 " D I 6"DI 6"DI 2"STL 6"STL 6 " S T L 6"STL 2"STL E O I EOI 2 " S T L 8 " C L A Y 8" CLAY (DATUR)END UNKNOW N G R E G O R Y N O R M A N J O N E S D B 2 0 3 7 P G 1 6 3 9 P B 5 P G 3 4 D B 1 4 4 8 P G 8 7 4 P B 5 P G 3 4 P B 5 P G 3 4 D B 1 9 8 3 P G 4 5 5 D A V I D T O D D H U N T P B 5 P G 3 4 D B 1 1 4 8 P G 7 6 4 H . C L A Y K O O N T S H O L M A N S T E W A R T J A N E T F A Y E H O L M A N H O M E R R O G E R H O L M A N , J R . R O Y B A C E L D B 9 2 3 P G 1 3 8 P B 5 P G 3 4 H I L D A W . F L Y N T D B 8 4 0 P G 1 1 5 0 P B 5 P G 3 4 D B 1 1 1 0 P G 4 2 1 G R U B B H O L D I N G S C O M P A N Y , L L C D B 7 5 4 P G 1 0 5 0 C A R O L E . M c C A N D I E S D B 1 3 5 8 P G 1 2 1 2 1 6 4 . 2 0 ’ + 8 6 . 9 6 1 2 9 . 9 4 ’ + 1 7 . 1 0 1 2 9 . 8 6 ’ + 1 3 . 2 7 1 2 9 . 6 4 ’ + 8 8 . 2 7 1 2 9 . 2 3 ’ + 6 3 . 2 1 1 2 9 . 3 3 ’ + 4 1 . 4 7 1 3 2 . 0 3 ’ + 6 0 . 6 9 1 2 9 . 5 8 ’ + 4 7 . 5 3 7 . 3 4 ’ + 3 6 . 2 4 2 . 6 3 ’ + 7 2 . 0 7 1 . 8 7 ’ + 9 7 . 6 6 2 1 . 1 9 ’ + 7 6 . 0 8 2 9 . 6 5 ’ + 2 6 . 2 2 E L I Z A B E T H H . I N A B I N E T T D A V I D E . I N A B I N E T T R O S A R . T E R R Y R O N A L D T E R R Y H A G G I T H A . M O N Y O Y A J U A N A . M O N T O Y A R A I L 4 8 ’ S P L IT C C C C C C C C C C F C C C F F F C C C C C C C C C C C C C C F F C C C C C C C C C C C C C F C C C C NAD 83/ NSRS 2007 HYDRAULICSROADWAY DESIGN ENGINEERENGINEER R/W SHEET NO.SHEET NO.PROJECT REFERENCE NO.X-1B-3159 26-JUN-2014 14:11 R:\Roadway\Proj\B3159_Rdy_psh_XSC INDEX.dgn $$$$USERNAME$$$$8/17/99 DO NOT USE FOR CONSTRUCTIONPRELIMINARY PLANS C R O S S S E C T I O N I N D E X - L - - Y - - R P A - - L P A - - R P C - - L P C - - Y 3 - - Y 7 - - Y 2 - X - 2 T H R U X - 1 0 X - 1 1 X - 1 2 T H R U X - 2 2 X - 2 3 T H R U X - 2 7 X - 2 8 T H R U X - 3 0 X - 3 1 T H R U X - 3 5 X - 3 6 T H R U X - 3 7 X - 3 8 T H R U X - 3 9 X - 4 0 T H R U X - 4 1 0000 1 0 1 0 1 0 1 0 2 0 2 0 2 0 2 0 3 0 3 0 3 0 3 0 4 0 4 0 4 0 4 0 50 5 0 50 5 0 60 6 0 60 6 0 70 7 0 70 7 0 80 8 0 80 8 0 90 9 0 90 9 0 100 1 0 0 100 1 0 0 110 1 1 0 110 1 1 0 120 1 2 0 120 1 2 0 130 1 3 0 130 1 3 0 140 1 4 0 140 1 4 0 150 1 5 0 150 1 5 0 26-JUN-2014 14:11 R:\Roadway\CorridorModeling\B3159_Rdy_xpl_l.dgn $$$$USERNAME$$$$8/23/99 PROJ. REFERENCE NO.SHEET NO.0 7 9 0 790 8 0 0 800 7 8 0 780 7 + 0 0 . 0 0 7 9 0 790 8 0 0 800 7 8 0 780 7 + 5 0 . 0 0 7 9 0 790 8 0 0 800 7 8 0 780 7 + 7 5 . 0 0 7 9 0 790 8 0 0 800 7 8 0 780 8 + 0 0 . 0 0 7 9 0 790 8 0 0 800 7 8 0 780 8 + 5 0 . 0 0 7 9 0 790 8 0 0 800 7 8 0 780 9 + 0 0 . 0 0 X-2B-3159 - L - 510 DO NOT USE FOR CONSTRUCTIONPRELIMINARY PLANS 7 9 1 . 1 1 7 9 0 . 1 7 7 8 9 . 5 5 4 :1 0 . 0 2 0 789.85 7 8 9 . 4 9 4 :1 0 . 0 2 0 7 8 7 . 6 4 5.62:10.0080.023789.74 0 . 0 2 0 7 8 7 . 1 6 4.55:1 4 : 1 0 . 0 1 0 0 . 0 1 1 787.90 786.71 0 . 0 2 0 0000 1 0 1 0 1 0 1 0 2 0 2 0 2 0 2 0 3 0 3 0 3 0 3 0 4 0 4 0 4 0 4 0 50 5 0 50 5 0 60 6 0 60 6 0 70 7 0 70 7 0 80 8 0 80 8 0 90 9 0 90 9 0 100 1 0 0 100 1 0 0 110 1 1 0 110 1 1 0 120 1 2 0 120 1 2 0 130 1 3 0 130 1 3 0 140 1 4 0 140 1 4 0 150 1 5 0 150 1 5 0 26-JUN-2014 14:11 R:\Roadway\CorridorModeling\B3159_Rdy_xpl_l.dgn $$$$USERNAME$$$$8/23/99 PROJ. REFERENCE NO.SHEET NO.0 7 9 0 790 8 0 0 800 7 8 0 780 9 + 5 0 . 0 0 7 8 0 780 7 9 0 790 8 0 0 800 7 7 0 770 1 0 + 0 0 . 0 0 7 8 0 780 7 9 0 790 8 0 0 800 7 7 0 770 1 0 + 5 0 . 0 0 7 8 0 780 7 9 0 790 8 0 0 800 7 7 0 770 1 1 + 0 0 . 0 0 7 8 0 780 7 9 0 790 8 0 0 800 7 7 0 770 1 1 + 5 0 . 0 0 X-3B-3159 - L - 510 7 8 5 . 0 3 4 .0 5 :1 0 . 0 1 9 0 . 0 1 9 786.82 0 . 0 2 0 7 8 4 . 8 2 0 . 0 2 0 0 . 0 2 0 7 8 5 . 0 8 0 . 0 2 0 0 . 0 2 0 7 8 5 . 1 8 3:1 0 . 0 2 0 0 . 0 2 0 787.23 7 8 5 . 7 7 3:1 2:1 0 . 0 2 0 0 . 0 2 0 788.21 787.65 0000 1 0 1 0 1 0 1 0 2 0 2 0 2 0 2 0 3 0 3 0 3 0 3 0 4 0 4 0 4 0 4 0 50 5 0 50 5 0 60 6 0 60 6 0 70 7 0 70 7 0 80 8 0 80 8 0 90 9 0 90 9 0 100 1 0 0 100 1 0 0 110 1 1 0 110 1 1 0 120 1 2 0 120 1 2 0 130 1 3 0 130 1 3 0 140 1 4 0 140 1 4 0 150 1 5 0 150 1 5 0 26-JUN-2014 14:11 R:\Roadway\CorridorModeling\B3159_Rdy_xpl_l.dgn $$$$USERNAME$$$$8/23/99 PROJ. REFERENCE NO.SHEET NO.0 7 8 0 780 7 9 0 790 8 0 0 800 7 7 0 770 1 1 + 9 0 . 0 0 7 8 0 780 7 9 0 790 8 0 0 800 7 7 0 770 1 2 + 0 0 . 0 0 7 8 0 780 7 9 0 790 8 0 0 800 7 7 0 770 1 2 + 5 0 . 0 0 7 8 0 780 7 9 0 790 8 0 0 800 7 7 0 770 1 2 + 6 3 . 0 0 7 8 0 780 7 9 0 790 8 0 0 800 7 7 0 770X-4B-3159 - L - 510 B E G I N B R I D G E - L - S T A 1 2 + 6 6 . 9 7 7 8 5 . 7 7 2:1 2:1 0 . 0 2 0 0 . 0 2 0 789.28 788.73 7 8 5 . 8 5 2:1 2:1 0 . 0 2 0 0 . 0 2 0 789.55 789.08 7 8 5 . 5 4 2:1 2:1 0 . 0 2 0 0 . 0 2 0 790.93 790.79 7 8 1 . 3 7 2:1 2:1 0 . 0 2 0 0 . 0 2 0 791.27 791.13 7 8 1 . 1 1 0 . 0 2 0 0 . 0 2 0 0000 1 0 1 0 1 0 1 0 2 0 2 0 2 0 2 0 3 0 3 0 3 0 3 0 4 0 4 0 4 0 4 0 50 5 0 50 5 0 60 6 0 60 6 0 70 7 0 70 7 0 80 8 0 80 8 0 90 9 0 90 9 0 100 1 0 0 100 1 0 0 110 1 1 0 110 1 1 0 120 1 2 0 120 1 2 0 130 1 3 0 130 1 3 0 140 1 4 0 140 1 4 0 150 1 5 0 150 1 5 0 26-JUN-2014 14:11 R:\Roadway\CorridorModeling\B3159_Rdy_xpl_l.dgn $$$$USERNAME$$$$8/23/99 PROJ. REFERENCE NO.SHEET NO.0 7 7 0 770 7 8 0 780 7 9 0 790 8 0 0 800 7 6 0 760 1 3 + 0 0 . 0 0 7 7 0 770 7 8 0 780 7 9 0 790 8 0 0 800 7 6 0 760 1 3 + 5 0 . 0 0 7 7 0 770 7 8 0 780 7 9 0 790 8 0 0 800 7 6 0 760 1 4 + 0 0 . 0 0 7 7 0 770 7 8 0 780 7 9 0 790 8 0 0 800 7 6 0 760X-5B-3159 - L - 510 E N D B R I D G E - L - S T A 1 4 + 1 6 . 4 7 7 6 9 . 3 7 0 . 0 2 0 0 . 0 2 0 7 6 9 . 6 5 0 . 0 2 0 0 . 0 2 0 7 7 3 . 5 9 0 . 0 2 0 0 . 0 2 0 7 8 0 . 4 6 0 . 0 2 0 0 . 