Loading...
HomeMy WebLinkAboutNCC202988_NOT Closeout Documents_20220809North Carolina Department of Environmental Quality Land Resources: 943 Washington Square Mall, Washington, NC 27889 (252) 946-6481 County: Tyrrell Project: Town of Columbia - Contract 33 - 2017 River basin: Pasquotank Person financially responsible: Town of Columbia - Michael Griffin, Mayor Project #: TYRRE-2020-001 Address: P.O. Box 361, Columbia, NC 27925 1. Project Location: Road Street and Green Street, Town of Pictures: No Columbia 2. Weather and soil conditions: sunny, hot, dry Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A, and rules? Yes If no, check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: S. Contact made with (name): No one. Title: Inspection report: Sent Report Date given/sent: July 21, 2022 9. Corrective action needed: None at this time Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. Project is in compliance and released under the SPCA. Termination of coverage 10. Comments: under the NPDES General Stormwater Permit for Construction Activities (NCGO1) must be requested by the permittee via a Notice of Termination (NOT). The NOT is available at: https://edoes.deQ.nc.eov/Forms/NCGO 1 -Termination. Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: James Edwards Others present: No one. Date of inspection: July 20, 2022 Time arriving on site: 11:30 AM Time leaving site: 11:45 AM cc: