Loading...
HomeMy WebLinkAboutSW6211002_Plansheet C-6.1 - Misc. Detail_20220810CHANNEL INSTALLATION [-12" 4.00'[1.22M] % B" I/ TRM INSTALLATION 8.00' I2.44M1 �I 2.00' [0.61 M] 12" L �!J L v •.:.• �� 4.00' [1.22M] 2"-5^ 0.7 STAPLES PER SQ. YD. 0.8 STAPLES PER SQ. M) PIPE OUTLET TO FLAT AREA NO WELL-DEFINED CHANNEL 6„ . •• .•••• 1 . . . ^ ^ ^^ 4 1 50' 0.46M 0' I0.6 MI 1 3 01 4.00' [1.22M] /\\ �. . . . . . . . . . . . . . . . . . 2 • .00'[0.61M] PLAN ) • L .\ 2"-5" 1 1.3 STAPLES PER SQ. YD. 1.7 STAPLES PER SQ YD. 1.5 STAPLES PER SQ. M 2.0 STAPLES PER SQ. M 0 " r3.............................. ............... \ \ ...................... ...........3O 11-III-III-III- 11=III=III=III= \ \\ 4"-s" y \ 6" \ \ '::'.. \ ........... ........................... \\ \\ rj O 1.50' 0.46M 1.50' 0.46M 3.00' [0.91 M] • 3.00' [0.91 M] • • FILTER LAYER GRAVEL OR FABRIC \ ` ... \. ...... • • 2 1M .00 0.6 [ ] • • • SECTION A -A $ 4 Q Q 4.00' [1.22M] 00'[0.30M] • • 2.00' [0.61 M] • • • 1. PREPARE SOIL BEFORE INSTALLING BLANKETS, INCLUDING ANY NECESSARY APPLICATION OF LIME, FERTILIZER, AND SEED. 4.00' [1.22M] • • NOTE: WHEN USING CELL-0 SEED DO NOT SEED PREPARED AREA. CELL-0-SEED MUST BE INSTALLED WITH PAPER SIDE DOWN. • • • • • 2. BEGIN AT THE TOP OF THE CHANNEL BY ANCHORING THE BLANKET IN A 6" (15 CM) DEEP X 6" (15 CM) WIDE TRENCH WITH APPROXIMATELY 12" (30 CM) OF BLANKET EXTENDED BEYOND THE UP -SLOPE PORTION OF THE TRENCH. ANCHOR THE BLANKET 3.4 STAPLES PER SQ. YD. 3.6 STAPLES PER SQ. YD. (a.1STAPLES PER SQ. M) (a.3STAPLES PER SQ. M) NTS WITH A ROW OF STAPLES/STAKES APPROXIMATELY 12" (30 CM) APART IN THE BOTTOM OF THE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. APPLY SEED TO COMPACTED SOIL AND FOLD REMAINING 12" (30 CM) PORTION OF BLANKET BACK OVER SEED AND COMPACTED SOIL. SECURE BLANKET OVER COMPACTED SOIL WITH A ROW OF STAPLES/STAKES SPACED 4 STAPLE PATTERN FOR 4' ROLLS APPROXIMATELY 12" (30 CM) ACROSS THE WIDTH OF THE BLANKET. NOTES 3. ROLL CENTER BLANKET IN DIRECTION OF WATER FLOW IN BOTTOM OF CHANNEL. BLANKETS WILL UNROLL WITH APPROPRIATE SIDE 1 THE LENGTH OF THE RIPRAP AGAINST THE SOIL SURFACE. ALL BLANKETS MUST BE SECURELY FASTENED TO SOIL SURFACE BY PLACING STAPLES/STAKES IN ALA PRONIS APPROPRIATE LOCATIONS AS SHOWN IN THE STAPLE PATTERN GUIDE. WHEN USING THE DOT SYSTEM STAPLES/STAKES SHOULD BE PLACED THROUGH EACH OF THE COLORED DOTS CORRESPONDING TO THE APPROPRIATE STAPLE PATTERN. 