HomeMy WebLinkAbout20221070 Ver 1_ePCN Application_20220809Pre -Construction Notification (PCN) Form
For Nationwide Permits and Regional General Permits
(along with corresponding Water Quality Certifications)
April 13, 2022 Ver 4.3
Initial Review
Has this project met the requirements for acceptance in to the review process?*
OO Yes
0 No
Is this project a public transportation project?*
OYes 0No
Change only if needed.
Pre -Filing Meeting Date Request was submitted on:
10/22/2020
BIMS # Assigned*
20221070
Is a payment required for this project?*
0 No payment required
O Fee received
Fee needed - send electronic notification
Reviewing Office*
Washington Regional Office - (252) 946-6481
Information for Initial Review
Version#*
What amout is owed?*
O $240.00
0 $570.00
Select Project Reviewer*
Robert Tankard:eads\rbtankard
la. Name of project:
Aurora Industrial Park
la. Who is the Primary Contact?*
Cliff Williams - Mayor
lb. Primary Contact Email:*
townofaurora@auroranc.org
Date Submitted
8/9/2022
Nearest Body of Water
South Creek
Basin
Tar -Pamlico
Water Classification
SC;NSW
Site Coordinates
Latitude:
35.3002
A. Processing Information
Longitude:
-76.7858
lc. Primary Contact Phone:*
(252)322-4611
County (or Counties) where the project is located:
Beaufort
Is this a NCDMS Project
0Yes ONo
Is this project a public transportation project?*
0Yes ONo
la. Type(s) of approval sought from the Corps:
EI Section 404 Permit (wetlands, streams and waters, Clean Water Act)
❑ Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act)
Has this PCN previously been submitted?*
0 Yes
O No
1b. What type(s) of permit(s) do you wish to seek authorization?
I Nationwide Permit (NWP)
0 Regional General Permit (RGP)
0 Standard (IP)
lc. Has the NWP or GP number been verified by the Corps?
OYes 0No
Nationwide Permit (NWP) Number:
Nationwide Permit (NWP) Number:
NWP Numbers (for multiple NWPS):
Id. Type(s) of approval sought from the DWR:
I 401 Water Quality Certification - Regular
0 Non-404 Jurisdictional General Permit
0 Individual 401 Water Quality Certification
39 - Commercial/Institutional Developments
58 - Utility Line Activities for Water and Other Substances (frequently used)
le. Is this notification solely for the record because written approval is not required?
For the record only for DWR 401 Certification:
For the record only for Corps Permit:
tf. Is this an after -the -fact permit application?*
O Yes O No
0 401 Water Quality Certification - Express
0 Riparian Buffer Authorization
lg. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts?
O Yes @ No
1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts?
O Yes O No
lh. Is the project located in any of NC's twenty coastal counties?
O Yes O No
1i. Is the project located within a NC DCM Area of Environmental Concern (AEC)?
O Yes O No
1j. Is the project located in a designated trout watershed?
Yes !t- No
B. Applicant Information
0 Unknown
OYes 0No
OYes 0No
1d. Who is applying for the permit?
0 Owner OO Applicant (other than owner)
le. Is there an Agent/Consultant for this project?*
® Yes 0 No
2. Owner Information
2a. Name(s) on recorded deed:
Mary Guilford Thompson
2b. Deed book and page no.:
Db 1134 Pg 467
2c. Contact Person:
2d. Address
Street Address
820 Vineyard Drive
Address Line 2
City
New Bern
Postal / Zip Code
28562
2e. Telephone Number:
(252)322-4611
2g. Email Address:*
townofaurora@auroranc.org
3. Applicant Information (if different from owner)
3a. Name:
Cliff Williams
3b. Business Name:
Town of Aurora
3c. Address
Street Address
295 Main Street
Address Line 2
PO Box 86
City
Aurora
Postal / Zip Code
27806
3d. Telephone Number:
(252)322-4611
3f. Email Address:*
townofaurora@auroranc.org
4. Agent/Consultant (if applicable)
4a. Name:
Michelle Clements
4b. Business Name:
The East Group
4c. Address
Street Address
324 Evans Street
Address Line 2
City
Greenville
Postal / Zip Code
27858
4d. Telephone Number:
(252)758-3746
4f. Email Address:*
michelle.clements@eastgroup com
C. Project Information and Prior Project History
State / Province / Region
NC
Country
USA
2f. Fax Number:
State / Province / Region
NC
Country
USA
3e. Fax Number:
State / Province / Region
NC
Country
USA
4e. Fax Number:
1. Project Information
1b. Subdivision name:
(if appropriate)
lc. Nearest municipality / town:
Town of Aurora
2. Project Identification
2a. Property Identification Number:
6567111165
2b. Property size:
51.16
2c. Project Address
Street Address
NC 33
Address Line 2
City
Aurora
Postal / Zip Code
27806
3. Surface Waters
3a. Name of the nearest body of water to proposed project: *
South Creek
3b. Water Resources Classification of nearest receiving water: *
SC;NSW
3c. What river basin(s) is your project located in?*
Tar -Pamlico
3d. Please provide the 12-digit HUC in which the project is located.
