HomeMy WebLinkAboutSW6211002_Plansheet C-6.0 - Misc. Detail_20220810DESIGN CRITERIA
AGGREGATE SIZE - USE 2-3 INCH WASHED STONE
DIMENSION OF GRAVEL PAD
GRAVEL ENTRANCE SHALL BE 50 FEET THICKNESS -6 INCHES MINIMUM
IN LENGTH AND 12 FEET IN WIDTH
WITH 20 FOOT RADIUS AT EXISTING WIDTH - 12 FT. MINIMUM OR FULL WIDTH AT ACCESS
ROADWAY POINTS OF THE VEHICULAR ENTRANCE AND EXIT
36'-0" MIN 4'-0" 10'-0" AREA, WHICHEVER IS GREATER
6"� LENGTH- 50 FT. MINIMUM.
1. UNLESS OTHERWISE INDICATED, ALL VEGETATIVE AND 7. ALL DISTURBED AREAS ARE TO DRAIN TO APPROVED SEDIMENT
STRUCTURAL EROSION AND SEDIMENT CONTROL MEASURES SHALL CONTROL MEASURES AT ALL TIMES DURING LAND DISTURBING
LOCATION - LOCATE CONSTRUCTION ENTRANCES AND
BE CONSTRUCTED AND MAINTAINED IN ACCORDANCE WITH THE ACTIVITIES AND DURING SITE DEVELOPMENT UNTIL FINAL
Ii EXITS TO LIMIT SEDIMENT FROM LEAVING THE SITE
AND PROVIDE FOR MAXIMUM UTILITY BY ALL
MINIMUM STANDARDS AND SPECIFICATIONS OF THE NORTH STABILIZATION IS ACHIEVED.
FILTER FABRIC CONSTT RUCTION VEHICLES. AVOID STEEP GRADES
CAROLINA EROSION AND SEDIMENT CONTROL HANDBOOK.
2-3" WASHED STONE AND ENTRANCES AT CURVES IN PUBLIC ROADS.
8. ALL AREAS DISTURBED BY CONSTRUCTION UNLESS OTHERWISE
CONTRACTOR SHALL INSTALL ADDITIONAL GRAVEL
SEEDING SPECIFICATIONS
2. THE CONTRACTOR SHALL NOTIFY PLAN APPROVING AUTHORITY IMPROVED SHALL BE SODDED OR SEEDED AS INDICATED AND
GRAVEL CONSTRUCTION ENTRANCE CONSTRUCTION ENTRANCES NOT INDICATED ON THE PLANS
ONE WEEK PRIOR TO THE PRECONSTRUCTION CONFERENCE, ONE STABILIZED.
WEEK PRIOR TO THE COMMENCEMENT OF LAND DISTURBING
REQUIRED FOR STAGING AND/OR BORROW AREAS AND
MAINTAIN AT NO ADDITIONAL EXPENSE TO THE OWNER.
TEMPORARY SEEDING/MULCHING SPECIFICATIONS (FOR LATE WINTER AND EARLY SPRING)
SEEDING MIXTURES:
ACTIVITY, AND ONE WEEK PRIOR TO FINAL INSPECTION. 9. DURING DEWATERING OPERATIONS, WATER SHALL BE PUMPED
CONTRACTOR SHALL SUPPLEMENT AND MAINTAIN GRAVEL
SEEDING MIXTURE:
SPECIES RATE (LB./ACRE)
SPECIES RATE (LBS.IACRE)
INTO AN APPROVED FILTERING DEVICE PRIOR TO DISCHARGE TO
3. IF POSSIBLE ALL EROSION AND SEDIMENT CONTROL MEASURES RECEIVING OUTLET.
CONSTRUCTION ENTRANCES AT HIS EXPENSE UNTIL FINAL
ACCEPTANCE.
ARE TO BE PLACED PRIOR TO CLEARING AND/OR LAND DISTURBANCE.
