HomeMy WebLinkAbout20221070 Ver 1_Aurora Industrial Park 7-2-22_2022080912 11 10 GENERAL NOTES: 9 8 7 6 5 60' RIGHT-OF-WAY 4 3 2 1 HWY + VICINITY MAP NOT TO SCALE 50' HIGHWAY 33 Rid TYPICAL 4n� R/W 1. ALL VEGETATION AND TOPSOIL SHALL BE STRIPPED FROM FILL AREAS PRIOR TO PLACING FILL. ANY QUESTIONABLE OR UNSUITABLE SOIL CONDITIONS SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER. 2. ALL FILL SHALL BE COMPACTED TO AT LEAST 95% OF THE STANDARD PROCTOR MAXIMUM DRY DENSITY (ASTM D698). 3. GRADING CONTRACTOR SHALL SEED AND MULCH ALL DISTURBED AREAS IN ACCORDANCE WITH THE SPECIFICATIONS WITHIN 14 CALENDAR DAYS OF COMPLETION OF GRADING WORK. UPON COMPLETION OF THE PROJECT, THE GENERAL CONTRACTOR SHALL INSTALL PERMANENT SEEDING AS OUTLINED IN THE SPECIFICATIONS. ALL DRAINAGE PIPES SHALL BE CLEANED BY THE GENERAL CONTRACTOR TO REMOVE ANY SEDIMENTS THAT HAVE ACCUMULATED. 4. ALL PLANTING AREAS SHALL BE BACKFILLED WITH TOPSOIL AND RAKED DOWN, REMOVING ALL CLODS AND ROOTS, AND LEFT READY FOR SEEDING AND PLANTING. 5. ALL UTILITY TAPS, CONNECTIONS AND EXTENSIONS SHALL BE DONE IN ACCORDANCE WITH ALL APPLICABLE STATE AND LOCAL CODES. 6. LOCATIONS OF EXISTING UTILITIES AS SHOWN ARE APPROXIMATE. CONTRACTOR SHALL FIELD VERIFY LOCATIONS AND COORDINATE CONNECTION WITH PROPER AUTHORITIES. CALL NC ONE -CALL CENTER, INC. AT 811 OR 1-800-632-4949 72 HOURS BEFORE ANY EXCAVATION IS BEGUN. 7. ALL PERMITS AND FEES REQUIRED FOR CONSTRUCTION OF IMPROVEMENTS ARE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. 8. NCDOT DRIVEWAY PERMIT IS REQUIRED. 9. NCDOT ENCROACHMENT AGREEMENT FOR UTILITIES IS REQUIRED. 10. NOTIFY NCDENR-WASHINGTON PRIOR TO COMMENCING CONSTRUCTION. PHONE: (252) 946-6481. 11. ALL LOTS SERVED BY CENTRAL WATER SUPPLY AND GRAVITY SEWER MAINS. 12. ELEVATIONS SHOWN ARE BASED ON NORTH AMERICAN VERTICAL DATUM 1988 AND ARE RELATIVE TO MEAN SEA LEVEL, 13. AN EROSION AND SEDIMENT CONTROL PLAN SHALL BE APPROVED PRIOR TO CONSTRUCTION. 14. ALL ELECTRIC LINES SHALL BE UNDERGROUND. 15. A STORMWATER MANAGEMENT PLAN IS REQUIRED. 16. GENERAL CONTRACTOR SHALL VERIFY INVERTS ON EXISTING STORM DRAINAGE PRIOR TO CONSTRUCTION. 17. CONTRACTOR SHALL NOT COMMENCE CONSTRUCTION OF WATER MAINS OR SANITARY SEWER MAINS PRIOR TO APPROVAL OF ALL PERMITS. 18. WETLANDS WERE DELINEATED MONTH 2020, BY 24" CURB & GUTTER (SPILL) j- 44 II_ rZ4O rg I �`pn~ - j U U 1•4i ENTRANCE UWAN V. HOOKER DB 1214 PG 390 EIP INV. 4.95 FISCHERDB798 VILLAGEPG 808 APARTMENTS PROPOSED 40' WIDE DRAINAGE EASEMENT O (0 TEMPORARY CONSTRUCTION ENTRANCE 11 + PROPOSED CUT -IN 6" TEE & 6" G.V. 9.66 9.59 NC HIGHWAY 33 (PUBLIC RIGHT-OF-WAY VARIES) 8 DIP SSMH TOP iii S 8.27 INV PROPOSED 30' WIDE DRAINAGE EASEMENT GRADE IN PROPOSED DITCH BEFORE FILLING EXISTING DITCHES + 8 • 55 AURORA HOUSING LIMITED PARTNERSHIP 08 969 PG 133 EB 6.60 + 8,2' At 22 CONC. FLUM ROCK SILT -CHECK- DAM__ 3.50 + 5.35 + 3.35 + 3,32 PROPOSED 40' WIDE DRAINAGE EASEMENT rif 40' WIDE ACCESS AND UTILITY EASEMENT DB 848 PG 368 JOHN C. and wife UWANGVKER HOOKER DB 857 PG 402 Developer: Town of Aurora c/o 295 Main Street Aurora, NC 27806 Phone: (252) 322-4611 W W W W EXISTING 6" WATER MAIN C C E 7.8; PROPOSED FIRE HYDRANT N. MERLE MAYO and wife MARY LOUISE MAYO DB 757 PG 14. MARY GUILFORD THOMPSON DB 1134 PG 467 (TRACT))--,. 3' 5,10 5' �Sl 8 9 ASPHALT 6' 6' " PER FT- COMPACTED SUBGRADE 1 /4" PER FT. III 30' 30' PAVEMENT 3" ASPHALT MIN. WA -Mt 41014141 ill Ili 14 1;4 044' 6' „ PER FT. 8" AGGREGATE BASE COURSE (PER N.C.D.O.T. STANDARDS) TYPICAL ROAD SECTION 111:. I� 6 ROCK SIL11 CHECK DAM LT FENCE 731 1 i OUND1 TOPSOIL OCKPILWE II I 11993 0 EIS PROPOSED 30' WIDE 0 DRAINAGE EAgIIAENT- - +7.3 +7.10r r +6. PROPOSED FIRE HYDRANT +7.2" / PROPOSED 8" PVC SANITARY SEWER MAIN, TYP. + 7?47 + 7.52 +746 APPROXIMATE LOCATION OF THLr is I15CITY Y FLO00 AILAIN LIMIT AS TAKEN FgRp03M'N F.I.P. RATE 720656600J.APS DATEDMABASE JL000 ELEVATION aA7EL INV-3.P�Q ,a1:191 'S�= 41 V S WV = 4.32_ FES INV. 2.00 EXISTING WELL TOOBVIN 756 OF PAUG RO128RA b FES INV. 1.75 EXISTING 6" RAW WATER - 30' WIDE ACCESS AND UTILITY EASEMENT DB 586 PG 492 PCS PHOSPHATE COMPANY, INC. TOWN OF AURORA DB 1024 PG 588 DB 586 PG 492 1 "=100'-0n 18'CPP W INV= 3.69 -_ E INV = 2,66 X / 6_99 2 b�! / - 100 50 / PROPOSED / FOR 0 EXISTING FORCE MAIN 6' 3' JOHN DRIVE (50' PUBLIC R/W) a Fe+C. NC HIGHWAY 33 (PUBLIC RIGHT OF WAY VARIES) 77 E' W 73n B 05 + 7,82 -+ 7'53 760 _-£756 0 ` + t,h9 '1,2� 1.94 • UPLAND 82 •9a15 _0,03 �u 1�A 4=. It 3 6 Z .WETLA os ' l I++�I�POSEL 40' WIDE AI AGE EASEMENT CONNECT TO EXISTING PC$ PHOSPHATE COMPANY, INC. FORCE MAIN, CUT IN 6"X4" WYE DB 1295 PG 250 AND 4" GATE VALVE 100' AURORA VOLUNTEER FIRE DEPARTMENT D8 913 PG 795 ONE AE ZONE X . /Ili .\ Ij iIIIII! �III�- II� +6.75. I'" I\ II\1 III1I FES INV. 0.00 ' LIMITS OF DISTURBANCE, TYP. J INV.'0.25 I15� P 8POSED SANITARY / SEWER PUMP STATION 50( / \ f/ES INV 2.60/ • °leo3• IS IINV. -4 .5 . - PR�PpSE� TEMPORARY IIJ c13k WETLANDS IMPACT' -..., 7 30"CMP E INV 3.74 W INV = 4.04 DI TOP = 7,68 BOX INV = S OUTLET INV - 5.43 } !CT 14B P T 8.2.8 74 - 1501P r9 4NV - 4.89 WW INV=4.92 H TOP - 9.28 1.8* (TfSV IS BUSTED AND INVER IS APPROXIMATE; PIPE - DIRECTION IS AS51IME0) T 8.50 + 3,56 TB + 5,35 +.55 AURORA PAf 08 1 15'f N Ip 18"RCP N INV - 2,77 S INV - 4.42 40' WIDE ACCESS AND UTILITY EASEMENT DB 848 PG 368 JOHN C. H and wife ULUANOOV.KER HOOKER D8 657 PG 402 APPROXIMATE LOCATION OF THE 1X FLOOD PLAIN LIMIT AS TAKEN MAPS DATED 15, 2003 FROM COMMUNITY PANEL 37206566001 BASE FLOOD ELEVATION - 7 FM FM 404 WETLANDS PCS PHOSPHATE COMPANY, INC. TOWN OF AURORA DB 1024 PG 588 DB 586 PG 492 FM 1_ + 5,39 / 404 WETLANDS + 2,16 COASTAL WETLANDS - OUTLET STRUCTURE TOP 4.00 24" INV. 0.50 BOTTOM 0.00 404 WETLANDS OUTLET PIPE FM FM FM PROPOSED DOUBLE GATE EXISTING SANITARY SEWER TREATMENT COP EMERGENCY SPILLWAY J H C SITE DATA: TOTAL ACREAGE 51.16 AC. ZONING - PIN No 6567111165 OWNER MARY GUILFORD THOMPSON ADDRESS 820 VINEYARD DR. CITY/STATE/ZIP NEW BERN, NC 28562 PROPERTY ADDRESS NC33 & SR 1925 TOWNSHIP 13 MBL 65671719 PIN_1 15002269 DEED BOOK/ PAGE DB 1134 PG 467 REID1 19492 IMPERVIOUS AREA EXISTING 0.00 AC. PROPOSED 1.81 AC. DISTURBED AREA 19.00 AC. LEGEND x 7.00 AL = AREA LIGHT CMP = CORRUGATED METAL PIPE CONC = CONCRETE DI = DROP INLET DIP = DUCTILE IRON PIPE EB = ELECTRIC BOX EIP = EXISTING IRON PIPE EIS = EXISTING IRON STAKE EX. = EXISTING FE = FINSHED ELEVATION FH = FIRE HYDRANT FOC = FIBER OPTIC CABLE GW = GUY WIRE INV. = INVERT M.E. = MATCH EXISTING PP = POWER POLE RCP = REINFORCED CONCRETE PIPE RWM = RIGHT-OF-WAY MONUMENT SI = SIGN SSMH = SANITARY SEWER MANHOLE TB = TELEPHONE BOX TYP. = TYPICAL WM = WATER METER YL = YARD LIGHT EXISTING CONTOUR EX. SPOT ELEVATION EX. STORM PIPE PROPOSED STORM PIPE W EX. WATER MAIN PROPOSED WATER MAIN SS EX. SANITARY SEWER MAIN PROPOSED SANITARY SEWER MAIN E EX. OVERHEAD ELECTRIC FM EX. FORCE MAIN -FM- PROPOSED FORCE MAIN X SILT FENCE FLOOD LINE LIMITS OF DISTURBANCE WETLANDS LINE ROCK SILT CHECK DAM REV. NO. ISSUE FOR PERMITTING REVISIONS "Engineering Architecture Surveying • Technology 324 Evans St., Greenville, NC 27858 (252) 758-3746 (252) 830-3954 (Fax) 4325 Lake Boone Trail, Suite 311, Raleigh, NC 27607 (919) 784-9330 (919) 784-9331 (Fax) • NC Engineering License No. C-0206 • NC Architectural License No. 50213 PROJECT TITLE TOWN OF AURORA INDUSTRIAL PACK BEAUFORT COUNTY AURORA, NC DRAWING TITLE EROSION & SEDIME\ TATION CO\TROL PLAN SCALE AS NOTED DEPARTMENT CIVIL DRAWN BY SLJ CHECKED APPROVED PROJECT NO. . DATE STARTED 7/20/21 SHEET No. 20190222 DRAWING NO. 12 11 10 7 6 THIS DRAWING IS THE PROPERTY IOF THE EAST ROUP, P.A. ANY USE, REUSE, REPRODUC11ON, Ij!SPLAY OR SALE OF 0H1S DRAWING WITHOUT WRITTEN CONSEN % OF THE EAST GROUP, P.A. IS STRICTLY PROHIBI 4 3 2 YR D. (0 COP IGHT, THE EAST GROUP. P.A. 2022 1 12 PROPOSED CUT -IN 6" TEE & 6" G.V. 11 THIRD STREET (60' PUBLIC RIGHT-OF-WAY) — W - FM 12 FM FM FM 24" CURB & GUTTER (SPILL) 11 FES INV. 4.50 d 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 DATU4/ ET.RV 0.00 1 riringto 10 ADDITIONAL BENDS REQ'D TO GET BELOW DITCH BOTTOM FES INV. 4.15 FAASSEMBLY \`X TEMPORARY CONSTRUCTION ENTRANCE wo 0n 00 a_ 't Z Q J m J 0 J 9 EIP 8 PROPOSED 30' WIDE DRAINAGE EASEMENT PROPOSED 6" PVC WATER MAIN 10' UTILITY EASEMENT PROPOSED 30' WIDE DRAINAGE EASEMENT + 7 FH ASSEMBLY 52 LF 24" RCP ® 0.31% ----�. 1 =50'-0" 6 5+00 8.89 I I FMB FM FM 50 25 FILL EXISTING DITCHES 0 Ioo + I 50' :T 5 EXISTING 6" RAW WATER MAIN (APPROX. LOCATION) PROPOSED 6" PVC WATER MAIN 4 B.O. ASSEMBLY —II —W—— - } 11 ptNIW- FM \\\ -6 - --44.,LF 48"-RCP • I,- 0 0.42% I 7+00 FM E E 1 PROPOSED 8" PVC SANITARY SEWER MAIN 00. EXISTING FORCE MAIN (APPROX. LOCATION) GRADE IN PROPOSED DITCH BEFORE FILLING EXISTING DITCHES Lit 4 4 REMOVE EXISTING \ STORM PIPE + \ \ FM FM E - 10' UTILITY/EASEMENT / 1 PROPOSED 4 WIDE DRAINAGE SEMENT 7 \\7\. E FM E o, FES INV. 2.00 11 1 1I 11 IllIl 1.1111=1,111111= iiiiiM MEN WM= BEGIN NEW PA V EM NT Mini E D NE PAVE ° ENT STA: 0+00 TA: 9 00 EL. 8.35 INTERSEG O-N- MEM STA--• +-42: ' 3 E . . 