HomeMy WebLinkAbout20140505 Ver 1_DCM Permit_20140728Permit Class
NEW
-�4.
Permit Number
66 -14 -
STATE OF NORTH CAROLINA
Department of Environment and Natural Resources
- and
Coastal Resources Commission
'r=�
for D
X Major Development in an Area of Environmental C nc UG 1 12014
pursuant to NCGS 113A -118
Q - �Ve roue
Excavation and /or filling pursuant to NCGS 113
;..Issued to Edwin Causey, P.O. Box 717, Ayden, NC 28513.
;Authorizing development in Beaufort County adj. to the Pamlico River, at 57 W. Bayside Dr.,
, as requested in the permittee's application dated 5/14/14 (MP -1 and MP -2 and
4R(MP -4), including the attached workplan drawings (12), 9 dated 4/27/14, 1 dated 3/31/14, 1 dated 5/14/14, and I dated 5/12/14.
%fihis_perinit, issued on July 28, 2014 , is subject to compliance with the application (where consistent
=:with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may
subject to fines, imprisonment or civil action; or may cause the permit to be null and void.
Docking Facility
Unless specifically altered herein, this permit authorizes the additional boathouse with associated
catwalk and additional personal water craft lifts, as well as the associated uses located in or over the
" water that are expressly and specifically set forth in the permit application. No other structure, whether
floating or stationary, may become a permanent part of this docking facility without permit
modification. No non -water dependent uses of structures may be conducted on, in or over public trust
waters without permit modification.
(See attached sheets for Additional Conditions)
This permit action may be appealed by the permittee or
°a.other qualified persons within twenty (20) days of the issuing
date. An appeal requires resolution prior to work initiation or
t3
continuance as the case may be.
This permit must be accessible on -site to Department
;. .� , 'P� e,r_ so.�_n; n. el when the project is inspected for compliance.
a'4
7„--Any maintenance work or project modification not covered
e;her - under requires further Division approval.
, `'-All work must cease when the permit expires on
z p p
P 1 %December 31, 2017
_ -,1n issuing this permit, the State of North Carolina agrees
-'that, your project is consistent with the North Carolina Coastal
� Management Program.
Signed by the authority of the Secretary of DENR and the
Chairman of the Coastal Resources Commission.
.� :Braxton C. Davis, Director I
1-01vlsion of Coastal Management
This permit and its conditions are hereby accepted.
�E
c
)
Signature of Permittee
.K -`4.^p ry :.:tiw^^.N^: ii �•4t4`W. X* �]^:' ntiKtia^ S'^.°}: �kY�W+; aX^ �-0° ti^: � .k:b{^h}p9�F"+i4h}-0^G�}'P43",
#1
.Edwin Causey
ADDITIONAL CONDITIONS
Permit # 66 -14
Page 2 of 3
2) The boathouse shall not be completely enclosed or have side coverage more than one half the height of
the side, fr6m'the roof waterward.
�3) _ The authorized�boathouse shall be single story, and shall not be designed to allow for second story use.
1f
4) The authorized structure shall not extend more than I/4 of the width of the waterbody, as measured from
:'¢ 5 tlie"waterward edge of the bulkhead on both sides of the water body immediately in front of the project
site:
No attempt shall be made by the permittee to prevent the full and free use by the public of all navigable
waters at or adjacent to the authorized work.
The permittee shall-maintain the authorized work in- good condition and in conformance witli "the terms
and conditions of this permit. The permittee is not relieved of this requirement if he abandons the
permitted activity without having it transferred to a third party.
This permit does not authorize the interference with any existing or proposed Federal project, and the
permittee shall not be entitled to compensation for damage to the authorized structure or work, or injury
which may be caused from existing or future operations undertaken by the United States in the public
interest.
The permittee shall install and maintain at his expense any signal lights or signals prescribed by the U.S.
Coast Guard, through regulation or otherwise, on the authorized facilities. At a minimum, permanent
reflectors shall be attached to the structure in order to make it more visible during hours of darkness or
inclement weather.
This permit authorizes a maximum of six formalized boat slips at the authorized facility.
Boat Ramp
Unless specifically altered herein, this permit authorizes the construction of the new boat ramp as
indicated on the attached workplan drawings.
The boat ramp shall either be poured at an upland location and pushed into place once hardened, or
poured entirely within a watertight containment structure. Live concrete shall not be allowed to contact
waters of the State or waters that will enter waters of the State.
Shoreline Stabilization
The authorized replacement bulkhead shall adhere to the alignment depicted on the attached workplan
^ _ drawings.