Q
RYE (GRAIN) 120
TALL FESCUE 80
10. THE CONTRACTOR SHALL INSPECT ALL EROSION CONTROL
Q,OP
/
ANNUAL KOBE LESPEDEZA 50
PENSACOLA BAHIAGRASS 50
4. A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL MEASURES WEEKLY AND AFTER EACH RUNOFF -PRODUCING EVENT.
�G MAINTENANCE
OMIT ANNUAL LESPEDEZA WHEN DURATION OF TEMPORARY COVER IS NOT EXTEND BEYOND JUNE.
SERICEA LESPEDEZA 30
PLAN AND PERMIT SHALL BE MAINTAINED ON THE SITE AT ALL TIMES. ANY NECESSARY REPAIRS OR CLEANUP TO MAINTAIN THE
JQj�
SEEDING DATES:
KOBE LESPEDEZA 10
EFFECTIVENESS OF THE EROSION CONTROL DEVICES SHALL BE
5. PRIOR TO COMMENCING LAND DISTURBING ACTIVITIES IN AREAS MADE IMMEDIATELY.
Q MAINTAIN THE GRAVEL PAD INBA CONDITION TO PREVENT MUD OR
SEDIMENT FROM LEAVING THE CONSTRUCTION SITE. THIS MAY
JAN UARY 1 -MAY 1
SEEDING NOTES:
OTHER THAN INDICATED ON THESE PLANS (INCLUDING, BUT NOT
LIMITED TO OFF -SITE BORROW OR WASTE AREAS STAGING OR 11. ALL TEMPORARY EROSION CONTROL MEASURES SHALL BE
so,m/n REQUIRE PERIODIC TOPDRESSING WITH 2-INCH STONE. AFTER EACH
RAINFALL INSPECT ANY STRUCTURE USED TO TRAP SEDIMENT AND
1. FROM SEPT. 1 TO MAR. 1 USE UNSCARIFIED SERICEA SEED.
STORAGE AREAS), THE CONTRACTOR SHALL PREPARE AND SUBMIT REMOVED BY CONTRACTOR ONCE STABILIZATION OR A SUFFICIENT
CLEAN IT OUT AS NECESSARY. IMMEDIATELY REMOVE ALL
SOIL AMENDMENTS:
2. ON POORLY DRAINED SITES OMIT SERICEA AND INCREASE KOBE TO 30 LB./ACRE.
A SUPPLEMENTARY EROSION CONTROL PLAN TO THE OWNER FOR GROUND COVER HAS BEEN ESTABLISHED OR AS DIRECTED BY THE
OBJECTIONABLE MATERIALS SPILLED, WASHED OR TRACKED ONTO
/
FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY 2,000 LB./ACRE GROUND AGRICULTURAL LIMESTONE AND 750
3. WHERE A NEAT APPEARANCE IS DESIRED, OMIT SERICEA AND INCREASE KOBE TO 40 LB./ACRE.
REVIEW AND TO NCDENR REGIONAL OFFICE FOR APPROVAL. ENGINEER. NCDENR'S FINAL APPROVAL IS REQUIRED.
PUBLIC ROADWAYS.
LB./ACRE 10-10-10 FERTILIZER.
CONTRACTOR SHALL PAY ALL FEES REQUIRED AND SHALL INSTALL
NURSE PLANTS:
NECESSARY MEASURES AT NO SEPARATE PAYMENT. THE 12. TEMPORARY GRAVEL CONSTRUCTION ENTRANCE SHALL BE
MULCH:
BETWEEN APRIL 15 AND AUG. 15, ADD 10 LB./ACRE OF GERMAN MILLET OR 15 LB./ACRE SUDANGRASS. PRIOR TO MAY 1
CONTRACTOR SHALL PROVIDE THE OWNER AND THE ENGINEER A REQUIRED AT ALL CONSTRUCTION STAGING AREA ENTRANCES AND
APPLY 4,000 LB./ACRE STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR A MULCH ANCHORING TOOL.
OR AFTER AUG. 15, ADD 25 LBJACRE RYE (GRAIN).
