Loading...
HomeMy WebLinkAboutSW6220602_Design Calculations (Culvert 6)_20220810Culvert Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. Thursday, Jul 7 2022 PIPE 6 Invert Elev Dn (ft) = 128.05 Calculations Pipe Length (ft) = 50.00 Qmin (cfs) = 28.00 Slope (%) = 0.50 Qmax (cfs) = 28.00 Invert Elev Up (ft) = 128.30 Tailwater Elev (ft) = (dc+D)/2 Rise (in) = 30.0 Shape = Circular Highlighted Span (in) = 30.0 Qtotal (cfs) = 28.00 No. Barrels = 1 Qpipe (cfs) = 28.00 n-Value = 0.012 Qovertop (cfs) = 0.00 Culvert Type = Circular Concrete Veloc Dn (ft/s) = 6.23 Culvert Entrance = Square edge w/headwall (C) Veloc Up (ft/s) = 7.39 Coeff. K,M,c,Y,k = 0.0098, 2, 0.0398, 0.67, 0.5 HGL Dn (ft) = 130.20 HGL Up (ft) = 130.10 Embankment Hw Elev (ft) = 131.26 Top Elevation (ft) = 131.30 Hw/D (ft) = 1.19 Top Width (ft) = 20.00 Flow Regime = Inlet Control Crest Width (ft) = 5.00 Ele (R) 132.00 131A0 130A0 129.00 126A0 127 M 0 PIPE 6 ft Depth i$i 3.70 2.70 1.70 0.70 -030 -130 5 1D 15 2� 25 30 35 40 45 50 55 60 65 70 [SrcVer GUverl HGL Embank Reach (t)