HomeMy WebLinkAboutNCC215215_Modification Confirmation Email_20220812Georgoulias, Bethany
From:
laserfiche@ncdenr.gov
Sent:
Friday, August 12, 2022 9:22 AM
To:
gknapp@nvrinc.com
Cc:
Georgoulias, Bethany; gknapp@nvrinc.com; abeck@nvrinc.com
Subject:
Modification Confirmation
This e-mail is to notify you that the modification information for COC No. NCC215215 for the project Stockbridge at
Tanglewood Phase 2 that you submitted on 8/12/2022 has been added to the permit file records as of 8/12/2022.
Modification Reason: Additional Lots/Outparcels Approved - E&SC Revised
Additional Details (if provided): adding lots 201-214
You can find all Construction COC Permit files in our Document Repository here.
Questions? Please contact The NC Stormwater Program at (919) 707-3640.
This email was automatically generated by Laserfiche. Please do not respond to this email address, as responses are not
monitored.