Loading...
HomeMy WebLinkAboutGW1-2022-07304_Well Construction - GW1_20220809 WELL CONSTRUCTION RECORD(GW-1} For Lltemal Use Only': 1.Well Contractor Information: Alfred Kiesling Sr 14.NS FR N TO DE'�'C'RiPTtO\ Well Contractor No OLl h. G Q Q 2670-A ft_ jigVV fir. )l4l,4 p( S NC Well Contractor Cetrification Number B & K Well Drilling Inc FROM TO DIAMETER THICIGNESS MATERLAL 0 ft• Is' ft- 6 114 SDR-21 PVC Company Name tt : ER'G§iFl\1�'t#� 3SEaI final' I t�ZO�i i 7'0 UtAMEfEK 77i1CKhE55 MATEKI\L 2.Well Construction Permit#: ft. List all applicable well c0larrucd0n pern-iis fix.LUC.Corarrv.Stole.7•an"Olfcc.etc-) ft. CL In- 3.Well Use(check well use): l.: '. Water.Supply Well: FROM TO DIAMETER CLOT SIZE THICKh£5$ MATEKIAL ❑. cultura! ❑municipal/Public fr. ft in. OGeothermal(HeatinsiC•oolilla Supply) 2<lidential Water Supply(single] ft- rL in. Water Supply(shared)L)❑]ndustrial/Conmrercial ❑ResidCnnal i;'l�r�iltf3�1..:: <; ❑Irrigation ❑Wells>100,000 GPD FROM TU >L\TERL'1L EhtPLACEM&NT METHOD&L\IUUS�T Nun-Water Supply Well: p tL 20 fL Bentonite Pour ❑monitoring ORccoccry R, ft. Injection Well: ft• tr- ou dwater Remediation _. ....... ..:.. ..: >:;::•.::.::., ❑Aquifer Recharge OGr n a>s<';:>::<; ❑Aquifer Storage and Recovery ❑Saliuiry Barrier FROM TO FIATF.RIAL EMPLACEMENT METHOD CAquifer Test OStormwater Drainage i ❑Experimental Technology ❑Subsidence Control ft. ft. OGeothermal(Closed Loop) OTracer attai Aaddiiianeli€saeaisix??><: FROM TO D iPTiOh(wtar.bardnesstspOltrock erzinsnte etc) ❑Geothermal(Heatine(Coolins Return) ❑Other(explain under=21 Remarks) ic, 0 ft. 4.Date WeD(s)Completed- ZZ Well ID# tt• ft. ft. fit. Sa.Well Location: .� Facility (ifz licable; fr. R Facility/Owner Name GF ft. f. Intc-r"R3w n Flrzx.3ccK'ng Unit Physical.Address,City.ar Zip ('ounn. Parcel Identification No.(PIN) 5b.Latitude and longitude in degrees/minutes/seconds or decimal degrees: (if-ell Held,one latrlona is sufficient) WCertOfffic in•6_Is(are)the well(s): Permanent or ,Temporary' ledWellCon a or bate Zr sigmng ri�Lc form.I herei•.rtattfi�that the,&II(s).va!r(tvereJ<-onstrue•red in arcordanve::irh 7.Is this a repair to an existing well: ❑Yes or nNo S.a N-CAC Ok.0100 or 15.;NC.4C 92C.A20n Well Co¢rtruction Standards and that a gain 1)this is a repair.TI/nut knov,r.well<»nctnrcr;rne infortrarinn and ern!air,the raver nl tit^ njthis rr•enrd has bretr provided to the­110 7mr. repair rnrder#21 remarks section or on the back arthis.orm. 23-Site diagram or additional well details: S.For Geoprobe/DPT or Closed-Loop Geothermal Wells having the same You may use the back of this page to provide additional well construction info construction,only i GW-1 is needed. Indicate TOTAL NUMBER of wells (add'See Over'inRemarks Box You may also attach additional pages if necessary. drilled: / 24.SUBMITTAL INSTRUCDONS 9.Total well depth below land surface: -� (ft.) Submit this GW-1 within 30 days of well completion per the following: fur muhipie uri/s list rrll depdLy if eliffe-r-ent(eromple-3kg000 and 2(d!i 001 24a. For AJJ Wells: Original form to Division of Water Resources (DW'R), 10.Static water level below top of casing:40 (ft.) information Processing Unit,1617 MSC.Raleigh.NC 27699-1617 !l muter level is ubure easing,else 6 1/8 24b.For Injection WeDs:Copy to DWR Underground Injection Control(IUC) 11-Borehole diameter: (lo•) Program,1636 MSC,Raleigh,NC 27699-1636 12.Well construction method: Air Rotary24c.For Water Supply and opeo-Loop Geothermal Return Wells.Copy to the (i.e.auger,rotary.cable.direct push,etc.) county environmental health department of the county wfie re tn.talled FOR WATER SUPPLY WELLS ONLY: 24d.For Water Wells ptodncina over 100.000 GPD:Copy to DWR,CCPCL'A — - Air Lift Permit Prom,16l t MSC,Ralagh,N L 27699 161 I 13a.Yield(gpm) Method of test: Tabs - 1 1/2 Lbs 13b.Disinfection type: Chlor. .Amount. t Form GW-I North Carolina Department of En,iroomcnral Qualiry-Division of Watcr Rcso`urccs Revised 6.6-2019