1. PREPARE SOIL BEFORE INSTALLING BLANKETS, INCLUDING ANY NECESSARY APPLICATION OF LIME, FERTILIZER, AND SEED. NOTE: WHEN USING CELL-O-SEED DO NOT SEED PREPARED AREA. CELL-O-SEED MUST BE INSTALLED WITH PAPER SIDE DOWN. � PIPE OUTLET TO 2. D = 1.5 TIMES THE MAXIMUM WELL-DEFINED CHANNEL STONE DIAMETER BUT NOT LESS 2. BEGIN AT THE TOP OF THE SLOPE BY ANCHORING THE BLANKET IN A 6" (15 CM) DEEP X 6" (15 CM) WIDE TRENCH a.00' [1.z2M] THAN 6". 4. PLACE CONSECUTIVE BLANKETS END OVER END (SHINGLE STYLE) WITH A 4' - 6" (10 CM -15 CM) OVERLAP. USE A DOUBLE WITH APPROXIMATELY 12" (30cm) OF BLANKET EXTENDED BEYOND THE UP -SLOPE PORTION OF THE TRENCH. ANCHOR THE BLANKET WITH A ROW OF STAPLES/STAKES APPROXIMATELY 12" (30 CM) APART IN THE BOTTOM OF THE TRENCH. 8.00'[2.44M] • • A o A 3. IN A WELL-DEFINED CHANNEL EXTEND ROW OF STAPLES STAGGERED 4" (10 CM) APART AND 4" (10 CM) ON CENTER TO SECURE BLANKETS. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. APPLY SEED TO COMPACTED SOIL AND FOLD REMAINING 12" (30 CM) 2.00'[0.61MI THE APRON UP THE CHANNEL BANKS TO AN ELEVATION OF 6" 5. FULL LENGTH EDGE OF BLANKETS AT TOP OF SIDE SLOPES MUST BE ANCHORED WITH A ROW OF STAPLES/STAKES PORTION OF BLANKET BACK OVER SEED AND COMPACTED SOIL. SECURE BLANKET OVER COMPACTED SOIL WITH A ROW OFABOVE • THE DEPTH OR TO THE MAXIMUM OFTER BANK, APPROXIMATELY 12" (30 CM) APART IN A 6" (15 CM) DEEP X 6" (15 CM) WIDE TRENCH. BACKFILL AND COMPACT THE TRENCH STAPLES/STAKES SPACED APPROXIMATELY 12" (30 CM) APART ACROSS THE WIDTH OF THE BLANKET. 4.00' [1.22M] WHICHEVER IS LESS. AFTER STAPLING. 3. ROLL THE BLANKETS (A.) DOWN OR (B.) HORIZONTALLY ACROSS THE SLOPE. BLANKETS WILL UNROLL WITH APPROPRIATE SIDE • • 4. A FILTER FABRIC OR BLANKET SHOULD BE INSTALLED BETWEEN THE RIPRAP 6. ADJACENT BLANKETS MUST BE OVERLAPPED APPROXIMATELY 2" - 5" (5 CM -12.5 CM) (DEPENDING ON BLANKET TYPE) AND AGAINST THE SOIL SURFACE. ALL BLANKETS MUST BE SECURELY FASTENED TO SOIL SURFACE BY PLACING STAPLES/STAKES IN APPROPRIATE LOCATIONS AS SHOWN IN THE STAPLE PATTERN GUIDE. WHEN USING THE DOT SYSTEM STAPLES/STAKES 0.7 STAPLES PER SQ. YD. (0.8 STAPLES PER SQ. M) o AND SOIL FOUNDATION. STAPLED. SHOULD BE PLACED THROUGH EACH OF THE COLORED DOTS CORRESPONDING TO THE APPROPRIATE STAPLE PATTERN. 