COPY OF THE AMENDED PERMIT. ALL CONSTRUCTION ACCESS LOCATIONS INTO NON -PAVED AREA.
A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL.
6. THE CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OF ANY 13. WHEN CROSSING CREEK OR DRAINAGE -WAY, THE CONTRACTOR
SEEDING DATES:
ADDITIONAL EROSION CONTROL MEASURES NECESSARY TO PREVENT SHALL RIP -RAP WITH FABRIC DISTURBED BANKS AND CHANNEL AND
AGGREGATE N
MAINTENANCE:
BEST POSSIBLE
EROSION AND SEDIMENTATION AS DETERMINED BY EITHER NCDENR RESTORE SLOPES TO ORIGINAL CONTOURS, BUT NOT STEEPER THAN
6" MIN. THICKNESS
REFERTILIZE IF GROWTH IS NOT FULLY ADEQUATE. RESEED, REFERTILIZE AND MULCH IMMEDIATELY FOLLOWING
EARLY SPRING: FEB. 15 - MAR. 20 FEB. 15 - APR. 30
OR THE ENGINEER. 2:1 MAXIMUM. DISTURBED CREEK AREA SHALL BE STABILIZED
EROSION OR OTHER DAMAGE.
FALL: SEPT. 1 - SEPT. 30 SEPT. 1 - OCT. 31
IMMEDIATELY.
2-3" COURSE
TEMPORARY SEEDING/MULCHING SPECIFICATIONS (FOR SUMMER)
SOIL AMENDMENTS:
SEEDING MIXTURE:
APPLY LIME AND FERTILIZER ACCORDING TO SOIL TEST, OR APPLY 3,000 - 5,000 LB./ACRE GROUND AGRICULTURAL
SPECIES RATE (LB./ACRE)
LIMESTONE (USE THE LOWER RATE ON SANDY SOILS) AND 1,000 LB./ACRE 10-10-10 FERTILIZER.
NTS
GERMAN MILLET 40
MULCH:
APPLY 4,000 LB./ACRE GRAIN STRAW OR EQUIVALENT COVER OF ANOTHER SUITABLE MULCH. ANCHOR STRAW BY
A SMALL -STEMMED SUDANGRASS MAY BE SUBSTITUTED AT A RATE OF 50 LB./ACRE.
TACKING WITH ASPHALT, NETTING, OR ROVING OR BY CRIMPING WITH A MULCH ANCHORING TOOL. A DISK WITH
BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL.
3 GENERAL EROSION AND SEDIMENT CONTROL NOTES
4 TEMPORARY GRAVEL CONSTRUCTION ENTRANCE
SEEDING DATES:
MAY 1 - AUGUST 15
MAINTENANCE:
IF GROWTH IS LESS THAN FULLY ADEQUATE, REFERTILIZE IN THE SECOND YEAR, ACCORDING TO THE SOIL TESTS OR
SOIL AMENDMENTS:
TOP DRESS WITH 500 LB./ACRE 10-10-10 FERTILIZER. MOW AS NEEDED WHEN SERICEA IS OMITTED FROM THE MIXTURE.
FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY 2,000 LB./ACRE GROUND AGRICULTURAL LIMESTONE AND 750
RESEED, FERTILIZE, AND MULCH DAMAGED AREAS IMMEDIATELY.
GRASSED OR RIP RAP LINED SWALE
LBJACRE 10-10-10 FERTILIZER.
NOTE: THIS CROSS SECTION IS TO BE USED FOR THE
STANDARD METAL POSTS 2'-0" IN GROUND
MULCH:
SEEDING SPECIFICATIONS
ENTIRE LENGTH OF THE SWALE.
APPLY 4,000 LBJACRE STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR A MULCH ANCHORING TOOL.
SEEDING MIXTURE:
19 GAUGE HARDWARE CLOTH (1/4
MESH OPENINGS)
A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL.