0 2 0 0000 1 0 1 0 1 0 1 0 2 0 2 0 2 0 2 0 3 0 3 0 3 0 3 0 4 0 4 0 4 0 4 0 50 5 0 50 5 0 60 6 0 60 6 0 70 7 0 70 7 0 80 8 0 80 8 0 90 9 0 90 9 0 100 1 0 0 100 1 0 0 110 1 1 0 110 1 1 0 120 1 2 0 120 1 2 0 130 1 3 0 130 1 3 0 140 1 4 0 140 1 4 0 150 1 5 0 150 1 5 0 26-JUN-2014 14:11 R:\Roadway\CorridorModeling\B3159_Rdy_xpl_l.dgn $$$$USERNAME$$$$8/23/99 PROJ. REFERENCE NO.SHEET NO.0 7 7 0 770 7 8 0 780 7 9 0 790 8 0 0 800 7 6 0 760 1 4 + 2 1 . 0 0 7 8 0 780 7 9 0 790 8 0 0 800 7 7 0 770 1 4 + 4 3 . 2 2 7 8 0 780 7 9 0 790 8 0 0 800 7 7 0 770 1 4 + 4 3 . 2 4 7 8 0 780 7 9 0 790 8 0 0 800 7 7 0 770 1 4 + 5 0 . 0 0 X-6B-3159 - L - 510 7 8 0 . 7 9 2:1 2:1 0 . 0 2 0 0 . 0 2 0 792.44 792.30 7 8 6 . 4 3 2:1 2:1 0 . 0 2 0 0 . 0 2 0 792.15 792.01 7 8 6 . 4 3 2:1 2:1 0 . 0 2 0 0 . 0 2 0 792.15 792.01 7 8 5 . 8 6 2:1 2:1 0 . 0 2 0 0 . 0 2 0 792.04 791.90 0000 1 0 1 0 1 0 1 0 2 0 2 0 2 0 2 0 3 0 3 0 3 0 3 0 4 0 4 0 4 0 4 0 50 5 0 50 5 0 60 6 0 60 6 0 70 7 0 70 7 0 80 8 0 80 8 0 90 9 0 90 9 0 100 1 0 0 100 1 0 0 110 1 1 0 110 1 1 0 120 1 2 0 120 1 2 0 130 1 3 0 130 1 3 0 140 1 4 0 140 1 4 0 150 1 5 0 150 1 5 0 26-JUN-2014 14:12 R:\Roadway\CorridorModeling\B3159_Rdy_xpl_l.dgn $$$$USERNAME$$$$8/23/99 PROJ. REFERENCE NO.SHEET NO.0 7 8 0 780 7 9 0 790 8 0 0 800 7 7 0 770 1 4 + 7 0 . 0 0 7 7 0 770 7 8 0 780 7 9 0 790 8 0 0 800 7 6 0 760 1 5 + 0 0 . 0 0 7 7 0 770 7 8 0 780 7 9 0 790 8 0 0 800 7 6 0 760 1 5 + 2 0 . 0 0 7 8 0 780 7 9 0 790 8 0 0 800 7 7 0 770 1 5 + 5 0 . 0 0 X-7B-3159 - L - 510 7 8 5 . 6 8 2:1 2:1 0 . 0 2 0 0 . 0 2 0 791.66 791.52 7 8 5 . 5 0 2:1 2:1 0 . 0 2 0 0 . 0 2 0 790.86 790.77 7 8 5 . 1 0 2:1 0 . 0 2 0 0 . 0 2 0 790.22 790.16 3:1 7 8 4 . 5 0 3:1 2:1 0 . 0 2 0 0 . 0 2 0 789.15 789.09 0000 1 0 1 0 1 0 1 0 2 0 2 0 2 0 2 0 3 0 3 0 3 0 3 0 4 0 4 0 4 0 4 0 50 5 0 50 5 0 60 6 0 60 6 0 70 7 0 70 7 0 80 8 0 80 8 0 90 9 0 90 9 0 100 1 0 0 100 1 0 0 110 1 1 0 110 1 1 0 120 1 2 0 120 1 2 0 130 1 3 0 130 1 3 0 140 1 4 0 140 1 4 0 150 1 5 0 150 1 5 0 26-JUN-2014 14:12 R:\Roadway\CorridorModeling\B3159_Rdy_xpl_l.dgn $$$$USERNAME$$$$8/23/99 PROJ. REFERENCE NO.SHEET NO.0 7 8 0 780 7 9 0 790 8 0 0 800 7 7 0 770 1 6 + 0 0 . 0 0 7 8 0 780 7 9 0 790 7 7 0 770 1 6 + 5 0 . 0 0 7 8 0 780 7 9 0 790 7 7 0 770 1 7 + 0 0 . 0 0 7 8 0 780 7 9 0 790 7 7 0 770 1 7 + 5 0 . 0 0 7 8 0 780 7 9 0 790 8 0 0 800 7 7 0 770 1 8 + 0 0 . 0 0 7 8 0 780 7 9 0 790 8 0 0 800 7 7 0 770 1 8 + 5 0 . 0 0 X-8B-3159 - L - 510 7 8 4 . 6 8 3:1 3: 1 0 . 0 2 0 0 . 0 2 0 787.29 787.23 7 8 2 . 2 0 0 . 0 2 0 0 . 0 2 0 7 8 0 . 9 5 0 . 0 2 0 0 . 0 2 0 7 8 0 . 7 0 0 . 0 2 0 0 . 0 2 0 7 8 1 . 5 1 7 : 1 0 . 0 0 1 0 . 0 2 0 782.67 7 8 1 . 8 8 4:1 0 . 0 2 0 0 . 0 2 0 784.09 782.50 6 . 5 : 1 0000 1 0 1 0 1 0 1 0 2 0 2 0 2 0 2 0 3 0 3 0 3 0 3 0 4 0 4 0 4 0 4 0 50 5 0 50 5 0 60 6 0 60 6 0 70 7 0 70 7 0 80 8 0 80 8 0 90 9 0 90 9 0 100 1 0 0 100 1 0 0 110 1 1 0 110 1 1 0 120 1 2 0 120 1 2 0 130 1 3 0 130 1 3 0 140 1 4 0 140 1 4 0 150 1 5 0 150 1 5 0 26-JUN-2014 14:12 R:\Roadway\CorridorModeling\B3159_Rdy_xpl_l.dgn $$$$USERNAME$$$$8/23/99 PROJ. REFERENCE NO.SHEET NO.0 7 8 0 780 7 9 0 790 8 0 0 800 7 7 0 770 1 9 + 0 0 . 0 0 7 8 0 780 7 9 0 790 8 0 0 800 7 7 0 770 1 9 + 2 8 . 7 9 7 8 0 780 7 9 0 790 8 0 0 800 7 7 0 770 1 9 + 5 0 . 0 0 7 8 0 780 7 9 0 790 8 0 0 800 7 7 0 770 1 9 + 6 4 . 7 2 7 8 0 780 7 9 0 790 8 0 0 800 7 7 0 770 2 0 + 0 0 . 0 0 7 9 0 790 8 0 0 800 7 8 0 780 2 0 + 5 0 . 0 0 X-9B-3159 - L - 510 7 8 2 . 2 6 4:1 6 : 1 0 . 0 1 4 0 . 0 2 0 784.13 782.81 7 8 3 . 0 4 4:1 0 . 0 0 0 0 . 0 2 0 783.98 7 8 3 . 6 0 4:1 0 . 0 1 1 0 . 0 2 0 783.95 7 8 3 . 9 2 0 . 0 1 8 0 . 0 2 0 783.97 2 :1 7 8 4 . 7 4 0 .0 3 6 0 . 0 2 0 784.15 2 : 1 5 : 1 7 8 5 . 8 8 4 :1 11:1 0 .0 3 7 0 . 0 2 0 785.20 785.74 0000 1 0 1 0 1 0 1 0 2 0 2 0 2 0 2 0 3 0 3 0 3 0 3 0 4 0 4 0 4 0 4 0 50 5 0 50 5 0 60 6 0 60 6 0 70 7 0 70 7 0 80 8 0 80 8 0 90 9 0 90 9 0 100 1 0 0 100 1 0 0 110 1 1 0 110 1 1 0 120 1 2 0 120 1 2 0 130 1 3 0 130 1 3 0 140 1 4 0 140 1 4 0 150 1 5 0 150 1 5 0 26-JUN-2014 14:12 R:\Roadway\CorridorModeling\B3159_Rdy_xpl_l.dgn $$$$USERNAME$$$$8/23/99 PROJ. REFERENCE NO.SHEET NO.0 7 9 0 790 8 0 0 800 7 8 0 780 2 0 + 6 4 . 7 2 7 9 0 790 8 0 0 800 7 8 0 780 2 1 + 0 0 . 0 0 7 9 0 790 7 8 0 780 2 1 + 4 3 . 7 4 7 9 0 790 7 8 0 780 2 1 + 5 0 . 0 0 7 9 0 790 8 0 0 800 7 8 0 780 2 1 + 9 3 . 5 8 7 9 0 790 8 0 0 800 7 8 0 780 2 2 + 0 0 . 0 0 7 9 0 790 8 0 0 800 7 8 0 780 2 2 + 5 0 . 0 0 7 9 0 790 8 0 0 800 7 8 0 780 2 3 + 0 0 . 0 0 X-10B-3159 - L - 510 7 8 6 . 2 3 4 :1 0 . 0 3 0 0 . 0 2 0 785.74 786.04 15 :1 7 8 7 . 0 8 0 . 0 3 0 0 . 0 2 0 7 8 8 . 2 1 7 8 8 . 3 9 7 8 9 . 8 1 7 9 0 . 0 3 7 9 1 . 8 4 7 9 3 . 7 5 0000 1 0 1 0 1 0 1 0 2 0 2 0 2 0 2 0 3 0 3 0 3 0 3 0 4 0 4 0 4 0 4 0 50 5 0 50 5 0 60 6 0 60 6 0 70 7 0 70 7 0 80 8 0 80 8 0 90 9 0 90 9 0 100 1 0 0 100 1 0 0 110 1 1 0 110 1 1 0 120 1 2 0 120 1 2 0 130 1 3 0 130 1 3 0 140 1 4 0 140 1 4 0 150 1 5 0 150 1 5 0 26-JUN-2014 14:12 R:\Roadway\CorridorModeling\B3159_Rdy_xpl_Y2.dgn $$$$USERNAME$$$$8/23/99 PROJ. REFERENCE NO.SHEET NO.0 7 9 0 790 8 0 0 800 8 1 0 810 7 8 0 780 1 0 + 0 0 . 0 0 7 9 0 790 8 0 0 800 7 8 0 780 1 0 + 2 5 . 0 0 7 9 0 790 8 0 0 800 7 8 0 780 1 0 + 5 0 . 0 0 7 9 0 790 8 0 0 800 7 8 0 780 1 0 + 5 3 . 1 3 X-11B-3159 - Y 2 - 510 7 9 3 . 4 0 4 : 1 0 .0 5 0 0 . 0 2 5 792.67 792.72 7 9 2 . 2 9 4 :1 4 : 1 0 .0 5 0 0 . 0 2 5 791.55 791.60 7 9 1 . 1 5 4 :1 4 : 1 0 .0 5 0 0 . 0 2 5 790.44 790.49 7 9 1 . 0 1 4 :1 4 : 1 0 .0 4 8 0 . 