4. THE EDGES OF PARALLEL BLANKETS MUST BE STAPLED WITH APPROXIMATELY 2" - 5" (5 CM - 12.5 CM) OVERLAP DEPENDING PLAN 7. IN HIGH FLOW CHANNEL APPLICATIONS, A STAPLE CHECK SLOT IS RECOMMENDED AT 30 TO 40 FOOT (9 M - 12 M) INTERVALS. ON BLANKET TYPE. I I GRAVEL OR FABRIC USE A DOUBLE ROW OF STAPLES STAGGERED 4" (10 CM) APART AND 4" (10 CM) ON CENTER OVER ENTIRE WIDTH OF THE 1.50'[0.46M] CHANNEL. 5. CONSECUTIVE BLANKETS SPLICED DOWN THE SLOPE MUST BE PLACED END OVER END (SHINGLE STYLE) WITH AN APPROXIMATE 2.00' [0.61 M] 3.00' [0.91 M] • • L 8. THE TERMINAL END OF THE BLANKETS MUST BE ANCHORED WITH A ROW OF STAPLES/STAKES APPROXIMATELY 12' (30 CM) APART IN A 6" (15 CM) DEEP X 6" (15 CM) WIDE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. NOTE: * IN LOOSE SOIL CONDITIONS, THE USE OF STAPLE OR STAKE LENGTHS GREATER THAN 6" (15 CM) MAY BE NECESSARY TO 3" (7.5 CM) OVERLAP. STAPLE THROUGH OVERLAPPED AREA, APPROXIMATELY 12" (30 CM) APART ACROSS ENTIRE BLANKET WIDTH. NOTE: *IN LOOSE SOIL CONDITIONS, THE USE OF STAPLE OR STAKE LENGTHS GREATER THAN 6" (15 CM) MAY BE NECESSARY TO • 2.00'[0.61 M] • z.ao' [o.s1M] T •� • • •41•41 • • 4.00' [1.22M] PROPERLY ANCHOR THE BLANKETS. PROPERLY SECURE THE BLANKETS. • 4.00'[1.22M] • D A NOTE: B * HORIZONTAL STAPLE SPACING SHOULD BE ALTERED • • fI1�Tf=_ -I I -III- =III=III1Tf=-i1 FILTER LAYER C CRITICAL POINTS IF NECESSARY TO ALLOW STAPLES TO SECURE THE A. OVERLAPS AND SEAMS CRITICAL POINTS ALONG THE CHANNEL SURFACE. 1.3 STAPLES PER SQ. YD. 1.7 STAPLES PER SQ. YD. (1.5 STAPLES PER SQ. M) (2.0 STAPLES PER SQ. M) =III�II-III 11=III= GRAVEL OR FABRIC B. PROJECTED WATER LINE -III-III-I SECTION A -A C. CHANNEL BOTTOM/SIDE ** IN LOOSE SOIL CONDITIONS, THE USE OF STAPLE MAINTENANCE SLOPE VERTICES OR STAKE LENGTHS GREATER THAN 6" (15 cm) MAY MAINTENANCE: BE NECESSARY TO PROPERLY ANCHOR THE BLANKETS. 1.50'[0.46M] 1.50'[0.46M] INSPECT RIPRAP OUTLET STRUCTURES WEEKLY AND AFTER SIGNIFICANT (} INCH OR GREATER) 1. INSPECT THE EROSION CONTROL BLANKET ONCE A WEEK AND AFTER EVERY RAINFALL. 3.00'[0.91 M] • • • 3.00'[0.91M] • • • • • • • • • • RAINFALL EVENTS TO SEE IF ANY EROSION 2. IMMEDIATELY REPAIR AND/OR REPLACE ANY DAMAGED BLANKET. 