HomeMy WebLinkAboutSW6211002_Plansheet C-3.1 - Grading/Drainage Plan_20220810- TEMPORARY CONSTRUCTION PHILL/Pi 1406 ENTRANCE - �/422 CHURCH ' SR SR RD % s ROAD ROCK6R NORTH VICINITY MAP ', NOT TO SCALE "_�--�" .50 CALIBER J BARREL LEGEND: - ECM® ECM -EXISTING CONCRETE MONUMENT EIP Oo EIP-EXISTING IRON PIPE I EIR OO EIR-EXISTING IRON ROD 26.44 LF @ 3.52% 15" RCP o EPKO EPK-EXISTING PK NAIL INV IN 180.28 ERBO ERB-EXISTING REBAR INV OUT 179.35 I SRBO LIMITS OF CONSTRUCTION ARE OUTSIDE SRB-SET REBAR OF THE R/W AND WILL REQUIRE A PERMISSION o COMPUTED POINT TO GRADE LETTER FROM THE LAND OWNER. C N/F - NOW OR FORMERLY DRIVEWAY TIE IS SHOWN USING A 16% GRADE. \ THE PRIVATE DRIVEWAY MODIFICATION SHALL BE R/W - RIGHT OF WAY APPROVED BY THE LAND OWNER PRIOR TO CONSTRUCTION 0p�-- PROPERTY LINE ADJACENT PROPERTY LINE -- RIGHT-OF-WAY N - - - - -SETBACK LINE OVERHEAD UTILITY - - WETLANDS X FENCE LINE N/F TREE LINE WILBERT JULIAN BAREFOOT I LOC LIMITS OF CONSTRUCTION DB 329, PG 502 SF SILT FENCE LINE JN JUTE NETTING �/ I DIV DIVERSION BERM SKIMMER pp UTILITY POLE GUY WIRE 50 CALIBER ❑❑ WATER METER BARREL ASPHALT EXISTING AXLE CONCRETE 0 WETLANDS ® BUILDINGS = EROSION CONTROL MATTING QCHECK DAM WITH WEIR OINLET PROTECTION GRADING NOTES 1. ALL DRAINAGE OUTSIDE OF THE NCDOT RIGHT-OF-WAY SHALL BE MAINTAINED BY THE DEVELOPMENT HOA. 2. DI 17 & DI 11 ARE IN THE BOTTOM OF A SWALE AND SHALL BE 2GI'S WITH NARROW SLOT GRATES. SEE SHT. C-6.8 FOR NCDOT STANDARD DRAWINGS 840.19 & 840.24 3. ALL ELEVATIONS SHOWN ARE IN REFERENCE TO THE BENCHMARK AND MUST BE VERIFIED BY THE GENERAL CONTRACTOR.ALL SPOT ELEVATIONS ARE TO THE FINISHED GRADE OF THE CURB, UNLESS OTHERWISE NOTED. 4. ALL SIDEWALKS AND PEDESTRIAN WALKING SURFACES 2" SHALL HAVE A CROSS SLOPE NO STEEPER THAN 2% AND EIF LONGITUDINAL SLOPE NO STEEPER THAN 5%. 5. THE CONTRACTOR SHALL ASSUME RESPONSIBILITY FOR ALL LAND DISTURBING ACTIVITIES AND ENSURE COMPLIANCE ' WITH THE APPROVED EROSION AND SEDIMENTATION / CONTROL PLAN. THE CONTRACTOR SHALL INSPECT AND MAINTAIN ALL EROSION CONTROL DEVICES AND CLEAR ANY 10,E DEBRIS LEAVING THE SITE ON NEIGHBORING ROADS. 6. EXISTING GROUND UPON WHICH FILL OR BASE IS TO BE N N/F PLACED SHALL BE CLEARED OF WEEDS, DEBRIS, TOPSOIL, J & K GENERAL / c? AND ALL OTHER DELETERIOUS MATERIALS; NO FILL SHALL BE PLACED UNTIL PREPARATION OF THE EXISTING GROUND CONTRACTORS, INC. / HAS BEEN COMPLETED DB 1374, PG 252 Iy / 7. PROTECTIVE MEASURES SHALL BE TAKEN BY THE P74.96 LF @ 1.09% 18" RCP CONTRACTOR AND THE OWNER TO PROTECT ADJACENT INV IN 174.23 PROPERTY, THE PUBLIC AND UTILITIES DURING GRADING INV OUT 173.41 / OPERATIONS. THE CONTRACTOR ASSUMES ALL LIABILITY FOR THE UNDERGROUND UTILITY PIPES, CONDUITS, OR /2 ^ STRUCTURES, WHETHER SHOWN OR NOT ON THE PLAN ERB / 8. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO VERIFY THE LOCATION OF ALL UTILITIES OR STRUCTURES ABOVE 1 9 AND BELOW GROUND, SHOWN OR NOT SHOWN ON THESE PLANS. THEY WILL BE HELD RESPONSIBLE FOR ALL DAMAGE N/F TO ANY UTILITIES OR STRUCTURES CAUSED BY HIS J & K GENERAL / OPERATION. CONTRACTORS, INC. 9. ALL CUT AND FILL SLOPES SHOULD BE INVESTIGATED BOTH DB 1374, PG 252 DURING AND AFTER GRADING BY THE CONTRACTOR TO PB 4162, PG 6 ) ' DETERMINE IF ANY SLOPE STABILITY PROBLEMS EXIST. IF IT IS DETERMINED THAT THERE IS A SLOPE STABILITY' - PROBLEM THE ENGINEER OF RECORD SHOULD BE NOTIFIED. 36.09 LF @ 0.96% 18" CLASS V RCP 10. STOCKPILE AREAS THAT WILL EXCEED 10' IN HEIGHT INV IN 172.61 INV OUT 172.26 SHOULD BE GRADED WITH 3:1 SLOPES AND SURROUNDED BY SILT FENCE. �� "71, PERFORMING WORK ON THIS PROJECT. 13. ALL EROSION AND SEDIMENT CONTROL PRACTICES WILL BE CHECKED FOR STABILITY AND OPERATION FOLLOWING EVERY RUNOFF -PRODUCING RAINFALL BUT IN NO CASE LESS THAN ONCE EVERY WEEK. ANY NEEDED REPAIRS WILL BE MADE IMMEDIATELY TO MAINTAIN ALL PRACTICES AS DESIGNED. 14. PURSUANT TO G.S. 113A-57(2), THE ANGLE FOR GRADED SLOPES AND FILLS SHALL BE NO GREATER THAN THE ANGLE THAT CAN BE RETAINED BY VEGETATIVE COVER OR OTHER ADEQUATE EROSION CONTROL DEVICES OR STRUCTURES. IN ANY EVENT, SLOPES LEFT EXPOSED WILL, WITHIN 7 OR 14 CALENDAR DAYS OF COMPLETION OF ANY PHASE OF GRADING, BE PLANTED OR OTHERWISE PROVIDED WITH TEMPORARY OR PERMANENT GROUND COVER, DEVICES OR STRUCTURES SUFFICIENT TO RESTRAIN EROSION. PURSUANT TO G.S. 113A-57(3), PROVISIONS FOR PERMANENT GROUND COVER SUFFICIENT TO RETAIN EROSION MUST BE ACCOMPLISHED FOR ALL DISTURBED AREAS WITHIN 90 CALENDAR DAYS FOLLOWING COMPLETION OF CONSTRUCTION OR DEVELOPMENT. 15. CONTRACTOR IS RESPONSIBLE FOR INSTALLING ALL EROSION CONTROL MEASURES SHOWN AND ANY ADDITIONAL MEASURES REQUIRED TO CONTROL THE SEDIMENT DURING THE COURSE OF CONSTRUCTION. 16. ALL SEEDED AREAS WILL BE FERTILIZED, RESEEDED AS 5 EMERGENCY SPILLWAY: 171.00 NECESSARY, AND MULCHED ACCORDING TO THE DETAILS m 23.03 LF C� 0.74% 18" RCP v.0'k, STP.PAT.D HEREIN. Cl I SIDE SLOPES OF BASIN ARE TO .t .t .1• .1• .1• .1• .t 17. THE CONTACT PERSON FOR EROSION CONTROL ISSUES THAT I _W .