25 HIG POIN STA: 0+55 EL. 10. '5 HIG POIN T10 POINT STA: 8+17.4 I L. 9.1 . RO • 9 ED-GI�A E 0.2% EXIST PROPOSED ' CONCRETEOLLAR THRUST °POSED _ __ GRAD " 36 MIN. STO-M PIPE STING RADE --, S ORM PIPEIII COVE" __- - --- "-- .MEI — PRO.OSED 6" PVC ATER MAIN _1 20 LF PAST 6" DIP 7YR / -BEND, EAc H SIDE OSED 6" PVC WATER MAIN i���,� DIP 1 20-LPAST { 111.1111111 rar 1111111 III PAST BE E VD RE OVE-EXISTIIV STORM PIPE I ,, STORM PPROPOSED STORM�- - REMOVEED T��;� I 6" 45' BED TYP. �' �. --4- REMO� STOR XFSTtIV v1 PIPE liaI - - tdQVE._EX STORM I` PIPE RESTRAIN JOINT / A ER MAN ____ XISTiNG tZAW WAT€, AIN 20 LF 6� DIP CENTERED PIPE, TYP_ d ' - G E\STIN. AW_W/ __- --' --� � r PV ' [ = c 0.5% 24" MIN. UND -PIPE R ..`►� , -Y--SSE" MAIN _-rr �Q •r'.� �-= `� L - „ PVC SAN►T' 8 RY R-14A1 S�� STORM - _ Z1p 6 45' BENT, RESTRAINED TYP. JOINT--- IN - MH TO - 5 • . - MH-6 - • fib; 20-LF-6" UNDER tar- STORM €NTEREs -IPE, TYP. INV. OUT 3.50 TOP 9.25 IN-V.--OU-T-2.2 INV. OUT 3.50 \. INV. IN 2.45 0+00 10 1+00 9 2+00 3+00 8 4+00 5+00 6 6+00 7+00 THIS DRAWING IS THE PROPERTY 5 8+00 F THE EAST GROUP, P.A. ANY USE, REUSE, REPRODUCTION, <1ISPLAY OR SALE OF THIS DRAWING WITHOUT WRITTEN CONSEN OF THE EAST GROUP, P.A. IS STRICTLY PROHIBITED. (® COPYfjIGHT, THE EAST GROUP. P.A. 2022 ) 3 FE INV. 1.75 RIFj RAP, TYP. 0 ZZ 20 19 18 17 16 15 14 13 12 10 9 8 7 EMOVE EXISTING TORM PIPE 6 5 4 / 3 / 2 DATU41 ET FT 0.00 9+00 x X 2 Oco N ter. <0 Li 0u7 r, 00 NOTES: 1. ALL VEGETATION AND TOPSOIL SHALL BE STRIPPED FROM FILL AREAS PRIOR TO PLACING FILL. ANY QUESTIONABLE OR UNSUITABLE SOIL CONDITIONS SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER. 2. ALL FILL SHALL BE COMPACTED TO AT LEAST 95% OF THE STANDARD PROCTOR MAXIMUM DRY DENSITY (ASTM D698). 3. GRADING CONTRACTOR SHALL SEED AND MULCH ALL DISTURBED AREAS IN ACCORDANCE WITH THE SPECIFICATONS WITHIN 21 DAYS COMPLETION OF GRADING WORK. UPON COMPLETION OF THE PROJECT, THE GENERAL CONTRACTOR SHALL INSTALL PERMANENT SEEDING AS OUTLINED IN THE SPECIFICATIONS. ALL DRAINAGE PIPES SHALL BE CLEANED BY THE GENERAL CONTRACTOR TO REMOVE ANY SEDIMENTS THAT HAVE ACCUMULATED. 4. ALL UTILITY TAPS, CONNECTIONS AND EXTENSIONS SHALL BE DONE IN ACCORDANCE WITH ALL APPLICABLE STATE AND LOCAL CODES. 5. LOCATIONS OF EXISTING UTILITIES AS SHOWN ARE APPROXIMATE. CONTRACTOR SHALL FIELD VERIFY LOCATIONS AND COORDINATE CONNECTION WITH PROPER AUTHORITIES. CALL NORTH CAROLINA "ONE -CALL -CENTER" 72 HOURS BEFORE ANY EXCAVATION IS BEGUN. ALL PERMITS AND FEES REQUIRED FOR CONSTRUCTION OF IMPROVEMENTS ARE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. 7. G.C. SHALL VERIFY INVERTS ON EXISTING SANITARY SEWER & STORM DRAINAGE PRIOR TO CONSTRUCTION OF NEW SANITARY SEWER AND STORM DRAINAGE. WHERE WATER LINE CROSSES UNDER STORM DRAINAGE PIPING, A 24" MIN. SEPARATION BETWEEN THE BOTTOM OF THE STORM DRAINAGE PIPING AND THE TOP OF THE WATER LINE SHALL BE MAINTAINED. ROAD NO. 1 » _ HORIZONTAL SCALE: 1 50' VERTICAL SCALE: 1" = 2' 4 3 2 1 A FM FM X— REV. NO. LEGEND AL = AREA LIGHT CMP = CORRUGATED METAL PIPE CONC = CONCRETE DI = DROP INLET DIP = DUCTILE IRON PIPE EB = ELECTRIC BOX EIP = EXISTING IRON PIPE EIS = EXISTING IRON STAKE EX. = EXISTING FE = FINSHED ELEVATION FH = FIRE HYDRANT FOC = FIBER OPTIC CABLE GW = GUY WIRE INV. = INVERT M.E. = MATCH EXISTING PP = POWER POLE RCP = REINFORCED CONCRETE PIPE RWM = RIGHT -OF --WAY MONUMENT SI = SIGN SSMH = SANITARY SEWER MANHOLE TB = TELEPHONE BOX TYP. = TYPICAL WM = WATER METER YL = YARD LIGHT EXISTING CONTOUR EX. SPOT ELEVATION EX. STORM PIPE PROPOSED STORM PIPE EX. WATER MAIN PROPOSED WATER MAIN EX. SANITARY SEWER MAIN PROPOSED SANITARY SEWER MAIN EX. OVERHEAD ELECTRIC EX. FORCE MAIN PROPOSED FORCE MAIN SILT FENCE FLOOD LINE LIMITS OF DISTURBANCE WETLANDS LINE 05/25/22 ISSUE FOR PERMITTING REVISIONS ■ Engineering • Architecture • Surveying ■Technology 324 Evans St., Greenville, NC 27858 (252) 758-3746 (252) 830-3954 (Fax) 4325 Lake Boone Trail, Suite 311, Raleigh, NC 27607 (919) 784-9330 (919) 784-9331 (Fax) u NC Engineering License No. C-0206 a NC Architectural License No. 50213 PROJECT TITLE TOWN OF AURORA INDUSTRIAL PARK BEAUFORT COUNTY AURORA, NC DRAWING TITLE PLAN AND PROFILE ROAD \ O. 1 SCALE AS NOTED DRAWN BY SLJ ............ CHECKED APPROVED PROJECT NO. DATE STARTED 12/03/19 20190222 DEPARTMENT CIVIL SHEET No. DRAWING NO. 12 11 10 9 8 7 6 5 2 1 + 7 A m /5i 15 14 13 12 11 10 9 8 5 EX. RAW WATER 4 MAIN 3 2 0 -3 -4 DATUM ELEV -5.00 GRADE PROPOSED 6" PVCr-WATER-MAIN 1 "7/ - + IN STA: + 7;18 RIP RAP, TYP. FIRE HYDRANT ASSEMBLY, TYP. t 6.96 +746 7.04 I +7.56 /7/7/// /7// /47 /7/ //7/ // /./7/ //,>>//,? 3+00 6" TEE & (2) 6" G.V. \ NOTES: +7.29 +7A0 1. ALL VEGETATION AND TOPSOIL SHALL BE STRIPPED FROM FILL AREAS PRIOR TO PLACING FILQ. THE ENGINEER. 2. ALL FILL SHALL BE COMPACTED TO AT LEAST 95% OF THE STANDARD PROCTOR MAXIMUM DRY DENSITY (ASTM D698). 3. GRADING CONTRACTOR SHALL SEED AND MULCH ALL DISTURBED AREAS IN ACCORDANCE WITH 1I THE SPECIFICATONS WITHIN 21 DAYS COMPLETION OF GRADING WORK. UPON COMPLETION OF THE Ili PROJECT, THE GENERAL CONTRACTOR SHALL INSTALL PERMANENT SEEDING AS OUTLINED 71tz THE SPECIFICATIONS. ALL DRAINAGE PIPES SHALL BE CLEANED B Y- THE GENERAL CONTRACTOR TO REM,OW,6 ANY SEDIMENTS THAT "WAVE ACCUMULATED. Ills 4. ALL UTILITY TAPS, CONNECTIONS AND EXTENSIONS SHALL BE DONE IN ACCORDANCE WITH ALL / 1l1 APPLICABLE STATE AND LOCAL CODES. 1 CLILTILrT-Y-EA-SEMEN F 7,20 + 7.37 FILL EXISTING DITCHES PROPOSED 6" PVC WATER MAIN 5. LOCATIONS OF EXISTING UTILITIES AS SHOWN ARE APPROXIMATE. CONTRACTOR SHALL FIELD / VERIFY LOCATIONS AND COORDINATE CONNECTION WITH PROPER AUTHORITIES. CALL NORTH / CAROLINA "ONE -CALL -CENTER" 72 HOURS BEFORE ANY EXCAVATION IS BEGUN. 6. ALL PERMITS AND FEES REQUIRED FOR CONSTRUCTION OF IMPROVEMENTS ARE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. 7. G.C. SHALL VERIFY INVERTS ON EXISTING SANITARY SEWER & STORM DRAINAGE PRIOR TO CONSTRUCTION OF NEW SANITARY SEWER AND STORM DRAINAGE. 8. WHERE WATER LINE CROSSES UNDER STORM DRAINAGE PIPING, A 24" MIN. SEPARATION BETWEEN THE BOTTOM OF THE STORM DRAINAGE PIPING AND THE TOP OF THE WATER LINE SHALL BE MAINTAINED. ERSECTION 0+00 EL. 9. 2 PROPOSED STORM PIPE EXISTING 20 LF 6" DIP PAST BEND, TYP. 6" 45' B ND, TYP. RESTR-A ED-JOIN-T 20 LF 6" DIP UNDER--S-TO MH-1 TOP 9.25 _INV OU-T._2 25.--- INV. IN 2.45 CENTERED RIPE 0+00 1+00 2+00 i 3+00 4+00 II ii it it ANY QUESTIONABLE OR UNSUITABLE SOIL CONDITIONS SHALL BE BROUGHT TO THE ATTENTION QF Ili it l it la �l.i `f58 + 6.75 7.90 /// I I I I- I 1 I I l I I I I + 8. 6 I I I 1 I 1 I 1 I1 I1 + 7,72 5+00 36" MIN. COVE 11 11 11 11. I t1 16.55 + 7.24 II FIRE HYDRANT ic,SSEMBLY, TYP. / / / / I //.,,///// ////%///////, 1 \ + ' \ / ROAD °INO. 2 (60' PUBLIC RIGHT-OF-WAY 9 1 »=50'-0" PROPOSED GRADE 6+00 + 6,72 50 25 0 / / + • 11 11 - 10' UTIL/TY EASEMENT + 7.29 7///////, //,/// ZONE X ZONE AE /�- / 7+00 ROAD NO. 2 HORIZONTAL SCALE: 1" = 50' VERTICAL SCALE: 1" = 2' 8+00 .36 1+ 6.41 ////�///////,�,�f \i /04 PR(O+ OSED 8" PVC SANITARY SEWER MAIN MH TOP 7.63 t V- 1:35- INV. IN (7: 1.25 9+00 + II II II II STA: 11+0 + 7.34 t3 11 II II II I S INV. I 55 44 LF 24" RCP I FES iNV. ® 0.36% 3.35 (I FIRE HYDRANT ASSEMBLY, 'IiYP. ,g0 5,62 + + 4*4 + 6,73 1 li I I 1 I I 1 1 I l 1 / 7 5.69 1,+1 +5.76 LOW POINT -- 7.00 Elr. 7.03 + 6 81 59 EP1 7.07 1.0% I FE EP 7.55 ®.80 12+00 I )E L -®a-- - 1 FE 7.29 Nips-4 0.5% •...\O O EP 7.07 FES INI. 3.15 32 LF124" RCP ® 0.34% + 6 55 END STA RADIUS CUL-DE-SAC 'A: 12+10.97 E . 7.55 FROPOSED S FARM RIPE 45=BEND;T-Y' R STRAINED JOIN 10+00 THIS DRAWING IS THE PROPERTY F THE EAST GROUP, P.A. ANY USE, REUSE, REPRODUCTION,1 (SPLAY 0R SALE OF THIS DRAWING .WITHOUT WRITTEN CONSEN1 5 � 4 3 0 LFyf;' FP CE-NTERE - UNDER TORM PIPE 11+00 0 LF 6 DIP T � ACH SIDE 45' BEND, TY1f. 12+00 2/ 2 PRO OSED STOW/ PIPE 13+00 OF THE EAST GROUP, P.A. IS STRICTLY PROHIBITED. (o copr 2 112 9 IEP 15 14 13 12 11 10 9 8 7 6 5 4 3 2 -2 3 4 DATUIV ELEV 13+48.97 A FM X 05/25/22 REV. NO. LEGEND AL = AREA LIGHT CMP = CORRUGATED METAL PIPE CONC = CONCRETE DI = DROP INLET DIP = DUCTILE IRON PIPE EB = ELECTRIC BOX EIP = EXISTING IRON PIPE EIS = EXISTING IRON STAKE EX. = EXISTING FE = FINSHED ELEVATION FH = FIRE HYDRANT FOC = FIBER OPTIC CABLE GW = GUY WIRE INV. = INVERT M.E. = MATCH EXISTING PP = POWER POLE RCP = REINFORCED CONCRETE PIPE RWM = RIGHT-OF-WAY MONUMENT SI = SIGN SSMH = SANITARY SEWER MANHOLE TB = TELEPHONE BOX TYP. = TYPICAL WM = WATER METER YL = YARD LIGHT EXISTING CONTOUR EX. SPOT ELEVATION EX. STORM PIPE PROPOSED STORM PIPE EX. WATER MAIN PROPOSED WATER MAIN EX. SANITARY SEWER MAIN PROPOSED SANITARY SEWER MAIN EX. OVERHEAD ELECTRIC EX. FORCE MAIN PROPOSED FORCE MAIN SILT FENCE FLOOD LINE LIMITS OF DISTURBANCE WETLANDS LINE ISSUE FOR PERMITTING REVISIONS THE EAST GROUP, P.A. • Engineering • Architecture • Surveying • Technology 324 Evans St., Greenville, NC 27858 (252) 758-3746 (252) 830-3954 (Fax) • NC Engineering License No. C-0206 • NC Architectural License No. 50213 PROJECT TITLE TOWN OF AURORA BEAUFORT COUNTY AURORA NC DRAWING TITLE SCALE PLAN AND PROFILE OAD NO. 2 I DATE STARTED DRAWN BY CHECKED APPROVED PROJECT NO. 20190222 DEPARTMENT CI VI L SHEET No DRAWING NO. 12 11 10 8 6 12 12 1 "=50'-0" 8°'SgNI SEWERPVCMAIN 10 -4 -5 -10 -11 -12 -13 -14 DATUM ELEV -15.00. 