Loading...
HomeMy WebLinkAboutNC0086665_Fact Sheet_20220502FACT SHEET EXPEDITED - PERMIT RENEWAL NPDES NC0086665 Basic Information for Expedited Permit Renewal Permit Writer/Date Sergei Chernikov, Ph.D. / 26 April 2022 Permit Number — County - Region NC0086665 —Rockingham County - WSRO Facility Name Rockingham Combustion Turbine Station (Gas Fired) Basin Name/Sub-basin number Roanoke / 03-02-02 Receiving Stream UT to Little Jacobs Creek [segment 22-32-2] Stream Classification in Permit C Does permit need Daily Max NH3 limits? No Does permit need TRC limits/language? No Does permit have toxicity testing? Yes Does permit have Special Conditions? No Does permit have instream monitoring? No Is the stream impaired (on 303(d) list)? No Any obvious compliance concerns? No Any permit MODs since last permit? No Request for Renewal October 10, 2021 Current expiration date April 30, 2022 Comments: COGEN classified "minor" industry (see Renewal; Approach). Facility Description. Rockingham Combustion Turbine Station dispatches backup and peaking power in support of the regular Duke Energy system. The station consists of five (5) simple -cycle gas turbine generators designed to produce about 180 megawatts each, for a total possible 900 MGW. Wastewater treatment begins with an oil/water separator (OWS) followed by a coalescing filter (11,600-gallon capacity). Principal fuel consumption includes natural gas and #2 diesel. Renewal Approach. This facility is not coal-fired, but natural-gas fired with self-contained backup storage of #2 diesel. In deference to Federal categorical 40 CFR 423, North Carolina has never considered this facility a "major" industry, but permitted it as a "minor" industrial discharger. Treated wastewater and stormwater drain to a single outfall (001) requiring compliance monitoring. No changes recommended, except as follows. When operating, the facility discharges a very low volume of water, typically less than 0.011 MGD. Toxicity: The Permittee passed all annual Whole Effluent Toxicity (WET) tests since 2018, please see attached. Compliance: During this past permit cycle, this facility's database shows no violations, please see attached. Page 1 of 2 Renewal Summary: 1. updated Whole Effluent Toxicity special condition 2. updated eDMR text Schedule to Issue: Public Notice May 3, 2022 Approximate Issue Date . July 5, 2022 Page 2 of 2