HomeMy WebLinkAboutNCG140003_Name-Owner Change Application_20220809NC DEPARTMENT OF ENVIRONMENTAL QUALITY
DIVISION OF Energy, Mineral, and Land Resources
STORMWATER PROGRAM
NORTH CAROLINA
Enytranrnental Quality
WES STORMWATER PERMIT NAME: OWNERSHIP CHANGE FORM
1. CURRENT PERMIT INFORMATION:
Permit Number: NCS__J_/__/_/_/� or NCG_/__/^/_/_
1. Facility Name (prior to change): _ 4:Zhi /Ck ✓' 61n re te— /7
11. NEW OWNER NAME INFORMATION:
2. This request for a name change is a result of:
a. Change in ownership of property/company
b. Name change only (Facility and/or Company)
—V—c. Other (please explain): l
(for example, facility address update. Include additional attachments if necessary.)
3. New owner's name (name to be put on permit as Permittee):
4. New owner's or signing official's name and title:
(Person legally responsible for permit)
(Title)
5. Mailing address:
City:
State: Zip Code: Phone: (
E-mail address:
6. New facility name (if applicable): //leis v )c;eefe ao
7. Effective date of transfer or name change:
North Carolina Department or Environrne.ntaf Duality I Divislon of Energy, Mineral and Land Resources
512 North Salisbury Street 1 1612 Mat? Service Center I Raleigh, North Carolina 27699-1612
?#i!?f,ats,grc. V
�venmr+ire era�wa� 919.707.91.00
NPDES Stormwater Permit Name/Ownership Change
Page 2of2
THIS APPLICATION PACKAGE WILL NOT BE ACCEPTED BY THE DIVISION UNLESS
ALL OF THE ITEMS LISTED BELOW ARE INCLUDED.
REQUIRED ITEMS;
1. This completed application form (with original signature)
2. Legal documentation of transfer of ownership (such ;as relevant pages of a deed or a bill of sale) is
required for an ownership change request. Articles of incorporation are not sufficient for an
ownership change but can be provided for a name change.
3. Information to document facility, industrial activities, stormwater discharges, or outfall changes
as noted in item IV above (if appropriate)
Why is this information needed?
Regulations in 40 CFR §122.63 allow for minor modifications to NPDES permits for a change of
ownership or operational control of a facility, provided that information supports that no other change
in the permit are necessary.
Why does this form need to be mailed in?
Permittees and applicants must fulfill signatory requirements in the NPDES federal
regulations in 40 CFR §122.22 (please see those regulations for guidance). Until NCDEQ's
electronic submission process meets Cross -Media Electronic Reporting (CROMERR)
requirements, this original signed (not digital signature) form must be mailed to the
address below. The uploaded copy is stored as part of the permit record in the Division's
digital repository.
Applicant's Certification:
I, cfie// . , attest that the application for A�ame nd/or ownership
change submitted has been reviewed and is accurate and complete to the best of my
knowledge. I understand that if all required parts of this application are not completed, or if all
required supporting information is not included, this application package will be considered
incomplete and may be returned.
Signature: 4w)� i Date:
THE COMPLETED APPLICATION AND ALL SUPPORTING INFORMATION SHOULD BE SENT TO:
DEMLR Stormwater Program
512 North Salisbury Street, 6th Floor (Office 640K)
1612 Mail Service Center
Raleigh, NC 27699-1612
Last Revised 3/13/2022