11 10 PROPOSED\ • ROMP STATION\ N . 50 25 0 50' RA NUS C L 10DE—SAC STA: 0+00 L.97.55 0 EX, GRADE RADE 36" MIN. COVER PROPOSED WATER MAIN 106LF- SNI SEWER MAINTARY I 0.52z — MH-4 TOP 7.55 INV OUL(— .20 INV. IN (-) .05 PUMP STATIO TOP 8.0 INV. IN (-) 3.7 B TTeM-F=)-10:0 0+00 7 6 5 4 3 2 0 1 2 -4 5 -6 7 -8 9 -10 14 DATUM ET.FV 15,00 1+00 1+12.23 PUMP STL4TION HORIZONTAL SCALE: 1" = 50' VERTICAL SCALE: 1" = 2' 11 10 CONCRETE FILLET 0 0 8 F— in PLAN VIEW i 7 6 48"x36" DOUBLE LEAF ALUMINUM COVER W/ HINGED HATCH, PADLOCK & HASP 4" 90° BEND, TYP. 8' INSIDE DIAMETER 12.00' TOP ELEV. 8.00 FIN. GRADE ELEV. 7.00 4" FORCE MAIN PRECAST CONCRETE BASIN PROVIDE STAINLESS STEEL GUIDE RAIL SYSTEM HW ALARM (-) 5.50 PUMP 2 ON (-) 6.50 PUMP 1 ON (-) 7.50 PUMP 1 & 2 OFF (-) 9.00 1'-0" (TYP. vpVo "voVc o ° �°V;° °"�oVo ° ° �°Y o u"votJc ° °Op°° Op° O OCCC°p°°° p OOO °Op°° Op° O O°°p� °° p oOO °Op°° °p'O O°°p°°° p f. 0,0.000. Oc,-)l0 0° OOOnOO°O OOOnO OOoOi°';'00 O °O° cgo O °O?OoO 11 ITIII-Ill '-0" I 7--- - I - `� BOTTOM ELEV. (-) 10.00 1 8'-0" SECTION A -A PUMP STATION DETAIL C2.3 9 ALUMINUM LADDER LIFT STA. FLEXIBLE CAST IN RUBBER SLEEVE BOOT W/ SS STRAP PRECAST CONCRETE FLAT SLAB TOP FINISH GRADE STAINLESS STEEL LIFTING CHAIN IN ADDITION TO JOINT SEAL, APPLY EXTERNAL SEALING WRAP TO ALL JOINTS, ASTM C877, TYPE III, 6-INCH WIDTH. 8" (MIN.) ALUMINUM LADDER INVERT IN ELEV. (-) 3.75 TWO SUBMERSIBLE EFFLUENT PUMPS, EACH 100 GPM CO 25' TDH, 2HP, 460V, 3 PHASE 9 N.T.S. 8 COMPACTED CRUSHED STONE, 1' DEPTH (TYP.) UNDISTURBED SUBGRADE 6 5 5' INSIDE DIAMETER 42"x24" DOUBLE LEAF ALUMINUM COVER W/ HINGED HATCH, PADLOCK & HASP 4" GATE VALVE, TYP. 4" 90° BEND, TYP, VALVE VAULT 4" FORCE MAIN 4" TEE CHECK VALVE, TYP. 2 1 NOTES: 1. ALL VEGETATION AND TOPSOIL SHALL BE STRIPPED FROM FILL AREAS PRIOR TO PLACING FILL. ANY QUESTIONABLE OR UNSUITABLE SOIL CONDITIONS SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER. ALL FILL SHALL BE COMPACTED TO AT LEAST 95% OF THE STANDARD PROCTOR MAXIMUM DRY DENSITY (ASTM D698). 3. GRADING CONTRACTOR SHALL SEED AND MULCH ALL DISTURBED AREAS IN ACCORDANCE WITH THE SPECIFICATONS WITHIN 21 DAYS COMPLETION OF GRADING WORK. UPON COMPLETION OF THE PROJECT, THE GENERAL CONTRACTOR SHALL INSTALL PERMANENT SEEDING AS OUTLINED IN THE SPECIFICATIONS. ALL DRAINAGE PIPES SHALL BE CLEANED BY THE GENERAL CONTRACTOR TO REMOVE ANY SEDIMENTS THAT HAVE ACCUMULATED. 4. ALL UTILITY TAPS, CONNECTIONS AND EXTENSIONS SHALL BE DONE IN ACCORDANCE WITH ALL APPLICABLE STATE AND LOCAL CODES. 5. LOCATIONS OF EXISTING UTILITIES AS SHOWN ARE APPROXIMATE. CONTRACTOR SHALL FIELD VERIFY LOCATIONS AND COORDINATE CONNECTION WITH PROPER AUTHORITIES. CALL NORTH CAROLINA "ONE -CALL -CENTER" 72 HOURS BEFORE ANY EXCAVATION IS BEGUN. 6. ALL PERMITS AND FEES REQUIRED FOR CONSTRUCTION OF IMPROVEMENTS ARE THE RESPONSIBILITY OF THE GENERAL CON TRACTOR. 7. G.C. SHALL VERIFY INVERTS ON EXISTING SANITARY SEWER & STORM DRAINAGE PRIOR TO CONSTRUCTION OF NEW SANITARY SEWER AND STORM DRAINAGE. 8. WHERE WATER LINE CROSSES UNDER STORM DRAINAGE PIPING, A 24" MIN. SEPARATION BETWEEN THE BOTTOM OF THE STORM DRAINAGE PIPING AND THE TOP OF THE WATER LINE SHALL BE MAINTAINED. EXISTING DITCH PROPERTY LINE ENLARGED SITE PLAN SCALE: 1"=10' THIS DRAWING IS THE PROPERTYIDF THE EAST GROUP, P.A. ANY USE, REUSE, REPRODUCTION, ISPLAY OR SALE OF THIS DRAWING WITHOUT WRITTEN CONSENOF THE EAST GROUP, P.A. IS STRICTLY PROHIBITED. (® COPYfIGHT, THE EAST. GROUP. P.A. 2022 5 4 3 2 A LEGEND AL = AREA LIGHT CMP = CORRUGATED METAL PIPE CONC = CONCRETE DI = DROP INLET DIP = DUCTILE IRON PIPE EB = ELECTRIC BOX EIP = EXISTING IRON PIPE EIS = EXISTING IRON STAKE EX. = EXISTING FE = FINSHED ELEVATION FH = FIRE HYDRANT FOC = FIBER OPTIC CABLE GW = GUY WIRE INV. = INVERT M.E. = MATCH EXISTING PP = POWER POLE. RCP = REINFORCED CONCRETE PIPE RWM = RIGHT-OF-WAY MONUMENT SI = SIGN SSMH = SANITARY SEWER MANHOLE TB = TELEPHONE BOX TYP. = TYPICAL WM = WATER METER YL = YARD LIGHT EXISTING CONTOUR x 7.00 EX. SPOT ELEVATION EX. STORM PIPE PROPOSED STORM PIPE W EX. WATER MAIN —II— PROPOSED WATER MAIN SS EX. SANITARY SEWER MAIN PROPOSED SANITARY SEWER MAIN E EX. OVERHEAD ELECTRIC FM EX. FORCE MAIN —FM— PROPOSED FORCE MAIN X SILT FENCE FLOOD LINE LIMITS OF DISTURBANCE WETLANDS LINE 05/25/22 REV. NO. ISSUE FOR PERMITTING REVISIONS ■ Engineering ■Architecture • Surveying • Technology 324 Evans St., Greenville, NC 27858 (252) 758-3746 (252) 830-3954 (Fax) 4325 Lake Boone Trail, Suite 311, Raleigh, NC 27607 (919) 784-9330 (919) 784-9331 (Fax) • NC Engineering License No. C-0206 • NC Architectural License No. 50213 PROJECT TITLE TOWN OF AURORA INDUSTRIAL PARK BEAUFORT COUNTY AURORA, NC DRAWING TITLE PLAN AND PROFILE PUMP STATION AND DETAILS SCALE AS NOTED DRAWN BY DATE STARTED SLJ 12/04/19 CHECKED, APPROVED PROJECT NO. 20190222 DEPARTMENT CIVIL SHEET No. DRAWING NO. 12 11 10 9 8 7 6 5 3 2 Ca m P rncs) 0 0 a rz 0 U CC 0 CC CL N INSTALL GEOTEXTILE UNDERLAYMENT UNDER STONE 6" MIN. 2"-3" MARS AGGREGATE v1 CONSTRUCTION ENTRANCE DETAIL C3.1 N.T.S. FINISHED SUBGRADE CL 0.D. OF 12" noPIPE STORM DRAIN TRENCH DETAIL SLOPE SIDES AS NECESSARY FOR CONSTRUCTION rj\ UNDISTURBED SOIL PIPE GRADE 6" MIN. SEEDING AND MULCHING ALL ROADWAY AREAS MARCH 1 50# 10# 25# 500# 4000# - AUGUST 31 TALL FESCUE CENTIPEDE BERMUDAGRASS (HULLED) FERTILIZER LIMESTONE SEPTEMBER 1 - FEBRUARY 28 50# 10# 35# 500# 4000# TALL FESCUE CENTIPEDE BERMUDAGRASS (HULLED) FERTILIZER LIMESTONE WATER AND BORROW LOCATIONS MARCH 1 - AUGUST 31 75# 25# 500# 4000# SEPTEMBER 1 75# 35# 500# 4000# TALL FESCUE BERMUDAGRASS (HULLED) FERTILIZER LIMESTONE - FEBRUARY 28 TALL FESCUE BERMUDAGRASS (HULLED) FERTILIZER LIMESTONE NOTE: 50# OF BAHIAGRASS MAY BE SUBSTITUTED FOR EITHER CENTIPEDE OR BERMUDAGRASS ONLY UPON ENGINEER'S REQUEST. MAXIMUM SIDE ' CLEARANCE VEGETATIVE PLAN: STEEL "T" POST MIN. 10 GA. WIRE 8'-0" MAX. ti 0 GV PLAN SYNTHETIC FILTER FABRIC LINER, MIRAFI 100X OR EQUAL NOTE: IF FLARED END SECTI❑N IS DISCHARGING INT❑ DITCH FROM THE SIDE, EXTEND RIP RAP UP DITCH BANK ON ❑FF-SIDE A MINIMUM OF 4 FEET, FRONT VIEW 1 0 I STEEL "T" POST WIRE MESH FENCE CRIMP RING CONNECTOR SYNTHETIC WOVEN FILTER FABRIC #57 WASHED STONE TO ANCHOR BOTTOM DIG IN 6" DOWN & SIDE VIEW 6" OUT NOTE: SEE SHEET C2. ENGINEER MAY REQUIRE ADDITIONAL SILTFENCE AS DICTATED BY SITE CONDITIONS DURING CONSTRUCTION. SILT FENCE DETAIL N.T.S. SEE PLAN FOR DIM, 2 TOP OF BANK U U 4' MIN, UP EACH SIDE SLOPE -41 N.C.D.O.T. d50 STONE SIZE SECTION OF 8". MAXIMUM SIZE OF 12" #5 WASHED STONE FLARED END SECT. INLET/OUTLET PROTECTION N.T.S. VEGETATIVE COVER SHALL BE IN ACCORDANCE WITH THE SEEDING SCHEDULE AND THE FOLLOWING SPECIFICATION SECTIONS: SECTION 02110 SITE CLEARING SECTION 02120 EROSION & POLLUTION CONTROL SECTION 02228 CLEAN-UP & SEEDING TEMPORARY SEEDING DATE APR 15-AUG 14 AUG 15-APR 14 YEAR ROUND GERMAN MILLET RYE (GRAIN) FERTILIZER 10-20-20 ANALYSIS 50 LBS/ACRE 50 LBS/ACRE 400 LBS/ACRE SEED BED PREPERATION NOTES 1. SCARIFY SOIL TO A DEPTH OF THREE (3) INCHES AND WORK INTO A SATISFACTORY SEED BED BY DISKING, USE OF CULTIPACKERS, HARROWS, DRAGS AND OTHER APPROVED MEANS. 2. PREPARATION OUTLINED ABOVE SHALL NOT BE DONE WHEN THE SOIL IS FROZEN, WET OR OTHERWISE IN AN UNFAVORABLE CONDITION. 3. BEGIN AND COMPLETE SEEDING OPERATIONS AS OUTLINED AS SOON AS POSSIBLE AFTER FINAL GRADING IS COMPLETED, BUT 1N NO EVENT LATER THAN 14 CALENDAR DAYS AFTER COMPLETION OF FINAL GRADING. 4. SEEDING AND MULCHING OPERATIONS SHALL NOT BEGIN UNTIL ELECTRICAL SERVICE HAS BEEN INSTALLED WITHIN THE PROJECT, UNLESS DIRECTED BY THE ARCHITECT/ENGINEER. 5. DISTRIBUTE LIME AND FERTILIZER, UNIFORMLY OVER SEED BED AND HARROW, RAKE, OR OTHERWISE WORK SAME INTO SEED BEDS. 6. DISTRIBUTE SEED UNIFORMLY OVER SEED BED. COVER SEED LIGHTLY AFTER SEEDING. 7. NO LIME, FERTILIZER, OR SEED SHALL BE APPLIED DURING A STRONG WIND, WHEN SOIL IS WET OR OTHERWISE UNWORKABLE. SHOULD RAIN FOLLOW SEEDING BEFORE ROLLING IS BEGUN, THE BED SHALL NOT BE ROLLED. NPDES INSPECTION REQUIREMENTS: 1. MUST KEEP A RAIN GAUGE ON THE PROJECT SITE. i FILL SLOPE GROUND LINE. WIDTH VARIES I I III1 1 t rI0,;„,,� NOTE: CONTRACTOR SHALL INSTALL EROSION CONTROL MATTING ON ALL DITCH SLOPES NOTE: PROVIDE TEMPORARY SINGLE NET STRAW MAT. TENSAR DS75 OR EQUAL. INSTALL PER MFG REQUIREMENTS. (NET MUST BEAR ON UNDISTURBED EARTH) 2. DEDICATED DEMOLITION AND OTHER WASTE AREAS AND EARTHEN MATERIAL STOCKPILES MUST BE LOCATED AT LEAST 50' FORM STORM DRAINS OR STREAMS UNLESS NO ALTERNATIVE IS FEASIBLE. 3. MUST INSPECT ALL EROSION AND SEDIMENT CONTROL MEASURES AT LEAST ONCE A WEEK AND WITHIN 24 HOURS AFTER ANY STORM EVENT GREATER THAN A HALF -INCH (DURING A 24 HOUR PERIOD). MUST TAKE IMMEDIATE CORRECTIVE ACTION FOR ANY DEVICE FAILURE. 4. MUST INSPECT ALL OUTLETS WHERE STORMWATER RUNOFF LEAVES THE SITE AND EVALUATE THE EFFECT ON NEARBY STREAMS OR WETLANDS. 5. CORRECTIVE ACTION MUST BE TAKEN IF SEDIMENT IS DEPOSITED OFF -SITE OR INTO A STREAM OR WETLAND, OR CAUSES A VISIBLE INCREASE IN TURBIDITY OF ANY WATERBODY. 6. MUST KEEP RECORDS OF THESE INSPECTIONS AND ANY CORRECTIVE ACTIONS TAKEN. MAINTENANCE PLAN: 1. ALL EROSION AND SEDIMENT CONTROL PRACTICES WILL BE CHECKED FOR STABILITY AND SEPERATION FOLLOWING EVERY 0.5" OVER 24-HOUR PERIOD RAINFALL EVENT, BUT IN NO CASE LESS THAN ONCE EVERY WEEK. ANY NEEDED REPAIRS WILL BE MADE IMMEDIATELY TO MAINTAIN ALL PRACTICES AS DESIGNED. 2. SEDIMENT WILL BE REMOVED FROM BEHIND THE SEDIMENT FENCE WHEN IT BECOMES 0.5 FT DEEP AT THE FENCE. THE SEDIMENT FENCE WILL BE REPAIRED AS NECESSARY TO MAINTAIN A BARRIER. 3. EROSION CONTROL MATTING SHALL BE MAINTAINED UNTIL ALL WORK IS COMPLETE. AREAS SHALL BE RESEEDED AND MATTING SHALL BE REPLACED AS NEEDED. 4. TEMPORARY GRAVEL CONSTRUCTION ENTRANCE/ EXIT WILL BE INSPECTED PERIODICALLY. WHEN MUD BEGINS TO BUILD-UP, THE ENTRANCE WILL BE BLADED OFF REMOVING THE MUD. ADD NEW STONE TO ENTRANCE AS NEEDED. 5. ALL SEEDED AREAS WILL BE FERTILIZED, RE -SEEDED AS NECESSARY AND MULCHED ACCORDING TO SPECIFICATION IN THE VEGETATIVE PLAN TO MAINTAIN A VIGOROUS, DENSE VEGETATIVE COVER. 6. CHECK SEDIMENT TRAPS AFTER PERIODS OF SIGNIFICANT RUNOFF. REMOVE SEDIMENT AND RESTORE THE TRAPS TO ITS ORIGINAL DIMENSIONS WHEN SEDIMENT ACCUMULATES TO ONE-HALF THE DESIGN DEPTH. CHECK THE EMBANKMENT, SPILLWAYS AND OUTLET FOR EROSION DAMAGE AND INSPECT THE EMBANKMENT FOR PIPING & SETTLEMENT. MAKE ALL NECESSARY REPAIRS IMMEDIATELY. REMOVE ALL TRASH AND OTHER DEBRIS FROM THE RISER AND POND AREA. 2' BOTTOM DITCH SECTION WIDTH VARIES c_ 411►41P411; 1 - I I 'ap,41. -404•4//0"- SWALE SE TION sC \0 0 SPILL OFF CURB & GUTTER CROSS SECTION CURB & GUTTER DETAIL N.T.S. FINISH GRADE II 1111 11 FINISH GRADE -I I II II-1 I II NOTE: SLOPES 4:1 OR LESS SHALL BE SEEDED ACCORDING THE SPECIFICATION AS DETERMINED BY TIME OF YEAR.. TYPICAL DITCH/ SWALE SECTIONS N.T.S. CONSTRUCTION SEQUENCE: (SPILL) 1. OBTAIN AND POST A COPY OF THE CERTIFICATE OF EROSION AND SEDIMENT CONTROL PLAN APPROVAL. NOTIFY NCDEQ - LAND QUALITY SECTION, WASHINGTON REGIONAL OFFICE AT 252-946-6481 PRIOR TO COMMENCING CONSTRUCTION. A PRECONSTRUCTION MEETING MAY BE REQUIRED AT THE DISCRETION OF THE DIVISION. 2. CONSTRUCT TEMPORARY CONSTRUCTION ENTRANCE/EXIT 3. DISTURB LAND ONLY AS NECESSARY TO INSTALL TEMPORARY EROSION AND SEDIMENT CONTROL DEVICES. INSTALL ADDITIONAL EROSION AND SEDIMENT CONTROL DEVICES AS NEEDED OR AS DIRECTED BY THE ENGINEER. 4. PERFORM SITE CLEARING AND DEMOLITION, IN ACCORDANCE WITH PLANS, INCLUDING REMOVAL OF EXISTING CURB AND GUTTER, AGGREGATE BASE COURSE, STORM DRAINAGE STRUCTURES, TREES, SHRUBS, ETC. FROM THE SITE AND DISPOSE OF DEBRIS AT AN APPROVED SITE. PRIOR TO AND DURING DEMOLITION PHASE INSTALL APPROPRIATE EROSION AND SEDIMENTATION CONTROL MEASURES. 5. TRANSITION EROSION CONTROL MEASURES FROM DEMOLITION PHASE TO CONSTRUCTION PHASE AND INSTALL MEASURES IN APPROPRIATE AREAS. 6. BEGIN THE GRADING OF THE PROPOSED RIGHT-OF-WAY AND ESTABLISH AREA FOR THE TOPSOIL STOCKPILE. 7. BEGIN CONSTRUCTION OF UTILITIES INCLUDING GRAVITY SEWER AND WATER MAIN. 8. BEGIN CONSTRUCTION OF THE ROADWAY INCLUDING ROUGH GRADING, PLACING AGGREGATE STONE BASE AND STORM DRAINAGE STRUCTURES. 9. MAINTAIN EROSION AND SEDIMENTATION MEASURES DURING CONSTRUCTION. CHECK THE MEASURES FOR FAILURE AND AVAILABLE SEDIMENT STORAGE AFTER EACH SIGNIFICANT RAINFALL EVENT. 10. COMPLETE CONSTRUCTION OF ROADWAY INCLUDING ASPHALT PLACEMENT. 11. MULCH AND SEED ALL DISTURBED AREAS. ANY SLOPES LEFT EXPOSED WILL WITHIN 14 CALENDAR DAYS OF COMPLETION OF ANY PHASE OF GRADING, BE PLANTED OR OTHERWISE PROVIDED WITH TEMPORARY OR PERMANENT GROUND COVER, DEVICES, OR STRUCTURES SUFFICIENT TO RESTRAIN EROSION. 12. REMOVE ALL TEMPORARY EROSION CONTROL MEASURES ONCE PERMANENT VEGETATION IS ESTABLISHED. 13. TIME OF EXPOSURE IS APPROXIMATELY 6 MONTHS OR UNTIL COMPLETION AND STABILIZATION OF THE SITE. CONTRACTOR SHALL PREPARE FOR MAINTENANCE OF THE SITE EROSION AND SEDIMENTATION MEASURES APPROPRIATE FOR THE EXPECTED DURATION. THIS DRAWING IS THE PROPERTY F THE EAST GROUP, P.A. ANY USE, REUSE, REPRODUC11ON, FLOW / / / / / / / / / / / / / / / / / / \\\\\\\\\\\\\\\\ UNDISTURBED OR COMPACTED SUBGRADE - 3" S9.5B (TWO 1 1/2" LIFTS) 8" COMPACTED ABC (MIN.) TYPICAL NEW ASHPALT PAVEMENT SECTION C3.1 TOP OF BANK BEYOND #5 WASHED STONE 2' SEDIMENT AREA N.T.S. 1' MIN. PLACE RIP RAP UP SIDES OF DITCH v ��-.,, z / \ /,%/ N 2' MIN. ELEVATION 1' 2' SECTION TOP OF WEIR 9" MIN. FREEBOARD DITCH SLOPE TOP OF WEIR (MAX.) ROCK SILT CHECK DAM N.T.S. NCDOT CLASS B STONE 4' APRON GRADING NOTES: 1. ALL VEGETATION AND TOPSOIL SHALL BE STRIPPED FROM FILL AREAS PRIOR TO PLACING FILL. ANY QUESTIONABLE OR UNSUITABLE SOIL CONDITIONS SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER. 2. AFTER STRIPPING TOPSOIL AND PRIOR TO PLACING FILL, IT IS RECOMMENDED THAT ALL BUILDING, PARKING AND DRIVEWAY AREAS BE ROLLED WITH A VIBRATORY ROLLER TO CONSOLIDATE LOOSE SOILS IN THE UPPER SUBGRADE. COMPACTION TEST RESULTS OF AT LEAST 95 PERCENT OF THE STANDARD PROCTOR MAXIMUM DRY DENSITY WILL BE REQUIRED PRIOR TO ENGINEER'S APPROVAL FOR FILL PLACEMENT. CONTRACTOR SHALL CONTACT THE ENGINEER AND SCHEDULE A PROOF ROLL FOR SUBGRADE AND WHEN AGGREGATE BASE COURSE HAS BEEN INSTALLED. 3. ALL FILL SHALL BE COMPACTED TO AT LEAST 95% OF' THE STANDARD PROCTOR MAXIMUM DRY DENSITY (ASTM D698). 4. PAVEMENT DESIGN IN PARKING LOTS SHALL BE 8" AGGREGATE BASE COURSE WITH 3" ASPHALT. 5. ALL CULVERT CLEANOUT MUST BE DONE SUCH THAT THE SEDIMENT IS EITHER EXTRACTED OR BLOWN UPSTREAM FOR CLEANUP. UNDER NO CIRCUMSTANCES SHALL SEDIMENT BE BLOWN DOWNSTREAM. 6. GRADING CONTRACTOR SHALL TEMPORARY SEED AND MULCH ALL DISTURBED AREAS IN ACCORDANCE WITH THE SPECIFICATIONS WITHIN 14 DAYS OF COMPLETION OF GRADING WORK. UPON COMPLETION OF THE PROJECT, THE GENERAL CONTRACTOR SHALL INSTALL PERMANENT SEEDING AS OUTLINED IN THE SPECIFICATIONS. ALL DRAINAGE PIPES SHALL BE CLEANED BY THE GENERAL CONTRACTOR TO REMOVE ANY SEDIMENTS THAT HAVE ACCUMULATED. 7. ALL EXCESS TOPSOIL STRIP MATERIAL TO BE HAULED OFF -SITE AND DISPOSED OF AT AN APPROVED SITE. 8. ALL PLANTING AREAS SHALL BE BACKFILLED WITH TOPSOIL AND RAKED DOWN, REMOVING ALL CLODS AND ROOTS, AND LEFT READY FOR SEEDING AND PLANTING. GROUND STABILIZATION SITE AREA DESCRIPTION STABILIZATION TIME FRAME STABILIZATION TIME FRAME EXCEPTIONS * PERIMETER DIKES, SWALES, DITCHES AND SLOPES 7 DAYS NONE * HIGH QUALITY WATER (HOW) ZONES 7 DAYS NONE * SLOPES STEEPER THAN 3:1 7 DAYS IF SLOPES ARE 10' OR LESS IN LENGTH AND ARE NOT STEEPER THAN 2:1, 14 DAYS ARE ALLOWED. * SLOPES 3:1 OR FLATTER 14 DAYS 7 DAYS FOR SLOPES GREATER THAN 50 FEET IN LENGTH * ALL OTHER AREAS WITH SLOPES FLATTER THAN 4:1 14 DAYS NONE (EXCEPT FOR PERIMETERS AND HQW ZONES) SPLAY OR SALE OF THIS DRAWING WITHOUT WRITTEN CONSENT OF THE EAST GROUP, P.A. IS STRICTLY PROHIBITED. (0 COPYf GHT, THE EAST GROUP. P.A. 2022 ) ISSUE FOR PERMITTING REVISIONS ■Engineering ■Architecture ■ Surveying Technology 324 Evans St., Greenville, NC 27858 (252) 758-3746 (252) 830-3954 (Fax) 4325 Lake Boone Trail, Suite 311, Raleigh, NC 27607 (919) 784-9330 (919) 784-9331 (Fax) ■ NC Engineering License No. C-0206 ■ NC Architectural License No. 50213 PROJECT TITLE TOWN OF AURORA INDUSTRIAL PARK BEAUFORT COUNTY AURORA, NC DRAWING TITLE GRADING, DRAINAGE, EROSION & SEDI v E\TATION CONTROL AND NOTES SCALE AS NOTED DRAWN BY SLJ CHECKED APPROVED PROJECT NO. 20190222 DEPARTMENT CIVIL SHEET No. DRAWING NO. 12 11 10 8 7 5 4 3 2 1 12 M L J A SELECT BACKFILL FINISHED SUBGRADE LOCATING WIRE TO BE PLACED ABOVE ALL WATER PIPE WATER MAIN -\ CONC THRUST COLLAR O.D. OF PIPE MAGNETIC TRACING TAPE 12" (TYP. 12" MAXIMUM SIDE CLEARANCE SLOPE SIDES AS NECESSARY FOR CONSTRUCTION 36" MIN. COVER WATER PIPE TRENCH DETAIL N.T.S. ADJUSTABLE CAST IRON