Loading...
HomeMy WebLinkAbout20140881 Ver 1_Site Plan_2014081451 ............. . ... ... .. .... J : 1014 NOT TO SCALE REYNOLDS PARKWAY 1boir,4 Al N NOTE: NO PROPOSED STREAM OR WETLAND IMPACTS TO BE PERFORMED UNTIL LSACOE AND NC DWQ PERMITS ARE ISSUED. EXISTING CONTOUR PERENIAL STREAM INTERMITTENT STREAM WETLAND EXISITNG TRAIL PROPOSED TRAIL PROPOSED CULVERT TROUT BUFFER 2600 Iz 1. CONSTRUCTION OF THE PROJECT SHALL BE AS jNDICATED ON THE DRAWINGS UNLESS AUTHORIZED BY THE ENGINEER. 2. FILL TO BE COMPACTED IN 8" LIFTS AT 2% PLUS OR MINUS OF OPITMUM MOISTURE AT 95% STANDARD PROCTOR IF REQUIRED. 3. ADDITIONAL EROISON CONTROL MEASURES WILL 'BE REQUIRED IF SILTATION OCCURS BEYOND THE BUFFER ZON' 4. CONTRACTOR TO FIELD VERIFY LOCATION OF EXISTING GRADES & UTILITIES. 5. 25' UNDISTURBED BUFFER TO BE MAINTAINED AT ALL CREEKS UNLESS NOTED OTHERWISE. 6. DRAINAGE STRUCTURES, CATCH BASINS, DISSIPA;TORS AND APPURTENANCES SHALL COMPLY WITH NCDOT AS REQUIRED. 7. BASE INFROMATION FROM BRIVIC DATA, WESTERN CAROLINA SURVEYORS, ED FLEMING, PLS AND ONSITE OBS:'RVATIONS. 8. STREAM & WETLAND INFORMATION BY McGILL ASSOCIATES. 7. CONTOUR INTERVAL — 1 0 FT. 2 0 1 4 0 8 8 1 zo U- § d. .4 d. 1.4 Z u 0 w u 00 • 0 CD C) (N n LLI L < C) 0 Lo /_1 I ;3l 4 SHEET )i P E \t 1 � I / Lf I I ` 1 � I 1 on t� Hroposea gravel road snittea away trom existing trail to avoid trout buffer encroachment, STA. 10 +00 through STA. 12 +50. 0 0 Lf C""-\l N Z 10X / /` / r� r , t ! 8 +00 Q- 1 4 0 , 11 n I� 1, —1 l 7 +00 ! ! 6+ (( ! cP !(( `i a S A L E A t ! 1 1 ! 8 - � o0 C ! HB -10W S L EN I S'SIpA;fC I (rvv) (1�yp f 1 I /cl:� My Ex'sting P nd & Dam W o z 0 � 2 2 N01TE: NO PROPOSED STREAM OR WETLAND IMPAC S TO BE PERFORMED UNTIL USACOE �N N DWQ PERMITS ARE ISSUED. GENERAL NOT 0 U CTI —N-° f' �` e 3 *00 1. CONSTRUCTION OF THE PROJECT SHALL BE AS INDICATED \ \ FTQ I TS /�/ �' �' ON THE DRAWINGS UNLESS AUTHORIZED BY THE ENGINEER. 2. FILL TO BE COMPACTED IN 8 LIFTS AT 2% PLUS OR MINUS OF \ \ r OPITMUM MOISTURE AT 95% STANDARD PROCTOR IF REQUIRED. 3. ADDITIONAL EROISON CONTROL MEASURES MAY BE REQUIRED \ \ IF SILTATION OCCURS BEYOND THE BUFFER ZONE. \ �_ �� �� 4. CONTRACTOR TO FIELD VERIFY LOCATION OF EXISTING GRADES & UTILITIES. \\ \ - --' -f' 5. 