Loading...
HomeMy WebLinkAboutNCC203166_NOT Closeout Documents_20220811North Carolina Department of Environmental Quality Land Resources: Systel Building, 225 Green Street, Suite 714, Fayetteville, NC 28301-5094 (910) 433-3300 County: Sampson Project: Van Buren Solar, LLC River basin: Cape Fear Person financially responsible: National Renewable Energy Corp. - Andrew A Project #: SAMPS-2019-005 Giraldo, President Address: 227 Southside Drive, Suite B, Charlotte, NC 28217 1. Project Location: Dunn Road, Roseboro Pictures: No 2. Weather and soil conditions: dry, workable soils Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): Steve Donovan Title: Site Manager Inspection report: Sent Report Date given/sent: June 01, 2022 9. Corrective action needed: 10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. Project has been released and coverage under NPDES General Permit for Construction Activities is terminated. Reported by: Melissa Joyner Others present: Date of inspection: May 25, 2022 Time arriving on site: 3:05 PM Time leaving site: 3:15 PM cc: Mark Caddell, Steve Donovan (via email)