2.00' [0.61 M] AROUND OR BELOW THE RIPRAP HAS TAKEN PLACE, OR IF STONES HAVE BEEN DISLODGED. MAINTENANCE: 3. IF GROUND COVER IS NOT ESTABLISHED THROUGH THE BLANKET WITHIN 2 WEEKS, THE BLANKET • • • 4.00' [1.22M] • • • • 1.00' [0.30M] • • • • • • IMMEDIATELY MAKE ALL NEEDED REPAIRS TO SHOULD BE REMOVED AND THE AREA RESEEDED. AFTER RESEEDING, THE BLANKET SHOULD BE • • • • • • 2.00' [0.61M] PREVENT FURTHER DAMAGE. 1. INSPECT THE EROSION CONTROL BLANKET ONCE A WEEK AND AFTER EVERY RAINFALL. REINSTALLED. 1.00' [0.30M] 2. IMMEDIATELY REPAIR AND/OR REPLACE ANY DAMAGED BLANKET. • • • • • • 3. IF GROUND COVER IS NOT ESTABLISHED THROUGH THE BLANKET WITHIN 2 WEEKS, THE BLANKET • • • • • • • NTS SHOULD BE REMOVED AND THE AREA RESEEDED. AFTER RESEEDING, THE BLANKET SHOULD BE NTS REINSTALLED. NTS • • • • • • NTS 3.4 STAPLES PER SQ. YD. 3.6 STAPLES PER SQ. YD. (4.1 STAPLES PER SQ. M) (4.3 STAPLES PER SQ. M) 1 TYPICAL RIP RAP APRON 2 EROSION CONTROL BLANKET INSTALLATION 3 EROSION CONTROL BLANKET INSTALLATION 5 STAPLE PATTERN FOR 8' ROLLS PLAN VIEW PVC VENT PIPE I_ &MIN. NOTES: �►� 1' THICK #57 FILTER STONE �1.5' 1. USE FOR DRAINAGE AREAS NOT \`t , EXCEEDING 5 (FIVE) ACRES. V� 3600 CU. FT/ACRE 2. EARTH BERM SHALL BE STABILIZED W/ SEEDING ACCORDING TO SPECIFICATIONS. NATURAL GROUND MAX. SLOPE (TYP) _�- w INFLOW OO�p�/��\ 3.FILTER STONE TO BE A DEPTH OF �\\/�\\/�\\/�\\/�\\.\\�\\�\\� 1 FOOT ON THE DAM SIDE STRUCTURE -� a ®" I N. 2.5 2.5 1 / w FLEXIBLE HOSE FILTER FABRIC CROSS SECTION OVERFILL FOR SETTLEMENT EMERGENCY NATURAL GROUND �1 z 1� / SKIMMER 21" MIN BY-PASS 6" BELOW �\ SETTL.EA TOP --- DEWATERING DA DEVICE EMERGENCY ON STONE SPILLWAY BEDDING 4' MIN. V 1.5' MIN 8" SCH 40 PVC **SKIMMER CAN BE PURCHASED FROM J.W. FAIRCLOTH & SON INC. - - COMPACTED SOIL �� i PIPE SKIMMER CHOSEN SHALL BE EQUAL TO THE FAIRCLOTH SKIMMER. 2:1 SIDE SLOPE MAX WHEN A GRAVEL DIVERSION BERM IS REQUIRED, THE HEIGHT MAINTENANCE jfT SHALL BE REDUCED TO 12 INCHES AND THE TOP WIDTH TO 6", FILTER FABRIC EXIST. GRADE ALL OTHER REQUIREMENTS SHALL REMAIN THE SAME. BAFFLES EMBANKMENT INSPECT LEAST EEKLY AN AFrER EACH ICANT (0.5 OT001/2RHEGHT IR\ `1:1SIDE SLOPE MAX TEMPORARY DIVERSION KEY NOTES: INFLOW 1' FREEBOARD STRUCTURE SEDIMENTSKIMMER AND RESTOREENT BASINATIOSITSTORGNALVDIMENSIONS