25' UNDISTURBED BUFFER TO BE MAINTAINED AT ALL CREEKS 00 NOTED OTHERWISE. ° 6. DRAINAGE STRUCTURES, CATCH BASINS, DISSIPATORS AND APPURTENANCES SHALL COMPLY WITH NCDOT AS REQUIRED. 7. BASE INFROMATION FROM BRNIC DATA, WESTERN CAROLINA V, ° SURVEYORS, AND ED FLEMING, PLS AND ONSITE OBSERVATIONS. 8. STREAM & WETLAND INFORMATION BY McGILL ASSOCIATES. 9. CONTOUR INTERVAL - 10 FT. CONSTRUCTION 12 FT TRAIL TYP ) ENTRANCE E A \ ` 18 HDPE OUT BUFFER (TYP) d O LO 0 ^1! J Q V 00 r SHEET SEDIMENT BASIN x x x SILT FENCE - -> - -> - -> GRASS SWALE - -- -3000 - - -- EXISTING GRADE 3000 PROPOSED GRADE m CONSTRUCTION LIMITS ® RIP RAP CHECK DAM 6 RIP RAP DISSIPATOR DRAINAGE PIPE - LOGGING TRACE STREAM 0 — BUFFER 50 0 50 100 150 GRAPHIC SCALE — FEET 1 " = 50' d O LO 0 ^1! J Q V 00 r SHEET ii • Z U I, • • 6 i 0 0 .. U. 0 Uj d O LO 0 ^1! J Q V 00 r SHEET ii I, • 6 i 0 0 fi U. Uj r Uji • i' m d O LO 0 ^1! J Q V 00 r SHEET P S� 1W L R U-'C L,1-M I T5 2-- 7 A Rq� I I NAIL- S H H E3 HB�2S B-3W RM B-4 B-5W E < \ H —6 CM T X S1 L T, F E\\N C T Y 0 X Cj Wetland Impact W-3 W 1 etland Sl- Stream Impact S-4 \�\\ \ \1 N16-11 0 3l}�� � i aTOR T� '�� O J �FE P 20 F G L R 'VC �ON UIT0 FU TU 0 E 60 T IN T Z Li V ct' 0- \ , k�IPE B 1 99 DPE + I ? r� s� TST— ,a C D A� � i4+ 0 W L C rL-Lj z. 0 L10 LP 0) 0 i-roposea graver roaa snittea away from existing trail to avoid trout buffer encroachment, STA. 13+00 through STA. 17+50. E� 1�" \ M TO E 'E�'OED o NOTE: NO PROPOSED STREAM OR WETLAND IMPACTS TO BE PERFORMED UNTIL USACOE AND NC DWQ PERMITS ARE ISSUED. 1. CONSTRUCTION OF THE PROJECT SHALL BE AS INDICATED ON THE DRAWINGS UNLESS AUTHORIZED BY THE ENGINEER. 2. FILL TO BE COMPACTED IN 8" LIFTS AT 2% PLUS OR MINUS OF OPITMUM MOISTURE AT 95% STANDARD PROCTOR IF REQUIRED. 3. ADDITIONAL EROISON CONTROL MEASURES MAY BE REQUIRED IF SILTATION OCCURS BEYOND THE BUFFER ZONE. 4. CONTRACTOR TO FIELD VERIFY LOCATION OF EXISTING GRADES & UTILITIES 5. 25' UNDISTURBED BUFFER TO BE MAINTAINED AT ALL CREEKS UNLESS NOTED OTHERWISE. 6. DRAINAGE STRUCTURES, CATCH BASINS, DISSIPATORS AND APPURTENANCES SHALL COMPLY WITH NCDOT AS REQUIRED. 7. BASE INFROMATION FROM BRIVIC DATA, WESTERN CAROLINA SURVEYORS, AND ED FLEMING, PLS AND ONSITE OBSERVATIONS. 