Loading...
HomeMy WebLinkAbout20140817 Ver 1_More Info Received_20140822Strickland, Bev From: Sent: To: Subject: Attachments: Smith, Cherri L Friday, August 22, 2014 2:24 PM Strickland, Bev; Montalvo, Sheri A FW: Grigsby Sidewalk Phase 2 20140822141557.pdf L'o-Old you pfease put tnis attacned revised drawing an exc f) I f) e T i I e T o r ;4*--FF "-, Mf =f L-g—sM Sidewalk. Thanks so much and have a good weekend - it's almost here! From: Aaron Levitt [ ma i Ito: aa ron. levitt(d) Hol lyspri nqsnc. us] Sent: Friday, August 22, 2014 2:18 PM To: Smith, Cherri L Subject: RE: Grigsby Sidewalk Phase 2 Cherri, Here is the revised drawing. Thank you, From: Smith, Cherri L [mai Ito: cherri.smith(a)ncdenr. go Sent: Friday, August 22, 2014 1:43 PM To: Aaron Levitt Subject: RE: Grigsby Sidewalk Phase 2 From: Aaron Levitt [ ma i Ito: aa ron. levitt(d) Hol lyspri ncisnc. us] Sent: Friday, August 22, 2014 1:25 PM To: Smith, Cherri L Subject: RE: Grigsby Sidewalk Phase 2 From: Smith, CherhL [mai Ito: cherri.smith(a)ncdenr. go Sent: Friday, August 22, 20149:48AM To: Aaron Levitt Subject: RE: Grigsby Sidewalk Phase 2 Thanks — the temporary impact in Zone 1is not aproblem. So| was thinking that the total temporary buffer impacts equal 310 SF because that's what the site plan says which doesn't correspond to the 455 SF and 42 SF. |f you could help me understand that I'd appreciate it. Thank you. From: Aaron Levitt Sent: Friday, August 22, 20149:37AM To: Smith, CheniL Subject: RE: Grigsby Sidewalk Phase 2 Cherh, Sure thing, Zone 1(inner3(Ybuffer):42sf Zone 2(50' buffer): 455 sf I hope that helps. If the temporary impact to the inner 30' buffer is a problem I could probably adjust so we stay out of this area completely but |'d prefer to leave as is to ensure the contractor has enough room to work. Please let me know if you need any additional details. Have a great weekend. From: Smith, Cherri L [ mai Ito: cherri.smithCa)ncdenr.gov] Sent: Thursday, August 21, 2014 2:05 PM To: Aaron Levitt Subject: Grigsby Sidewalk Phase 2 Hi Aaron, I was just reviewing your PCN Project Summary for Grigsby Sidewalk Phase 2 and noticed that you also have some temporary stream and buffer impacts associated with this project. I'll need to include them in the permit as well. It looks like you have 7 LF of temporary stream impact and 310 SF of temporary buffer impact. Could you just email me how much of the temporary buffer impact is in Zone 1 and how much is Zone 2. Thanks very much for your help. Cherri Cherri Smith NCDENR Division of Water Resources Raleigh Regional Office 1628 Mail Service Center Raleigh, NC 27699 -1628 ph. 919 - 791 -4251 E -mail correspondence to and from this address may be subject to the North Carolina Public Records Low and may be disclosed to third parties -1 6 O r 0 m (7 D �m0 V1 O m Z r fF,N. m I x v— A d�a ..zti • • D — • f C � • 71 a•n•J)I� n • � O m O m; m� o �c C) x xY — �o N rnt mN a -rn D p N N C 0 z C) N N '0 � m b a O � � b D � N � � N cn N H ?I i '[7 rn 0 N II N zz p m0 m 0 Fl AM =4 00 x z m is a f I O 11 ' +, z m, • • D — • f C � • 71 a•n•J)I� n • � O m O m; m� o �c C) x xY — �o N rnt mN a -rn D p N N C 0 z C) N N '0 � m b a O � � b D � N � � N cn N H ?I i '[7 rn 0 N II