VALVE BOX W/ REMOVABLE COVER LABELED "WATER" (TYP) 2" GATE VALVE MECH JOINT TAPPED PLUG CONC VALVE SUPPORT // 2'-0" SQ CONC PAD ,y / EACH END OF BOX // // BRICK SUPPORTS TAMPED BACKFILL 2" SCH 40 PVC 3'-0" UNDISTURBED EARTH BLOW -OFF DETAIL N.T.S. 47T-IgEllglikErEq TYPICAL MANHOLE STEPS AT 16" ON CENTER PRECAST CONE SEE SPECS FOR JOINT REQUIREMENTS M.J. CAP WITH UPPER - 2/3 OF END REMOVED. SECURE WITH RETAINER GLAND SLOPE 1"/FT. DEPTH CONE GREATER THAN 6' ECCENTRIC 6' OR LESS CONCENTRIC OPENING ti 2'-0"SQ CONC COLLAR ///// air ADJUSTABLEIll N/. CAST IRON VALVE BOX W/ REMOVABLE COVER LABELED "WATER" (T(P) .l i I GATE VALVE CAST IRON METER BOX AND LID //- 2" CAP -SLIP ON \/ 45' BEND CRUSHED STONE CONC BLOCKING 4 /\ (3000 PSI MIN) MANHOLE RING & COVER 1/2" GROUT GATE VALVE DETAIL N.T.S. NOTES: ® CL TO BE PLUMB. IF ADJUSTMENT IS NECESSARY AFTER PRESSURE TEST, RETESTING MAYBE REQUIRED BY G.U.C. ✓ VALVE BOX SHALL NOTE BE INSTALLED IN CURB AND GUTTER. G INLET SHOE SHALL HAVE A SIX INCH INSIDE DIAMETER AND SHALL BE DUCTILE IRON WITH MECHANICAL JOINT FITTINGS PER AWWA STANDARD C110. o CONVERT 4 1/2" NOZZLE CAP TO STORZ CONNECTION. TOP OF PAVEMENT PRECAST OR CORED HOLE W/ FLEXIBLE SLEEVE (TYP.) TEE (DIP)(W/ RETAINER GLANDS) 1 JOINT -DIP i-'ii PI I, GROUT CHANNEL 00 1 MIN CRUSHED COMPACTED _ _ 0° a° AGGREGATE BASE /0° III I I =,III III-11=11°SOcboeoo0foewce 0�?°°fi► 111 111_I1 —I 1 #1111j- ' ' * 41 14471 TTff �-1T= "t -J-I- I_I I _— 11- DROP MANHOLE DETAIL N. T. S. ADAPTOR COMPACTED SAND 1 JOINT -DIP /WITH POLYWRAP INCOMING PIPE SIZE OF 8"-12"- USE 8" DROP 90' (DIP) (W/RETAINER GLAND) UNDISTURBED GROUND z d w w U) CAST IRON VALVE BOX LOCKED HYDRANT TEE 6" MIN. CLASS B CONCRETE PLAN — BENDS PIPE SIZE <4" 4" 6" 8" 12" // UNDISTURBED EARTH BUTTRESS DefIENSIONS 22 1/2 BENDS L 1'-0" 1'-0" 1'-6" 2'-0" 2'-0" H 1'-0" 1'-0" 1'-6" 2'-0" 2'-0" 45 BENDS L 1'-0" 1'—O" 1'-6" 2'-0" 3'-0" H TRENCH WIDTH UNDISTURBED EARTH CLASS B CONCRETE 1'-0" 1'-0" 1'-6" 2'-0" 2'-6" SECTION 90 BENDS L 1'-0" 1'-6" 2'-0" 3'-0" 4'-6" H 1'-0" 1'-6" 2'-0" 2'-0" 3'-0" NOTES: 1. DIMENSION "A" SHOULD BE AS LARGE AS POSSIBLE WITHOUT INTERFERRING WITH THE MECH. JOINT BOLTS. 2. THE SHAPE OF THE BACK OF THE BUTTRESS MAY VARY AS LONG AS THE CONCRETE IS AGAINST FIRM, UNDISTURBED EARTH. 3. BUTTRESS DIMENSIONS ARE BASED UPON A SOIL RESISTANCE OF 2000 LBS. PER SQ. FT. AND A WATER PRESSURE OF 150 P.S.I. STREET RIGHT-OF-WAY OR AS NOTED ON PLANS FIRE HYDRANT, PUMPER NOZZLE TO BE PERPENDICULAR TO STREET. 6" GATE VALVE 18" MIN. 24" MAX. UNFORMED CONC THRUST BLOCK, PROVIDE 8 SQ FT OF BEARING AREA PLAN B. D. <4" 4" 6" 8" CLASS B CONCRETE UNDISTURBED EARTH BUTTRESS DIONS L 1'-0" 1'-6" 2'-0" 3'-0" H 1'-0" 1'-6" 2'-0" 2'-0" 12" 4'-6" 3'-O" C "' Z • WZ N B. D. = BRANCH DIAMETER UNDISTURBED EARTH TRENCH WIDTH SECTION D O N Z tl Z NOTES: 1. DIMENSION "C" SHOULD BE LARGE ENOUGH TO MAKE ANGLE "A" EQUAL TO OR GREATER THAN 45'. 2. DIMENSION "D" SHOULD BE AS LARGE AS POSSIBLE WITHOUT INTERFERRING WITH THE MECHANICAL JOINTS. 3. BUTTRESS DIMENSIONS ARE BASED UPON A SOIL RESISTANCE OF 2000 LBS. PER SQ. FT. AND A WATER PRESSURE OF 150 P.S.I. THRUST BLOCKING DETAIL N.T.S. HYDRANTS SHALL BE (42{. AMERICAN DARLING B-84-B OR MUELLER A-423 W/ 5 1/4" MAIN VALVE, (2) 2 1/2" NOZZLES AND (1) 4 1/2" NOZZLE W/CAPS ALL HAVING NATIONAL STANDARD THREADS. FIRE HYDRANT DETAIL N.T.S. PLYWOOD 48" X 24" PAINTED WHITE --GROUND LINE PROVIDE ROCK SPILL ARROUND WEEP HOLES SLOPE TOP OF CONC TO PROVIDE DRAINAGE FROM HYDRANT DRAIN BLACK LETTERS 6" HEIGHT WOOD POST 3.5" X 3.5" X 8' CONCRETE WASHOUT SIGN DETAIL (OR EQUIVALENT) REQUIRED FOR ANY OPTION STRAW BALE-\ i-)- )(i\1 (4 2:-..----7.- )(I''4) N ....----r -4.---Thr _.-----r 10 mil PLASTIC LINING STRAW BALE TYP. 10 mil PLASTIC LINING NATIVE MATERIAL (OPTIONAL) BINDER WIRE WOOD OR METAL STAKES (2 PER BALE) ABOVE GRADE WITH STRAW BALES MIN. (1) GRADE RING REQ.'D. IN NON -PAVED AREAS. GRADE RINGS NOT REQ.'D. IN PAVED AREAS UNLESS NEEDED TO MEET GRADE. MANHQLE STEPS AT 16 OC FLOW CHANNEL BENCH COMPACTED CRUSHED STONE, 1' DEPTH (TYP) SANDBAG CLASS B CONCRETE MANHOLE RING & COVER FLOW CHANNEL BENCH -SLOPE UP FROM CHANNEL 1/2" PER FT. 1/2" GROUT SECTION MANHOLE STEPS 16" O.C. FLEXIBLE RUBBER SLEEVE W/ SST STRAP (TYP) FLEXIBLE RUBBER SLEEVE PLAN BOOT W/ SST STRAP THE CONTRACTOR SHALL NOTIFY ENGINEER FOR INSPECTION OF ALL SUCH CROSSINGS PRIOR TO BACKFILLING. FAILURE TO DO SO WILL RESULT IN CONTRACTOR HAVING TO UNCOVER WATERLINE FOR CROSSING INSPECTION. 24 HOUR ADVANCE NOTICE IS REQUIRED FOR ALL INSPECTIONS. ONE JOINT OF D.I.P. ONE JOINT OF D.I.P. RETAINER GLANDS/GRIP RINGS (TYP.) RETAINER GLANDS/GRIP RINGS (TYP.) M.J. 45' BEND (D.I.P.) M.J. 45' BEND (D.I.P.) D.I.P. RETAINER GLANDS/GRIP RINGS (TYP.)------"' M.J. 45. BEND (D.I.P.) CONCRETE BLOCKING NOTE: PLACE CONC. BLOCKING SUCH THAT IT WILL NOT INTERFERE WITH REMOVAL OF BOLTS. NOTES: 1. MANHOLES EXCEEDING 12'-0" DEPTH MUST HAVE EXTENDED BASE SECTION. 2. MANHOLES 6'-0" DEEP AND LESS USE CONCENTRIC OR ECCENTRIC CONE MORE THAN 6'-0" DEEP USE ECCENTRIC CONE. UNDISTURBED SUBGRADE NEW SANITARY SEWER MANHOLE N. T. S. ❑V Y A I 0 0 0 EEE 10 mil PLASTIC' LINING SANDBA 10 mil PLASTIC LINING �IIC=III�IIl' LATH AND FLAGGING ON 3 SIDES ERM ERM NOTES; 1, ACTUAL LAYOUT TO BE DETERMINED IN THE FIELD BUT NOT WITHIN SOFT OF A PROPOSED/ EXISTING CATCH BASIN AND/ OR INLETS, TOP OF BANK OF PERENNIAL STREAM, SURFACE WATER BODY, OR WETLAND. 2, A CONCRETE WASHOUT SIGN SHALL BE INSTALLED IN CLOSE PR❑XIMITY OF THE AREA AND SHALL BE CLEARLY VISIBLE, 3, GEOMEMBRANE BASIN LINER SHALL C❑NSIST OF A P❑LYPRQPLENE OR POLYETHYLENE 10 MIL THICK GE❑MEMBRANE, 4, HOLES, DEPRESSI❑NS OR OTHER GROUND DISTURBANCE CAUSED BY THE REMOVAL OF THE TEMPORARY CONCRETE WASHOUT FACILITIES SHALL BE BACKFILLED, REPAIRED, AND STABILIZED TO PREVENT EROSION. MAINTENANCE; 1, MAINTAIN WASHOUT STRUCTURE TO PROVIDE ADEQUATE CAPACITY PLUS A MINIMUM OF 12 INCHES, REMOVE AND DISPOSE HARDENED CONCRETE AND RETURN THE STRUCTURE TO A FUNCTI❑NAL C❑NDITI❑N AFTER REACHING 75% CAPACITY. 2. INSPECT WASHOUT STRUCTURE FOR DAMAGE AND MAINTAIN FOR EFFECTIVENESS WEEKELY, 3, REMOVE CONCRETE STRUCTURE AND SIGN ON PROJECT COMPLETION, DISPOSE CONCRETE IN APPROVED LANDFILL SITE OR RECYCLE. 4, GRADE THE EARTH MATERIAL TO MATCH EXISTING CONTOURS AND SEED ACC❑RDINGLY TO PLANT SCHEDULE. MULCH AREA ACC❑RDINGLY. 5, PROVIDE 2" SAND LAYER TO CONCRETE WASHOUT PIT. CONCRETE WASHOUT DETAIL N.T.S. FINAL BACKFILL INITIAL BACKFILL HAUNCHING BEDDING - 4" MIN. FOUNDATION (MAY NOT BE REQD.) STORM DRAIN MINIMUM 20 LF (10' EACH SIDE) OF DUCTILE IRON PIPE UNDER RCP CULVERT CROSSING, ALL INTERNAL JOINTS TO BE RESTRAINED STORM/ WATER CROSSING PIPE GRADE THIS DRAWING IS THE PROPERTY THE EAST GROUP, P.A. ANY USE, REUSE, REPRODUCTION, !SPLAY OR SALE OF THIS DRAWING VVITHOUT WRITTEN CONSEN RETAINER GLANDS/GRIP RINGS (TYP.) CONCRETE BLOCKING FINISH GRADE NOTE: INSTALLATION OF SDR 35 PVC SHALL BE IN ACCORDANCE VvITH THE LATEST REVISION OF ASTM D2321. 1.-0" SELECT BACKFILL SPRING UNE GRANULAR EMBEDMENT ZONE # 57 STONE BEDDING STONE TO BE THOROUGHLY COMPACTED UNDER PIPE PVC. SAN. SEWER PIPE SEWER TRENCH DETAIL OF THE EAST GROUP, P.A. IS STRICTLY PROHIBITED. NI COP IGHT, THE EAST GROUP. P.A. 2022 ) REV. NO. ISSUE FOR PERMITTING SU REVISIONS BY 4325 Lake Boone Trail, Suite 311, Raleigh, NC 27607 (919) 784-9330 (919) 784-9331 (Fax) N NC Engineering License No. C-0206 NC Architectural License No. 50213 PROJECT TITLE TOWN OF AURORA INDUSTRIAL PARK BEAUFORT COUNTY DRAWING TITLE AURORA, NC WATH AND SANITARY SEWE DETAILS SCALE AS NOTED DRAWN BY DATE STARTED SHEET No. SLJ 12/04/19 CHECKED APPROVED PROJECT NO. DEPARTMENT CIVIL DRAWING NO. 12 11 10 9 8 7 6 5 4 3 2 12 11 10 9 8 7 6 5 4 3 2 1 FM CONNECT TO EX. FORCE MAIN, CUT IN 6"X4" WYE AND 4" GATE VALVE 6 FM + 6.5 FM FES INV. 2.85 FM RIP RAP I I FM I , I I I I II RI IRA a3 PP III 100 LF 24" DIP (`DUAL PI1' S) ® 0.22% SUPPORT PIPES 1/1WITH PIER IN CENTER OF DITCH i h7 73 II II I I II I I, I I I FM • FM x FES/ INV. 2.60 N FM i / RIP. ''AP PROPOSED DITCH X I 4.'G2 II 3.94 ♦ • ♦ ♦ ♦ � I • s FM \ FM \FES INV. 2.35 f. "I'II +5243 II / III r 31.22 I + 3.40 I ` + 3.54 364 - - -•�„,5;15- J4 352 \ _ I BOUIVDAR/ LINE_ , FM \ FM X FM • 404 WETLANDS X FM FM X FM FESINV. 1.80 X 7 + 3 20/ PROPERTY LINE WETLANDS LINE, TYP. RIP { RAP 7 X FM FM FM FM FM ENLARGED VIEW _cALE-. 