Loading...
HomeMy WebLinkAboutSW6220602_Design Calculations (Culvert 2)_20220810Culvert Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. Thursday, Jul 7 2022 PIPE 2 Invert Elev Dn (ft) = 133.60 Calculations Pipe Length (ft) = 56.00 Qmin (cfs) = 13.40 Slope (%) = 0.54 Qmax (cfs) = 13.40 Invert Elev Up (ft) = 133.90 Tailwater Elev (ft) = (dc+D)/2 Rise (in) = 24.0 Shape = Circular Highlighted Span (in) = 24.0 Qtotal (cfs) = 13.40 No. Barrels = 1 Qpipe (cfs) = 13.40 n-Value = 0.012 Qovertop (cfs) = 0.00 Culvert Type = Circular Concrete Veloc Dn (ft/s) = 4.81 Culvert Entrance = Square edge w/headwall (C) Veloc Up (ft/s) = 6.08 Coeff. K,M,c,Y,k = 0.0098, 2, 0.0398, 0.67, 0.5 HGL Dn (ft) = 135.26 HGL Up (ft) = 135.22 Embankment Hw Elev (ft) = 135.97 Top Elevation (ft) = 136.40 Hw/D (ft) = 1.03 Top Width (ft) = 20.00 Flow Regime = Inlet Control Crest Width (ft) = 5.00 Ele (R) 137.00 135 m 135A0 134 0D 133AD 132 M 0 PIPE 2 Hai Depth (R) 3.10 2.10 1.10 0.10 -090 -190 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 00 — [Qraiar Qlverl HGL Embank Rmrh (R)