� 1 . \BE SEEDED WITHIN SEVEN DAYS. I ARISE ON SITE IS DAN FARRELL. CONTACT 910-684-0648. 10 2014 5 AC 17 19 \ �. `• `�O. \ 30� / p M 1 z O I 10,470 S \\ 1 L -�-� 3Q� L L L L L L f ' r 1 CI 9 O 170.50 0.24 AC i \ �� SILT FENCE I l / DI-17 y CI 10 168.20- OUTLET (TYP) I o� -- DITCH #2 TST#2 \ 173.77 16.01 LF @ 1.25% 15" RCP � ` � _ - z = 1-1 � ALL DITCHES ARE TO HAVE THE MATTING 11/ 11/ ' 26.00 LF @1.00% 18" RCP / / 23 12 LF @1 00% 18 P _ DIVERSION BERM TO BE INSTALLED IMMEDIATELY UPON CONSTRUCTION\"' r/ NAG S75 10/L *--,-SEEDED WITHIN 7 DAYS `2O• e 14/ 14/ 14/ 12 / STP.PAT.D i (TYP) .1 .1 13,912 S / / I ` ; .1130' VEGETATIVE BUFFER L0• 11r 11r `11, ♦ \ \\ \ 0.32 AC 1 23 11, 11, 11, 11, 1 INACCESSIBLE AREA \ / FROM TOP OF BANK 0 / 22 I m DUET 00 FLOODING 175.00 � 20 �p �/L 21 11,381 F \ 16j \ ` 6' 175.35 r O 10,500 F 0.26 A \ �' - `%0 1 Y o I 14,366 S,F 1Q500 S 0.24 A \� - __ ° rq L+ `1' `1' `1' \ 0.33'4C 0.24 A 6 16g ` r 11i 11i 11i 11i 11i /2,,, ♦ ♦(O / l / 0.a� :yam y L°B y ERB � / �p o 168.58.50 \ lk0� 11, \ f 1 \l/ \l/ \l/ \l/ \l/ \1/ 175.12 SF UTILITY EASEMENT16 - \L> �� \fie` �\ \ \ '♦°0y���O _ - - 169.34 dddd \ 11. APPROVED COPIES OF THE GRADING AND EROSION CONTROL 1ERe / ; /; , ( 174.89 168.02CI 3 12.00 LF @ 1.00% 15" RCP PLANS SHALL BE ON THE PERMITTED SITE WHILE R}� IS \ IN PROGRESS. i ;%„�* / \ 115 AINSDALE WARREN COURT 169.34 1 ..- 31.01 LF C� 1.61% 15" RCP 9 CI 1 ,%,_ .. %* , 11 W (PUBLIC) 110 �6 164.23 20.61ACF 12. ALL EXISTING DRAINAGE COURSES THROUGH THIS SIiE ALL DITCHES ARE TO HAVE THE MATTING O 50' R/ ( CI 2 i i 'r''� \ \ SHALL REMAIN IN A CONDITION SUCH THAT THEY GIGS STALLED IMMEDIATELY UPON CONSTRUCTION n, 7/.PO__16y�,- NAG S75 11� TRANSPORT THE NATURAL DRAINAGE UNTIL PA&ILIKTINHL / „� 12,431 SF O / INACCESSIBLE AREA lii - 168.51 12.00 LF @ 1.00% 15 RCP - STP.PAT.D S C' DUE TO FLOODING HANDLE THE STORM WATER ARE CONSTRU TRACTORS, INC. / 0.29 AC - `'- �� CONTRACTOR SHALL BE RESPONSIBLE FOR ARY13AMAIM 252 / 's:kL ' UTILITY EASEMENT - . - - // �\� DITCH #6 175 10' IT .. - - \ RIP RAP DISSIPATER= DUE TO OBSTRUCTING NATURAL DRAINAGE PR>73Tf 188, PG 6 / _ - - _ - - - / CO , , - \ \ T I� 715� ANY DEVIATION FROM THE APPROVED GRADING PLAN D8�„ 0� 2„ ' �`L- ='�� , '- o ,n��p� �T °� SHOULD BE REPORTED TO THE ENGINEER OF RECORD PRIOR / I - TO IMPLEMENTATION OF THE CHANGE. CLASS B 18" THICK N/F14. ALL SLOPES 3:1 OR STEEPER THAT EXTEND TEN FEET OR - - `,��4 , 10,640 4 ACO F 169 2 C & K GENEV6RE SHALL BE LINED WITH NORTH AMERICAN GREEN S75 / 9 1� h \ O 1 VM N E' \ TRACTORS �TORARY EROSION CONTROL BLANKET ORE UAL � ^ 0 o �62.00 ^ s 1374 PG / 24,760 SF ::::`::::::::::.... �STITUTE. a • 12,729 SF _ O - / O B 41621EPGSfORM PIPE DISTANCES SHOWN ARE TO THE CENTER OF / 1"�EIP 0.29 0.57AC �t.......................:.:�g9:::::`..7 r ............. WITH 13,501 THE B�FOB�LL�TRUCTURES UNLESS OTHERWISE NOTED. / --. ❑:: �, 1 " ERB 2 . `.. 6 '(i(i(i(i( .i:" .'':1: j:'1:i(r.:... 5.............. f:a::::::: / \ 3/4" CHECK DAM 12,119 SF O O...................I DISSIPATER L RIP RAP DISSIP T / EIP WITH WEIR 0.28 AC 10.26 AC / 3 ;'::::::::::.:: F::::::::-: = W=1/3. NAG S75 12,244 SF 11,853 SF L 3' / \ .DITCH #1 - , (T) STP.PAT.D 0.28 AC / 10, 2 SF NAG S75 _1i - - - -_ -- - --- p4" pMA:=g" 0.27 AC / 0 5 AC STP.PAT.D ^ r \ I I -o - - CLASS B 12" THICK too1R FLD 00, IP \ \ `7;� 7 - - - - RIPS P DISSIPATER- TEMPORARY SKIMMER BASIN #1 _ -- -- -_" D 12" D -14" L 145', W-60', D 2' �FE ---- CLASS B 12" THICK SIDE SLOPES= 2:1 Know what's below. \ FR - -__'� _--_ _----- -_--_--_---== -- - __- _ _ -- - _ - I60, o'= = - --- ----- -----=------- =1 7 _ _ -- _ TOP OF BASIN: 166.00' C111 before you dig. I _ _ ___ _ - - -� � - ,- BOTTOM OF BASIN: 163.00' Y 16a - ____ _ _ _ N/F 5' EMERGENCY SPILLWAY: 165.00' RICK J. LAVELLE & INVERT OF SKIMMER: 162.00' GRAPHIC SCALE I 1 _ RIP RAP DISSIPATER' DAVID THOMAS MASON S SIDE SLOPES OF BASIN ARE TO \ 12" DM14" DB 1159, PG 844 BE SEEDED WITHIN SEVEN DAYS. D 50 0 25 50 100 200 I \ o° **ATTACH A 2.5" FAIRCLOTH SKIMMER (OR EQUAL) CLASS B 12" THICK- ; ERB ALL DITCHES ARE TO HAVE THE MATTING WITH 2.3" ORIFICE FOR DEWATERING THE I- _ INSTALLED IMMEDIATELY UPON CONSTRUCTION SEDIMENT BASIN DURING CONSTRUCTION. ( IN FEET ERB' A060,FVO I inch = 50 ft. I N/F N/F GLORY GUTIERREZ DAVID T. MASON & WIFE, \ 1001'R FLD DB 477, PG 797 I KELLY C. MASON / f1R 11 r,Q Pr: Rdd THE CONTRACTOR MUST CONTACT NORTH CAROLINA ONE CALL CENTER AT 1-800-632-4949 A MINIMUM OF 72 HOURS PRIOR TO DIGGING IN ORDER TO HAVE THE EXISTING UTILITIES LOCATED o° \� NOTIFICATION OF COMBINED SELF -MONITORING AND EROSION CONTROL NOTES SELF -INSPECTION FORM: 1. ALL INLET/OUTLET PROTECTION WILL BE CHECKED FOR \ - _ THE SEDIMENTATION POLLUTION CONTROL ACT WAS AMENDED IN MAINTENANCE AND FAILURE EACH ACTIVE DAY ON SITE. 2006 TO REQUIRE THAT PERSONS RESPONSIBLE FOR SEDIMENT WILL BE REMOVED