Loading...
HomeMy WebLinkAbout20121131 Ver 1_Sediment Inspection_20140519Strickland, Bev From: Suggs, Phillip H Sent: Monday, May l0'ZUl44:08PK4 To: Griffith, Aaron E;Panek, Lindsey F Cc: Eu|io' Amy; VVanucha' Dave Subject: Bridge over Little Yadkin River Attachments: 14.pdf For your review. smallomrr*qwna*ncwm and nnmmImeona*,immuNwommww o puumpZcon:JmI mw and may u*aimmmwammli'dpmmwm North Carolina Department of Transportation Erosion and Sedimentation Control /Stormwater Report Roadside Environmental Unit Report Type �✓ Routine PCN ICA ECPAR [—]ICA Ex 1 st ❑ ICA Ex 2nd ❑ CICA - SWO Project Information Project Number: 38452.3.1 Location: Bridges on US 52 over Little Yadkin River Project Type: Contract Length of Project: 0.50 Project Evaluation Length Section Description Date of Inspection: 05/19/2014 Evaluator: Phil Suggs County: STOKES Division: 9 TIP Number: B -4645 Disturbed Acreage: 20 HOW Zone: N Trout Zone: N Installation of Maintenance Effectiveness Plan Overall Project BMP's of BMP's of BMP's Implementation Evaluation 0.40 Remainder of Project 8 8 8 8 8 0.10 Permitted Area(s) 7 7 7 6 7 Grading Scale: 10 = Excellent 9 = V. Good 8 = Good 7 = Fair 6 -0 = Immediate Corrective Action Needed Cnmments- Remarks and Recommendations: - Project right from approx sta 28 to end of fill, stabilize slopes. Recommend permanent stage seeding. - Approx Sta 32 to end, stabilize the ditch with seeding and matting. Seed /mulch slopes. - Stabilize pipe outlets along toe of fill on right, end bent 2 side -Clean out and refurbish special sediment control fence outlet at bent 1; Clean out accum silt in skimmer and behind silt check at bent 1 -Pipe inlet wetland 2: Install rock slope protection per plans. Install EC per plan in approaching ditch line. Insure inlet area is isolated from erodible surrounding slopes. Repair gully at junction box above the skimmer. Divert runoff from top of slope to the skimmer with berms or slope drain. Sediment loss occurred at this location so it is imperative to finish work on the wetland /pipe inlet area and protect this area from further impacts. -Pipe inlet wetland 1: Repair silt fence where undermined and recommend wattle break below rock checks. No erodible area should be left outside the silt fence. Mat remaining erodible areas at inlet leaving main channel unmatted. Install berm or false sump behind drop inlets at top of slope to direct storm water into the drop inlets. - Realign orange safety fence to keep equipment out of jurisdictional areas. -Open erodible areas thru out the project that will not be worked should be walked and temp seeded mulched to provide groundcover and limit site erosion - Westmoreland pit: Submit new revised plan with drainage areas and calculations per as built on the site. Direct site runoff into the large basins wit diversions and stabilize the basin inlets with slope drains or spillways. 5/19114 4:05 Page 1 of 1