1"=40' X FM 70.00' / 404 WETLANDS 70.00' TEMPORARY FLOATING SKIMMER PROPOSED DOUBLE GATE x OUTLET STRUCTURE TOP 4.00 24" INV. 1.00 BOTTOM 0.00 PROPERTY LINE LEVEL • SPREADER \ • WETLANDS LINE, TYP. 28 LF 24" RCP © 0.0% \ FES INV. 1.00 *JrL. RIP RAP J`4%5Q�• EMERGENCY SPILLWAY BOUNDARY LINE L J ELEV. 5.00 ISOMETRIC VIEW A "ARM ASSEMBLY" SCH 40 PVC END CAP SCH 40 PVC PIPE PLAN VIEW WATER LEVEL A SCH 40 PVC BEND, ANGLE BASE ON "ANGLE 0" SCH 40 PVC "WATER" ENTRY UNIT" 1/2" DIA. HOLES IN UNDERSIDE SEE PIPE MANUFACTURER FOR APPROVED CONNECTION TRANSITION FLEXIBLE HOSE/PIPE OUTLET PIPE 1 SECTION B-B SECTION A -A SKIMMER DETAIL A ELEV. 2.75 ELEV. 1.50 BOTTOM ELEV. (-) 1 00 B "C ENCLOSURE A B SCH 40 PVC VENT PIPE SCH 40 teiPVC PIPE "C ENCLOSURE" PIVOT POINT OF "C ENCLOSURE" ORIFICE PLATE SCH 40 PVC TEE SCH 40 PVC PIPE "ARM ASSEMBLY" "ANGLE E3" (MAX. 45' AT MAX. POOL ELEVATION) SEE NOTE 16 (352.02) BOTTOM OF BASIN SUPPORT ROPE TO WIRE TO PRE- VENT SAGGING EXISTING GRADE ill II III 0.5' 0.5' AQUATIC BENCH ELEV. 2.00 ELEV. 1.50 ELEV. 1.00 C� DETENTION POND DETAIL C 5 .. N.T.S. SUPPORT POST, 24" INTO BOTTOM OR SIDE SPACED 4 FOOT MAX. - COIR MESH OR SIMILAR, STAPLED OR TRENCHED INTO THE BOTTOM OR SIDE BAFFLE TOP OF RIP RAP ELEV. 4.50 FILTER FABRIC LINER (MIRAFI 100X OR EQUAL) NOTE: SEE GRADING PLAN FOR LOCATION AND WIDTH. SECTION VIEW 02 EMERGENCY SPILLWAY DETAIL C5.1 N.T.S. ELEV. 2.75 ELEV. 1.50 ORIFICE INV. ELEV STAKE TO SUPPORT WIRE RIP RAP TO BE (N.C.D.O.T. d50 STONE SIZE 8". MAX. SIZE 12") TEMP. POOL PERM. POOL BOTTOM OF POND NORMAL WATER LEVEL BOTTOM ELEV. (-) 3.00 4'x4' PRECAST CONC. BASIN W/ KNOCKOUT PANELS ALL 4 SIDES #4 STEEL REBAR (GALV. OR ASPHALT COATED) TACKWELDED AT 6" O.C. E.W. LAID IN TOP OF BASIN 24" PIPE 0 0 0 IT FILTER SCREEN TOP 4.00 /\\\//\//\' 1 /\ A 15 4' BOTTOM 0.00 PLAN INSTALL 3'-0" X 0'-6" OPENING ON THREE SIDES ONCE POND IS COMPLETE AND PRIOR TO POND BEING PUT IN SERVICE r CAP INSTALL 3.0" I.D. INLET PIPE W/ TEE AND SCREEN AFTER CONSTRUCTION IS COMPLETE AND PRIOR TO POND BEING PUT IN SERVICE a a SECTION 12" MIN. ELEV. 5.00 \ / //. / OUTLET STRUCTUR E 4'X4' INSIDE DIM. 24" PIPE TOP 4.00 OPENING INV. 2.75 3.0" ORIFICE INV. 1.50 24" INV. 1.00 BOTTOM 0.00 INV. 1.00 1 r r TOP = 4.00 OPENING INV. = 2.75 (7 O 3.0" INV. = 1.50 (NORMAL WATER LEVEL) INV. = 1.00 1 8" MIN. a NO. 57 STONE BEDDING OUTLET STRUCTURE N.T.S. a ELEVATION BOTTOM = 0.00 THIS DRAWING IS THE PROPERTY OF THE EAST GROUP, P.A. ANY USE, REUSE, REPRODUCTION, ISPLAY OR SALE OF THIS DRAWING WITHOUT WRITTEN GONSEN OF THE EAST GROUP, P.A. IS STRICTLY PROHIBITED. (0 COPY IGHT, THE EAST GROUP. P.A. 2022 ) A SEAL SEAL NO. DATE REVISIONS BY AO • NC Engineering License No. THE EAST GROUP, C-0206 • NC Architectural License PA No. 50213 PROJECT TITLE BEAUFORT COUNTY AURORA, NC DRAWING TITLE SCALE AS NOTED DEPARTMENT CIVIL DRAWN BY SLJ DATE STARTED 12/04/19 SHEET No. CHECKED DRAWING NO. C5 . 1 APPROVED PROJECT NO. 20190222 12 11 10 9 8 7 6 5 4 3 12 11 10 9 8 7 6 5 4 3 2 RAPT 111 SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION A: SELF -INSPECTION Self -inspections are required during normal business hours in accordance with the table below. When adverse weather or site conditions would cause the safety of the inspection personnel to be in jeopardy, the inspection may be delayed until the next business day on which it is safe to perform the inspection. In addition, when a storm event of equal to or greater than 1.0 inch occurs outside of normal business hours, the self -inspection shall be. performed upon the commencement of the next business day. Any time when inspections were delayed shall be noted in the Inspection Record. Inspect Frequency (during normal business hours) Inspection records rnusai include: (�) Rain gauge 4 maintained In goad *Orkin; order Daily Daily rainfall amounts. If no daily rain gauge observations are made during weekend or holiday periods, and no individual -day rainfall information is available, record the curriu.lative rain measurement for those un- attended days (anc this will determine if a site inspection is needed). Days on which no rainfall occurred shall 'he recorded as zero." The permittee may use another rain -monitoring device approved by the Division, (2) E&s Measures At least once per 7 calendar days and within 24 hours of a rain event > 1.0 inch in 24 hours 1. Idet tit'cation of the measures inspected, 2. Date Arid time of the inspection, 3. Name of the person. performing the inspection, 4, Indization of Whether the measures were operating_ properly, 5. Description of rrOntenance needs for the measure, 6. Description, evidence, and date of corrective actions taken- i3) or ter discharge tiutfalls (SDCs) At least ranee per 7 calendar days and within 24 hours of a rain event > 1.0 inch in 24 hours 1.. Identification of the discharge outfalls inspected, 2. Date and time of the inspection, 3. Name of the person performing the inspection, 4: Evidence Of indicators of stormwater pollution such as.oil sheen, floating or suspended solids or diiscoloration, a- Indication of visible sediment leaving the site, Description; evidence, and date of corrective eactions taken, (4) Perimeter of Sit e At least c nee per 7 calendar days and within 24 hours of a rain event > 1.0 inch in 24 hours If visible sr'diinentation iS found outside site limits; then a record of the following shall be made: 1, Actions taken to dean up or stabilize the sediment that has left th,e site limits, 2, Description, evidence, and date Of corrective actions taken, and 3. An explanation as to the actions taken to control future releases: (5) Streams or wetlands onsite or offsite (whore accessible) (6) Ground stabilization measures At least once per 7 calendarclays and within 24 : hours of a rain = event > 1,0 inch in 24 hours After each phase_R of grading If the. stream or wetiand'has increased vislhle sedimentationiar a stream has visible increased turbidity from the construction activity, then a record of the following shall be made: 1_ Description; evidence and date of corrective actions taken, and 2. Records of the required reports to the appropriate Division Regional Office per Part 111, Section C, Item (2)(a) of this permit. 1, The, phase of radin installation of Perimeter Ei4SC grading measures, clearing and grubbing, installation of storm drainage facilities, completion of all land -disturbing activity; construction or redevelopment, permanent ground cover). 2; Documentation that the required ground stabilization measures have been provided "within the required. timefrarne or an assurance that they will be provided as soon as possible. NOTE The rain inspection resets the required 7 calendar day inspec on requirement. PART 111 SELF-INSPECTION,RECORDKEEPING AND REPORTING SECTION B: RECORDKEEPING 1. E&SC Plan Documentation The approved E&SC plan as well as any approved deviation shall be kept on the site. The approved E&SC plan must be kept up-to-date throughout the coverage under this permit,. The following items pertaining to the E&SC plan shall be kept on site and available for inspection at all times during normal business hours,_ item to Document Documentation Requirements (a) Each E&SC measure has been installed and, does not significantly deviate from the locations, dimensions and relative elevations shown on the approved E&SC plan. Initial and date each E&SC measure on a copy of the approved E&SC plan or complete, date and sign an inspection report that lists each E&SC measure shown on the approved E&SC plan. This documentation is required upon the initial installation of the. E&SC measures or if the E&SC measures are modified after initial insta'Ilation, (b) A phase, of grading has been completed. Initial and date a copy of the approved E&SC plan or complete, date and sign an inspection report to indicate completion of the construction phase. (e) Ground cover is located and installed, in accordance with the approved E&SC plan. (d) The Maintenance and repair requirements for all E&SC measures have been prforrnedl; Initial and date a copy of the approved E&SC plan or complete, date and sign an inspection report to indicate compliance with approved ground cover specifications. Complete, date and sign an inspection report. (e) Corrective actionshave been taken to E&SC measures. Initial and date a copy of the approved E&SC plan or complete, date and sign an inspection report to indicate the completion of the corrective action, 2. Additional Documentation to be Kept on Site In addition to the E&SC plan documents above, the following items shall be kept on the site and available for inspectors at all times during normal business hours, unless the Division provides a.site-specific exemption based on unique site conditions that make this requirement not practical: (a) This General Permit as well as the Certificate of Coverage, after it is received. (b) Records of inspections` made during the previous twelve months. The permittee shall record the required observations an the Inspection Record Form provided by the Division or a similar inspection form that includes all the required elements. Use of electronically -available records in lieu of the required paper copies will be allowed if shown to provide equal access arid utility as the hard -copy records. 