Loading...
HomeMy WebLinkAboutGW1-2022-07322_Well Construction - GW1_20220809 WELL CONSTRUCTION RECORD This form can be used for single or multiple welts For Internal Use ONLY: I 1.Well Contractor Information: ��� 1i WATERZONES�! �� � 1 l t` FROM TO -s- DESCRIPTION Well Contractor Name 2 7 0IL 4IL!_9�q 33 40 ft. 9 ,NC Well Contractor Certification Number 15.OUTER CASING for m°Iti-cased wells OR LINER if a licable FROM TO DIAMETER THICKNESS MATERIAL, �► �-�� l.l�,II Tlnh O ft tt ompany Name•� �` ``A�1 t �i� 6 1 0' in. $r �C_ A r+ 16..INNER CASING OR TUBING eothermalA� 2 cllossedd4be 2.Well Construction Permit#: ®It.F FROM To DIAMETER THICKNESS MATERIAL List all applicable well permits(i.e.County,State,Variance,Injection,etc.) ft• ft in. 3.Well Use(check well use): ft• ft Etura;; pply Well: 17.SCREEN FROM TO DIAMETER SLAT SIZE THICKNESS MATERIAL ltural ❑Municipal/Public tt ft i°• rmal(Heating/Cooling Supply) esidential Water Su 1 ft ftPP y(single)ial/COmmercial ❑Residential Water Supply(shared) 18.GROUT n FROM TO MATERIAL EMPLACEMENTMETHOD&AMOUNT er Supply Well: ft•ring ❑Recoveryv ft Well: ft. ft ❑Aquifer Recharge ❑Groundwater Remediation 19.SAND/GRAVEL PACK rfa"">jcsble ❑Aquifer Storage and Recovery ❑Salinity Bawer FROM To MATERIAL EMPLACEMENT METHOD ❑Aquifer Test ❑S ft ft tormwater Drainage ❑Experimental Technology ❑Subsidence Control ft. ft ❑Geothermal(Closed Loop) ❑Tracer 20.DRILLING LOG attach additional sheets if necessary) FROM TO DESCRIPTION color,hardness,soiUroek ❑Geothermal(leating/Cooling Rettun) ❑Other(ex lain under#21 Remarks) Q % 5" ft /P S grain shw,etc J 4.Date Well(s)Completed: —/ �2zwep w# f f Q f I tZIL A 5a.Well Location: '- /� / 2 ft. 3a It- s� + C R '/J C 1)� I ITJ$ e 1 ft 3 t/ ft P x GF/c Facility/Owner Name ft f Facility M#(ifapplicable) �m. tt ft ft _�. . Physical dress,City,and Zip ft, Q r, 2� 2L REMARKS County �•] �t11CrFf+1i�1 i iiJii C� nr, Parcel Identification No-(PIN) 5b.Latitude and Longitude in degrees/minutes/seconds or decimal degrees: (ifwell field,one lattlong is sufficient) 22.Certification: 3 G_ 3�8'f� 8' N 79• 4 n 3O 7 w v�,r-rti �-, "� 13 "Zz Signature of Certified Well Contractor Date v 6.Is(are)the well(s): G71�rmanent or ❑Temporary By signing this form,I hereby certify that the well(s)was(were)constructed in accordance with 15A NCAC 02C.0100 or 15A NCAC 02C.0200 Well Construction Standards and that a 7.Is this a repair to an existing well: ❑Yes or [Wr If this is a repair,fill out known well construction information and explain the nature of the copy of this record has been provided to the well owner repair under#21 remarks section or on the back of this form. 23.Site diagram or additional well details: S.Number of wells constructed: You may use the back of this page to provide additional well site details or well construction details. You may also attach additional pages if necessary. For multiple injection or non-water supply wells ONLY with the same construction,you can submit one form. SUBMITTAL INSTUCTIONS 9.Total well depth below land surface: 3166 (ft) 24a. For All Wells: Submit this form within 30 days of completion of well For multiple wells list all depths ifd�erent(example-3 00 00 CaX 'and 2 CJ 0 construction to the following: 10.Static water level below top of casing: ?Is— (ft.) Division of Water Resources,Information Processing Unit, If water level is above casing,use +/ 1617 Mail Service Center,Raleigh,NC 27699-1617 11.Borehole diameter: b � (in.) 24b.For Injection Wells ONLY: In addition to sending the form to the address in •12.Well construction method �' f 24a above, also submit a copy of thus form within 30 days of completion of well _ s �+ (i.e.auger,rotary,cable,direct push,etc. construction to the following:-�[T'�'�'fi' FOR WATER SUPPLY WELLS ONLY: Division of Water Resources,Underground Injection Control Program, 1636 Mail Service Center,Raleigh,NC 27699-1636 13a.Yield(gpm) ���_ Method of test: IIp l� 24c.For Water Supply&Injection Wells: Z 13b.Disinfection type: Amount: well construction to the county health department of the county where Also submit one copy of this form(within 30 days of completion of constructed Fort GW-1 North Carolina Department of Environment and Natural Resources—Division of Water Resources Revised August 2013