The alignment of the permitted bulkhead shall be staked by a representative of the Division of Coastal
Management within a maximum of 30 days prior to the start of any construction.
r., 14)- The bulkhead shall be structurally tight so as to prevent seepage of backfill materials through the
-k structure.
_ �Vd f�p-7p4p-CP }?n'tr7ihC-0{- +P9-0 -J^}°: .r ;C-. K �'e}C�MY.•;•sKKY•;,;•�.+`K+^�^C ;- d:- r'-0W4w'N`Y^)K hK +�h?:^Y� V°:v^'=- :v*Y:+^°:a`^C}�<�.�}L• QTY.•' .`.hKKKn`J'+ti+r�.✓rYh?'rt*T6: :- ,`T:Wi�}{.!^8ti- YrrM°G^J }Z�'r\ n0^Y+� Kd^'^; -?N 'r: ^i
..�... ✓r.:i9+ °AY.- ?:•7Y:i•Siv` X41.. M'.+..- fi'-:^?*.3 4ti.i K;^ t.; w;,. N^ C*" rY-: v` .^, P: da..^..: riw: ' eN}. nri},.0 o. d. w•.✓.+ rr.✓ r;. ra» . ;{."..e_.;..,...:•:hr.- !,.. »4}v :w,... :^.,: <`�:^: .^r"•.g .,^. zz_^... ^., rrivNi-. ; ,'^Cwwrw;•.3..�YrM^4+:a:✓.•'i S^i:•4a+: ^J,*AY A-^ -it�
dwin CauseY Permit # 66 -14
Page 3 of 3
ADDITIONAL CONDITIONS
The bulkhead shall be solid and constructed of treated wood, concrete slabs, metal sheet piles or other
suitable materials approved by department personnel
All backfill material shall be clean'and free of any pollutants except in trace quantities. A
". °•
=
Sedimentation and Erosion Control
`'
17
In order to protect water quality, from construction shall not visibly P q Y, y increase the amount of
suspended sediments in adjacent waters.
;` r 18) Appropriate sedimentation and erosion control devices, measures or structures shall be implemented to
ensure that eroded materials do not enter adjacent wetlands, watercourses and property (e.g. silt fence
'diversion swales or berms etc.). At a minimum a silt fence- shall- be -properly installed immediately
landward of the bulkhead ca
p immediately following completion of backfilling activities.
�. ty
General
'.. 19) The permittee understands and agrees that, if future operations by the United States requires the
removal, relocation, or other alteration of the structure or work authorized by this permit, or if in the
opinion of the Secretary of the Army or his authorized representative, said structure or work shall cause
unreasonable obstruction to free navigation of the navigable waters, the permittee will be required, upon
due notice from the Corps of Engineers, to remove, 'relocate or alter the structural work or obstructions
caused thereby, without expense to the United States or the state of North Carolina. No claim shall be
made against the United States or the state of North Carolina on account of any such removal or
t ` alteration.
-20) The permittee and /or his contractor shall meet with a representative of the Division prior to project
initiation in order to discuss the conditions set forth in this permit.
=n21) This permit shall not be assigned, transferred, sold, or otherwise disposed of to a third party without the,
" written approval of the Division of Coastal Management.
NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits,
' approvals or authorizations that may be required, including any Stormwater Permit needed from
the Division of Energy, Mineral, and Land Resources, Land Quality Section.
-N®TE: Future development of the permittee's property may require a modification of this permit.
Contact a representative of the Division at (252) 946 -6481 prior to the commencement of any
such activity for this determination. The permittee is further advised that many development or
land disturbing activities are not allowed within the Environmental Management Commission's
Tar Pamlico River Buffer. Contact a representative of the Division of Water Resources at (252)
946 -6481 for more information concerning allowable 'uses within the Tar Pamlico Buffer.
NOTE: The U.S. Army Corps of Engineers has assigned the proposed project COE Action Id. No. SAW
201401030.
� �isd' thW+ 0. 4-0^ a^+.-0rwP3wC=Cv*:dM{4'r}.M.�d.W titer+ rh'- t.' n{ 4} yG:✓.. Q^' r5w4+✓ r' rTS,., s, w.:✓ ✓. d- :K.•?.:.;•.:•iv+ >krYw- ;•��r•, ..a.:+.'i+..: r',i °'^C%^: :!- :.:.iv..ti+ri+:^X. N ,ih+�..4•:•44✓N. �i✓r=' �: 4'Y�+>}6^::^L^M�.S+w^^r:^+v �'r:✓r :^�oa•`P,'••:r.;r"r:7