HomeMy WebLinkAboutNCC202988_NOT Closeout Documents_20220809North Carolina Department of Environmental Quality
Land Resources: 943 Washington Square Mall, Washington, NC 27889 (252) 946-6481
County: Tyrrell Project: Town of Columbia - Contract 33 - 2017 River basin: Pasquotank
Person financially responsible: Town of Columbia - Michael Griffin, Mayor Project #: TYRRE-2020-001
Address: P.O. Box 361, Columbia, NC 27925
1. Project Location: Road Street and Green Street, Town of
Pictures: No Columbia
2. Weather and soil conditions: sunny, hot, dry Initial inspection: No
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A, and rules? Yes If no, check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply)
Degree of damage:
S. Contact made with (name): No one. Title:
Inspection report: Sent Report Date given/sent: July 21, 2022
9. Corrective action needed: None at this time
Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or
self -inspections are required. Project is in compliance and released under the SPCA. Termination of coverage
10. Comments: under the NPDES General Stormwater Permit for Construction Activities (NCGO1) must be requested by the
permittee via a Notice of Termination (NOT). The NOT is available at:
https://edoes.deQ.nc.eov/Forms/NCGO 1 -Termination. Please note that this correspondence must be uploaded as
part of completing the NOT process.
Reported by: James Edwards Others present: No one.
Date of inspection: July 20, 2022 Time arriving on site: 11:30 AM Time leaving site: 11:45 AM
cc: