Loading...
HomeMy WebLinkAboutSW6211002_Design Calculations (Storm Drain)_20220810AME LOOP 7Raeford, DATE 11-02-21 PROJECT NO 1649 DESIGN PHA PRELIM CONSTR REVISION orth Carolina BY CJP RECORD OTHER CHECKED BY CSB (SPECIFY) n= 0.013 9= 226 h= 26 STORM DRAINAGE SCHEDULE CONTINUE AREAS (INLETS) INLET AREA (AC) INLET Cc RUNOFF COEFF. INLET DISCHARGE (CFS) Q (+) UPSTREAM BYPASS (CFS) DO INLET BYPASS (CFS) CAPTURED INLET DISCHARGE (CFS) TOTAL AREAS (AC) INLET TIME (MIN) PIPE TIME (MIN) Tc TIME OF CONC. (MIN) I INTENSITY (IN/HR) FROM TO 0.94 0.14 0.08 0.00 Cl2 CI Cl2 0.26 0.90 0.00 0.87 0.26 5.00 0.00 5.00 7.29 CI P016 CI 0.00 0.90 0.14 0.14 0.26 5.00 0.04 5.04 7.28 0.78 0.06 0.72 CI3 CI CI3 0.22 0.90 0.00 0.22 5.00 0.00 5.00 7.29 0.66 0.18 0.07 0.00 CI CI10 CI 0.19 0.85 0.00 0.59 0.19 5.00 0.00 5.00 7.29 CI10 P012 CI10 0.07 0.65 0.00 0.18 0.26 5.00 0.07 5.07 7.27 0.59 0.10 0.03 0.00 CI7 CI8 CI7 0.20 0.65 0.07 0.56 0.20 5.00 0.00 5.00 7.29 CI P013 CI8 0.04 0.65 0.00 0.10 0.24 5.00 0.07 5.07 7.27 0.50 0.85 0.00 0.00 0.85 0.85 0.26 0.03 0.00 0.26 0.75 0.22 0.00 0.00 0.22 0.75 0.65 0.00 0.00 0.65 0.40 0.53 0.00 0.00 0.53 DI 11 CI5 DI11 0.43 0.43 5.00 0.00 5.00 7.29 CI5 CI6 CI5 0.07 0.49 5.00 0.05 5.05 7.28 CI6 P014 CI6 0.07 0.57 5.00 0.12 5.12 7.26 Cl 14 PO 5 CI 14 0.22 0.22 5.00 0.00 5.00 7.29 D117 CI D117 0.33 0.33 5.00 0.00 5.00 7.29 0.65 0.00 8.86 DRIVE UP DRIVE DIN DRIVE UP 0.22 475 0.00 0.65 0.22 5.00 0.00 5.00 0.40 1.94 0.00 0.00 1.94 5.00 8.86 B&B 6+70 X-PIPE B&B 6+70 1.21 1.21 5.00 0.00 1649 Storm.xim 10-YEAR Date: 8/10/2022 Time: 10:39 AM Page 1 of 4 • " ' PROJECT NAME 1649 B&B LOOP DATE 11-02-21 DESIGN PHASE PRELIM / / CONSTR / X / REVISION PROJECT NO 1649 LOCATION Raeford, North Carolina BY CJP RECORD OTHER CHECKED BY CSB (SPECIFY) n= 0.013 9= 226 h= 26 STORM DRAINAGE SCHEDULE -CONTINUED Q DISCHARGE (CFS) Q SIDE- STREAM (CFS) SLOPE DIA. (I N) CAPACITY (FULL) (CFS) V FULL (FPS) LENGTH (FT) SEGMENT TIME (MIN) UPPER INV. (FT) LOWER INV. (FT) UPSTREAM TOP ELEV. (FT) FROM TO 12 33 168.35 168.23 Cl2 CI 1.72 0.00 1.42 0.0100 15 6.5 5.3 0.04 164.85 164.73 CI P016 3.14 0.0154 15 8.0 6.5 0.08 164.73 164.23 12 168.33 Cl3 CI 0.00 0.0100 15 6.5 5.3 0.04 164.85 164.73 26 23 174.57 174.57 CI CI 10 2.16 0.96 0.0100 18 10.5 5.9 0.07 171.00 170.74 CI 10 P012 2.48 0.00 0.0099 18 10.5 5.9 0.07 170.74 170.51 26 23 174.13 174.13 Cl7 CI8 0.95 0.00 0.0100 18 10.5 5.9 0.07 170.63 170.37 CI8 P013 1.14 0.00 0.0074 18 9.0 5.1 0.08 170.37 170.20 5.9 16 0.05 169.50 172.68 169.23 173.53 169.00 173.59 169.80 172.85 171.00 173.74 DI 11 CI5 1.55 0.00 0.0125 15 7.2 169.70 169.50 169.23 CI5 CI6 1.97 0.00 0.0102 18 10.6 6.0 26 0.07 CI6 P014 2.37 0.00 0.0102 18 10.6 6.0 23 0.06 170.10 Cl 14 PO 5 1.18 0.00 0.0155 15 8.0 6.5 19 0.05 171.20 DI 17 CI 0.96 0.00 0.0125 15 7.2 5.9 16 0.05 75 176.80 DRIVE UP DRIVE DN 1.44 0.00 0.0109 18 11.0 6.2 0.20 174.23 173.41 5.8 36 0.10 172.26 174.81 B&B6+70 X-PIPE 4.29 0.00 0.0097 18 10.3 172.61 1649 Storm.xim 10-YEAR Date: 8/10/2022 Time: 10:39 AM Page 2 of 4 n= 0.013 g= 226 h= 26 Cl COVER BOX COVER BELOW BEND DEPTH SUBGRADE LOSS (8") K FROM TO C12 C11 3.50 1.13 0.70 CI1 PO16 3.50 1.13 0.00 Cl 3 CI 1 3.48 1.11 0.70 CI9 CI10 3.57 0.94 0.00 CI 10 PO12 3.83 1.20 0.00 CI7 CI8 3.50 0.88 0.00 CI8 PO13 3.76 1.13 0.00 DI 11 CI5 2.98 1.73 0.00 CI5 CI6 4.03 1.41 0.28 CI6 PO14 4.36 1.74 0.00 Cl 14 PO 5 2.75 1.50 0.90 DI 17 CI9 2.54 1.29 0.00 DRIVE UP DRIVE DIN 2.57 (0.05) 0.00 B&B6+70 X-PIPE 2.20 (0.43) 0.00 1649 Storm.xim 10-YEAR Date: 8/10/2022 Time: 10:39 AM Page 3 of 4 •"`` '� DATE 11-02-21 PROJECT NAME PROJECT NO 1649 B&B LOOP 1649 LOCATION BY Raeford, North Carolina CJP CHECKED BY CSB 0.013 226 26 OUTLET � OUTLETFROM TO W.S..�VC�FTOL CONTROL CONDITION BOARD TO CROWN COMMENTS CAPACITY VSI FT(FT) CONTROL DISCHARGE 165.78 165.64 DESIGN PHASE PRELIM CONSTR / X / REVISION RECORD OTHER (SPECIFY) DESIGN CRITERIA: 1. DESIGN FOR THE 10 YR STORM 2. ASSUME TIME OF CONCENTRATION TO AN INDIVIDUAL INLET = 5 MIN. (Unless otherwise noted) 3. INTENSITY = g/(h+T), FOR 10 YR STORM (g and h were derived from Raleigh -Durham Intensity - Duration -Frequency Charts, REF: NC Erosion and Sediment Control Planning and Design Manual) 4. MANNINGS "n" FACTOR= 0.013 5. RUNOFF COEFICIENT Cc=0.50 (Per CR-7107) 1649 Storm.xim 10-YEAR Date: 8/10/2022 Time: 10:39 AM Page 4 of 4