Loading...
HomeMy WebLinkAboutSW6220701_Design Calculations_20220810 (6)' ' • • DATE DESIGN PHASE 6-1-2022 PRELIM NAME rROCK PROJECT NO CONSTR / XLL MANOR 1809 REVISIONN RECORD BY Cumberland County, North Carolina BPB OTHER (SPECIFY) CHECKED BY CSB Storm Outlet Structure FES No.= PIPE 1 OUT Pipe Dia= 18 in Q10 = 1.69 cfs Qfull = 7.69 cfs Vfull = 4.34 fps From Fig. 8.06.b.1: From Fig. 8.06.b.2: s Length Storm Outlet Structure FES No.= PIPE 2 OUT Pipe Dia= 24 in Q10 = 9.09 cfs Qfull = 16.56 cfs Vfull = 5.26 fps From Fig. 8.06.b.1: From Fig. 8.06.b.2: s v 3 Length Q1 o/Qfu I = 0.22 V/Vfu11 = 0.78 V = 3.4 fps Zone = 2 D50 = 8 in DMAX = 12 in Riprap Class = B Apron Thickness = 18 in Apron Length = 9.0 ft Apron Width @ Outlet = 4.5 ft Apron Width @ End = 10.5 ft Q10/Qfu11 = 0.55 V/Vfu I = 1.02 V = 5.4 fps Zone = 2 D5o = 8 in DMAX = 12 in Riprap Class = B Apron Thickness = 18 in Apron Length = 12.0 ft Apron Width @ Outlet = 6 ft Apron Width @ End = 14.0 ft 1809-Storm Drainage for Spread.xls LATEST REVISION: 8/10/2022 1:17 PM PAGE 1 OF 1