8. STREAM & WETLAND INFORMATION BY McGILL ASSOCIATES. 9. CONTOUR INTERVAL — 10 FT. Stream Impact S-5 PIPE #1 + 95"X67" ARCH CMP SEE DETAIL SHEET D2 I U SEDIMENT BASIN -X—X—X— SILT FENCE --> --> GRASS SWALE - - -- 3000 - - -- EXISTING GRADE --3000 PROPOSED GRADE 0 CONSTRUCTION LIMITS M7 RIP RAP CHECK DAM F- RIP RAP DISSIPATOR 0 DRAINAGE PIPE LOGGING TRACE =): O:z STREAM • UL BUFFER 50 0 50 100 150 z =) 0 GRAPHIC SCALE — FEET 1 50? U 1 0.4 IN z U 0 W 0 F- 0 z z 0 =): O:z • • UL on 00 LU z =) 0 z W Ogigolo## WEINEA■ D F- z z �- o Lr) II Uj < o� • a SHEET W • W W F- 0 z z 0 =): O:z • • UL 0 X LU z =) 0 W < 0 C0 I • Uj ii �- o Lr) II Uj < o� • a SHEET PIPE #4 42 "X29" RCH CMP SEE DET IL SHEET�D2 \ 1 V A, C C E A x TV `A\ C A Y \R P � 2`� --_ 265 26Qc) :j- Li n Cl- 0 / /0 (�o Wetland Impact W -2 HB -2W \ ; C D f Matphline Sta 3 +5 Stream Impact S -2 X B R\y �V 1 \ QTY L R A D I� � �`' T Y``P --' � � \t C N''\ TRUCT�ON 1 \ \ 1 � 1 2 T \T }VC, coy U TU'F 6d E. N I T F�0 PO r 1 road shifted away from existing (trail to avoid trout buffer encroachment and wetland impacts, STA. 21 +00 through STA. 25 +50. C/C TOLA\ PROPERTY( /LIN 1 1A � \A , 00 ��l \3 HB -W3 \ \` STS T i HB -1S 1 1 29 +0 11 1� (Tlyp) 7/ y I I f f; t Proposed gravel road shifted away from existing trail to avoid trout buffer encroachment, STA. 27 +00 2 00 through STA. 29 +00. SIJ)F NC o HB KW2 S \\' Streaim Impact S -3 i t� PI'Ei #3 -7 \ / H "X 'l / 9� ARCH CM B -KW1 SEE DET /h ISME�T -A \ HB 2S B- 3'f'11 Z ` 1 13- 5W � (7y I Q I- 1. CONSTRUCTION OF THE PROJECT SHALL BE AS INDICATED ON THE DRAWINGS UNLESS AUTHORIZED BY THE ENGINEER. 2. FILL TO BE COMPACTED IN 8" LIFTS AT 2% PLUS OR MINUS OF OPITMUM MOISTURE AT 95% STANDARD PROCTOR IF REQUIRED. 3. ADDITIONAL EROISON CONTROL MEASURES MAY BE REQUIRED IF SILTATION OCCURS BEYOND THE BUFFER ZONE. 4. CONTRACTOR TO FIELD VERIFY LOCATION OF EXISTING GRADES & UTILITIES 5. 25' UNDISTURBED BUFFER TO BE MAINTAINED AT ALL CREEKS 2 UNLESS NOTED OTHERWISE. 6. DRAINAGE STRUCTURES, CATCH BASINS, DISSIPATORS AND APPURTENANCES SHALL COMPLY WITH NCDOT AS REQUIRED. 7. BASE INFOOMATION FROM BRMC DATA, WESTERN CAROLINA SURVEYORS, AND ED FLEMING, PLS AND ONSITE OBSERVATIONS. 8. STREAM & WETLAND INFORMATION BY McGILL ASSOCIATES. 