HomeMy WebLinkAboutSW6220302_Supplement-EZ Form_20220812SUPPLEMENT-EZ COVER PAGE
FORD
PROJECT INFORMATION
1
Project Name
Gruber Mini Matt
2
Project Area ac
5.06
3
Coastal Wetland Area ac
High_
4
Surface Water Area ac
5
Is this project High or Low Density?
6
Does this project use an off -site SCM?
No
COMPLIANCE WITH 02H .1003(4)
7
Width of vegetated setbacks provided feet
0
8
Will the vegetated setback remain vegetated?
N/A
9
If BUA is proposed in the setback, does it meet NCAC 02H.1003 4 c-d ?
N/A
10
Is streambank stabilization proposed on this project?
No
NUMBER AND TYPE OF SCMs:
11
Infiltration System
1
12
Bioretention Cell
13
Wet Pond
14
Stormwater Wetland
15
Permeable Pavement
16
Sand Filter
17
lRainwater Harvesting RWH
18
Green Roof
19
Level Spreader -Filter Stri LS-FS
20
Disconnected Impervious Surface DIS
21
Treatment Swale
22
Dry Pond
23
lStormFilter
24
Silva Cell
25
113ayfilter
26
1 Filterra
FORMS LOAM
DESIGNER CERTIFICATION
27
Name and Title:
Howard Resnik PE
28
Organization:
Calibre Engineering
29
Street address:
PO BOX 4041
30
City, State, Zip:
Wimin ton NC 28406
910-791-4441
31
Phone numbers :
Email: T
32
howard@calibre-engineering.com
Certification Statement.
I certify. under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision; that
the information provided in the form is, to the best of my knowledge and belief. true, accurate and complete, and that the engineering plans
specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here
`\`N„CARO�
O; FESS/�'•loe
iL SEAL i '�
025483 '
Seal 111,11S
11,tS . 1%0\\`
49- ZZ
X
Date
DRAINAGE AREAS
1
Is this a high density project?
Yes
2
If so, number of drainage areas/SCMs
1
3
Does this oroiect have low densit areas?
No
4
If so number of low 4-ify drainage areas
0
5
Is all/part of this project subject to previous rule
versions?
No
FORMS LOADED
DRAINAGE AREA INFORMATION
Entire Site
1
4
Type of SCM
Infiltration Basin
5
Total drainage area (sq ft
220340
164291
6
Onsite drainage area (sq ft
164291
7
Offsite drainage area (sq ft
0
8
Total BUA in project (sq ft
142746 sf
128786 sf
9permitting)
New BUA on subdivided lots (subject to
s ft
10
New BUA not on subdivided lots (subject to
permitting) (sf)
128786 sf
11
Offsite BUA (sq ft
12
Breakdown of new BUA not on subdivided lots:
- Parking (sq ft
106765 sf
103744 sf
- Sidewalk (sq ft
10701 sf
9548 sf
- Roof (sq ft
15494 sf
15494 sf
- Roadway s ft
4369 sf
- Future (sq ft
- Other, please specify in the comment box
below (sq ft
13
New infiltrating permeable pavement on
subdivided lots (sq ft
14
New infiltrating permeable pavement not on
subdivided lots (sq ft
15permitting)
Existing BUA that will remain (not subject to
s ft
5417 sf
16
lExistina BUA that is already permitted (sq ft
17
Existing BUA that will be removed (sq ft
701 sf
18
Percent BUA
64 0
78.4
19
IDesign storm inches
1.0 in
1.0 in
20
IDesign volume of SCM cu ft
13553 cf
13553 cf
21 lCalculation method for design volume Simple
ADDITIONAL INFORMATION
Please use this space to provide any additional information about the
22 drainage area(s):
Simple
INFILTRATION SYSTEM
1 IlDrainage area number 1 1
2 IMinimum required treatment volume (cu ft) 10401 cf
GENERAL MDC FROM 02H .1050
3
Is the SCM sized to treat the SW from all surfaces at build -out?
Yes
4
Is the SCM located away from contaminated soils?
Yes
5
What are the side slopes of the SCM (H:V or enter "Vertical' for
trenches)?
3:1
6
Does the SCM have retaining walls, gabion walls or other
engineered side slopes?
Yes
7
Are the inlets, outlets, and receiving stream protected from erosion
10- ear storm)?
Yes
8
Is there an overflow or bypass for inflow volume in excess of the
desi n volume?
Yes
9
lWhat is the method for dewatering the SCM for maintenance?
Pump (preferred)
10
If applicable, will the SCM be cleaned out after construction?
Yes
11
Does the maintenance access comply with General MDC (8)?
Yes
12
Does the drainage easement comply with General MDC (9)?
Yes
13
If the SCM is on a single family lot, does (will?) the plat comply with
General MDC 10 ?
14
Is there an O&M Agreement that complies with General MDC (11)?
Yes
15
Is there an O&M Plan that complies with General MDC (12)?
Yes
16
Does the SCM follow the device specific MDC?
Yes
17
Was the SCM designed by an NC licensedprofessional?
Yes
umnu rwi
wry 3T3 nrvi rvw%- rrtvrvi ucn .ivai
18
JProposed slope of the subgrade surface (%)
0%
19
JAre terraces or baffles provided?
No
20
IType of pretreatment:
Forebay
Soils Data
21
Was the soil investigated in the footprint and at the elevation of the
infiltrations stem?
Yes
22
SHWT elevation (fmsl)
382.90
23
Depth to SHWT per soils report (in)
125.00
24
Ground elevation at boring in soils report (fmsl)
393.30
25
Is a detailed hydrogeologic study attached if the separation is
between 1 and 2 feet?
No
26
JSoil infiltration rate (in/hr)
0.99
27
IFactor of safety (FS) (2 is recommended):
2.00
Elevations
29
lBottom elevation (fmsl)
386 ft
30
IStorage elevation (fmsl)
388.5 ft
31
JBypass elevation (fmsl)
388.5
Basins
32 JBottom surface area if 4858 ft
33 Istorage elevation surface area(ft) 5887. ft
For Trenches Only
34
Length (ft)
35
Width (ft)
36
Perforated pipe diameter, if applicable (inches)
37
Number of laterals
38
Total length of perforated piping
39
Stone type, if applicable
40
Stone porosity (%)
41
Is stone free of fines?
42
Is the stone wrapped in geotextile fabric?
43
Has at least one inspection port been provided?
Volumes/Drawdown
44 IDesign volume of SCM (cu ft) 13553 cf
45 ITime to draw down (hours) 67.6
I 46 IPlease use this space to provide any additional information about I
the infiltration system(s):
12,14&15 - Project is located at Ft. Bragg - Standard documents are not
red forthis proiect.
Infiltration 3 10:30 AM 8/11/2022