FROM THE SEDIMENT TRAP LAND -DISTURBING ACTIVITIES INSPECT A PROJECT AFTER EACH AND INLET PROTECTION DEVICES WHEN THE STORAGE PHASE OF THE PROJECT TO MAKE SURE THAT THE APPROVED CAPACITY HAS BEEN APPROXIMATELY 50% FILLED. GRAVEL TBM-- _ _- EPK -o-- EROSION AND SEDIMENTATION CONTROL PLAN IS BEING WILL BE CLEANED OR REPLACED WHEN THE SEDIMENT POOL 4D NAIL #8-- �OOI _ _ EPK E FOLLOWED. RULES DETAILING THE DOCUMENTATION OF THESE NO LONGER DRAINS PROPERLY. SEDIMENT WILL BE N 451,932.346-- INSPECTIONS TOOK EFFECT OCTOBER 1, 2010. REMOVED FROM BEHIND THE SEDIMENT FENCE WHEN IT E 1,957,749.589 \ PP / p^ o „_, TEMPORARY o BECOMES ABOUT 0.5' DEEP AT THE FENCE. THE SEDIMENT ELEV 174.70 1 /2„ - CONSTRUCTION NC GRID NAD 83 ERB - I o _ - - TO SIMPLIFY DOCUMENTATION OF SELF -INSPECTION REPORTS FENCE WILL BE REPAIRED AS NEEDED TO MAINTAIN A (2011) - / I ENTRANCE _ �'/��-// PP �� - AND NPDES SELF -MONITORING REPORTS, DWQ AND DEMLR PROPER BARRIER. NAVD 88 - _ -/� - �b -1 /2 P \ ,11� _ _ = - = 1 /2 ERB DEVELOPED A COMBINED FORM. THE SELF -INSPECTION 2. TEMPORARY EROSION CONTROL FACILITIES AND/OR _�� ERB PROGRAM IS SEPARATE FROM THE WEEKLY SELF -MONITORING PERMANENT FACILITIES INTENDED TO CONTROL EROSION OF sea z S2alI M PROGRAM OF THE NPDES STORMWATER PERMIT FOR AND EARTH DISTURBANCE OPERATION SHALL BE INSTALLED f INV i 66.70 = „ sea 165.85 I I ' i �� - - s sea >' 2�a CONSTRUCTION ACTIVITIES. THE FOCUS OF THE BEFORE ANY EARTH DISTURBANCE OPERATIONS TAKE PLACE O _ 0o i J - _ ; �� _ - j= - M `�`1' `1' `1' SELF -INSPECTION REPORT IS THE INSTALLATION AND OR AT THE EARLIEST POSSIBLE POINT DURING f' \66'• _ - %� - ' - \ MAINTENANCE OF EROSION AND SEDIMENTATION CONTROL CONSTRUCTION. MEASURES ACCORDING TO THE APPROVED PLAN. THE 3. TEMPORARY & PERMANENT EROSION CONTROL MEASURES i� INSPECTIONS SHOULD BE CONDUCTED AFTER EACH PHASE OF SHALL BE CONSTRUCTED PER THE DETAILS HEREIN, OR 8.00 LF 24" RC _ Za-� -- / �/' -� o COUNTY OF HOKE \I THE PROJECT, AND CONTINUED UNTIL PERMANENT GROUND SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE NORTH <o /� 30 , -32.00 LF @ 1.31% 24" RCP j72 30' 'o UTILITY EASEMENT COVER IS ESTABLISHED. THE FORM CAN BE ACCESSED AT: CAROLINA EROSION AND SEDIMENT CONTROL PLANNING AND C INV IN 170.92 _ - % \�► DB 863, PG 686 HTTP: //PORTAL.NCDENR.ORG/WEB/LR/EROSION DESIGN MANUAL. ' \}L �S \v p� 172 171 ' ♦,_� . �`� INV OUT 170.50 o 3 PC 3, SLIDE 3-90, MAP 008 4. THE CONTRACTOR MUST NOTIFY THE APPROPRIATE NCDEQ ., ) I �° ! ♦ O,� ' l IF YOU HAVE QUESTIONS OR CANNOT ACCESS THE FORM, OFFICE A MINIMUM OF 48 HOURS PRIOR TO BEGINNING ANY /11' 11' 11' 11' 11' PLEASE CONTACT THE FAYETTEVILLE REGIONAL OFFICE AT 910 LAND DISTURBING ACTIVITIES. 