9. CONTOUR INTERVAL — 10 FT. I M xey= U$ SEDIMENT BASIN a SILT FENCE -- - -> - -> GRASS SWALE n Zz - -- -3000 - - -- H � WW PROPOSED GRADE Q � CONSTRUCTION LIMITS 0 . C� H o 00 V1 • z . UV DRAINAGE PIPE N ^II t- D w Ld o V) SEDIMENT BASIN x x x SILT FENCE -- - -> - -> GRASS SWALE ��. iz - -- -3000 - - -- EXISTING GRADE Z - - -- 3000 N ^II t- D w Ld o V) SEDIMENT BASIN x x x SILT FENCE -- - -> - -> GRASS SWALE iz - -- -3000 - - -- EXISTING GRADE Z - - -- 3000 PROPOSED GRADE � 1 CONSTRUCTION LIMITS 0 . C� U. • LLj . DRAINAGE PIPE - - LOGGING TRACE STREAM 0. UJI ® 1 SHEET 50 0 50 100 150 i� N ^II t- D w Ld o V) SEDIMENT BASIN x x x SILT FENCE -- - -> - -> GRASS SWALE - -- -3000 - - -- EXISTING GRADE Z - - -- 3000 PROPOSED GRADE � CONSTRUCTION LIMITS ® RIP RAP CHECK DAM C� RIP RAP DISSIPATOR DRAINAGE PIPE - - LOGGING TRACE STREAM ® BUFFER SHEET 50 0 50 100 150 GRAPHIC 'SCALE - FEET 1" = 50' 4 SEDIMENT BASIN (TYP) 6;R C ;C HE Ra ERT L -X—X—X- SILT FENCE GRASS SWALE GENERAL NOTES N � 7ER �T-__ N E - - -- 3000 - - -- EXISTING GRADE It 1. CONSTRUCTION OF THE PROJECT SHALL BE AS INDICATED ON THE DRAWINGS UNLESS AUTHORIZED BY THE ENGINEER. ___3000 PROPOSED GRADE 2. FILL TO BE COMPACTED IN 8" LIFTS AT 2% PLUS OR MINUS OF OPITMUM MOISTURE AT 95% STANDARD PROCTOR IF REQUIRED. CONSTRUCTION LIMITS `/ ! i ; 3. ADDITIONAL EROISON CONTROL MEASURES MAY BE REQUIRED --- / i i / IF SILTATION OCCURS BEYON IFD TH ER OF—ZONEI 4. CONTRAC OR TO FIE LD VERY LOH L19 EIXL S) TING GRADES & UTILITIES. RIP RAP CHECK DAM 5. 25' UNDISTURBED BUFFER TO BE MAINTAINED AT ALL CREEKS UNLESS NOTED OTHERWISE. RIP RAP DISSIPATOR 6. DRAINAGE STRUCTURES, CATCH BASINS, DISSIPATORS AND APPURTENANCES SHALL COMPLY WITH NCDOT AS REQUIRED. 7. BASE INFROMATION FROM BRIVIC DATA, WESTERN CAROLINA DRAINAGE PIPE N SURVEYORS, AND ED FLEMING, PLS AND ONSITE OBSERVATIONS. LOGGING TRACE 8. STREAM & WETLAND INFORMATION BY McGILL ASSOCIATES, - ------- 9. CONTOUR INTERVAL — 10 FT. ---CLAY =FR­AE_ M A C H I N E i 'STREAM ,- (TYP�) I/ I BUFFER ATV ACS SS E3 R I P/G E (TYP) vs.......... 25 FT T OUT BUFFER (TYP ATV ACCESS TRAI) (TYP L% AN 3" PVC CONDUIT FOB"' FlJTURE WE R�IQN 60 FT LENGTH EN END F ROAD P STA 40 Lodge a 71 H CM P '_ S ----DETAIL "SHEET D2 18 M P S-EE D -t- SHEET D2 HB-1W . ..... .... .. .... Wetland Impact W-1 0"I, ROAD (TYP) GENERATOR Stream Impact S-1 EX 12 FT TRAIL-.� (T SEPTIC FIELD EPTI D3 I C SILT F E N C TYP PIPE #4 42X29 RCN CM SEE DE AIL SHEET D3 7 pact S-2 Q5 CONS\TRUCTION LIMITS Wetland Impact W-2 —2W R C D' at line St 35+ 0 X U 13 1.4 to lo-4 P-4 ON Z S9 Ht: F- C) C�d z W • u. 0 00 z 0 u In . 13 ........ to S9 C) LO _j .3 Ld _j < 13 uu w Ht: F- C) z z W • u. 0 Lu w In Cl) 0 CL w D 1L C) LO _j .3 Ld _j < 2800 2700 2600 2500 2400 PIPE A Q +00 15" RCP STA 0 +03 2700 2600 2500 2400 27- 1 +00 2 +00 3 +00 4 +00 5 +00 6 +00 7 +00 8 +00 9 +00 10 +00 °I1 +00 12 +00 13 +00 14 +00 15 +00 16 +00 17 +00 18 +00 19 +00 20 +00 21 +00 22 +00 23 +00 24 +00 25 +00 26 +00 27 +00 �o 0 • LU I� a PIPE 4 1 ! LLJ � L0 00 N •' LL u') I LAJ I O i LLJ +J • i ■ ' I d o u7 O O + O (n -- 2700 2600 2500 2400 27- 1 +00 2 +00 3 +00 4 +00 5 +00 6 +00 7 +00 8 +00 9 +00 10 +00 °I1 +00 12 +00 13 +00 14 +00 15 +00 16 +00 17 +00 18 +00 19 +00 20 +00 21 +00 22 +00 23 +00 24 +00 25 +00 26 +00 27 +00 HORTON CREEK TRAIL SCALE: H-1"=100' V-1"=50' m % rrrrrttffffft,,,'��f► _ N /ilrtN� • LU PIPE 4 1 ! LLJ � L0 00 N •' LL u') I LAJ I i LLJ +J • i ■ ' I ------4-2-"X'— I- STA CH-Ct 35+80 p I - - -- - EXISTING � GRAD'— , PIPE 5 PIP 6 PRO GRA�E OSEDj o ST C 38 +� P 0 _ „ 71 „ X47 ARCH SIA CMP —I 00 28+00 29 00 30 00 31 00 32—+-00 33 +00 34100 � 35+00 36-00 37+00 381-00 39 00 40-00 41 +00 i 42+00 43 00 44+00 45+00 46 00 47 00 48-00 49+00 50 ±00 51400 52 —�-00 53 00 54 HORTON CREEK TRAIL SCALE: H-1"=100' V-1"=50' m % rrrrrttffffft,,,'��f► _ N /ilrtN� r1-1 m O FW- N O �z LLI�Q w Q C) o V) TV I • • LU uj 1 LLJ t •' LL • LAJ i LLJ +J • i ■ ' r1-1 m O FW- N O �z LLI�Q w Q C) o V) TV I • 1 ■ • 1 i C� z X w 3xD La Crushed aggregate greater than 2 in but smaller 'han 4 in D - Filter fabric: Original °o _\ a ra d e 1- 12 in Min, unless otherwise specified by a soils engineer Match Existing Grade PLAN N TS 12 ft min • Al 8' MAX FOR STD. STRENGTH FABRIC WITH WIRE MESH ?EINFORCEMENT SILT FENCE NOTES: 1. FILTER BARRIERS SHALL BE INSPECTED IMMEDIATELY AFTER EACH RAINFALL AND DAILY DURING PROLONGED RAINFALL. REPAIR SHALL BE MADE AS NECESSARY. 