0 2 3 790.32 790.41 0000 2 0 2 0 2 0 2 0 4 0 4 0 4 0 4 0 6 0 6 0 6 0 6 0 8 0 8 0 8 0 8 0 100 1 0 0 100 1 0 0 120 1 2 0 120 1 2 0 140 1 4 0 140 1 4 0 160 1 6 0 160 1 6 0 180 1 8 0 180 1 8 0 200 2 0 0 200 2 0 0 220 2 2 0 220 2 2 0 240 2 4 0 240 2 4 0 260 2 6 0 260 2 6 0 280 2 8 0 280 2 8 0 300 3 0 0 300 3 0 0 26-JUN-2014 14:12 R:\Roadway\CorridorModeling\B3159_Rdy_xpl_Y.dgn $$$$USERNAME$$$$8/23/99 PROJ. REFERENCE NO.SHEET NO.0 7 6 0 760 7 8 0 780 7 4 0 740 1 0 + 0 0 . 0 0 7 6 0 760 7 8 0 780 7 4 0 740 1 0 + 5 0 . 0 0 7 4 0 740 7 6 0 760 7 2 0 720 1 1 + 0 0 . 0 0 7 4 0 740 7 6 0 760 7 8 0 780 7 2 0 720 1 1 + 5 0 . 0 0 7 4 0 740 7 6 0 760 7 8 0 780 7 2 0 720 1 2 + 0 0 . 0 0 7 6 0 760 7 8 0 780 7 4 0 740 1 2 + 5 0 . 0 0 7 6 0 760 7 8 0 780 7 4 0 740 1 3 + 0 0 . 0 0 X-12B-3159 - Y - 1020 7 5 5 . 5 7 7 5 4 . 8 6 7 5 5 . 1 8 7 5 2 . 8 7 4 : 1 6 :1 0 . 0 2 0 7 5 5 . 3 3 0 . 0 2 0 6 :1 4 : 1 2:1 7 5 3 . 9 2 7 5 6 . 3 4 0 . 0 2 0 6 :1 4 : 1 2:1 7 5 4 . 9 1 7 5 7 . 2 3 0 . 0 2 0 2:1 4 : 1 6 :1 7 5 5 . 8 4 7 5 8 . 2 4 0000 2 0 2 0 2 0 2 0 4 0 4 0 4 0 4 0 6 0 6 0 6 0 6 0 8 0 8 0 8 0 8 0 100 1 0 0 100 1 0 0 120 1 2 0 120 1 2 0 140 1 4 0 140 1 4 0 160 1 6 0 160 1 6 0 180 1 8 0 180 1 8 0 200 2 0 0 200 2 0 0 220 2 2 0 220 2 2 0 240 2 4 0 240 2 4 0 260 2 6 0 260 2 6 0 280 2 8 0 280 2 8 0 300 3 0 0 300 3 0 0 26-JUN-2014 14:12 R:\Roadway\CorridorModeling\B3159_Rdy_xpl_Y.dgn $$$$USERNAME$$$$8/23/99 PROJ. REFERENCE NO.SHEET NO.0 7 6 0 760 7 8 0 780 7 4 0 740 1 3 + 5 0 . 0 0 7 6 0 760 7 8 0 780 7 4 0 740 1 4 + 0 0 . 0 0 7 6 0 760 7 8 0 780 8 0 0 800 7 4 0 740 1 4 + 5 0 . 0 0 7 6 0 760 7 8 0 780 8 0 0 800 7 4 0 740 1 5 + 0 0 . 0 0 7 6 0 760 7 8 0 780 8 0 0 800 7 4 0 740 1 5 + 5 0 . 0 0 7 6 0 760 7 8 0 780 8 0 0 800 7 4 0 740 1 6 + 0 0 . 0 0 X-13B-3159 - Y - 1020 4 : 1 2:1 6 :1 7 5 6 . 7 5 0 . 0 2 0 7 5 9 . 1 8 0 . 0 2 0 6 :1 4 : 1 7 5 7 . 5 8 2:1 7 5 9 . 7 2 0 . 0 2 0 1 0 + 0 0 . 0 0 - R P C - 2:1 4 : 1 6 :1 7 5 8 . 6 4 7 6 0 . 5 0 7 5 9 . 2 8 4 : 1 2: 1 6 :1 0 . 0 2 0 1 0 + 4 9 . 7 3 - R P C - 7 6 1 . 7 8 0 . 0 2 0 1 0 + 9 9 . 4 2 - R P C - 2: 1 4 : 1 7 5 9 . 9 1 6 :1 7 6 2 . 2 7 2: 1 4 : 1 6 :1 7 6 0 . 1 7 0 . 0 3 2 1 1 + 4 9 . 1 1 - R P C - 7 6 2 . 9 3 0000 2 0 2 0 2 0 2 0 4 0 4 0 4 0 4 0 6 0 6 0 6 0 6 0 8 0 8 0 8 0 8 0 100 1 0 0 100 1 0 0 120 1 2 0 120 1 2 0 140 1 4 0 140 1 4 0 160 1 6 0 160 1 6 0 180 1 8 0 180 1 8 0 200 2 0 0 200 2 0 0 220 2 2 0 220 2 2 0 240 2 4 0 240 2 4 0 260 2 6 0 260 2 6 0 280 2 8 0 280 2 8 0 300 3 0 0 300 3 0 0 26-JUN-2014 14:12 R:\Roadway\CorridorModeling\B3159_Rdy_xpl_Y.dgn $$$$USERNAME$$$$8/23/99 PROJ. REFERENCE NO.SHEET NO.0 7 6 0 760 7 8 0 780 8 0 0 800 7 4 0 740 1 6 + 5 0 . 0 0 7 6 0 760 7 8 0 780 8 0 0 800 7 4 0 740 1 7 + 0 0 . 0 0 7 6 0 760 7 8 0 780 8 0 0 800 7 4 0 740 1 7 + 5 0 . 0 0 7 6 0 760 7 8 0 780 8 0 0 800 7 4 0 740 1 8 + 0 0 . 0 0 7 6 0 760 7 8 0 780 8 0 0 800 7 4 0 740 1 8 + 5 0 . 0 0 7 6 0 760 7 8 0 780 8 0 0 800 7 4 0 740 1 9 + 0 0 . 0 0 X-14B-3159 - Y - 1020 1 1 + 9 8 . 8 4 - R P C - 0 .0 5 3 6 :1 4 : 1 2:1 7 6 0 . 0 2 7 6 3 . 1 0 7 5 9 . 6 0 6 :1 4 :12:1 0 .0 7 6 1 2 + 4 8 . 7 6 - R P C - 0 . 0 2 0 2:1 7 6 2 . 9 3 2:1 0 . 0 2 0 1 2 + 9 9 . 1 5 - R P C - 0 .0 8 0 6:14:12:1 759.28 7 6 3 . 9 4 2:12:1 767.55 1 3 + 5 0 . 3 5 - R P C - 0 .0 8 0 6:14:1 759.25 0 . 0 2 0 2:1 2:1 7 6 4 . 3 7 2:1 770.102:1 2:1 0 . 0 2 0 7 6 2 . 1 8 4 : 1 6 :1 1 4 + 0 2 . 6 9 - R P C - 0.0806:14:1 759.622:1 7 6 4 . 4 1 2:1 772.722:1 S P = 7 6 0 . 3 8 D P = 7 6 0 . 2 7 6 :1 S P 0 . 0 2 0 2:1 7 6 4 . 7 3 0000 2 0 2 0 2 0 2 0 4 0 4 0 4 0 4 0 6 0 6 0 6 0 6 0 8 0 8 0 8 0 8 0 100 1 0 0 100 1 0 0 120 1 2 0 120 1 2 0 140 1 4 0 140 1 4 0 160 1 6 0 160 1 6 0 180 1 8 0 180 1 8 0 200 2 0 0 200 2 0 0 220 2 2 0 220 2 2 0 240 2 4 0 240 2 4 0 260 2 6 0 260 2 6 0 280 2 8 0 280 2 8 0 300 3 0 0 300 3 0 0 26-JUN-2014 14:12 R:\Roadway\CorridorModeling\B3159_Rdy_xpl_Y.dgn $$$$USERNAME$$$$8/23/99 PROJ. REFERENCE NO.SHEET NO.0 7 6 0 760 7 8 0 780 8 0 0 800 7 4 0 740 1 9 + 5 0 . 0 0 7 6 0 760 7 8 0 780 8 0 0 800 7 4 0 740 2 0 + 0 0 . 0 0 7 6 0 760 7 8 0 780 8 0 0 800 7 4 0 740 2 0 + 1 4 . 2 9 7 6 0 760 7 8 0 780 8 0 0 800 7 4 0 740 2 0 + 5 0 . 0 0 7 6 0 760 7 8 0 780 8 0 0 800 7 4 0 740 2 1 + 0 0 . 0 0 7 6 0 760 7 8 0 780 8 0 0 800 7 4 0 740 2 1 + 5 0 . 0 0 X-15B-3159 - Y - 1020 3:1 0 . 0 2 0 7 6 2 . 7 1 6 :1 4 : 1 2: 1 7 6 5 . 0 8 4 : 1 7 6 2 . 8 9 6 :1 0 . 0 2 0 4 : 1 7 6 5 . 1 9 4 : 1 0 . 0 2 0 6 :1 4 : 1 7 6 2 . 9 8 7 6 5 . 2 2 2: 1 4 : 1 6 :1 7 6 3 . 1 6 0 . 0 2 0 3: 1 7 6 1 . 2 2 4 :1 0 . 0 1 0 0 . 0 1 0 1 0 + 0 0 . 0 0 - Y 3 - 4 : 1 7 6 1 . 2 3 2:1 7 6 5 . 4 4 2:1 4 : 1 7 6 2 . 3 4 0 . 0 2 0 0 . 0 2 0 1 0 + 3 6 . 3 2 - Y 3 - 4 :1 4 : 1 7 6 2 . 6 0 0 . 0 2 0 6 :1 4 : 1 2: 1 7 6 3 . 3 2 7 6 5 . 5 7 6 :1 4 : 1 2: 1 7 6 3 . 5 1 0 . 0 2 0 7 6 3 . 3 2 4 : 1 4 :1 0 . 0 4 6 0 . 0 4 6 1 0 + 8 7 . 2 0 - Y 3 - 4 : 1 7 6 3 . 2 6 2:1 7 6 5 . 7 8 0000 2 0 2 0 2 0 2 0 4 0 4 0 4 0 4 0 6 0 6 0 6 0 6 0 8 0 8 0 8 0 8 0 100 1 0 0 100 1 0 0 120 1 2 0 120 1 2 0 140 1 4 0 140 1 4 0 160 1 6 0 160 1 6 0 180 1 8 0 180 1 8 0 200 2 0 0 200 2 0 0 220 2 2 0 220 2 2 0 240 2 4 0 240 2 4 0 260 2 6 0 260 2 6 0 280 2 8 0 280 2 8 0 300 3 0 0 300 3 0 0 26-JUN-2014 14:12 R:\Roadway\CorridorModeling\B3159_Rdy_xpl_Y.dgn $$$$USERNAME$$$$8/23/99 PROJ. REFERENCE NO.SHEET NO.0 7 6 0 760 7 8 0 780 8 0 0 800 7 4 0 740 2 2 + 0 0 . 0 0 7 6 0 760 7 8 0 780 8 0 0 800 7 4 0 740 2 2 + 5 0 . 0 0 7 6 0 760 7 8 0 780 8 0 0 800 7 4 0 740 2 3 + 0 0 . 0 0 7 6 0 760 7 8 0 780 8 0 0 800 7 4 0 740 2 3 + 5 0 . 0 0 7 6 0 760 7 8 0 780 8 0 0 800 7 4 0 740 2 4 + 0 0 . 0 0 7 6 0 760 7 8 0 780 8 0 0 800 7 4 0 740 2 4 + 5 0 . 