910-433-3300 11� To oe� A ...... °g- W� r a� ) / 433-3300. 5. REMOVE ALL SOILS AND SEDIMENTS TRACKED OR e COUNTY OF HVKt o ♦ _ = ��� �►i, r 11� 11� 11� 11� OTHERWISE DEPOSITED ONTO PUBLIC AND PRIVATE toe 30' UTILITY EASEMEI - PAVEMENT AREAS. REMOVAL SHALL BE ON A DAILY BASIS DB 887, PG 419 _ WHEN TRACKING OCCURS. a1 joe °::PC 3, SLIDE 3-99, MAF ♦ - \ '°o �o CONSTRUCTION SEQUENCE O- 6. LOCATE SOIL STOCKPILES NO LESS THAN FIFTY (50) FEET o . 3 \ O FROM ANY PUBLIC OR PRIVATE ROADWAY OR DRAINAGE :.:::.:: Y fir. k .:::.::.. lob ',28.69 LF @ 1.39% 15" RCP \ \ 24 \ \eo 1. OBTAIN ALL NECESSARY PERMITS AND APPROVALS AND CHANNEL. IF REMAINING FOR MORE THAN SEVEN DAYS, �.:.. INV IN 167.10 \ -_ , O \ HOLD PRE CONSTRUCTION CONFERENCE. STABILIZE THE STOCKPILES BY VEGETATIVE COVER, TARPS, ........ .t\.......�... INV OUT 166.70 �0, ^ 11� 11� 11� 11� 1j )' VEGETATIVE BUFFER, 30 7__ ♦ 28,257 SF \ o0 2. INSTALL STONE CONSTRUCTION ENTRANCE, TEMPORARY SILT OR OTHER MEANS. CONTROL EROSION FROM ALL �� `.......:v/ O MATTING IS TO BE PLACED AS SOON AS THE ♦ 0.65 AC •O FENCE, CHECK DAMS AND DIVERSION BERMS WHERE STOCKPILES BY PLACING SILT BARRIERS AROUND THE PILES. FROM TOP OF BANK.-,, - C � / NAG S75 \SLOPE IS CONSTRUCTED. �Z'� NAG S75 `1' `1' `1' `1' SPECIFIED. TEMPORARY STOCKPILES LOCATED ON PAVED SURFACES STP.PAT.D� �'\ \\ STP.PAT.D 3. CONSTRUCT TEMPORARY SKIMMER BASIN, & SEDIMENT MUST BE NO LESS THAN FIVE FEET FROM THE 30. TEMPORARY SEDIMENT TRAP #4 NAG S75 71/ 11/ 11/ 11/ 1l TRAPS. DRAINAGE GUTTER LINE AND SHALL BE COVERED IF LEFT 10` L=66', W=25', D=4.5 STP.PAT.D Q SIDE SLOPES= 2:1 \ ''�,� 5. ROUGH GRADE THE SITE AND APPLY TEMPORARY SEEDING 7. MAINTAIN ALL TEMPORARY EROSION AND SEDIMENT TOP OF BASIN: 174.00' o INACCESSIBLE AREA TO AREAS TO REMAIN GRASSED. CONTROL DEVICES IN PLACE UNTIL THE CONTRIBUTING BOTTOM OF BASIN: 168.50' .1 I DUE TO FLOODING 6. INSTALL EROSION CONTROL MATTING IMMEDIATELY UPON DRAINAGE AREA HAS BEEN STABILIZED. INSPECT 30, CONSTRUCTION OF DITCHES OR FILL SLOPES. TEMPORARY EROSION AND SEDIMENT CONTROL DEVICES ON 1ao 5' EMERGENCY SPILLWAY: 173.00 17 ' - SIDE SLOPES OF BASIN ARE TO 0 ♦ 7. INSTALL TEMPORARY CHECK DAMS IN SWALES AS SHOWN. A DAILY BASIS AND REPLACE DETERIORATED, DAMAGED, OR \� ''0 BE SEEDED WITHIN SEVEN DAYS. I ,,, ` • ♦ 8. INSTALL UTILITIES. ROTTED EROSION CONTROL DEVICES IMMEDIATELY. 