Loading...
HomeMy WebLinkAbout20130781 Ver 2_Corps of Engineer Correspondence_20140825REPLY TO ATTENTION OF: fi ar WILMIlu 1WT1 jF1Sn'vrC'1' CUAV'S-m 151 PATTON AVENUE ROOM 208 ASHEVILLE, NORTH CAROLINA 28801-5006 Special Condition a): All work authorized by this permit must be performed in strict compliance with the attached plans dated July 2, 2013, updated September 10, 2013, updated April 27, 2014 and again on June 27, 2014, which are a part of this pennit- Any modification to these plans must be approved • the US Army Corps of Engineers (USACE) prior to implementation. As stated in your perinit conditions, construction within jurisdictional areas on the property for each phase shall begin only after the permittee has made fall payment to the NCEEP in accordance with the provisions outlined on the most recent version of the Compensatory - 2 - Mitigation Responsibility Transfer Form. The requirements of this forin, including any special conditions listed on this form, were incorporated as special conditions of this pen-nit authorization. A revised Compensatory Mitigation Responsibility Form is enclosed reflecting the approved modification to Phase II of this project. If you have questions, please contact Mr. Steve Kichefski at the Asheville Regulatory Field Office, telephone (828) 271-7980 extension 234. Enclosure: Revised Phase 11 Compensatory Mitigation Responsibility Transfer Form Wfi@-1M%W4 LWVAW#-W1tA • - r, - 3714 Spokeshave Lane Matthews, North Carolina 28105 Instructions to Sponsor: The Sponsor must verify that the mitigation requirements shown below are available at the identified site. By signing below, the Sponsor is accepting full responsibility for the identified mitigation, regardless of whether or not they have received payment from the Permittee. Once the form is signed, the Sponsor must update the appropriate ledger and provide a copy of the signed form to the Permittee and to the USACE Bank/In-Lieu Fee Program Manager. The Sponsor must also comply with all reporting requirements established in their authorizing instrument. Permitted Impacts and Compensatory Mitigation Requirements: Permitted Impacts Requiriag Mitigation* 8-digit HLIC and Basin: 03040105, Yadkin River A Stream Impacts (linear feet) Wetland Impacts (acres) Warm Cool Cold Riparian Riparian Non-Riparian Coastal 261 0.06 Stream Mitigation (credits) Wetland Mitigation (credits) Warm Cool Cold Riparian Riparian I . Non-Riparian Coastal 261 0.06 Mitigation Site Debited: NCEEP (List the name of the bank to be debited. For umbrella banks, also list the specific site. For N[EEP, list N[EEP. |f the NCEEP acceptance letter identifies a specific site, also list the specific site to be debited). Signature of Sponsor's Authorized Representative Date of Signature Page 1of2 Form Updated 2 October, ZO17 USACE Wilmington District Compensatory Mitigation Responsibility Transfer Form, Page 2 0 . I This form is not valid unless signed by the mitigation Sponsor and USACE Project Manager. For questions regarding this form or any of the conditions of the permit authorization, contact the Project Manager at the address below. USACE Project Manager: Steve Kichefski JSACE Field Office: Asheville Regulatory Field Office US Army Corps of Engineers 151 Patton Avenue, Room 208 Asheville, North Carolina 28801-5006 Email: steven.l.kichefski@usace.army.mil Digitally signed by KICHEFSKI.5TEVEN.L.1386908539 KICHEFSKI.STEVEN.L.1 3869085 DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USA, Zy� The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at our website at http:/ZreRulatorv.usacesurvey.comZ to complete the survey online.