0 0 X-16B-3159 - Y - 1020 2:1 4 : 1 7 6 4 . 4 7 0 . 0 7 5 0 . 0 7 5 1 1 + 3 8 . 1 1 - Y 3 - 4 :1 7 6 4 . 1 3 6 : 1 0 . 0 2 0 6 :1 7 6 3 . 8 1 4 : 1 2: 1 7 6 6 . 0 7 6 : 1 S P = 7 6 4 . 9 7 D P = 7 6 3 . 8 3 6 :1 S P 0 . 0 2 0 6 : 1 7 6 4 . 8 6 4 :1 2 :1 7 6 6 . 3 8 2 :1 4 :1 7 6 4 . 7 6 6 : 1 0 . 0 2 0 1 3 + 1 3 . 0 4 - L P C - 0 .0 7 6 764.91 2:1 7 6 6 . 7 3 4: 1 4 :1 7 6 3 . 1 7 0 .0 6 0 1 2 + 5 8 . 9 9 - L P C - 0 . 0 2 0 6 : 1 7 6 5 . 3 1 4 :1 2 :1 7 6 6 . 9 9 2 :14 :1 6 : 1 7 6 5 . 9 5 0 . 0 2 0 1 2 + 0 8 . 7 0 - L P C - 0 .0 4 0 3 :1 7 6 1 . 9 9 2:1 7 6 7 . 5 4 1 1 + 5 8 . 9 9 - L P C - 0 . 0 2 0 1 0 + 0 0 . 0 0 - L P A - 0 . 0 2 0 7 6 8 . 1 3 MSE WALL MSE WALL 0000 2 0 2 0 2 0 2 0 4 0 4 0 4 0 4 0 6 0 6 0 6 0 6 0 8 0 8 0 8 0 8 0 100 1 0 0 100 1 0 0 120 1 2 0 120 1 2 0 140 1 4 0 140 1 4 0 160 1 6 0 160 1 6 0 180 1 8 0 180 1 8 0 200 2 0 0 200 2 0 0 220 2 2 0 220 2 2 0 240 2 4 0 240 2 4 0 260 2 6 0 260 2 6 0 280 2 8 0 280 2 8 0 300 3 0 0 300 3 0 0 26-JUN-2014 14:12 R:\Roadway\CorridorModeling\B3159_Rdy_xpl_Y.dgn $$$$USERNAME$$$$8/23/99 PROJ. REFERENCE NO.SHEET NO.0 7 8 0 780 8 0 0 800 7 6 0 760 2 5 + 0 0 . 0 0 7 8 0 780 8 0 0 800 7 6 0 760 2 5 + 5 0 . 0 0 7 8 0 780 8 0 0 800 7 6 0 760 2 6 + 0 0 . 0 0 7 8 0 780 8 0 0 800 7 6 0 760 2 6 + 1 0 . 0 0 7 6 0 760 7 8 0 780 8 0 0 800 7 4 0 740 2 6 + 3 7 . 4 4 7 6 0 760 7 8 0 780 8 0 0 800 7 4 0 740 2 6 + 5 0 . 0 0 X-17B-3159 - Y - 1020 MSE WALL 0 . 0 2 0 1 0 + 5 0 . 3 2 - L P A - 1 1 + 0 9 . 3 1 - L P C - 0 . 0 2 0 MSE WALL 7 6 8 . 6 9 MSE WALL 0 . 0 2 0 1 0 + 5 9 . 6 2 - L P C - 1 1 + 0 0 . 6 3 - L P A - 0 . 0 2 0 MSE WALL 7 6 9 . 5 1 MSE WALL 0 . 0 2 0 1 1 + 5 0 . 9 5 - L P A - 1 0 + 0 9 . 9 4 - L P C - 0 . 0 2 0 MSE WALL 7 6 9 . 8 9 MSE WALL 0 . 0 2 0 1 0 + 0 0 . 0 0 - L P C - 1 1 + 6 1 . 0 2 - L P A - 0 . 0 2 0 MSE WALL 7 7 0 . 1 0 2:1 2:1 7 6 4 . 0 8 0 . 0 2 0 1 1 + 8 8 . 6 4 - L P A - 0 . 0 2 0 6 :1 4 : 1 2:1 7 6 7 . 0 7 7 7 0 . 4 4 6 :1 4 : 1 2:1 0 . 0 2 0 1 2 + 0 1 . 2 8 - L P A - 0 . 0 2 0 2:1 7 6 4 . 2 3 2:1 7 6 7 . 2 7 7 7 0 . 5 6 0000 2 0 2 0 2 0 2 0 4 0 4 0 4 0 4 0 6 0 6 0 6 0 6 0 8 0 8 0 8 0 8 0 100 1 0 0 100 1 0 0 120 1 2 0 120 1 2 0 140 1 4 0 140 1 4 0 160 1 6 0 160 1 6 0 180 1 8 0 180 1 8 0 200 2 0 0 200 2 0 0 220 2 2 0 220 2 2 0 240 2 4 0 240 2 4 0 260 2 6 0 260 2 6 0 280 2 8 0 280 2 8 0 300 3 0 0 300 3 0 0 26-JUN-2014 14:12 R:\Roadway\CorridorModeling\B3159_Rdy_xpl_Y.dgn $$$$USERNAME$$$$8/23/99 PROJ. REFERENCE NO.SHEET NO.0 7 8 0 780 8 0 0 800 7 6 0 760 2 7 + 0 0 . 0 0 7 8 0 780 8 0 0 800 7 6 0 760 2 7 + 5 0 . 0 0 7 8 0 780 8 0 0 800 7 6 0 760 2 8 + 0 0 . 0 0 7 8 0 780 8 0 0 800 7 6 0 760 2 8 + 5 0 . 0 0 7 8 0 780 8 0 0 800 7 6 0 760 2 9 + 0 0 . 0 0 7 8 0 780 8 0 0 800 7 6 0 760 2 9 + 5 0 . 0 0 X-18B-3159 - Y - 1020 2:1 3:1 7 6 6 . 0 3 0 . 0 2 7 1 2 + 5 1 . 7 0 - L P A - 0 . 0 2 0 6 :1 4 : 1 2: 1 7 6 8 . 0 4 7 7 0 . 9 7 6 :1 4 : 1 2: 1 0 . 0 2 0 1 3 + 0 2 . 9 5 - L P A - 0 . 0 5 0 4 : 1 4 :1 7 6 8 . 4 4 7 6 8 . 8 0 7 7 1 . 6 2 2 :1 770.56 0 . 0 6 8 1 3 + 5 8 . 2 3 - L P A - 0 . 0 2 0 6 :1 4 : 1 2:1 7 6 8 . 9 3 7 7 2 . 0 7 0 . 0 2 0 5 : 1 D P = 7 6 9 . 6 1 S P S P = 7 6 9 . 7 1 6 :1 4 : 1 7 7 1 . 5 1 7 7 2 . 3 1 0 . 0 2 0 6 : 1 7 7 0 . 9 6 4 :1 2 :1 6 :1 4 : 1 2:1 7 6 9 . 8 2 7 7 2 . 2 1 2 :14 :1 6 : 1 7 7 1 . 4 1 0 . 0 2 0 6 :1 4 : 1 2:1 7 7 0 . 3 4 7 7 2 . 5 9 0000 2 0 2 0 2 0 2 0 4 0 4 0 4 0 4 0 6 0 6 0 6 0 6 0 8 0 8 0 8 0 8 0 100 1 0 0 100 1 0 0 120 1 2 0 120 1 2 0 140 1 4 0 140 1 4 0 160 1 6 0 160 1 6 0 180 1 8 0 180 1 8 0 200 2 0 0 200 2 0 0 220 2 2 0 220 2 2 0 240 2 4 0 240 2 4 0 260 2 6 0 260 2 6 0 280 2 8 0 280 2 8 0 300 3 0 0 300 3 0 0 26-JUN-2014 14:12 R:\Roadway\CorridorModeling\B3159_Rdy_xpl_Y.dgn $$$$USERNAME$$$$8/23/99 PROJ. REFERENCE NO.SHEET NO.0 7 8 0 780 8 0 0 800 7 6 0 760 3 0 + 0 0 . 0 0 7 8 0 780 8 0 0 800 8 2 0 820 7 6 0 760 3 0 + 5 0 . 0 0 7 8 0 780 8 0 0 800 8 2 0 820 7 6 0 760 3 1 + 0 0 . 0 0 7 8 0 780 8 0 0 800 8 2 0 820 7 6 0 760 3 1 + 5 0 . 0 0 7 8 0 780 8 0 0 800 8 2 0 820 7 6 0 760 3 2 + 0 0 . 0 0 X-19B-3159 - Y - 1020 0 . 0 2 0 7 7 1 . 9 8 4 :1 6 : 1 2:1 6 :1 4 : 1 2:1 7 7 0 . 8 6 7 7 3 . 5 9 2:1 4 :1 6 : 1 7 7 2 . 6 4 0 . 0 2 0 6 :1 4 : 1 2:1 7 7 1 . 4 7 7 7 4 . 1 6 0 . 0 2 0 6 : 1 7 7 3 . 2 6 4 :1 2:1 6 :1 4 : 1 2:1 7 7 2 . 1 1 7 7 5 . 0 5 S P 0 . 0 2 0 3:1 6 : 1 4 :1 S P = 7 7 9 . 9 9 D P = 7 7 3 . 8 6 3: 1 6 :1 4 : 1 2:1 7 7 2 . 8 1 7 7 5 . 5 5 0 . 0 2 0 6 : 1 S P S P = 7 7 5 . 3 5 D P = 7 7 4 . 5 8 4 :1 4 : 1 6 :1 4 : 1 2:1 7 7 3 . 4 7 7 7 6 . 1 5 0000 2 0 2 0 2 0 2 0 4 0 4 0 4 0 4 0 6 0 6 0 6 0 6 0 8 0 8 0 8 0 8 0 100 1 0 0 100 1 0 0 120 1 2 0 120 1 2 0 140 1 4 0 140 1 4 0 160 1 6 0 160 1 6 0 180 1 8 0 180 1 8 0 200 2 0 0 200 2 0 0 220 2 2 0 220 2 2 0 240 2 4 0 240 2 4 0 260 2 6 0 260 2 6 0 280 2 8 0 280 2 8 0 300 3 0 0 300 3 0 0 26-JUN-2014 14:12 R:\Roadway\CorridorModeling\B3159_Rdy_xpl_Y.dgn $$$$USERNAME$$$$8/23/99 PROJ. REFERENCE NO.SHEET NO.0 7 8 0 780 8 0 0 800 8 2 0 820 7 6 0 760 3 2 + 1 2 . 0 0 7 8 0 780 8 0 0 800 8 2 0 820 7 6 0 760 3 2 + 5 0 . 0 0 7 8 0 780 8 0 0 800 8 2 0 820 7 6 0 760 3 3 + 0 0 . 0 0 7 8 0 780 8 0 0 800 8 2 0 820 7 6 0 760 3 3 + 5 0 . 0 0 7 8 0 780 8 0 0 800 8 2 0 820 7 6 0 760 3 4 + 0 0 . 0 0 X-20B-3159 - Y - 1020 6 : 1 0 . 0 2 0 S P = 7 7 4 . 8 7 D P = 7 7 4 . 7 0 4 :1 4 : 1 S P 6 :1 4 : 1 2:1 7 7 3 . 6 2 7 7 6 . 3 6 0 . 0 2 0 S P 6 : 1 6 :1 S P = 7 7 5 . 7 6 D P = 7 7 4 . 8 8 6 :1 4 : 1 2:1 7 7 4 . 0 7 7 7 6 . 8 7 2 :1 4 : 1 7 7 6 . 9 6 2:1 1 5 + 2 7 . 5 7 - Y 7 - 7 7 2 . 5 7 6: 1 1 3 + 0 6 . 