SEE PLAN FOR WIDTH
MAINTENANCE:
SPECIES RATE (LB./ACRE)
REFERTILIZE IF GROWTH IS NOT FULLY ADEQUATE. RESEED, REFERTILIZE AND MULCH IMMEDIATELY FOLLOWING
COMMON BERMUDAGRASS 40-80(1-2 LB./1,000 FT2)
GRASS OR EROSION EXISTING
-- CONSTRUCTION SPECIFICATIONS
EROSION OR OTHER DAMAGE.
SEEDING DATES:
CONTRL LINING SEE GROUND
GRADING PLANT
- t S 1. UNIFORMLY GRADE A SHALLOW DEPRESSION
g APPROACHING THE INLET.
TEMPORARY SEEDING/MULCHING SPECIFICATIONS (FOR FALL)
COASTAL PLAIN: APR. - JULY
4 $ $ 2. DRIVE 5-FOOT STEEL POSTS 2 FEET INTO THE GROUND
SEEDING MIXTURE:
SPECIES RATE (LB./ACRE)
SOIL AMENDMENTS:
APPLY LIME AND FERTILIZER ACCORDING TO SOIL TEST, OR APPLY 3,000 LB./ACRE GROUND AGRICULTURAL LIMESTONE
SEE PLAN FOR
SURROUNDING THE INLET. SPACES POSTS EVENLY AROUND
_o THE PERIMETER OF THE INLET, A MAXIMUM OF 4 FEET
�� b� p APART.
AND 500 LB./ACRE 10-10-10 FERTILIZER.
1 DEPTH 4
CY -�
RYE (GRAIN) 120
SEEDING DATES:
MULCH:
3
3
3 CONSTRUCTION SPECIFICATIONS:
v2To � 3. SURROUND THE POSTS WITH WIRE MESH HARDWARE
11O
OV - CLOTH. SECURE THE WIRE MESH TO THE STEEL POSTS AT
/ �Jo _ THE TOP, MIDDLE AND BOTTOM. PLACING A 2 FOOT FLAP
¢o 0
AUGUST 15 - DECEMBER 30
USE JUTE, EXCELSIOR MATTING, OR OTHER EFFECTIVE CHANNEL LINING MATERIAL TO COVER THE BOTTOM OF
CHANNELS AND DITCHES. THE LINING SHOULD EXTEND ABOVE THE HIGHEST CALCULATED DEPTH OF FLOW. ON
= I (TYPICAL
I I� I I� I I- 1. REMOVE ALL TREES, BRUSH, STUMPS, AND OTHER
N
o
OF THE WIRE MESH UNDER THE GRAVEL FOR ANCHORING
�gg
- Coxb@000a O o0a - IS RECOMMENDED.
SOIL AMENDMENTS:
FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY 2,000 LB./ACRE GROUND AGRICULTURAL LIMESTONE AND
CHANNEL SIDE SLOPES ABOVE THIS HEIGHT, AND IN DRAINAGES NOT REQUIRING TEMPORARY LININGS, APPLY 4,000
LB./ACRE GRAIN STRAW AND ANCHOR STRAW BY STAPLING NETTING OVER THE TOP.
I� I I I I� GRADING OBJECTIONABLE MATERIAL FROM THE FOUNDATION AREA.
I I-2. EXCAVATE THE CHANNEL AND SHAPE IT TO NEAT LINES
PLAN)
COMPACTED AND DIMENSIONS SHOWN ON THE PLANS PLUS 0.2 FT
- �� -' �- 4. PLACE CLEAN GRAVEL (NCDOT #5 OR #57 STONE) ON
OF A INCHES AROUND THE
�� A 2:1 SLOPE WITH A N EVEN
WIRE AND SMOTH TO AN EVEN GRADE.
1,000 LB./ACRE 10-10-10 FERTILIZER.
MULCH AND ANCHORING MATERIALS MUST NOT BE ALLOWED TO WASH DOWN SLOPES WHERE THEY CAN CLOG
SUBGRADE OVERCUT AROUND THE CHANNEL PERIMETER TO ALLOW
2:1 SLOPE GRAVEL FILTER 1 57 WASHED STONE PLACED TO A HEIGHT OF 16"
MINIMUM ABOVE TOP OF BOX
MULCH:
DRAINAGE DEVICES.
