HomeMy WebLinkAboutNCC203166_NOT Closeout Documents_20220811North Carolina Department of Environmental Quality
Land Resources: Systel Building, 225 Green Street, Suite 714, Fayetteville, NC 28301-5094
(910) 433-3300
County: Sampson Project: Van Buren Solar, LLC River basin: Cape Fear
Person financially responsible: National Renewable Energy Corp. - Andrew A Project #: SAMPS-2019-005
Giraldo, President
Address: 227 Southside Drive, Suite B, Charlotte, NC 28217
1. Project Location: Dunn Road, Roseboro
Pictures: No
2. Weather and soil conditions: dry, workable soils Initial inspection: No
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply)
Degree of damage:
8. Contact made with (name): Steve Donovan Title: Site Manager
Inspection report: Sent Report Date given/sent: June 01, 2022
9. Corrective action needed:
10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional
self -monitoring or self -inspections are required. Project has been released and coverage
under NPDES General Permit for Construction Activities is terminated.
Reported by: Melissa Joyner Others present:
Date of inspection: May 25, 2022 Time arriving on site: 3:05 PM Time leaving site: 3:15 PM
cc: Mark Caddell, Steve Donovan (via email)