8 2 - R P A - 6 :1 6 : 1 7 7 7 . 3 4 0 . 0 2 0 0 . 0 6 0 0 . 0 6 0 0 . 0 8 0 0 . 0 8 0 6 :1 4 : 1 2:1 7 7 4 . 7 6 7 7 7 . 7 9 S P = 7 7 8 . 6 7 S P 0 . 0 2 0 1 2 + 5 3 . 9 1 - R P A - 7 7 4 . 0 3 6 : 1 2:1 1 4 + 7 1 . 2 1 - Y 7 - 4 : 1 2:1 7 7 6 . 7 8 0 . 0 8 0 0 . 0 6 0 0 . 0 6 0 6 :1 4 : 1 2:1 7 7 5 . 4 4 7 7 8 . 3 9 2:1 4 : 1 7 7 7 . 1 9 1 4 + 1 8 . 5 8 - Y 7 - 3:1 6: 1 7 7 5 . 7 8 0 . 0 6 01 2 + 0 2 . 3 4 - R P A - 0 . 0 2 0 0 . 0 5 0 0 . 0 5 0 6 :1 4 : 1 2:1 7 7 6 . 1 4 7 7 8 . 8 1 0000 2 0 2 0 2 0 2 0 4 0 4 0 4 0 4 0 6 0 6 0 6 0 6 0 8 0 8 0 8 0 8 0 100 1 0 0 100 1 0 0 120 1 2 0 120 1 2 0 140 1 4 0 140 1 4 0 160 1 6 0 160 1 6 0 180 1 8 0 180 1 8 0 200 2 0 0 200 2 0 0 220 2 2 0 220 2 2 0 240 2 4 0 240 2 4 0 260 2 6 0 260 2 6 0 280 2 8 0 280 2 8 0 300 3 0 0 300 3 0 0 26-JUN-2014 14:12 R:\Roadway\CorridorModeling\B3159_Rdy_xpl_Y.dgn $$$$USERNAME$$$$8/23/99 PROJ. REFERENCE NO.SHEET NO.0 7 8 0 780 8 0 0 800 8 2 0 820 7 6 0 760 3 4 + 5 0 . 0 0 7 8 0 780 8 0 0 800 8 2 0 820 7 6 0 760 3 5 + 0 0 . 0 0 7 8 0 780 8 0 0 800 8 2 0 820 7 6 0 760 3 5 + 5 0 . 0 0 7 8 0 780 8 0 0 800 8 2 0 820 7 6 0 760 3 6 + 0 0 . 0 0 7 8 0 780 8 0 0 800 8 2 0 820 7 6 0 760 3 6 + 5 0 . 0 0 7 8 0 780 8 0 0 800 8 2 0 820 7 6 0 760 3 7 + 0 0 . 0 0 X-21B-3159 - Y - 1020 0 . 0 2 0 1 1 + 5 1 . 4 6 - R P A - 0 . 0 4 0 6: 1 7 7 6 . 6 2 4 :1 0 . 0 2 3 1 3 + 6 7 . 3 6 - Y 7 - 4 : 1 7 7 7 . 8 0 2:1 0 . 0 2 3 6 :1 4 : 1 2:1 7 7 7 . 2 9 7 7 9 . 4 5 4 : 1 2:1 7 7 8 . 1 5 0 . 0 2 0 1 3 + 1 6 . 2 6 - Y 7 - 4 :1 7 7 7 . 1 3 6 : 1 0 . 0 2 0 1 1 + 0 0 . 8 7 - R P A - 0 . 0 2 0 0 . 0 1 0 6 :1 4 : 1 2:1 7 7 8 . 2 7 7 7 9 . 4 6 0 . 0 2 0 0 . 0 2 0 1 0 + 5 0 . 4 1 - R P A - 7 7 7 . 5 4 6 : 1 4 :1 0 . 0 2 0 0 . 0 2 0 1 2 + 6 5 . 2 1 - Y 7 - 2:1 6 :1 4 : 1 7 7 9 . 2 9 3:1 7 8 0 . 5 1 7 7 8 . 7 3 2:1 4 : 1 0 . 0 2 0 0 . 0 2 0 1 2 + 1 4 . 2 1 - Y 7 - 4 :1 6 : 1 7 7 7 . 9 8 0 . 0 2 0 1 0 + 0 0 . 0 0 - R P A - 0 . 0 2 0 3:1 6 :1 4 : 1 7 8 0 . 3 0 7 8 1 . 3 7 4 :1 0 . 0 2 0 0 . 0 2 0 6 : 1 7 7 8 . 2 1 4 :1 1 1 + 6 3 . 2 4 - Y 7 - 0 . 0 2 0 0 . 0 2 0 2:1 4 : 1 7 7 8 . 4 9 7 8 0 . 7 0 4 : 1 7 8 2 . 0 4 2:1 4 : 1 7 7 7 . 5 6 0 . 0 2 0 0 . 0 2 0 1 1 + 1 2 . 3 0 - Y 7 - 4 :1 7 7 6 . 9 4 4 : 1 0 . 0 2 0 0 . 0 2 0 3 :1 7 8 2 . 6 9 0000 2 0 2 0 2 0 2 0 4 0 4 0 4 0 4 0 6 0 6 0 6 0 6 0 8 0 8 0 8 0 8 0 100 1 0 0 100 1 0 0 120 1 2 0 120 1 2 0 140 1 4 0 140 1 4 0 160 1 6 0 160 1 6 0 180 1 8 0 180 1 8 0 200 2 0 0 200 2 0 0 220 2 2 0 220 2 2 0 240 2 4 0 240 2 4 0 260 2 6 0 260 2 6 0 280 2 8 0 280 2 8 0 300 3 0 0 300 3 0 0 26-JUN-2014 14:12 R:\Roadway\CorridorModeling\B3159_Rdy_xpl_Y.dgn $$$$USERNAME$$$$8/23/99 PROJ. REFERENCE NO.SHEET NO.0 7 8 0 780 8 0 0 800 8 2 0 820 7 6 0 760 3 7 + 5 0 . 0 0 7 8 0 780 8 0 0 800 8 2 0 820 7 6 0 760 3 8 + 0 0 . 0 0 7 8 0 780 8 0 0 800 7 6 0 760 3 8 + 5 0 . 0 0 7 8 0 780 8 0 0 800 7 6 0 760 3 9 + 0 0 . 0 0 7 8 0 780 8 0 0 800 7 6 0 760 3 9 + 5 0 . 0 0 7 8 0 780 8 0 0 800 7 6 0 760 4 0 + 0 0 . 0 0 X-22B-3159 - Y - 1020 0 . 0 2 0 3 : 1 7 7 5 . 4 1 4 :1 0 . 0 2 0 0 . 0 2 0 1 0 + 6 1 . 3 8 - Y 7 - V A R 7 8 3 . 2 8 0 . 0 2 0 1 0 + 1 0 . 4 7 - Y 7 - 4 :12:1 7 7 4 . 9 5 2:1 0 . 0 2 0 0 . 0 2 0 V A R 7 8 3 . 9 6 0 . 0 2 0 2:1 7 8 4 . 5 3 0 . 0 2 0 V A R 7 8 5 . 1 2 7 8 5 . 6 8 7 8 6 . 2 6 0000 1 0 1 0 1 0 1 0 2 0 2 0 2 0 2 0 3 0 3 0 3 0 3 0 4 0 4 0 4 0 4 0 50 5 0 50 5 0 60 6 0 60 6 0 70 7 0 70 7 0 80 8 0 80 8 0 90 9 0 90 9 0 100 1 0 0 100 1 0 0 110 1 1 0 110 1 1 0 120 1 2 0 120 1 2 0 130 1 3 0 130 1 3 0 140 1 4 0 140 1 4 0 150 1 5 0 150 1 5 0 26-JUN-2014 14:12 R:\Roadway\CorridorModeling\B3159_Rdy_xpl_rpa.dgn $$$$USERNAME$$$$8/23/99 PROJ. REFERENCE NO.SHEET NO.0 7 7 0 770 7 8 0 780 7 9 0 790 8 0 0 800 7 6 0 760 1 3 + 5 0 . 0 0 7 7 0 770 7 8 0 780 7 9 0 790 8 0 0 800 7 6 0 760 1 3 + 8 8 . 6 7 7 7 0 770 7 8 0 780 7 9 0 790 8 0 0 800 7 6 0 760 1 4 + 0 0 . 0 0 7 7 0 770 7 8 0 780 7 9 0 790 8 0 0 800 7 6 0 760 1 4 + 5 0 . 0 0 X-23B-3159 - R P A - 510 6 :1 6 : 1 0 .0 8 0 0 .0 8 0 4 : 1 7 7 2 . 5 5 S P 2:1-Y7-15+39.79 2:14:1 776.980.0600.060 D P = 7 7 4 . 8 8 S P = 7 7 5 . 7 6 7 9 2 . 9 5 6 :1 0 .0 8 0 0 .0 8 0 4 : 1 7 7 2 . 1 7 S P 6 : 1 VAR.-Y7-15+73.97 2:1 4:1 777.470.0600.060 D P = 7 7 4 . 6 8 S P = 7 7 5 . 8 3 4 :1 7 9 3 . 8 4 6 :1 0 .0 7 5 0 .0 7 5 4 : 1 7 7 2 . 1 7 6 : 1 S P VAR.-Y7-15+84.00 2:1 4:1 777.670.0600.060 S P = 7 7 5 . 3 5 D P = 7 7 4 . 4 2 4 :1 7 9 4 . 0 8 6 :1 6 : 1 0 .0 5 3 0 .0 5 3 S P SP 6:1 D P = 7 7 1 . 5 3 SP=775.72 S P = 7 7 9 . 9 9 4 :1 2:1 D P = 7 7 3 . 8 9 7 9 4 . 3 8 0000 1 0 1 0 1 0 1 0 2 0 2 0 2 0 2 0 3 0 3 0 3 0 3 0 4 0 4 0 4 0 4 0 50 5 0 50 5 0 60 6 0 60 6 0 70 7 0 70 7 0 80 8 0 80 8 0 90 9 0 90 9 0 100 1 0 0 100 1 0 0 110 1 1 0 110 1 1 0 120 1 2 0 120 1 2 0 130 1 3 0 130 1 3 0 140 1 4 0 140 1 4 0 150 1 5 0 150 1 5 0 26-JUN-2014 14:12 R:\Roadway\CorridorModeling\B3159_Rdy_xpl_rpa.dgn $$$$USERNAME$$$$8/23/99 PROJ. REFERENCE NO.SHEET NO.0 7 7 0 770 7 8 0 780 7 9 0 790 8 0 0 800 7 6 0 760 1 5 + 0 0 . 0 0 7 8 0 780 7 9 0 790 8 0 0 800 7 7 0 770 1 5 + 5 0 . 0 0 7 8 0 780 7 9 0 790 8 0 0 800 7 7 0 770 1 5 + 7 2 . 6 7 7 8 0 780 7 9 0 790 8 0 0 800 7 7 0 770 1 6 + 0 0 . 0 0 X-24B-3159 - R P A - 510 6 :1 6 : 1 0 . 0 3 2 0 . 0 3 2 4 :1 7 7 4 . 1 7 SP 4:1 D P = 7 7 2 . 1 0 SP=775.62 2:1 7 9 4 . 5 3 6 :1 6 : 1 0 . 0 1 0 0 . 0 1 0 4 :1 7 7 4 . 2 6 4 : 1 7 7 3 . 7 2 2:1 2:1 7 9 4 . 5 9 6 : 1 0 . 0 0 0 0 . 0 0 0 4 :1 7 7 4 . 3 7 2:1 7 9 4 . 4 5 2:1 4 :1 6 : 1 0 . 0 1 2 0 . 0 1 2 4 :1 7 7 4 . 5 2 2:1 7 9 4 . 