FOR BULKING DURING SEEDBED PREPARATIONS AND SOD
2.0' UNLESS
BUILDUP.
5. ONCE THE CONTRIBUTING DRAINAGE AREA HAS BEEN
STABILIZED, REMOVE ACCUMULATED SEDIMENT AND
APPLY 4,000 LBJACRE STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR A MULCH ANCHORING TOOL.
MAINTENANCE:
OTHERWISE SHOWN 3. REMOVE AND PROPERLY DISPOSE OF ALL EXCESS SOIL
ESTABUSH FINAL GRADING ELEVATIONS.
A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL.
A MINIMUM OF 3 WEEKS IS REQUIRED FOR ESTABLISHMENT. INSPECTION AND REPAIR MULCH FREQUENTLY.
SO THAT SURFACE WATER MAY ENTER THE CHANNEL
FREELY.
6. COMPACT THE AREA PROPERLY AND STABILIZE IT WITH
MAINTENANCE:
REFERTILIZE THE FOLLOWING APR. WITH 50 LB./ACRE NITROGEN.
4. ESTABLISH GRASS IN THE CHANNEL IMMEDIATELY.
GROUNDCOVER.
REPAIR AND REFERTILIZE DAMAGED AREAS IMMEDIATELY. TOP DRESS WITH 50 LB./ACRE OF NITROGEN IN MARCH. IF
5. USE SEEDING SPECIFICATIONS SHOWN ON THIS SHEET
IT IS NECESSARY TO EXTEND TEMPORARY COVER BEYOND JUNE 15, OVERSEED WITH 50 LB./ACRE KOBE LESPEDEZA
TO SEED SWALES.
IN LATE OR EARLY MARCH.
MAINTENANCE & CONSTRUCTION:
MAINTENANCE
1. INSPECT THE SWALE FOR EROSION ONCE A WEEK AND AFTER EVERY RAINFALL.
INSPECT INLETS AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT (1Iz INCH OR GREATER)
RAINFALL EVENT. CLEAR THE MESH VIIRE OF ANY DEBRIS OR OTHER OBJECTS TO PROVIDE
2. IMMEDIATELY REPAIR AND/OR REPLACE ANY DAMAGED AREAS.
ADEQUATE FLOW FOR SUBSEQUENT RAINS. TAKE CARE NOTTO DAMAGE OR UNDERCUT
3. MAINTAIN PROPER CROSS SECTION UNTIL THE SWALE IS STABLE.
4. KEEP THE GRASS IN A HEALTHY, VIGOROUS CONDITION AT ALL TIMES.
NTS
THE WIRE MESH DURING THE SEDIMENT REMOVAL. REPLACE STONE AS NEEDED NTS
1 TEMPORARY SEEDING SPECIFICATIONS
2 PERMANENT SEEDING SPECIFICATIONS
5 TYPICAL SWALE CROSS SECTION
6 HARDWARE CLOTH & GRAVEL INLET PROTECTION
10' UTILITY EASEMENT 50' ROW 10' UTILITY EASEMENT
CURB AND GUTTER TO BE POURED
0
IN 10' SECTIONS WITH EXPANSION
JOINTS EVERY 50'
(90' IF MACHINE PLACED)
11 3/8"
FINISH GRADE SF9.56
28' BC -BC
0.5'
;- (END OF CURVE) N
1 1 ' 14' 14' 5.5' 5'
11111 1111 1111
��a+l
N A. � � � �
n4.e '�\�
N
2 1 12'12' 2' 1 c�\oPe
2
e00
e < \ d 3000' PSI ' i�
'. .a A n .. ".� CONCRETE.4. -
a d
E 1.57o I -
ail 1.5% - 2%
( 2" SF9.5B 2%, -1.5� I-