WHEN SEDIMENT ACCUMULATES OFINFALL T E 1STENT BAFF BAFFLE. PULLITHE SKIMMER TOEONEESIDE BAFFLES FEf SUCH THAT THE SEDIMENT UNDERNEATH IT CAN BE EXCAVATED. EXCAVATE THE SEDIMENT FROM THE ENTIRE BASIN. MAKE SURE THE VEGETATION GROWING IN THE BOTTOM OF THE BASIN DOES NOT HOLD DOWN THE SKIMMER. CLASS B RIP RAP 3' MIN. 1. CLEAR THE ARE UNDER THE BERM AND STRIP THE ROOTS/OTHER ORGANICS. 2. COMPACT THE SIDE SLOPES, PREFERABLY WITH A TRACKED VEHICLE TO SLOW RUNOFF VELOCITIES. 3. VEGITATE THE RIDGE OF THE BERM IMMEDIATELY AFTER CONSTRUCTION UNLESS THE BERM WILL REMAIN IN PLACE T 6" MIN. INVE ELEVATION OF REPAIR THE BAFFLES IF THEY ARE DAMAGED. RE -ANCHOR THE BAFFLES IF WATER IS FLOWING UNDERNEATH OR AROUND THEM. MAINTENANCE STONE SECTION DESIGN OF SPILLWAYS FOR LESS THAN 30 DAYS. DEWATERING EMERGENCY SPILLWAY ZONE EMERGENCY SPILLWAY IF THE SKIMMER IS CLOGGED WITH TRASH AND THERE IS WATER IN THE BASIN, USUALLY JERKING THE ROPE WILL MAKE THE SKIMMER BOB UP AND DOWN AND INSPECT TEMPORARY SEDIMENT TRAPS AFTER EACH PERIOD OF SIGNIFICANT RAINFALL. REMOVE SEDIMENT AND DRAINAGE AREA WEIR LENGTH DISLODGE THE DEBRIS AND RESTORE FLOW. IF THIS DOES NOT WORK, PULL THE SKIMMER OVER TO THE SIDE OF THE BASIN AND REMOVED THE DEBRIS. CHECK RESTORE TRAP TO ITS ORIGINAL DIMENSIONS WHEN THE SEDIMENT HAS ACCUMULATED TO ONE-HALF THE (ACRES) (FT.) DESIGN DEPTH OF THE TRAP. PLACE THE SEDIMENT THAT IS REMOVED IN A DESIGNATED DISPOSAL AREA AND FILTER FABRIC STONE BEDDING THE ORIFICE INSIDE THE SKIMMER TO SEE IF IT IS CLOGGED; IF SO, REMOVE THE DEBRIS. REPLACE THE CONTAMINATED PART OF GRAVEL FACING. 1 4.0 2 6.0 MAINTENANCE: SEDIMENT IF THE SKIMMER ARM OR BARREL PIPE IS CLOGGED, THE ORIFICE CAN BE REMOVED AND THE OBSTRUCTION CLEARED WITH A PLUMBER'S SNAKE OR BY FLUSHING CHECK THE STRUCTURE FOR DAMAGE FROM EROSION OF PIPING. PERIODICALLY CHECK THE DEPTH OF THE 3 8.0 STORAGE ZONE WITH WATER. BE SURE AND REPLACE THE ORIFICE BEFORE REPOSITIONING THE SKIMMER. SPILLWAY TO ENSURE IT IS A MINIMUM OF 1.5 FT. BELOW THE LOW POINT OF THE EMBANKMENT. IMMEDIATELY 5 12.0 INSPECT TEMPORARY DIVERSIONS ONCE A WEEK AND AFTER EVERY RAINFALL. IMMEDIATELY REMOVE CROSS-SECTION VIEW CHECK THE FABRIC LINED SPILLWAY FOR DAMAGE AND MAKE ANY REQUIRED REPAIRS WITH FABRIC THAT SPANS THE FULL WIDTH OF