3. Documentation to be Retained for Three Years Ali data used to complete the e-NOI and all inspection records shall be rlaintained fora period of three years after project completion and made available upon request. [40 CFR 122.411 PART II, SECTION Go ITEM (4) DRAW DOWN OF SEDIMENT BASINS' FOR MAINTENANCE OR CLOSE OUT Sediment basins and trapss that receive runoff from drainage areas of one acre or more shall use outlet structures that withdraw water from the surface when these devices need to be drawn down g for maintenance or close out unless this is infeasible. The circumstances in which it is not feasible to withdraw water from the surface shall be rare (for example, times with extended cold weather). Non -surface withdrawals from sediment basins shall be allowed only when all of the following criteria have been met (a) (b) (c) d) e) f) Theplan authority has beenprovided with documentation of the non -surface wthdrawal and the specific time period or conditions in which it will occur. The non -surface withdrawal E&SC p u y d p P shall not commence until the E&SC plan authority has approved these items, The non -surface withdrawal has been reported as an anticipated bypass in accordance with Part Ill, Section C, Item (2)(c) and (d) of this permit, Dewatering discharges are treated with controls to minimize discharges of pollutants from stormwater that is removed from the sediment basin. Examples of appropriate controls include properly cited, designed and maintained dewatering tanks, weir tanks, and filtration systems, Vegetated, upland areas of the sites or a properly designed stone pad is used .to the extent feasible at the outlet of the dewateringtreatment devices described in Item (c)above, p p y g Velocity dissipation devices such as check dams, sediment traps, and riprap are provided at the discharge points of all dewatering devices, and Sediment removed from the dewatering treatment devices described in Item (c) above is disposed of in a manner that does not cause deposition of sediment into waters of the United States: PART I11 SELF -INSPECTION, RECORDKEEPiNG AND REPORTING SECTION C: REPORTING 1. Occurrences that Must be Reported Permittees shall report the following occurrences: (a) Visible sediment deposition in a stream or wetland.. (b) Oil spills ,if:. They are 25 gallons or more, They are less than 25 gallons but cannot be cleaned up within 24 hours, They cause sheen on surface waters (regardless of volume), or They are within 100 feet of surface waters (regardless of volume).. ) Releases of hazardous substances in excess of reportable quantities under Section 311 of the. Clean Water Act (Ref: 40 CFR 110,3 and 40 CFR'117.3) or Section 102 of CERCLA (Ref: 40 CFR 302.4) or G.S.143-215.85.. (d) Anticipated bypasses and unanticipated bypasses. (e) Noncompliance with the conditions of this permit that may endanger health or the environment. 2. Reporting Timeframes and Other Requirements After a permittee becomes aware of an occurrence that must be reported, he shall contact the appropriate ro .ria regional p Division r'e Iona office within the timeframes and in accordance with the other requirements listed below. Occurrences outside normal business hours may also be. reported to the Department's Environmental Emergency Center personnel at (800) 858-0368. Occurrence (a) Visible sediment deposition in a stream or wetland (b) Oil spills and_ release of hazardous substances per Item J(b)-(c) above (c) Anticipated bypasses [40 CFR 122.41(m)(3)1 (d) Unanticipated V T bypasses (40 CFR 122.41(m)(3)l (e) Noncompliance with the conditions of this permit that may endanger health or the environment[40 CFR 1.2.41(I)(7)) eporting Timeframes (After Discovery) and Other Regtliremen Within 24 hours, an oral or electronic notification. Within 7 calendar days; a report that contains a description of the sediment and actions taken. to address the cause of the deposition, Division staff may waive the requirement for a written report on a ease -by -case basis. If the stream is named on the NC 3O3(d) list as imparred for sediment - related causes, the permittee may be required to perform additional monitoring, inspections or apply more stringent practices if staff determine that additional requirertnents are needed to assure compliance with the federal or state impaired -waters conditions. Within 24 hours, an oral or electronic notification. The notification shall include information about the date, time, nature, volume and location of the spill or release. • A report at least ten days before The report shall include an evalua effect of the bypass, ���Within 24 hours, an oral or electronic notification. Within 7 calendar days, a report that includes an evaluation of the quality and effect of the bypass. • Within 24 hours, an oral or electronic notification. Within 7 calendar days, a report that contains a description of noncompliance, and its causes; the period of noncompliance, including exact dates and times, and if the noncompliance has not been corrected, the anticipated time noncompliance is expected to continue; and steps taken or planned to reduce, eliminate, and prevent reoccurrence of the noncompliance. [40 CFR 1.22,42(1)(5),. Division Staff may waive the requirement for a written report on a case -by• as bads. he date of the bypass, ff possible, ion of the anticipated quality and he NORTH CARO IN EnvironmentalI ty THIS DRAWING IS THE PROPERTY F THE EAST GROUP, P.A. ANY USE, REUSE, REPRODUCTION, ISPLAY OR SALE OF THIS DRAWING WITHOUT WRITTEN CONSEN OF THE EAST GROUP, P.A. IS STRICTLY PROHIBITED. (0 COP IGHT, THE EAST GROUP. P.A. 2022 ) 5 4 3 2 1 M L K J H G F E D 0 B A REV. NO. 05/25/22 ISSUE FOR PERMITTING REVISIONS THE EAST GROUP, P.A. ■ Engineering •Architecture • Surveying Technology 324 Evans St., Greenville, NC 27858 (252) 758-3746 (252) 830-3954 (Fax) 4325 Lake Boone Trail, Suite 311, Raleigh, NC 27607 (919) 784-9330 (919) 784-9331 (Fax) • NC Engineering License No. C-0206 • NC Architectural License No. 50213 PROJECT TITLE TOWN OF AURORA INDUSTRIAL PARK BEAUFORT COUNTY AURORA, NC DRAWING TITLE SELF -INSPECTION, RECORDKEEPING AND REPORTING SCALE AS NOTED DRAWN BY SLJ CHECKED APPROVED PROJECT NO. DEPARTMENT CIVIL DATE STARTED SHEET No, 01 /05/22 20190222 DRAWING NO. 12 11 10 9 8 7 6 12 11 10 9 8 7 6 5 4 3 2 1 c Pfll Ihln VTARII I7ATIf1rl Arun I fLTGQI©I C Li/third Iri( oonrTlrcc Eno rrinnol Inhlrc %AIITU 1 THE NCGO1 CONSTRUCTION .GENERAL PERMIT Implementing the details and specifications on this plan sheet will result in the construction activity being considered compliant with the Ground Stabilization and Materials Handling. sections of the NCGO1 Construction General Permit (Sections E and F, respectively). The perrnittee shall comply with the Erosion and. Sediment Control plan approved by the delegated authority having jurisdiction. All details and specifications shown on this sheet may riot apply depending on site conditions and the delegated authority having jurisdiction. SECTION E. GROUND STABILIZATION Required Ground Stabilization Ti Site Area Description ) Perimeter dikes, swales, ditches, and perimeter .slopes (b) High Quality Water (HQW) Zones (c) Slopes steeper. than (d) Slopes 3:1 to 4:1 ) Areas with slopes flatter than 4:1 Stabilize within this many calendar days after ceasing land disturbance 7 7 14 14 ie arises Time f ramp variations. None None if slopes are 10' or less in length and are not steeper than 2.1, 14 days are allowed -7 days for slopesgreater than 50' in length and with slopes steeper than 4 .. -7 days for perimeter dikes, swales, ditches, perimeter slopes and HQW Zones -10 days for Falls Lake Watershed -7 days for perimeter dikes, swales, ditches, perimeter slopes and HQW Zones -10 days for Falls Lake Watershed unless there is zero slope Note: After the permanent cessation of construction activities; any areas with temporary groundstabilization shall be converted to permanent ground stabilization as soon as p g practicable but in no case longer than 90 calendar days after the last land disturbing activity. Temporary ground stabilization shall be maintained in a manner to render the surface stable against accelerated erosion until permanent ground stabilization is achieved.. GROUND STABILIZATION SPECIFICATION Stabilize the ground sufficientlyso that rain will not d techniques in the table below: Temporary5 b • Temporary grass seed covered with straw or other mulches and tackifiers • Hydroseeding • Rolled erosion controlproducts with or without temporary grass seed • Appropriately applied straw or other mulch. • Plastic sheeting dge the soil. Use one. of the • Permanent grass seed covered with straw or other mulches and tackifiers • Geotextile fabrics such as permanent soil reinforcement matting • Rydroseeding. �► Shrubs or other perrnanent plantings covered with mulch • Uniform and evenly distributed ground cover sufficient to restrain erosion • Structural methods such as concrete, asphalt or retaining walls • Rolled erosion control products with grass seed POLYACRYLAMIDES (DAMS) AND FLOCCULANTS Select flocculants that are appropriate for the soils being exposed during construction, selecting from the NC DWR List of Approved PAMS/Fiocculants. Apply flocculants at or before the inlets to Erosion and Sediment Control Measures. Apply flocculants at the concentrations specified in the NC DWR List of Approved PAMS/Fiocculants and in accordance with the manufacturer's instructions. Provide ponding area for containment of treated Stormwater before discharging. offsite. Store flocculants in leak -proof containers that are kept under storm -resistant cover or surrounded by secondary containment structures. A l •• at&AM. 111T a6811.. t.1 t It AM. M. a 1B 111 B* ■.11.M. RB- as.re oar I11!1..1V 1 /11V.Re VELI111a.L.L IVIP 11111 f 'Ol'RIW41- 1. Maintain vehicles and equipment to prevent discharge of fluids. 