°'
OP GROUP
�- CABC
11 7/8"
(LOW POINT IN CURVE)
8" COMPACTED
ABC
6"
III- I EXTEND STONE 12" w
BEYOND THE BACK z z NOTES
24"
COMPACTED
OF CURB Uj
SUBGRADE
1. SECTION SHOWN TO DEPICT TYPICAL CUT & FILL CONDITIONS
CARRY BASE COURSE 6"
ONLY. GRADING PLAN SHOWS WHETHER SECTION IS IN CUT,
BEYOND SURFACE COURSE
FILL OR BOTH
AT LOCATIONS WITHOUT
CURB AND GUTTER
2. GEOTECHNICAL ENGINEER SHOULD BE CONSULTED TO DETERMINE
DEPTH OF ABC NEEDED TO MEET NCDOT REQUIREMENTS
3. DEVELOPMENT WILL HAVE SIDEWALK ON ONE SIDE OF THE ROAD,
NTS
NTS
SEE PLAN FOR SIDEWALK LOCATIONS. NTS
7 24" STANDARD ROLL CURB
8 ASPHALT PAVEMENT
9 ROADWAY TYPICAL SECTION
1/8" RADIUSJOINT SEALER -�. 1/8
1/8" TO 1/4" "
••
". 1. 4»
�' < ya•
VARIES 6' 20' 6'
• y.. ? P. :. • .d .
(SWALE) (SHOULDER) (SHOULDER)
10' 10'
1/2" JOINT FILLER GROOVE JOINT IN SIDEWALK
TRANSVERSE EXPANSION
.5'
cai 5
BSUR
JOINT IN SIDEWALK
a
BEYOND ACCERCOURSE 2% 2% 2" S9.56
8% � 8%
N I�
5' 5.5'//\\/\\\/\\
IN Rx
Mmdum \THIS IS FOR
P
/
�\ \\ FILL SECTION
3 i�/' 3 \//j�/j�/j/ MINIMUM 8" COMPACTED ABC 3
• e
`�-_III-_III
ENGINEER BE
SOUBGRADE
CONSUETEDICAL
TODETERMINESDEOTHDOFABC
_ II
MilIII�IIIIIilllllllllll_,II�I;,III <,
NEEDED TO MEET NCDOT REQUIREMENTS
I I_
USE 3:1 CUT SLOPES IN CUT SECTIONS
NOTE:
1. SIDEWALK SHALL BE 6" THICK UNDER DRIVEWAY MIN.
2. PROVIDE CONTROL JOINTS AT DISTANCE EQUAL TO WIDTH OF
SIDEWALK, PROVIDE 1/2" EXP. JOINTS WITH PRE -MOLDED E.J.
FILLER AT MAX. 30' O.C.
3. CONCRETE COMPRESSIVE STRENGTH SHALL BE 3000 PSI. NTS
IN 28 DAYS.
NTS
10 SIDEWALK WITH CURB
11 B&B LOOP TYPICAL SECTION (WITH DITCH)
4Dsite
solutions
civil engineering I land surveying
409 Chicago Drive, Suite 112, Fayetteville, NC 28306
office 1910-426-6777 fax 1910-426-5777 license number I C-2354
wwwAD site solutions.com
IICARO ,����
••••• •••
Nam` �•• .SS
/0 •'.
•• y i
T. i
•4 SEA
• 027
i
''V/z ,'C)
Uri US=22
REVISIONS
PROJECT NAME
B&B LOOP
SUBDIVISION
EROSION
CONTROL & SITE
DETAILS
CLIENT
J&K GENERAL
CONTRACTORS
645 Laurinburg Highway
Raeford, North Carolina 28376
Phone: (910) 638-6102
PROJECT INFORMATION
DESIGNED BY:
SEAN/CHRIS
DRAWN BY:
SEAN/CHRIS
CHECKED BY:
SCOTT
PROJECT NUMBER:
1649
DRAWING SCALE
NOT TO SCALE
DATE RELEASED
APRIL 5 2022
SHEET NUMBER
C-6mO