THE SPILLWAY. CHECK FILL ANY SETTLEMENT OF THE EMBANKMENT TO SLIGHTLY ABOVE DESIGN GRADE. ANY RIP RAP DISPLACED FROM THE SPILLWAY MUST BE REPLACED IMMEDIATELY. DIMENSIONS SHOWN ARE MINIMUM SEDIMENT FROM THE FLOW AREA AND REPAIR THE DIVERSION RIDGE. CAREFULLY CHECK OUTLETS AND MAKE TIMELY REPAIRS AS NEEDED. CONSTRUCTION SPECIFICATIONS EMBANKMENT, SPILLWAYS, AND OUTLET FOR EROSION DAMAGE AND INSPECT THE EMBANKMENT FOR PIPING AND SETTLEMENT. MAKE ALL NECESSARY REPAIRS. STABILIZE THE EMBANKMENT AND ALL DISTURBED AREAS ABOVE THE SEDIMENT POOL AND DOWNSTREAM FROM 1. CLEAR, GRUB & STRIP TOPSOIL FROM AREAS UNDER THE EMBANKMENT TO REMOVE TREES, VEGETATION, ROOTS AND OTHER OBJECTIONABLE MATERIAL. NTS THE TRAP IMMEDIATELY AFTER CONSTRUCTION WITH SEEDING. NTS V NTS PLACE TEMPORARY SEDIMENT CONTROLS BELOW THE BASIN AS NEEDED. 2. ENSURE THAT FILL MATERIAL FOR THE EMBANKMENT IS FREE OF ROOTS, INLET MATTER ANDALLOW OBJECTIONABLE WOOD ILL THETI EMBANKMENT LEMENT MATERIAL. PLACE THE FILL IN LIFTS NOT TO EXCEED 9 INCHES AND MACHINE COMPACT IT. PVC VENT PIPE OVER FILL THE EMBANKMENT 6 INCHES TO ALLOW FOR SETTLEMENT. 6 FAIRCLOTH SKIMMER 7 TEMPORARY SEDIMENT TRAP 8 TEMPORARY DIVERSION BERM 3. SHAPE THE BASIN TO THE SPECIFIED DIMENSIONS. PREVENT THE SKIMMING DEVICE FROM SETTLING INTO THE MUD BY EXCAVATING A SHALLOW PIT UNDER THE SKIMMER OR PROVIDING A LOW SUPPORT UNDER THE SKIMMER OF STONE OR TIMBER. P 4. PLACE THE BARREL ON A FIRM, SMOOTH FOUNDATION OF IMPERVIOUS SOIL. PLACE THE FILL MATERIAL AROUND THE PIPE SPILLWAY IN 4 INCH LAYERS ANDCOMPACT L = THE DISTANCE SUCH THAT POINTS A AND BARE OF EQUAL ELEVATION IT UNDER AND THE ADJACENT EMBANKMENT. PLACE A MINIMUM OF 2 FEET OF COMPACTED THE PIPE TO AT LEAST THE SAME DENSITY AS ooOpQ� BACKFILL OVER THE PIPE SPILLWAY BEFORE CROSSING IT WITH CONSTRUCTION EQUIPMENT. FLEXIBLE HOSE _ - - q E L CURB AND GUTTER TO BE POURED IN 10' SECTIONS WITH EXPANSION JOINTS EVERT sO' 60, C/L 5. ASSEMBLE THE SKIMMER FOLLOWING THE MANUFACTURER'S INSTRUCTIONS. SEDIMENT STORAGE I - III -III -III -III -III = _ _ _ = AREA I I -III=III=III-III (90' IF WHINE PUKED) R , , �. PAVEMENT CUT 6. LAY THE ASSEMBLED SKIMMER H THE BOTTOM . A THE BASIN WITH THE FLEXIBLE JOINT AT THE INLET OF THE BARREL PIPE. ATTACHED THE FLEXIBLE JOINT TO THE BARREL PIPE AND