2. FABRIC SHALL BE REPLr -��ED PROMPTLY IF FOUND TO BE IN DISF';- =PAIR. D = PIPE DIA. IN INCHES wa ►I�. C) a- ^1 0 z TEMP SWALE LINER "WESTERN EXCELSIOR CC CS -3 1 ROLL WIDTH REQUIRED ON ALL DITCH kL GRADE ur%P%SS SWALE DETAIL RIPRAP APRON S! ZING (PER FIG. 8.069) OUTLET AT PIPE DIAMETER (Do) APRON LEN&TH (La) APRON WIDTH (Wa) THICKNESS (T) STONE (CLASS) PIPE 18" 10' 12' 12" B SWALE -- 10' 12' 12" B SYNTHETIC FILTER FABRIC ATTACHED TO POSTS WITH APPROVED FASTENERS. PLACE ON UPHILL SIDE OF FENCE. 18" MAX. ItI:o FILTER FP SECTION A- A ax. 4TER STONE CHECK DAM!: STONE SHOULD BE PLACED OVER THE CHANNEL BANKS TO KEEP WATER FROM CUTTING AROUND THE DAM. L = THE DISTANCE SUCH THAT POINTS A AND B ARi= OF EQUAL ELEVATION THE FOLLOWING CR,11TERIA SHOULD BE USED WHEN DESIGNING A CHECK DAM: — ENSURE THAT THE DRAINAGE AREA ABOVE THE CHECK DAM DOES NOT EXCEED 2 AC:;:RES. — KEEP THE MAXIMUM HEIGHT AT 2 FT AT THE CENTER OF THE DAM. — KEEP THE CENTER OF THE CHECK DAM AT LEAST 9 INCHES LOWER THAN THE OUTER EDGES AT NATURAL GROUND ELEVATION. — KEEP THE SIDE SLOPES OF THE DAM AT 2:1 OR FLATTER. — STABILIZE 0VRFLOW AREAS ALONG THE CHANNEL TO RESIST EROSION CAUSED BY CHECK DAMS. ►C+ EXCAVATE 8 "x8" TRENCH UPSLOPE ALONG NINE OF POSTS. EXTEND FILTER FABRIC INTO TRENCH, BACKFILL TRENCH AND COMPACT SOIL 3. SEDIMENT DEPOSITS SHALL BE REMOVED AFTER EACH STORM EVENT AND WHEN DEPOSITS REACH APPROXIMATELY 1/3 HEIGHT OF BARRIER. EXISTING OR PROPOSED FILTER FACE VIEW 1) OBTAIN APPROVAL OF EROSION CONTROL PLAN FROM WATAUGA COUNTY DEPARTMENT OF PLANNING & INSPECTIONS. 2) FLAG CLEARING LIMITS, DIVERSIONS, AND SILT FENCE LOCATIONS. INSTALL TEMPORARY CONSTRUCTION ENTRANCE. ADJUST AS NECESSARY BASED ON FIELD CONDITIONS WITH PERMISSION OF ENGINEER. 3) BEGIN CLEARING OF ROAD. INSTALL SILT FENCE & DIVERSIONS AS AREAS ARE CLEARED. BURN OR PILE CLEARED MATERIAL ONSITE. 4) BEGIN ROUGH GRADING OF ROAD. WASTE TOPSOIL ON FILL SLOPES. 5) INSTALL DRAINAGE PIPE AS FINAL GRADE IS REACHED. INSTALL CREEK PIPES AS PER USACOE & DWQ REQUIREMENTS. INSTALL RIP —RAP CHECK DAMS AS REQ'D. 6) STABILIZE ROAD WITH GRAVEL AS REQUIRED. 7) STABILIZE ALL DISTURBED AREAS WITH SEEDING /MULCH /BLANKETS. ALL DISTURBED AREAS TO BE STABILIZED WITHIN 14 DAYS AFTER COMPLETION. 8) ALL EROSION CONTROL MEASURES TO BE MAINTAINED DURING THE CONSTRUCTION PERIOD. MAKE NECESSARY REPAIRS AS REQUIRED OR AS DIRECTED BY THE ENGINEER. 9) ESTIMATED TIME OF CONSTRUCTION IS 3 MONTHS. pill TEMPORARY SEEDING SPECIFICATIONS SEEDING MIXTURE: SPECIES RYE (grain) SEEDING DATES: AUG 15 TO DEC 30 RAT= (lb/acre) 120 SOIL ADMENDMENTS: FOLLOW RECOMMENDATIONS OF TESTS OR APPLY 2000 lb/ac GROUND AGRICULTURAL LIMESTONE AND 750 Ib /ac 10 -10 -10 FERTLIZER. MULCH: APPLY 40001b /ac STRAW. ANCHOR STRAW BY TACKING w/ ASPHALT, NETTING, OR A MULCH ANCHORING TOOL. A DISK w/ BLADES SER NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOC'_. MAINTENANCE: RE— FERTILIZE IF GROWTH IS NOT FULLY ADEQUATE, RE —SEED, RE— FERTILIZE AND MULCH IMMEDIATELY FOLLOWING EROSION OR OTHER DAMAGE. CUT ILL SLOPES SEEDING SPECIFICATIONS SEEDING MIXTURE: SPECIES RATE (Ib /acre) TALL FESCUE 100 SERICEA LESPENDEZA 30 KOBE LESPENDEZA 10 NURSE PLANTS: BETWEEN MAY 1 AND AUG 1 -, ADD 101b /ac GERMAN MILLET OR 15 Ib /ac SUDANGRASS. PRIOR TO MAY 1 OR AFTER AUG 15, ADD 40 lb/ac RYE (GRAIN). 'T MAY BE BENEFICIAL TO PLANT THE GRASSES IN LATE SUMMER A'ID OVERSEED THE LESPENDEZAS IN MARCH. SEEDING DATES: BEST AUG 25 — SEPT 15 FEB 15 — MAR 20 POSSIBLE AUG 20 — OCT 25 FEB 1 — APRIL SOIL ADMENDMENTS: APPLY LIME AND FERTILIZER ;ACCORDING TO SOIL TEST, OR APPLY 4000 Ib /ac GROUND :'AGRICULTURAL LIMESTONE AND 1200 Ib /ac 10 -10 -10 FERTILIZER. MULCH: APPLY 4000 Ib /ac GRAIN ST',\AW OR EQUIVALENT COVER OF ANOTHER SUITABLE MULCHING MATERIAL, ANCHOR MULCH BY TACKING w/ ASPHALT, ROVING OR NETTING, NETTING IS THE PERFERRED ANCHORING METHOD ON STEEP SLOPES. MAINTENANCE: MOW NO MORE THAN ONCE A YEAR, RE— FERTILIZE IN THE SECOND YEAR UNLESS GROWTH IS FULLY ADEQUATE. RE —SEED, RE— FERTILIZE, RE —MULCH DAMAGED AREAS IMMEDIATELY. C-) 0 0-40 a o a 0 r 0 G • z a D d 0 'v U 0 U i i r t w N O w z z D w J I- a C) o V) ■ ■ 1 SHEET • • ti I INLET MASS ROCK RETAINING ? HEADWALLS (w/ WINGWALLS AS REQ'D) 3600 CU FT ACRE ON BOTH SIDES. APPROX 2 FT THICKNESS VOLUME OF BASIN w ! w z M ------- - - - - -- --- - - - - -- ------------ - - - - -- :0 BASIN TO BE CLEANED OUT cv �J s WHEN SEDIMENT REACHES THIS LEVEL SECTION B 20' GRAVEL ROAD PIPE SCHEDL LE PIPE SIZE WIDTH HEIGHT CREEK SLOPE BEDROCK 1 95" 67" 0.8% > 3' 2 95" 67" 3.2% > 3' 3 83" 57" 2.8% > 3' 