2. Provide drip pans under any stored equipment.. 3. Identify leaks and repair as soon as feasible, or remove leaking equipment from the project. 4 Collect all spent fluids, store in separate containers and properly dispose as hazardous waste (recycle when possible). 5. Remove leaking vehicles and construction equipment from servic. e until the problem has been corrected. 6; Bring used fuels, lubricants, coolants, hydraulic fluids and other petroleum products to a recycling or disposal center that handles these materials. ITTER, BUILDING MATERIAL AND LAND CLEARING WASTE 1. Never bury or burn waste. Place litter and debris in approved waste containers. Provide a sufficient number and size of waste containers (e.g dumpster, trash receptacle) on site :to contain construction and domestic wastes. Locate waste containers at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. Locate wastecontainers on areas that do not receive substantial amounts of runoff from upland areas and does not drain directly to a storm drain, stream or wetland. Cover waste containers at the end of each workday and before storm events or provide secondary containment. Repair or replace darnaged waste containers. Anchor all lightweight items in waste containers during times of high winds. Empty waste containers as needed to prevent overflow. Clean up immediately if containers overflow. Dispose waste off -site at an approved disposal facility. On business days, clean up and dispose of waste in designated waste containers. PAINT AND OTHER LIQUID D WASTE 1. Do not dump paint and other liquid waste into storm drains, streams or wetlands. 2 Locate paint washouts at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available, 3. Contain liquid wastes in a controlled area. 4. Containment must be labeled, sized and placed appropriately for the needs of site. 5. Prevent the discharge of soaps, solvents, detergents and other liquid wastes from construction sites. PORTABLE TOILETS 1. Install portable toilets on level ground, at least 50 feet away from storm drains, streams or wetlands unless there is no alternative reasonably available. If 50 foot offset is not attainable, provide relocation of portable toilet behind silt fence or place on a gravel pad and surround with sand bags. 2. Provide staking or anchoring of portable toilets during periods of high winds or in high foot traffic areas. Monitor portable toilets for leaking and properly dispose of any leaked material. Utilize a licensed sanitary waste hauler to remove leaking portable toilets and replace with properly operating unit. EARTHEN STOCKPILE MANAGEMENT 1, Show stockpile locations on plans. Locate earthen -material stockpile areas at least 50 feet away from storm drain inlets, sediment basins, perimeter sediment controls and surface waters unless it can be shown no other alternatives are reasonably available. Protect stockpile with silt fence installed along toe of slope with a minimum offset of five feet from the toe of stockpile. Provide stable stone access point when feasible. 4. Stabilize stockpile within the timeframes provided on this sheet and in accordance with theapproved plan and anyadditional requirements. Soil stabilization is defined as vegetative, physical or chemical coverage techniques that will restrain accelerated erosion on disturbed soils for temporary or permanent control needs. IO FFI CARQLI tivironmenta BELOW GRAiriv UNLIL LUNLKt. I L W ASHIJU f STRUCTURE WITH LINER T STRUCTURE ABGVE GRA lee 6 THE COMPOTE WA UJT illUCORlT I >IIfAI L X WWI Tl! LIMB! MOM NW Or TIC T 111PACTITiO_MIAL AMMO! 1111311 TO 11CV=A WOOD win STRUCTURE CONCRETE WASHOUTS 1, Do not discharge concrete or cement slurry from the site. , 2 iDispose of, or recycle settled, hardened concrete residue in accordance with local and state solid waste regulations and at an approved facility. 3. Manage washout from mortar mixers in accordance with the above item and in addition place the mixer and associated materials on impervious barrier and within lot perimeter silt fence. 4, Install temporary concrete washouts per local requirements, where applicable. If an. alternate method or product is to be used, contact your approval authority for review and approval. If local standard details are not available, use one of the two types of ternporary concrete washouts provided on this detail. 5,. Do not use concrete washouts for dewatering orstoring defective curb or sidewalk sections, Stormwater accumulated within the washout may not be pumped into or discharged to the storm drain system or receiving surface waters. Liquid waste must be pumped out. and removed from project. G. Locate washouts at least 50 feet from storm drain inlets and surface waters unless it can be shown that no other alternatives are reasonably available. At a minimum, install protection of storm drain inlet(s) closest to the washout which could receive spills or overflow. 7. Locate washouts in an easily accessible area, on level ground and install a stone entrance pad in front of the washout. Additional controls may be required by the approving authority. 8. In stall at least' one sign directing concrete trucks to the washout within the project limits. Post signage on the washout itself to identify this location. 9. Remove leavings from the washoutwhen at approximately 75% capacity to limit overflow events. Replace the tarp, sand bags or other temporary structural components when no longer functional. pg When utilizing alternative or proprietary products, follow manufacturer's instructions. 10. At. the completion of the concrete work, remove remaining leavirigs and dispose of in an approved disposal facility. Fill pit, if applicable, and stabilize any disturbance caused by removal of washout. HERBICIDES, PESTICIDES AND RODENTICIDES Store and apply herbicides, pesticides and rodenticides in accordance with label restrictions, 2. Store herbicides, pesticides and rodenticides in their original containers with the label, which lists directions for use, ingredients and first aid steps in case of accidental poisoning. 3. Do not store herbicides, pesticides and rodenticides in areas where flooding is. possible or where they may spill or leak into yells, stormwater drains, ground water or surface water. If a spill occurs, clean area immediately. Do not stockpile these materials onsite. HAZARDOUS AND TOXIC WASTE 1. Create designated hazardous waste collection :areas on -site. 2. Place hazardous waste containers under cover or 1n secondary containment. 3. Do not store hazardous chemicals, drums or bagged materials directly on the groun THIS DRAWING IS THE PROPERTY {OF THE EAST GROUP, P.A. ANY USE, REUSE, REPRODUCTION, ISPLAY OR SALE OF THIS DRAWING WITHOUT WRITTEN CONSEN1 OF THE EAST GROUP, P.A. 15 STRICTLY PROHIBITED. (® COPIGHT, THE EAST GROUP. P.A. 2022 ) J G c A 05/25/22 REV. NO. ISSUE FOR PERMITTING REVISIONS ■ Engineering',Architecture n Surveying ■Technology 324 Evans St., Greenville, NC 27858 (252) 758-3746 (252) 830-3954 (Fax) 4325 Lake Boone Trail, Suite 311, Raleigh, NC 27607 (919) 784-9330 (919) 784-9331 (Fax) • NC Engineering License No. C-0206 • NC Architectural License No. 50213 PROJECT TITLE TOWN OF AURORA INDUSTRIAL PARK BEAUFORT COUNTY AURORA, NC DRAWING TITLE GROUND STABILIZATION AND MATERIALS HA\DLING SCALE AS NOTED DRAWN BY SLJ CHECKED APPROVED PROJECT NO. DEPARTMENT CIVIL DATE STARTED SHEET No. 01/05/22 20190222 DRAWING NO. 12 11 10 9 8 7 6 5 4 1 3 1 2 1 1