030201040205
4. Project Description and History
State / Province / Region
NC
Country
USA
4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: *
The existing site is undeveloped and partially farmland and partially wooded/wetlands. The properties around the site include the waste water treatment are for the town of Aurora to the
south, residential developments to the west, farmland and the Aurora Fire Department to the north and South Creek to the east.
4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past?*
O' Yes O No 0 Unknown
If yes, please give the DWR Certification number or the Corps Action ID (exp. SAW-0000-00000).
NCDEQ Erosion and Sedimentation Control - Beauf-2022-009, NCDEQ Stormwater Management Permit SW7220606
4f. List the total estimated acreage of all existing wetlands on the property:
17.6
4g. List the total estimated linear feet of all existing streams on the property:
0
4h. Explain the purpose of the proposed project: *
This project is the development of an Industrial Park for the Town of Aurora. This industrial park would provide an opportunity to business working on the local phosphate mine site to have
a local presence no on the mine property. This park would also stimulate the economy of Aurora which has seen negative growth and development for the past several years.
4i. Describe the overall project in detail, including indirect impacts and the type of equipment to be used: *
The proposed project will develop a public roadway and utilities to serve the development of the park so that individual lots can be sold for development. Utilities will include water main,
sanitary sewer collection system and sanitary sewer pump station. The roadways and utilities will be installed using excavators and motor graders. In addition all stormwater runoff from the
development will be collected and sent to the proposed stormwater wet detention pond for treatment. A small portion of the wooded area outside of the wetlands will be cleared for
development and a portion of the wetlands areas is being proposed to be cleared for installation of the stomwater outlet piping discharging to the wet detention pond. This area will be
cleared and the storm pipe installed with an excavator and then the area will be allowed to reestablish itself with natural vegetation Access to the stormwater pond will be from the Town of
Aurora property to the south so the wetland impact will be temporary and contained to only the area needed during construction. This discharge pipe will also need to cross the canal listed
as waters of the US with an aerial crossing.
5. Jurisdictional Determinations
5a. Have the wetlands or streams been delineated on the property or proposed impact areas?*
• Yes O No
Comments:
5b. If the Corps made a jurisdictional determination, what type of determination was made? *
O Preliminary 0i Approved 0 Not Verified 0 Unknown 0 N/A
Corps AID Number:
5c. If 5a is yes, who delineated the jurisdictional areas?
Name (if known):
Agency/Consultant Company:
Other:
Paul Farley
Land Management Group
0 Unknown
5d. List the dates of the Corp jurisdiction determination or State determination if a determination was made by the Corps or DWR
The original evaluation was completed by Land Management in July of 2020. The ACOE and NCDEQ were on site in October of 2020 and confirmed the delineation. Mapping of the
wetlands were completed and forwarded to the ACOE for approval in March of 2021.
6. Future Project Plans
6a. Is this a phased project?*
Yes .• No
Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity?
No.
D. Proposed Impacts Inventory
1. Impacts Summary
la. Where are the impacts associated with your project? (check all that apply):
O Wetlands
O Open Waters
2. Wetland Impacts
Streams -tributaries
Oi Pond Construction
O Buffers
2a. Site #* (?)
2a1 Reason (?)
2b. Impact type* (?)
2c. Type of W.*
2d. W. name
2e. Forested*
2f. Type of Jurisdicition*
(?)
2g. Impact
area*
1
Utility Crossing
T
Non -Tidal Freshwater Marsh
Wetland 1
Yes
Both
0.160
(acres)
2g. Total Temporary Wetland Impact
0.160
2g. Total Wetland Impact
0.160
2i. Comments:
E. Impact Justification and Mitigation
2g. Total Permanent Wetland Impact
0.000
1. Avoidance and Minimization
la. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project:
The drainage outlet is being constructed at the area for smallest impact to wetlands to be able to reach the uplands area. By piping the outfall we can
minimize the impact to just during construction and let the area return to its natural state. Construction will be limited to an area just wide enough to
install the stormwater piping.
lb. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques:
Excavated materials will be stockpiled on upland areas only. Trench widths will be minimized to decrease the footprint of the impact area. Excavation
and backfill immediately as the pipe is installed and access to the area will be either from the uplands on the east or west end of the site.
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State?
