Loading...
HomeMy WebLinkAboutNCC203125_NOT Closeout Documents_20220811North Carolina Department of Environmental Quality Land Resources: Systel Building, 225 Green Street, Suite 714, Fayetteville, NC 28301-5094 (910) 433-3300 County: Moore Project: Cameron Vista Lots 1, 2 & 3 Person financially responsible: Benjamin Stout Real Estate Services, Inc. - Benjamin Stout, Owner/Manager Address: P.O. Box 53798, Fayetteville, NC 28305 1. Project Location: Majestic Court, Greenwood Twsp Pictures: No 2. Weather and soil conditions: sunny/workable soils 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes 5. Violations: River basin: Cape Fear Project #: MOORE-2020-085 Initial inspection: Yes If no, check violations below: 6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): Inspection report: Sent Report 9. Corrective action needed: Title: Date given/sent: June 18, 2021 10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. Project is in compliance and released under the SPCA. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities (NCGO1) must be requested by the permittee via a Notice of Termination (NOT). The NOT is available at: https://edocs.deq.nc.gov/Forms/NCGOI-Termination. Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: Penny Markle Others present: Date of inspection: June 17, 2021 Time arriving on site: 3:00 PM Time leaving site: 3:05 PM cc: Yes