POSITION THE SKIMMER OVER THE EXCAVATED PIT. ATTACH A ROPE TO THE SKIMMER AND ANCHOR IT TO THE SIDE OF THE - III ; I I II;,I I111111=I I -I I = _ _-_ _ __ _ _ _ _ _ _ _ _ _OF III-1 I 1-III-I I II I I I I I I I I I I I I=III-III _ _ _ _ _ _ -1 1 I 1 1 I-1 1 1 I I I III-III-III-11 �-III-III=III-'�`+... III , (�, � p `v X' • ' ...; : a :. •: :: . , ry"� ' •'\ . . _ 25' - I - 25' _ T SCH 40 PVC "SKIMMER CAN BE PURCHASED FROM J.W. FAIRCLOTH & SON INC. BASIN. PIPE SKIMMER CHOSEN SHALL BE EQUAL TO THE FAIRCLOTH SKIMMER. 7. INSTALL THE SPILLWAY IN UNDISTURBED SOIL TO THE GREATEST EXTEND POSSIBLE. THE SPILLWAY SHOULD BE LINED WITH LAMINATED PLASTIC OR SKIMMER CENTER OF THE DAM IS TO BE 9" LOWER THAN THE EDGES (MIN) A 1,5' ..aDaD:Psr .'' ''''• 11 7/s• 3„ IMPERMEABLE GEOTEXTILE FABRIC. THE FABRIC MUST BE WIDE AND LONG TO FORM A WEIR MIN. (IDw Pars N attVO �i `3SR E - Z ENOUGH TO COVER THE BOTTOM AND SIDES AND EXTEND ONTO THE TOP OF I \ I 24' THE DAM FOR ANCHORING IN A TRENCH. THE EDGES MAY BE SECURED WITH 8 INCH STAPLES. THE FABRIC MUST BE LONG ENOUGH TO EXTEND DOWN THE Oo 9" MIN. 11 ' 28' 2' CONCRETE CURB SLOPE AND EXIT ONTO STABLE GROUND. THE WIDTH OF THE FABRIC MUST BE ONE PIECE. IF MULTIPLE SECTIONS AREA REQUIRED, THE UPPER SECTION 4" 625.00 SHOULD OVERLAP THE LOWER SECTION SO THAT WATER CANNOT FLOW UNDER CENTER OF THE DAM IS \\\ THE FABRIC. MAINTENANCE TO BE 9" LOWER THAN 50' 8. DISCHARGE WATER INTO THE BASIN TO PREVENT EROSION. USE TEMPORARY INSPECT SKIMMER SEDIMENT BASINS WEEKLY AND AFTER EACH PERIOD OF SLOPE DRAINS OR DIVERSIONS WITH OUTLET PROTECTION TO DIVERT SEDIMENT SIGNIFICANT RAINFALL. REMOVE SEDIMENT AND RESTORE TRAP TO ITS ORIGINAL FILTER FABRIC THE EDGES (MIN) TO FORM A WEIR R/W LADEN WATER TO THE UPPER END OF THE POOL AREA TO IMPROVE BASIN TRAP DIMENSIONS WHEN THE SEDIMENT HAS ACCUMULATED TO ONE-HALF THE HEIGHT EFFICIENCY. OF THE FIRST BAFFLE. EXCAVATE SEDIMENT FROM THE ENTIRE BASIN. MAKE SURE VEGETATION GROWING IN THE BOTTOM OF THE BASIN DOES NOT HOLD DOWN THE CLASS A OR B EROSION CHANNEL OR DITCH CONTROL STONE APPLICATION 2'7 COMPACTED 9. CONSTRUCT THE STRUCTURE SO THAT THE DISTURBED AREA IS MINIMIZED. SKIMMER. PLACE THE SEDIMENT THAT IS REMOVED IN AN AREA WITH SEDIMENT DIVERT SURFACE WATER AWAY FROM BARE AREAS. COMPLETE THE CONTROLS. A %99�J SUBGRADE AT4C LATER EMBANKMENT BEFORE THE AREA IS CLEARED. REPAIR THE BAFFLES IF THEY ARE DAMAGED. RE -ANCHOR THE BAFFLES IF WATER MAINTENANCE � 46' 2' 1 1 ' R/W 10. INSTALL POROUS BAFFLES AS SPECIFIED. IS FLOWING UNDERNEATH OR AROUND THEM. 11. AFTER ALL SEDIMENT PRODUCING AREAS HAVE BEEN STABILIZED, REMOVE UNCLOGGED THE SKIMMER AS NEEDED. CHECK TO MAKE SURE ORIFICE INSIDE OF THE STRUCTURE AND ALL THE UNSTABLE SEDIMENT. SMOOTH THE AREA TO THE SKIMMER IS NOT CLOGGED; IF SO, REMOVE THE DEBRIS. IF SKIMMER ARM OR 1. INSPECT THE CHECK DAMS AFTER EACH RAINFALL BUT IN NO FILTER FABRIC 1.5% BLEND WITH THE ADJOINING AREAS AND STABILIZE PROPERLY. BARREL IS CLOGGED, REMOVE THE ORIFICE AND CLEAR THE DEBRIS. CASE LESS THAN ONCE PER WEEK 3. REMOVE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE CHECK THE FABRIC LINED SPILLWAY FOR DAMAGE AND MAKE ANY REQUIRED REPAIRS WITH FABRIC THAT SPANS THE FULL WIDTH OF THE SPILLWAY. CHECK THE EMBANKMENT, SPILLWAYS AND OUTLET FOR EROSION DAMAGE. MAKE ALL ADEQUATE STORAGE VOLUME FOR THE NEXT RAINTAKE CARE SECTION A -A . TO AVOID UNDERMINING THE DAM DURING CLEANOUT. SECTION AA **TAPERED MILLING REQUIRED EACH SIDE OF CENTERLINE OF PAVEMENT CUT, 25' @ 0"-1.5" NECESSARY REPAIRS IMMEDIATELY. REMOVE TRASH AND DEBRIS FROM THE 3. CLEAN OR REPLACE THE STONE WHEN IT SHOWS SIGNS OF SKIMMER AND POOL AREAS. CLOGGING OR OTHERWISE DOES NOT PERFORM CORRECTLY NTS 4. WEIR SECTION MUST BE 9" LOWER THAN ABUTMENTS 5. DOWNSTREAM APRON LENGTH SHOULD BE 3 TIMES THE NTS NTS NTS HEIGHT OF THE WEIR. 9 TEMPORARY SKIMMER BASIN 10 CHECK DAM WITH WEIR 11 SYM. CUL-DE-SAC WITH CONCRETE CURB 12 FULL DEPTH PAVEMENT PATCH 4Dsite solutions civil engineering I land surveying 409 Chicago Drive, Suite 112, Fayetteville, NC 28306 office 1910-426-6777 fax 1910-426-5777 license number I C-2354 wwwAD site solutions.com 11CAR9�% !Q1 !1) ,1 FF0$10 ••/ ''�� •4 SEA • • 027 't i IN S C I r T 8 U -U 22 Li REVISIONS PROJECT NAME B&B LOOP SUBDIVISION EROSION CONTROL & SITE DETAILS CLIENT J&K GENERAL CONTRACTORS 645 Laurinburg Highway Raeford, North Carolina 28376 Phone: (910) 638-6102 PROJECT INFORMATION DESIGNED BY: SEAN/CHRIS DRAWN BY: SEAN/CHRIS CHECKED BY: SCOTT PROJECT NUMBER: 1649 DRAWING SCALE NOT TO SCALE DATE RELEASED APRIL 5 2022 SHEET NUMBER C-6m 1