0 Yes O No
2b. If this project DOES NOT require Compensatory Mitigation, explain why:
This project proposes to construction crossings of the waters of the US. One for a driveway to access uplands on the west side of the waters and one for an aerial crossing for utility
installation.
F. Stormwater Management and Diffuse Flow Plan (required by DWR)
1. Diffuse Flow Plan
la. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules?
0 Yes ) No
If no, explain why:
The area is over 2000 feet from South Creek which has the only riparian buffer. The waters of the US was determined by NCDEQ to not be a stream.
2. Stormwater Management Plan
2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250? *
OYes 0No
2b. Does this project meet the requirements for low density projects as defined in 15A NCAC 02H .1003(2)?
OYes®• No
2c. Does this project have a stormwater management plan (SMP) reviewed and approved under a state stormwater program or state -approved local government stormwater program?
O Yes No
0 N/A - project disturbs < 1 acre
2d. Which of the following stormwater management program(s) apply:
0 Local Government State
State Stormwater Programs
0 Phase II
0 HWQ or ORW
Comments:
G. Supplementary Information
OO Coastal Counties
0 Other NM—
1. Environmental Documentation
la. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?*
• Yes No
1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina)
Environmental Policy Act (NEPA/SEPA)?*
Yes • No
Comments:*
NC Department of Commerce and the Golden Leaf Foundation are providing partial funding for this project.
2. Violations (DWR Requirement)
2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or
Riparian Buffer Rules (15A NCAC 2B .0200)?*
Yes • No
3. Cumulative Impacts (DWR Requirement)
3a. Will this project result in additional development, which could impact nearby downstream water quality?*
• Yes No
4. Sewage Disposal (DWR Requirement)
4a. Is sewage disposal required by DWR for this project?*
• Yes No N/A
4b. Describe, in detail, the treatment methods and dispositions (non -discharge or discharge) of wastewater generated from the proposed project. If the wastewater will be treated at a
treatment plant, list the capacity available at that plant.
Wastewater generated by the development of the Industrial Park will be collected and pumped to the existing wastewater treatment plant for the Town of
Aurora. The existing WWTP has 0.056 MGD of capacity which is sufficient for this project.
5. Endangered Species and Designated Critical Habitat (Corps Requirement)
5a. Will this project occur in or near an area with federally protected species or habitat?*
Yes O No
5b. Have you checked with the USFWS conceming Endangered Species Act impacts?*
Yes O No
5d. Is another Federal agency involved?*
Yes
5e. Is this a DOT project located within Division's 1-8?
0 Yes 0 No
• No Unknown
5f. Will you cut any trees in order to conduct the work in waters of the U.S
0 Yes % No
5g. Does this project involve bridge maintenance or removal?
OYes 0No
5h. Does this project involve the construction/installation of a wind turbine(s)?*
0 Yes ® No
5i. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.?
0Yes ONo
5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat?
US Fish and Wildlife Data
6. Essential Fish Habitat (Corps Requirement)
6a. Will this project occur in or near an area designated as an Essential Fish Habitat?*
Yes f.) No
6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?*
US Fish and Wildlife data as well as NCDEQ CAMA data.
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status?*
O Yes ) No
7b. What data sources did you use to determine whether your site would impact historic or archeological resources?*
NC State Historic Preservation Office data.
8. Flood Zone Designation (Corps Requirement)
8a. Will this project occur in a FEMA-designated 100-year floodplain?*
O Yes O No
8b. If yes, explain how project meets FEMA requirements:
This project will not construct any structures or items needing flood protection in the 100 yr flood area. Excavation and stormwater management are the
only construction operations occurring in the 100 yr floodplain.
8c. What source(s) did you use to make the floodplain determination?*
NC FRIS Maps
Miscellaneous
Please use the space below to attach all required documentation or any additional information you feel is helpful for application review. Documents should be combined into one file when
possible, with a Cover Letter, Table of Contents, and a Cover Sheet for each Section preferred.
Click the upload button or drag and drop files here to attach document
Aurora Industrial Park Stormwater Permit.pdf 1.13MB
Beauf-2022-009 Aurora Industrial Park - 07052022.pdf 1.64MB
Aurora Industrial Park 7-2-22.pdf 12.08MB
aurora industrial_data package.pdf 4.76MB
wetlands-prelim-c.pdf 1.26MB
USGS Quad map Site.pdf 673.96KB
AIP Deed.pdf 296.49KB
File must be PDF or KMZ
Comments
Signature
ii By checking the box and signing below, I certify that:
• The project proponent hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief'; and
• The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time.
• I have given true, accurate, and complete information on this form;
I agree that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act");
I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act");
I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND
I intend to electronically sign and submit the PCN form.
Full Name:
Michelle S. Clements
Signature
Date
8/9/2022