1 2 2:1 4 :1 0000 1 0 1 0 1 0 1 0 2 0 2 0 2 0 2 0 3 0 3 0 3 0 3 0 4 0 4 0 4 0 4 0 50 5 0 50 5 0 60 6 0 60 6 0 70 7 0 70 7 0 80 8 0 80 8 0 90 9 0 90 9 0 100 1 0 0 100 1 0 0 110 1 1 0 110 1 1 0 120 1 2 0 120 1 2 0 130 1 3 0 130 1 3 0 140 1 4 0 140 1 4 0 150 1 5 0 150 1 5 0 26-JUN-2014 14:12 R:\Roadway\CorridorModeling\B3159_Rdy_xpl_rpa.dgn $$$$USERNAME$$$$8/23/99 PROJ. REFERENCE NO.SHEET NO.0 7 8 0 780 7 9 0 790 8 0 0 800 7 7 0 770 1 6 + 5 0 . 0 0 7 8 0 780 7 9 0 790 8 0 0 800 7 7 0 770 1 6 + 8 4 . 6 7 7 8 0 780 7 9 0 790 8 0 0 800 7 7 0 770 1 7 + 0 0 . 0 0 7 8 0 780 7 9 0 790 8 0 0 800 7 7 0 770 1 7 + 5 0 . 0 0 X-25B-3159 - R P A - 510 6 : 1 0 . 0 3 4 0 . 0 3 4 4 :1 7 7 4 . 8 8 2:1 7 9 3 . 9 8 2:1 4 :1 6 : 1 0 . 0 4 9 0 . 0 4 9 4 :1 7 7 5 . 1 9 2:1 7 9 3 . 7 9 2:1 4 :1 6 : 1 0 . 0 5 5 0 . 0 5 5 4 :1 7 7 5 . 3 2 2:1 7 9 3 . 6 5 2:1 4 :1 0 . 0 7 7 0 . 0 7 7 S P 6 : 1 4 :1 3 :1 S P = 7 8 3 . 9 5 D P = 7 7 5 . 3 8 7 9 2 . 6 2 2:1 4 :1 0000 1 0 1 0 1 0 1 0 2 0 2 0 2 0 2 0 3 0 3 0 3 0 3 0 4 0 4 0 4 0 4 0 50 5 0 50 5 0 60 6 0 60 6 0 70 7 0 70 7 0 80 8 0 80 8 0 90 9 0 90 9 0 100 1 0 0 100 1 0 0 110 1 1 0 110 1 1 0 120 1 2 0 120 1 2 0 130 1 3 0 130 1 3 0 140 1 4 0 140 1 4 0 150 1 5 0 150 1 5 0 26-JUN-2014 14:12 R:\Roadway\CorridorModeling\B3159_Rdy_xpl_rpa.dgn $$$$USERNAME$$$$8/23/99 PROJ. REFERENCE NO.SHEET NO.0 7 8 0 780 7 9 0 790 8 0 0 800 7 7 0 770 1 8 + 0 0 . 0 0 7 8 0 780 7 9 0 790 8 0 0 800 8 1 0 810 7 7 0 770 1 8 + 5 0 . 0 0 7 8 0 780 7 9 0 790 8 0 0 800 8 1 0 810 7 7 0 770 1 9 + 0 0 . 0 0 7 8 0 780 7 9 0 790 8 0 0 800 8 1 0 810 7 7 0 770 1 9 + 5 0 . 0 0 X-26B-3159 - R P A - 510 6 : 1 0 . 0 8 0 0 . 0 8 0 S P 4 :1 3 :1 3: 1 S P = 7 7 7 . 2 5 D P = 7 7 5 . 4 4 D P = 7 7 4 . 8 2 7 9 0 . 9 8 2:1 4 :1 8 : 1 0 . 0 8 0 0 . 0 8 0 S P S P = 7 7 6 . 5 2 D P = 7 7 5 . 6 7 7 8 9 . 5 6 2:1 4 :1 0 . 0 6 3 0 . 0 6 3 S P 6: 1 D P = 7 7 7 . 3 9 S P = 7 7 7 . 8 6 7 8 5 . 9 4 2:1 4 :1 6 : 1 0 . 0 4 2 0 . 0 4 2 6 :1 7 7 9 . 2 2 - L P A - 1 7 + 0 2 . 0 2 2:1 0 . 0 5 0 0 . 0 5 0 7 8 5 . 1 4 2:1 4 :1 0000 1 0 1 0 1 0 1 0 2 0 2 0 2 0 2 0 3 0 3 0 3 0 3 0 4 0 4 0 4 0 4 0 50 5 0 50 5 0 60 6 0 60 6 0 70 7 0 70 7 0 80 8 0 80 8 0 90 9 0 90 9 0 100 1 0 0 100 1 0 0 110 1 1 0 110 1 1 0 120 1 2 0 120 1 2 0 130 1 3 0 130 1 3 0 140 1 4 0 140 1 4 0 150 1 5 0 150 1 5 0 26-JUN-2014 14:12 R:\Roadway\CorridorModeling\B3159_Rdy_xpl_rpa.dgn $$$$USERNAME$$$$8/23/99 PROJ. REFERENCE NO.SHEET NO.0 7 8 0 780 7 9 0 790 8 0 0 800 8 1 0 810 7 7 0 770 2 0 + 0 0 . 0 0 7 8 0 780 7 9 0 790 8 0 0 800 8 1 0 810 7 7 0 770 2 0 + 5 0 . 0 0 7 8 0 780 7 9 0 790 8 0 0 800 8 1 0 810 7 7 0 770 2 0 + 6 3 . 2 8 7 8 0 780 7 9 0 790 8 0 0 800 8 1 0 810 7 7 0 770 2 1 + 0 0 . 0 0 X-27B-3159 - R P A - 510 6 : 1 0 . 0 2 0 0 . 0 2 0 7 8 0 . 7 8 6 :1 - L P A - 1 7 + 4 7 . 0 5 2:1 0 . 0 2 6 0 . 0 2 6 7 8 4 . 5 9 2:1 4 :1 6 : 1 0 . 0 0 2 0 . 0 0 2 7 8 2 . 0 6 6 :1 - L P A - 1 7 + 9 2 . 4 1 2 : 1 0 . 0 0 4 0 . 0 0 4 7 8 3 . 7 2 2:1 4 :1 6 : 1 0 . 0 0 8 0 . 0 0 8 7 8 2 . 3 6 6 :1 - L P A - 1 8 + 0 4 . 5 6 2 : 1 0 . 0 0 1 0 . 0 0 1 7 8 3 . 4 8 2:1 4 :1 0 . 0 2 0 0 . 0 2 0 7 8 3 . 0 9 - L P A - 1 8 + 4 1 . 4 5 2:1 0 . 0 2 0 0 . 0 2 0 7 8 3 . 0 9 2:1 0000 1 0 1 0 1 0 1 0 2 0 2 0 2 0 2 0 3 0 3 0 3 0 3 0 4 0 4 0 4 0 4 0 50 5 0 50 5 0 60 6 0 60 6 0 70 7 0 70 7 0 80 8 0 80 8 0 90 9 0 90 9 0 100 1 0 0 100 1 0 0 110 1 1 0 110 1 1 0 120 1 2 0 120 1 2 0 130 1 3 0 130 1 3 0 140 1 4 0 140 1 4 0 150 1 5 0 150 1 5 0 26-JUN-2014 14:12 R:\Roadway\CorridorModeling\B3159_Rdy_xpl_lpa.dgn $$$$USERNAME$$$$8/23/99 PROJ. REFERENCE NO.SHEET NO.0 7 7 0 770 7 8 0 780 7 9 0 790 7 6 0 760 1 3 + 9 0 . 0 0 7 7 0 770 7 8 0 780 7 9 0 790 7 6 0 760 1 4 + 2 0 . 0 0 7 7 0 770 7 8 0 780 7 9 0 790 7 6 0 760 1 4 + 5 0 . 0 0 7 7 0 770 7 8 0 780 7 9 0 790 8 0 0 800 7 6 0 760 1 4 + 7 5 . 0 0 7 7 0 770 7 8 0 780 7 9 0 790 8 0 0 800 7 6 0 760 1 5 + 0 0 . 0 0 X-28B-3159 - L P A - 510 6 :1 0 . 0 8 0 0 . 0 8 0 770.46 S P 2:1 D P = 7 6 9 . 6 1 S P = 7 6 9 . 7 1 7 7 4 . 5 1 4 : 1 6 :1 0 . 0 8 0 0 . 0 8 0 7 7 0 . 2 4 770.56 2:1 7 7 3 . 3 7 6 :1 0 . 0 8 0 0 . 0 8 0 7 7 0 . 5 7 770.89 2:1 4 : 1 2:1 7 8 8 . 1 0 6 :1 0 . 0 8 0 0 . 0 8 0 7 7 1 . 0 1 771.33 2:1 2:1 4 : 1 7 8 8 . 5 6 6 :1 0 . 0 8 0 0 . 0 8 0 7 7 1 . 6 1 771.93 2:1 2:1 4 : 1 7 8 9 . 4 4 0000 1 0 1 0 1 0 1 0 2 0 2 0 2 0 2 0 3 0 3 0 3 0 3 0 4 0 4 0 4 0 4 0 50 5 0 50 5 0 60 6 0 60 6 0 70 7 0 70 7 0 80 8 0 80 8 0 90 9 0 90 9 0 100 1 0 0 100 1 0 0 110 1 1 0 110 1 1 0 120 1 2 0 120 1 2 0 130 1 3 0 130 1 3 0 140 1 4 0 140 1 4 0 150 1 5 0 150 1 5 0 26-JUN-2014 14:12 R:\Roadway\CorridorModeling\B3159_Rdy_xpl_lpa.dgn $$$$USERNAME$$$$8/23/99 PROJ. REFERENCE NO.SHEET NO.0 7 7 0 770 7 8 0 780 7 9 0 790 8 0 0 800 7 6 0 760 1 5 + 2 5 . 0 0 7 8 0 780 7 9 0 790 8 0 0 800 7 7 0 770 1 5 + 5 0 . 0 0 7 8 0 780 7 9 0 790 8 0 0 800 7 7 0 770 1 5 + 6 5 . 0 0 7 8 0 780 7 9 0 790 8 0 0 800 7 7 0 770 1 5 + 9 0 . 0 0 X-29B-3159 - L P A - 510 6 :1 0 . 0 8 0 0 . 0 8 0 7 7 2 . 3 7 772.69 2:1 2:1 4 : 1 7 8 9 . 9 2 6 :1 0 . 0 8 0 0 . 0 8 0 7 7 3 . 2 8 773.60 2:1 2:1 4 : 1 7 8 9 . 3 6 0 . 0 8 0 0 . 0 8 0 774.18 SP 6 :1 3:1 2:1 SP=783.93 D P = 7 7 3 . 8 6 3:1 7 8 9 . 4 2 6 :1 0 . 0 8 0 0 . 0 8 0 775.14 S P 2:1 4 : 1 2: 1 S P = 7 7 7 . 2 5 D P = 7 7 4 . 8 2 7 8 9 . 3 7 0000 1 0 1 0 1 0 1 0 2 0 2 0 2 0 2 0 3 0 3 0 3 0 3 0 4 0 4 0 4 0 4 0 50 5 0 50 5 0 60 6 0 60 6 0 70 7 0 70 7 0 80 8 0 80 8 0 90 9 0 90 9 0 100 1 0 0 100 1 0 0 110 1 1 0 110 1 1 0 120 1 2 0 120 1 2 0 130 1 3 0 130 1 3 0 140 1 4 0 140 1 4 0 150 1 5 0 150 1 5 0 26-JUN-2014 14:12 R:\Roadway\CorridorModeling\B3159_Rdy_xpl_lpa.dgn $$$$USERNAME$$$$8/23/99 PROJ. REFERENCE NO.SHEET NO.0 7 8 0 780 7 9 0 790 8 0 0 800 7 7 0 770 1 6 + 3 0 . 