Loading...
HomeMy WebLinkAboutNCC214694_NOT Closeout Documents_20220805Charlolte-Mecklenburg STORM WATER 2145 Suttle Avenue Services EC Inspection Report Charlotte, NC 2 8 2 0 8 Project Name: Williamson Office Building Location: 7632 Norman Island Owner: Dean Williamson 16315-A Northcross Dr., Huntersville, NC 28078 EC - Final Inspection #: 69734 - Date/Time: 7/7/22 12:00 pm - Inspector: Hudson, Eugene Weather conditions: Sunny Soil conditions: Workable Contact made: YES Michael Mock Erosion and sediment control measures removed: YES Site permanently stabilized: YES BMP's installed per approved plans: YES Summary: Final inspection for Williamson Office All erosion control measures are removed and the site is stabilized. I found no erosion control issues. dx CHARLOTTE.. To report pollution or drainage problems call: 311 http://stormwater.charmeck.org 0 8/3/2022 6:48:59PM Page 1 of 1