4 42" 29" 1.0% > 3' 5 18" - -- 1.0% > 3' 6 71 " 47" 4.8% > 3' MASS ROCK RETAINING HEADWALLS (w/ WINGWALLS) ON BOTH SIDES PIPE TO BE FILLED 1 FT WITH EXCAVATED CREEK BED MATERIAL ry J D U ry Q SECTION A NOT TO SCALE • �� m b z 12" — WEIR MIN 5 ft' #57 STONE OPENING \ LINE J� LENGTH DIM. 25' CROSS-SECTION TOP WIDTH 25 ft PIPE IMPACT AT EACH CREEK CROSSING CROSS SECTION A NOT TO S��CALE COMPACTED FILL EXISTING CREEK � BANK FULL ELEVATION � ARCH CULVERT 12 GA. CMP, ALUMINIZED 1 FT OF BOTTOM OF PIPE FILLED NOT TO SCALE NOT TO SCALE . 1 :000c a JC�gO(_q( _)fl)1 -, 1, O� CLASS B FILTER RIP -RAP FABRIC 18" MAX. 3' -0" (MIN.) BOTTOM WIDTH NOTE: STONE - SECTION NOTE: INSPECT TEMPORARY SEDIMENT TRAPS AFTER EACH PERIOD OF SIGNIFICANT RAINFALL. REMOVE & RESTORE TRAP TO ITS ORIGINAL DIMENSIONS WHEN THE SEDIMENT HAS ACCUMULATED TO 1/2 THE DESIGN DEPTH OF THE TRAP. PLACE REMOVED SEDIMENT IN A DESIGNATED DISPOSAL AREA. REPLACE CONTAMINATED GRAVEL FACING AS REQUIRED. 9 X !`i TST LENGTH WIDTH DEPTH WEIR W TOP BOTTOM TOP BOTTOM OVERFILL 6" DESIGN 22' 16' FOR 12' SETTLED 21 " MfN. 4' r SETTLEMENT TOP ELEV. •I IUL • ■ WEIR DIM. X12" IN �` I (I EXTEND FILTER 50 YR. EMERGENCY 0 0 fl 01i u O ���' _ ��q�r -iiI h FABRIC 6" INT BY -PASS 6" BELOW SETTLED M�c �CgC�oofl9 TOP OF DAM 1 0C ?02� FILTER-W, 00000 L0 ABRIC flo06061 OC' NATURAL GROUND 3' -0" (MIN.) BOTTOM WIDTH NOTE: STONE - SECTION NOTE: INSPECT TEMPORARY SEDIMENT TRAPS AFTER EACH PERIOD OF SIGNIFICANT RAINFALL. REMOVE & RESTORE TRAP TO ITS ORIGINAL DIMENSIONS WHEN THE SEDIMENT HAS ACCUMULATED TO 1/2 THE DESIGN DEPTH OF THE TRAP. PLACE REMOVED SEDIMENT IN A DESIGNATED DISPOSAL AREA. REPLACE CONTAMINATED GRAVEL FACING AS REQUIRED. 9 X !`i TST LENGTH WIDTH DEPTH WEIR W TOP BOTTOM TOP BOTTOM A 22' 16' 20' 12' 4' 4' 45' PRIVATE RIGHT —OF —WAY � I 3' 20' GRAVEL 2' i 1/4" PER FT. 1 � ,v�. r,�yv�nu ' � ;��:' ?rc.-" Fa'�';.`' °s•` sY. "r arc. K.r - •�,;,, \J (ti'� 1.5' BASE —� I-- GRASSED 6" CABC SWALE EROSION CONTROL BLANKET- "WESTERN EXCELSIOR CORP." CS -3 1 ROLL WIDTH CREEK 3 FT MIN. EX GRADE FITTINGS AS REQ'D NOTE: CONDUIT TO BE INSTALLED WITH 1 FT BUCKET TO MINIMIZE STREAM IMPACT NOT TO SCALE 0 a W c co w i W i � r • •I IUL • ■ • i i �7 d w r z N 0 Z J I.tJ o cn ■ s t SHEET