Loading...
HomeMy WebLinkAboutSW6220602_Design Calculations (Storm Drains)_20220810• " ` " PROJECT NAME TARRANT ESTATES DATE 3-23-2022 PROJECT NO 1827 DESIGN PHASE PRELIM CONSTR REVISION / X / LOCATION Cumberland County, North Carolina BY BPB RECORD OTHER CHECKED BY CSB (SPECIFY) n= 9= h= 0.013 226 26 STORM DRAINAGE SCHEDULE CONTINUED AREAS (INLETS) INLET AREA (AC) INLET Cc RUNOFF COEFF. INLET DISCHARGE (CFS) Q (+) UPSTREAM BYPASS (CFS) Q(-) INLET BYPASS (CFS) CAPTURED INLET DISCHARGE (CFS) TOTAL AREAS (AC) INLET TIME (MIN) PIPE TIME (MIN) Tc TIME OF CONC. (MIN) I INTENSITY (IN/HR) Cc RUNOFF COEFF. FROM TO PIPE 1 IN PIPE 1 OUT PIPE 1 IN PIPE 2 IN PIPE 2 OUT PIPE 2 IN PIPE 3 IN PIPE 3 OUT PIPE 3 IN PIPE 4 IN PIPE 4 OUT PIPE 4 IN PIPE 5 IN PIPE 5 OUT PIPE 5 IN PIPE 6 IN PIPE 6 OUT PIPE 6 IN TSB 5 TSB 5 OUT TSB 5 1827-Storm Drainage for Spread.xls 10-YEAR Date 8110/2022 Time: 11:31 AM Pagel of 4 • " I " `c PROJECT NAME TARRANT ESTATES DATE 3-23-2022 PROJECT NO 1827 DESIGN PHASE PRELIM CONSTR REVISION / / / X / LOCATION Cumberland County, North Carolina BY BPB RECORD OTHER CHECKED BY CSB (SPECIFY) n= 9= h= 0.013 226 26 STORM DRAINAGE SCHEDULE - CONTINUED Q DISCHARGE (CFS) Q SIDE- STREAM (CFS) SLOPE DIA. (IN) CAPACITY (FULL) (CFS) V FULL (FPS) LENGTH (FT) SEGMENT TIME (MIN) UPPER INV. (FT) LOWER INV. (FT) UPSTREAM TOP ELEV. (FT) FROM TO PIPE 1 IN PIPE 1 OUT 10.64 0.00 0.0052 24 16.3 5.2 48 0.15 135.95 135.70 138.39 PIPE 2 IN PIPE 2 OUT 13.40 0.00 0.0054 24 16.6 5.3 56 0.18 133.90 133.60 136.40 PIPE 3 IN PIPE 3 OUT 5.34 0.00 0.0052 18 7.6 4.3 48 0.19 134.30 134.05 136.32 PIPE 4 IN PIPE 4 OUT 13.94 0.00 0.0051 24 16.2 5.1 49 0.16 131.80 131.55 134.30 PIPE 5 IN PIPE 5 OUT 8.12 0.00 0.0054 18 7.7 4.3 56 0.21 131.15 130.85 133.20 PIPE 6 IN PIPE 6 OUT 28.06 0.00 0.0052 30 29.6 6.0 48 0.13 128.30 128.05 131.30 TSB 5 TSB 5 OUT 17.31 0.00 0.0050 18 7.4 4.2 100 0.40 126.00 125.50 132.00 1827-Storm Drainage for Spread.xls 10-YEAR Date 8110t2022 Time: 11:31 AM Page 2 of 4 • " ` ` PROJECT NAME TARRANT ESTATES ` DATE 3-23-2022 PROJECT NO 1827 DESIGN PHASE PRELIM CONSTR REVISION / / / X / LOCATION Cumberland County, North Carolina BY BPB RECORD OTHER CHECKED BY CSB (SPECIFY) n= g= h= 0.013 226 26 HYDRAULIC GRADE LINE PIPE HYDRAULIC SIDESTREAM AREA RADIUS SUMMATION (FT) (FT) (CFS) Hf He 90 DEG=0.7 60 DEG=0.55 HEAD LOSS He BEND LOSS Hb K'S 30 DEG=0.28 15 DEG=0.10 Ht BEND LOSS K CONTINUED FRICTION SLOPE (FT/FT) FRICTION VELOCITY (FPS) FROM TO PIPE 1 IN PIPE 1 OUT 3.1416 0.5000 0.00 0.11 0.04 0.06 0.02 0.23 0.10 0.0022 3.37 PIPE 2 IN PIPE 2 OUT 3.1416 0.5000 0.00 0.19 0.07 0.10 0.03 0.39 0.10 0.0035 4.24 PIPE 3 IN PIPE 3 OUT 1.7671 0.3750 0.00 0.12 0.04 0.05 0.01 0.22 0.10 0.0026 3.01 PIPE 4 IN PIPE 4 OUT 3.1416 0.5000 0.00 0.18 0.08 0.11 0.03 0.40 0.10 0.0038 4.41 PIPE 5 IN PIPE 5 OUT 1.7671 0.3750 0.00 0.33 0.08 0.11 0.03 0.56 0.10 0.0059 4.58 PIPE 6 IN PIPE 6 OUT 4.9087 0.6250 #REF! 0.22 0.13 0.18 0.05 0.57 0.10 0.0046 5.68 TSB 5 TSB 5 OUT 1.7671 0.3750 #REF! 2.70 0.37 0.52 0.15 3.73 0.10 0.0270 9.75 1827-Storm Drainage for Spread.xls 10-YEAR Date 8/10/2022 Time: 11:31 AM Page 3 of 4 " I"`DESIGN NAME 7TARRANT ESTATES 3-23-2022 PROJECT NO 1827 PHASE PRELIMCT CONSTR / X REVISIONION County, North Carolina BY BPB RECORDerland OTHER CHECKED BY CSB (SPECIFY) n= g= h= 0.013 226 26 HYDRAULIC GRADE LINE - CONTINUED DESIGN CRITERIA: 1. DESIGN FOR THE 10 YR STORM 2. ASSUME TIME OF CONCENTRATION TO AN INDIVIDUAL INLET = 5 MIN. (Unless otherwise noted) 3. INTENSITY = g/(h+T), FOR 10 YR STORM (g and h were derived from Raleigh -Durham Intensity - Duration -Frequency Charts, REF: NC Erosion and Sediment Control Planning and Design Manual) 4. MANNINGS "n" FACTOR= 0.013 5. RUNOFF COEFICIENT Cc=0.50 (Per CR-7107) OUTLET W.S. ELEV (FT) INLET W.S. ELEV. FLOW CONDITION CONTROL FREE- BOARD (FT) COMMENTS FROM TO OUTLET INLET USE CONTOL CONTROL (FT) (FT) (FT) PIPE 1 IN PIPE 1 OUT 137.30 137.53 137.44 137.53 OUTLET 0.86 OK PIPE 2 IN PIPE 2 OUT 135.20 135.59 135.68 135.68 INLET 0.72 OK PIPE 3 IN PIPE 3 OUT #REF! #REF! 135.44 #REF! #REF! #REF! #REF! PIPE 4 IN PIPE 4 OUT #REF! #REF! 133.65 #REF! #REF! #REF! #REF! PIPE 5 IN PIPE 5 OUT #REF! #REF! 132.81 #REF! #REF! #REF! #REF! PIPE 6 IN PIPE 6 OUT #REF! #REF! 130.96 #REF! #REF! #REF! #REF! TSB 5 TSB 5 OUT #REF! #REF! 130.89 #REF! #REF! #REF! #REF! 1827-Storm Drainage for Spread.xls 10-YEAR Date 8110/2022 Time: 11:31 AM Page 4 of 4