0 0 7 8 0 780 7 9 0 790 8 0 0 800 7 7 0 770 1 6 + 6 7 . 0 0 X-30B-3159 - L P A - 510 6 :1 0 . 0 7 3 0 . 0 7 3 776.78 SP 8: 1 2:1 S P = 7 7 6 . 5 2 D P = 7 7 5 . 6 7 7 8 5 . 6 4 0 . 0 5 7 0 . 0 5 7 778.43 S P 6 :1 2:1 D P = 7 7 7 . 3 9 S P = 7 7 7 . 8 1 7 8 5 . 3 5 0000 1 0 1 0 1 0 1 0 2 0 2 0 2 0 2 0 3 0 3 0 3 0 3 0 4 0 4 0 4 0 4 0 50 5 0 50 5 0 60 6 0 60 6 0 70 7 0 70 7 0 80 8 0 80 8 0 90 9 0 90 9 0 100 1 0 0 100 1 0 0 110 1 1 0 110 1 1 0 120 1 2 0 120 1 2 0 130 1 3 0 130 1 3 0 140 1 4 0 140 1 4 0 150 1 5 0 150 1 5 0 26-JUN-2014 14:12 R:\Roadway\CorridorModeling\B3159_Rdy_xpl_rpc.dgn $$$$USERNAME$$$$8/23/99 PROJ. REFERENCE NO.SHEET NO.0 7 6 0 760 7 7 0 770 7 8 0 780 7 9 0 790 7 5 0 750 1 4 + 4 0 . 2 8 7 6 0 760 7 7 0 770 7 8 0 780 7 9 0 790 7 5 0 750 1 4 + 8 5 . 0 0 7 6 0 760 7 7 0 770 7 8 0 780 7 9 0 790 7 5 0 750 1 5 + 3 0 . 0 0 7 6 0 760 7 7 0 770 7 8 0 780 7 9 0 790 7 5 0 750 1 5 + 5 0 . 0 0 X-31B-3159 - R P C - 510 6 :1 0 .0 8 0 0 .0 8 0 4 : 1 7 5 9 . 8 6 S P 4: 1 2:1 D P = 7 6 0 . 2 7 S P = 7 6 0 . 3 8 6 :1 7 7 2 . 3 1 774.592:12:1 6 :1 6 : 1 0 .0 6 1 0 .0 6 1 4 : 1 4 :1 7 6 0 . 8 7 7 6 3 . 1 2 2:1 2 :1 7 7 3 . 3 6 2:12:1 776.82 6 :1 6 : 1 0 .0 4 1 0 .0 4 1 4 : 1 4 :1 7 6 2 . 1 3 7 6 3 . 7 6 2:1 2 :1 7 7 3 . 3 4 779.072:12:1 6 :1 6 : 1 0 . 0 3 2 0 .0 3 2 4 : 1 4 :1 7 6 2 . 7 8 7 6 4 . 1 3 2:1 2 :1 7 7 4 . 0 1 780.062:12:1 0000 1 0 1 0 1 0 1 0 2 0 2 0 2 0 2 0 3 0 3 0 3 0 3 0 4 0 4 0 4 0 4 0 50 5 0 50 5 0 60 6 0 60 6 0 70 7 0 70 7 0 80 8 0 80 8 0 90 9 0 90 9 0 100 1 0 0 100 1 0 0 110 1 1 0 110 1 1 0 120 1 2 0 120 1 2 0 130 1 3 0 130 1 3 0 140 1 4 0 140 1 4 0 150 1 5 0 150 1 5 0 26-JUN-2014 14:12 R:\Roadway\CorridorModeling\B3159_Rdy_xpl_rpc.dgn $$$$USERNAME$$$$8/23/99 PROJ. REFERENCE NO.SHEET NO.0 7 7 0 770 7 8 0 780 7 9 0 790 7 6 0 760 1 5 + 6 0 . 0 0 7 7 0 770 7 8 0 780 7 9 0 790 7 6 0 760 1 6 + 0 0 . 0 0 7 7 0 770 7 8 0 780 7 9 0 790 7 6 0 760 1 6 + 2 4 . 2 8 7 7 0 770 7 8 0 780 7 9 0 790 7 6 0 760 1 6 + 5 0 . 0 0 X-32B-3159 - R P C - 510 6 :1 6 : 1 0 . 0 2 8 0 . 0 2 8 4 : 1 4 :1 7 6 3 . 1 2 7 6 4 . 3 3 2:1 2 :1 7 7 4 . 6 0 780.562:12:1 6 :1 6 : 1 0 . 0 1 1 0 . 0 1 1 4:1 4 :1 7 6 4 . 6 5 7 6 5 . 2 7 2:1 2 :1 7 7 6 . 9 6 782.562:12:1 6 :1 6 : 1 0 . 0 0 0 0 . 0 0 0 4:1 4 :1 765.81 7 6 5 . 9 3 2:1 2 :1 7 7 8 . 7 7 783.772:12:16:1 6 : 1 0 . 0 1 1 0 . 0 1 1 4:1 4 :1 767.19 7 6 6 . 7 2 2:1 2:1 7 8 0 . 5 9 784.182:12:1 0000 1 0 1 0 1 0 1 0 2 0 2 0 2 0 2 0 3 0 3 0 3 0 3 0 4 0 4 0 4 0 4 0 50 5 0 50 5 0 60 6 0 60 6 0 70 7 0 70 7 0 80 8 0 80 8 0 90 9 0 90 9 0 100 1 0 0 100 1 0 0 110 1 1 0 110 1 1 0 120 1 2 0 120 1 2 0 130 1 3 0 130 1 3 0 140 1 4 0 140 1 4 0 150 1 5 0 150 1 5 0 26-JUN-2014 14:12 R:\Roadway\CorridorModeling\B3159_Rdy_xpl_rpc.dgn $$$$USERNAME$$$$8/23/99 PROJ. REFERENCE NO.SHEET NO.0 7 7 0 770 7 8 0 780 7 9 0 790 7 6 0 760 1 6 + 6 0 . 0 0 7 7 0 770 7 8 0 780 7 9 0 790 7 6 0 760 1 7 + 0 0 . 0 0 7 7 0 770 7 8 0 780 7 9 0 790 7 6 0 760 1 7 + 3 6 . 2 8 7 7 0 770 7 8 0 780 7 9 0 790 7 6 0 760 1 7 + 5 0 . 0 0 7 7 0 770 7 8 0 780 7 9 0 790 7 6 0 760 1 8 + 0 0 . 0 0 7 7 0 770 7 8 0 780 7 9 0 790 7 6 0 760 1 8 + 2 5 . 0 0 X-33B-3159 - R P C - 510 6:1 6 : 1 0 . 0 1 6 0 . 0 1 6 4:1 4 :1 767.77 7 6 7 . 0 5 2:1 2:1 7 8 1 . 1 6 784.352:12:16:1 6 : 1 0 . 0 3 3 0 . 0 3 3 4:1 4 :1 770.15 7 6 8 . 6 0 2:1 2:1 7 8 3 . 0 7 784.992:12:16:1 6 : 1 0 . 0 4 9 0 . 0 4 9 4:1 4 :1 772.45 7 7 0 . 1 7 2:1 2:1 7 8 4 . 3 1 6:1 6 : 1 0 . 0 5 5 0 . 0 5 5 4:1 773.332:1 6 : 1 4 :1 7 7 0 . 7 8 2:1 7 8 4 . 4 1 6:1 0 . 0 7 6 0 . 0 7 6 4:1 776.53 S P 2:1 4 :1 4: 1 2:1 S P = 7 7 2 . 6 4 D P = 7 7 1 . 9 7 7 8 4 . 1 8 6:1 0 . 0 8 0 0 . 0 8 0 4:1 777.85 S P 2:1 4: 1 S P = 7 7 3 . 0 0 D P = 7 7 2 . 1 4 7 8 3 . 4 0 0000 1 0 1 0 1 0 1 0 2 0 2 0 2 0 2 0 3 0 3 0 3 0 3 0 4 0 4 0 4 0 4 0 50 5 0 50 5 0 60 6 0 60 6 0 70 7 0 70 7 0 80 8 0 80 8 0 90 9 0 90 9 0 100 1 0 0 100 1 0 0 110 1 1 0 110 1 1 0 120 1 2 0 120 1 2 0 130 1 3 0 130 1 3 0 140 1 4 0 140 1 4 0 150 1 5 0 150 1 5 0 26-JUN-2014 14:13 R:\Roadway\CorridorModeling\B3159_Rdy_xpl_rpc.dgn $$$$USERNAME$$$$8/23/99 PROJ. REFERENCE NO.SHEET NO.0 7 8 0 780 7 9 0 790 7 7 0 770 1 8 + 5 0 . 0 0 7 8 0 780 7 9 0 790 8 0 0 800 7 7 0 770 1 9 + 0 0 . 0 0 7 8 0 780 7 9 0 790 8 0 0 800 7 7 0 770 1 9 + 0 8 . 9 6 7 8 0 780 7 9 0 790 8 0 0 800 8 1 0 810 7 7 0 770 1 9 + 5 0 . 0 0 X-34B-3159 - R P C - 510 6:1 4 : 1 0 . 0 7 9 0 . 0 7 9 4:1 778.98 S P 2:1 S P = 7 7 5 . 0 8 D P = 7 7 3 . 7 4 7 8 2 . 6 4 6:1 0 . 0 5 7 0 . 0 5 7 7 7 7 . 7 1 4: 1 6 :1 1 5 + 7 1 . 0 0 - L P C - 2 : 1 0 . 0 5 6 0 . 0 5 6 7 8 0 . 2 9 4:12:1 779.286:1 0 . 0 5 3 0 . 0 5 3 7 7 8 . 7 7 6 :1 4 : 1 2 : 1 1 5 + 7 9 . 6 5 - L P C - 0 . 0 5 3 0 . 0 5 3 7 8 0 . 0 2 2:14:1 779.336:1 0 . 0 3 5 0 . 0 3 5 2:1 1 6 + 2 1 . 6 6 - L P C - 0 . 0 3 5 0 . 0 3 5 7 7 8 . 7 9 2:14:1 779.58 0000 1 0 1 0 1 0 1 0 2 0 2 0 2 0 2 0 3 0 3 0 3 0 3 0 4 0 4 0 4 0 4 0 50 5 0 50 5 0 60 6 0 60 6 0 70 7 0 70 7 0 80 8 0 80 8 0 90 9 0 90 9 0 100 1 0 0 100 1 0 0 110 1 1 0 110 1 1 0 120 1 2 0 120 1 2 0 130 1 3 0 130 1 3 0 140 1 4 0 140 1 4 0 150 1 5 0 150 1 5 0 26-JUN-2014 14:13 R:\Roadway\CorridorModeling\B3159_Rdy_xpl_rpc.dgn $$$$USERNAME$$$$8/23/99 PROJ. REFERENCE NO.SHEET NO.0 7 8 0 780 7 9 0 790 8 0 0 800 8 1 0 810 7 7 0 770 2 0 + 0 0 . 0 0 X-35B-3159 - R P C - 510 0 . 0 1 3 0 . 0 1 3 6:1 2:1 0 . 0 2 0 0 . 0 2 0 1 6 + 7 1 . 7 6 - L P C - 7 8 1 . 