21,716 \ \`,: ` \w 1 go 9. INSTALL INLET PROTECTION ON ALL NEW STORM WATER 8. TEMPORARILY OR PERMANENTLY STABILIZE ALL DENUDED INLETS. AREAS WHICH HAVE BEEN FINISH GRADED, AND ALL \ TST#4 ,-_ NAG S75 \ 10. PERFORM FINE GRADING. DENUDED AREAS IN WHICH GRADING OR SITE BUILDING ^� 11. INSTALL AND PREPARE BASE COURSE. CONSTRUCTION OPERATIONS ARE NOT ACTIVELY UNDERWAY STP.PAT.D `� 14/9 ALL DITCHES ARE TO HAVE THE MATTING 12. PAVE ROADWAYS. AGAINST EROSION DUE TO RAIN, WIND AND RUNNING WATER ` DITCH #5 INSTALLED IMMEDIATELY UPON CONSTRUCTION 13. FERTILIZE, SEED AND MULCH ALL REMAINING DISTURBED WITHIN 14 DAYS. USE SEEDING AND MULCHING, EROSION \ '172.00 �; 1 ., °� o• \ a AREAS. CONTROL MATTING, AND/OR SODDING AND STAKING IN i 169.80 ��; \ I o 14. UPON SITE STABILIZATION, SEEK NCDEQ APPROVAL TO GREEN SPACE AREAS AND OTHERWISE APPROPRIATE 0 ,0 15 \ o� W \ ■ i ♦♦\ 14/ REMOVE ALL TEMPORARY MEASURES. MEASURES. USE EARLY APPLICATION OF GRAVEL BASE ON �o ■ eoi'� 15. ALL EROSION CONTROL MEASURES SHALL BE MAINTAINED AREAS TO BE PAVED. 167.98 �'' �`I r AS OUTLINED IN THE DETAILS WITHIN THE PLANS AND 9. DO NOT REMOVE ANY EROSION AND SEDIMENT CONTROL CI 4 SILT FENCE 0- r / / OUTLET (TYP)\ oe \ IC ` ACCORDING TO THE NCDEQ EROSION CONTROL MANUAL. DEVICES AFTER THE PROTECTED AREA HAS UNDERGONE 172.64 1 \ -01 • `ao W 16. TERMINATION OF COVERAGE UNDER THE NPDES GENERAL FINAL STABILIZATION AND PERMANENT VEGETATION HAS MATTING IS TO BE PLACED AS SOON AS THE 25 vl STORMWATER PERMIT FOR CONSTRUCTION ACTIVITIES MUST BEEN ESTABLISHED, IT IS RECOMMENDED THAT NCDEQ SLOPE IS CONSTRUCTED. pep\ BE REQUESTED BY THE PERMITTEE VIA A NOTICE OF APPROVE THE ACTION PRIOR TO REMOVAL. 18,000 SIF 4*\1' TERMINATION (NOT). THE NOT IS AVAILABLE AT: 10. THE CONSTRUCTION ENTRANCES SHALL BE INSTALLED 1 ,079 S / / I 173 1 \J, �to �, 0.41 AC ,i, HTTPS: //EDOCS.DEQ.NC.GOV/FORMS/NCG01-TERMINATION.CONCURRENTLY WITH THE INITIATION OF CONSTRUCTION .37 A PLEASE NOTE THAT THE CLOSE OUT INSPECTION REPORT ACTIVITY. \ ♦ W ■ •01, MUST BE UPLOADED AS PART OF COMPLETING THE NOTICE 11. THE INSTALLATION OF EROSION CONTROL MEASURES SHALL 173.29 30' - \ ♦ci k OF TERMINATION PROCESS. TAKE PRECEDENCE OVER ALL OTHER CONSTRUCTION -0 m RIP RAP DISSIPATER .1' ■ Y ACTIVITIES. 