6 5 0000 1 0 1 0 1 0 1 0 2 0 2 0 2 0 2 0 3 0 3 0 3 0 3 0 4 0 4 0 4 0 4 0 50 5 0 50 5 0 60 6 0 60 6 0 70 7 0 70 7 0 80 8 0 80 8 0 90 9 0 90 9 0 100 1 0 0 100 1 0 0 110 1 1 0 110 1 1 0 120 1 2 0 120 1 2 0 130 1 3 0 130 1 3 0 140 1 4 0 140 1 4 0 150 1 5 0 150 1 5 0 26-JUN-2014 14:13 R:\Roadway\CorridorModeling\B3159_Rdy_xpl_lpc.dgn $$$$USERNAME$$$$8/23/99 PROJ. REFERENCE NO.SHEET NO.0 7 7 0 770 7 8 0 780 7 6 0 760 1 3 + 5 0 . 0 0 7 7 0 770 7 8 0 780 7 6 0 760 1 3 + 7 5 . 0 0 7 7 0 770 7 8 0 780 7 6 0 760 1 4 + 0 0 . 0 0 7 7 0 770 7 8 0 780 7 6 0 760 1 4 + 2 5 . 0 0 7 7 0 770 7 8 0 780 7 6 0 760 1 4 + 5 0 . 0 0 7 7 0 770 7 8 0 780 7 9 0 790 7 6 0 760 1 4 + 7 5 . 0 0 X-36B-3159 - L P C - 510 7 6 8 . 0 3 0 . 0 8 0 0 . 0 8 0 764.51 S P 6 :1 2:1 S P = 7 6 4 . 9 7 D P = 7 6 3 . 8 3 7 6 8 . 9 0 0 . 0 8 0 0 . 0 8 0 7 6 4 . 2 6 764.58 6 :1 2:1 4: 1 2: 1 7 6 9 . 8 9 6 :1 0 . 0 8 0 0 . 0 8 0 7 6 4 . 6 7 764.99 2: 1 4: 1 2:1 7 7 1 . 5 9 0 . 0 8 0 0 . 0 8 0 7 6 5 . 4 6 765.78 6 :1 2: 1 4: 1 2:1 7 7 2 . 6 0 6 :1 0 . 0 8 0 0 . 0 8 0 7 6 6 . 5 9 766.91 2:1 4: 1 2:1 7 7 2 . 6 2 0 . 0 8 0 0 . 0 8 0 768.42 6 :1 7 6 8 . 1 0 2:1 4: 1 2:1 6 :1 0000 1 0 1 0 1 0 1 0 2 0 2 0 2 0 2 0 3 0 3 0 3 0 3 0 4 0 4 0 4 0 4 0 50 5 0 50 5 0 60 6 0 60 6 0 70 7 0 70 7 0 80 8 0 80 8 0 90 9 0 90 9 0 100 1 0 0 100 1 0 0 110 1 1 0 110 1 1 0 120 1 2 0 120 1 2 0 130 1 3 0 130 1 3 0 140 1 4 0 140 1 4 0 150 1 5 0 150 1 5 0 26-JUN-2014 14:13 R:\Roadway\CorridorModeling\B3159_Rdy_xpl_lpc.dgn $$$$USERNAME$$$$8/23/99 PROJ. REFERENCE NO.SHEET NO.0 7 7 0 770 7 8 0 780 7 9 0 790 7 6 0 760 1 5 + 0 0 . 0 0 7 7 0 770 7 8 0 780 7 9 0 790 7 6 0 760 1 5 + 1 6 . 8 9 7 7 0 770 7 8 0 780 7 9 0 790 8 0 0 800 7 6 0 760 1 5 + 3 8 . 0 0 X-37B-3159 - L P C - 510 7 7 3 . 5 3 6 :1 0 . 0 8 0 0 . 0 8 0 770.27 S P 2:1 6 :1 4: 1 2:1 D P = 7 6 9 . 6 6 S P = 7 7 2 . 6 4 7 7 5 . 4 5 0 . 0 8 1 0 . 0 8 1 771.72 S P 4: 1 2:1 6 :1 D P = 7 7 2 . 1 4 S P = 7 7 3 . 0 0 7 7 6 . 1 2 6 :1 0 . 0 7 1 0 . 0 7 1 773.76 S P 4: 1 2:1 D P = 7 7 3 . 1 2 S P = 7 7 5 . 0 8 0000 1 0 1 0 1 0 1 0 2 0 2 0 2 0 2 0 3 0 3 0 3 0 3 0 4 0 4 0 4 0 4 0 50 5 0 50 5 0 60 6 0 60 6 0 70 7 0 70 7 0 80 8 0 80 8 0 90 9 0 90 9 0 100 1 0 0 100 1 0 0 110 1 1 0 110 1 1 0 120 1 2 0 120 1 2 0 130 1 3 0 130 1 3 0 140 1 4 0 140 1 4 0 150 1 5 0 150 1 5 0 26-JUN-2014 14:13 R:\Roadway\CorridorModeling\B3159_Rdy_xpl_Y3.dgn $$$$USERNAME$$$$8/23/99 PROJ. REFERENCE NO.SHEET NO.0 7 7 0 770 7 8 0 780 7 6 0 760 1 2 + 2 5 . 0 0 7 7 0 770 7 8 0 780 7 6 0 760 1 2 + 7 5 . 0 0 7 7 0 770 7 8 0 780 7 6 0 760 1 3 + 0 0 . 0 0 7 7 0 770 7 8 0 780 7 6 0 760 1 3 + 5 0 . 0 0 7 7 0 770 7 8 0 780 7 9 0 790 7 6 0 760 1 4 + 0 0 . 0 0 7 7 0 770 7 8 0 780 7 9 0 790 7 6 0 760 1 4 + 1 1 . 9 9 7 7 0 770 7 8 0 780 7 9 0 790 7 6 0 760 1 4 + 5 0 . 0 0 X-38B-3159 - Y 3 - 510 7 6 8 . 3 7 2:1 2:1 4 :1 4 : 1 0 . 0 8 0 0 . 0 8 0 7 6 7 . 9 2 7 6 5 . 4 4 7 7 0 . 5 9 2:1 2:1 4 :1 4 : 1 0 . 0 7 6 0 . 0 7 6 7 6 9 . 8 2 7 6 7 . 4 6 7 7 1 . 6 1 2:1 4 :1 0 . 0 6 2 0 . 0 6 2 7 7 0 . 5 9 7 7 3 . 1 9 2:1 2:1 4 :1 4 : 1 0 . 0 3 4 0 . 0 3 4 7 7 2 . 1 2 7 7 1 . 0 0 7 7 4 . 3 3 2:1 2:1 4 :1 4 : 1 0 . 0 0 7 0 . 0 0 7 7 7 3 . 6 6 7 7 3 . 4 2 7 7 4 . 4 5 2:1 2:1 4 :1 4 : 1 0 . 0 0 0 0 . 0 0 0 7 7 4 . 0 1 7 7 4 . 0 1 7 7 5 . 0 2 2:1 2:1 4 :1 0 . 0 2 1 0 . 0 2 1 7 7 4 . 9 2 0000 1 0 1 0 1 0 1 0 2 0 2 0 2 0 2 0 3 0 3 0 3 0 3 0 4 0 4 0 4 0 4 0 50 5 0 50 5 0 60 6 0 60 6 0 70 7 0 70 7 0 80 8 0 80 8 0 90 9 0 90 9 0 100 1 0 0 100 1 0 0 110 1 1 0 110 1 1 0 120 1 2 0 120 1 2 0 130 1 3 0 130 1 3 0 140 1 4 0 140 1 4 0 150 1 5 0 150 1 5 0 26-JUN-2014 14:13 R:\Roadway\CorridorModeling\B3159_Rdy_xpl_Y3.dgn $$$$USERNAME$$$$8/23/99 PROJ. REFERENCE NO.SHEET NO.0 7 8 0 780 7 9 0 790 7 7 0 770 1 5 + 0 0 . 0 0 7 8 0 780 7 9 0 790 7 7 0 770 1 5 + 5 0 . 0 0 X-39B-3159 - Y 3 - 510 7 7 6 . 2 6 2:1 2:1 4 :1 0 . 0 3 0 0 . 0 3 0 7 7 6 . 5 4 7 7 8 . 3 6 3: 1 0 . 0 0 3 0 . 0 0 3 781.53 781.73 2:1 0000 1 0 1 0 1 0 1 0 2 0 2 0 2 0 2 0 3 0 3 0 3 0 3 0 4 0 4 0 4 0 4 0 50 5 0 50 5 0 60 6 0 60 6 0 70 7 0 70 7 0 80 8 0 80 8 0 90 9 0 90 9 0 100 1 0 0 100 1 0 0 110 1 1 0 110 1 1 0 120 1 2 0 120 1 2 0 130 1 3 0 130 1 3 0 140 1 4 0 140 1 4 0 150 1 5 0 150 1 5 0 26-JUN-2014 14:13 R:\Roadway\CorridorModeling\B3159_Rdy_xpl_Y7.dgn $$$$USERNAME$$$$8/23/99 PROJ. REFERENCE NO.SHEET NO.0 7 8 0 780 7 9 0 790 8 0 0 800 8 1 0 810 7 7 0 770 1 6 + 2 0 . 0 0 7 8 0 780 7 9 0 790 8 0 0 800 8 1 0 810 7 7 0 770 1 6 + 6 0 . 0 0 7 8 0 780 7 9 0 790 8 0 0 800 7 7 0 770 1 7 + 0 0 . 0 0 7 9 0 790 8 0 0 800 7 8 0 780 1 7 + 5 0 . 0 0 7 9 0 790 8 0 0 800 7 8 0 780 1 8 + 0 2 . 2 3 X-40B-3159 - Y 7 - 510 2:1 4 :1 3 : 1 0 .0 6 0 0 .0 6 0 7 7 8 . 4 2 S P S P = 7 7 5 . 7 2 D P = 7 7 1 . 5 3 7 9 2 . 7 5 2:1 4 :1 4 : 1 0 .0 6 0 0 .0 6 0 7 7 9 . 7 4 S P S P = 7 7 5 . 6 2 D P = 7 7 2 . 1 0 7 9 1 . 7 5 0 .0 6 0 0 .0 6 0 4 :1 7 8 1 . 3 1 2:1 2:1 4 : 1 7 8 3 . 1 1 7 9 1 . 2 1 2:1 4 : 1 0 .0 6 0 0 .0 6 0 7 8 5 . 1 8 4 :1 7 8 3 . 3 8 2:1 7 9 0 . 7 7 2:1 4 : 1 0 .0 4 0 0 .0 4 0 7 8 6 . 6 7 7 8 5 . 4 7 4 :1 2:1 0000 1 0 1 0 1 0 1 0 2 0 2 0 2 0 2 0 3 0 3 0 3 0 3 0 4 0 4 0 4 0 4 0 50 5 0 50 5 0 60 6 0 60 6 0 70 7 0 70 7 0 80 8 0 80 8 0 90 9 0 90 9 0 100 1 0 0 100 1 0 0 110 1 1 0 110 1 1 0 120 1 2 0 120 1 2 0 130 1 3 0 130 1 3 0 140 1 4 0 140 1 4 0 150 1 5 0 150 1 5 0 26-JUN-2014 14:13 R:\Roadway\CorridorModeling\B3159_Rdy_xpl_Y7.dgn $$$$USERNAME$$$$8/23/99 PROJ. REFERENCE NO.SHEET NO.0 7 9 0 790 8 0 0 800 7 8 0 780 1 8 + 5 0 . 0 0 7 9 0 790 8 0 0 800 7 8 0 780 1 8 + 5 3 . 5 7 X-41B-3159 - Y 7 - 510 0 . 0 3 0 0 . 0 2 0 2:1 4 :1 7 8 6 . 8 7 7 8 6 . 1 2 4 : 1 2:1 0 . 0 3 0 0 . 0 2 0 2:1 4 : 1 7 8 6 . 8 8 2:1 4 :1 7 8 6 . 1 3