172.70 ® PO 12, 13, 14 & 15 `� b GROUND STABILIZATION CHART 12. THE PERMITTEE SHALL BE HELD RESPONSIBLE FOR THE r 11 �L I ACTIONS AND PERFORMANCE OF ANY OTHER PARTIES / � 1 / 173.51 1 D-8" DMA-12" \ _ 173.53 CLASS B v8" THICK / o ♦ LIMITS OF CONSTRUCTION DITCH 4 ^� NAG S75 6Y� \' 1.1 AC f �o / 15 173.56/ # - STP.PAT.D ° y ♦ o / 26.42 LF @ 1.02% 18" RCP / / 22.57 LF @ 1.02% 18" RCP j 11,014 SF 1 I ' i ° °e CD 11 CI 5 CI 6� 1.1 167.11 �+a m 0.25 C `� ♦ ♦ oe INLET 169.00 j SILT FENCE T Toe CA ` ♦� - �, / PROTECTIONI Cl ' ,� 168 OUTLET (TYP) Qe� \ 3O^� TEMPORARY SEDIMENT TRAP #2 f . `� m (TYP): 172.71 k::_;,': N l o COMMON AREA o �., .1, L=50', W=24', D=3' .1 .1 _ 203,358 SF 16.00 LF @ 1.25% 18" RCP PO 14 30' 4.67 AC SIDE SLOPES= 2:1 TOP OF BASIN: 172.00' fl I 1 \ °0g BOTTOM OF BASIN: 168.00' 0) t4co °� T °e'5' EMERGENCY SPILLWAY: 171.00 30 0 Q �G'• ' ` o� Q� SIDE SLOPES OF BASIN ARE TO / �� ' 1£ BE SEEDED WITHIN SEVEN DAYS, 30'� 11,014 SF I , �`�'�`.` I T � % �N o0 0.2�5-Ac NAG S75 1Q092 \ ��� ��� SILT FENCE to I 26.00 LF @ 1.00% 18" RCP- STP.PAT.D 0.23 A� \^ ���`�,` ` `30OUTLET (TYP) �\` r TEMPORARY SEDIMENT TRAP 3 I 170.20 \ �� 168.55 `;` �' `1 o # / :1 7 CI 8 =- DITCH #3 TST#3 � , \ Ari 30' e� L=55', W=26', D=3' _,____-_- LIMITS OF CONSTRUCTION SIDE SLOPES= 2:1 Toe ^.`:.0 10.0 AC TOP OF BASIN: 172.00' T ,' .... oe V/ 173.32 a �... \ -___ --- �,`.`, BOTTOM OF BASIN: 168.00' 10' UTILITY EASEMENT a v -____ NAG S75 SITE AREA STABILIZATION STABILIZATION TIME DESCRIPTION TIME FRAME FRAME EXCEPTIONS PERIMETER DIKES, SWALES, DITHCES 7 DAYS NONE AND SLOPES HIGH QUALITY WATER (HOW) 7 DAYS NONE ZONES IF SLOPES ARE 10' OR SLOPES STEEPER 7 DAYS LESS IN LENGTH AND ARE THAN 3:1 NOT STEEPER THAN 2:1, 14 DAYS ARE ALLOWED SLOPES 3:1 OR 7-DAYS FOR SLOPES FLATTER 14 DAYS GREATER THAN 50 FEET IN LENGTH NONE ALL OTHER AREAS (EXCEPT FOR WITH SLOPES FLATTER 14 DAYS PERIMETERS AND THAN 4:1 HOW ZONES) 4DSite solutions civil engineering I land surveying 409 Chicago Drive, Suite 112, Fayetteville, INC 28306 office 1 910-426-6777 fax 1 910-426-5777 license number I C-2354 wwwAD site solutions.com IIGARO 2�: pFE /p •.• `9 . 4 SEA ' • 027 1111110 TT g�\``` U 4 - U -7- 22 REVISIONS PROJECT NAME B&B LOOP SUBDIVISION GRADING AND EROSION CONTROL PLAN CLIENT J&K GENERAL CONTRACTORS 645 Laurinburg Highway Raeford, North Carolina 28376 Phone: (910) 638-6102 PROJECT INFORMATION DESIGNED BY: SEAN/CHRIS DRAWN BY: SEAN/CHRIS CHECKED BY: SCOTT PROJECT NUMBER: 1649 DRAWING SCALE HORIZONTAL: 1 "=50' DATE RELEASED J U N E 7, 2022 SHEET NUMBER