Loading...
HomeMy WebLinkAboutGW1-2022-07096_Well Construction - GW1_20220801 WELL CONSTRUCTION RECORD(GW-1) For Internal Use Only: 1.Well Contractor Information: Chris C Russell ':14.WATER'ZONES " FROM TO DESCRIPTION Well Contractor Name 3254 A 60 It- 385 ft• ft ft. i NC Well Contractor Certification Number M OUTER CASING foi multi cased w�,Ols OR LINER' if>a "licatile Russell Well Drilling, Inc. FROM TO DIAMETER THICKNESS MATERIAL Company Name fe 0 121 ft 6.25 In SDR21 PVC 323340 =16;INNER'C9SING;ORTUBING" eottierrirel?closed-loo 2.Well Construction Permit#: FROM TO DIAMETER THICKNESS MATERIAL List all applicable well construction permits(i.e.UIC,County,State,Variance,etc) ft. ft. In. 3.Well Use(check well use): ft, ft. in. Water Supply Well: FROM ENI TO DIAMETER{ SLOT SIZE ITHICKNESS MATERIAL ❑Agricultural ❑Municipal/Public it. it. in. ❑Geothermal(Heating/Cooling Supply) ®Residential Water Supply(single) fL ft. ❑Industrial/Commercial ❑Residential Water Supply(shared) 18:GROUT ❑lni ation []Wells>100,000 GPD FROM TO MATERIAL EMPLACEMENT METHOD&AMOUNT Non-Water Supply Well: 0 ft• 20 Grout Poured ❑Monitoring ❑Recovery ft. ft. Injection Well: ft. ft. ❑Aquifer Recharge ❑Groundwater Remediation 19 SAND/GRAVEL'PACK•:if.a""liceble ❑Aquifer Storage and Recovery ❑Salinity Barrier FROM TO MATERIAL I EMPLACEMENT METHOD ❑Aquifer Test ❑Stormwater Drainage fa ft. ❑Experimental Technology ❑Subsidence Control ft. ft. ❑Geothermal(Closed Loop) ❑Tracer 920 DRILL7NG',LOG attictiadditional sheet§iifaiecessa ❑Geothermal(Heating/Cooling Return) ❑Other(explain under#21 Remarks) FROM I TO DESCRIPTION color,hardness,soil/rack type,grain size etc 0 ft- 116 fL Dirt 4.Date Well(s)Completed:4-10-22 Well ID# 116 ft- 385 ft- Rock 5a.Well Location: ft ft Terrance Hamby ft. ft. AUG a _ Facility/Owner Name Facility ID#(if applicable) % ft. 115 Hicks Rd, Statesville, NC 28625 ft. ft Af=9 uflm Physical Address,City,and Zip ft. ft. Iredell 21.REMARKS County Parcel Identification No.(PIN) 5b.Latitude and longitude in degrees/minutes/seconds or decimal degrees: (ifwell field,one lat/long is sufficient) 22.Certification: 35' 91.197' N 080' 94.963' W �� 7/29/2022 6.Is(are)the well(s): IMPermanent or ❑Temporary Signature of Certified Well Contractor Date By signing this form,I hereby certify that the well(s)was(were)constructed in accordance with 7.Is this a repair to an existing well: ❑Yes or 15No 15A NCAC 02C.0100 or 15A NCAC 02C.0100 Well Construction Standards and that a copy Ifthis is a repair,fill out known well construction information and explain the nature of the of this record has been provided to the well owner. repair under#21 remarks section or on the back of this form. 23.Site diagram or additional well details: 8.For Geoprobe/DPT or Closed-Loop Geothermal Wells having the same You may use the back of this page to provide additional well construction info construction,only 1 GW 1 is needed. Indicate TOTAL NUMBER of wells (add'See Over'in Remarks Box).You may also attach additional pages if necessary. drilled: 24.SUBMITTAL INSTRUCTIONS 9.Total well depth below land surface: 385 (fL) Submit this GW-1 within 30 days of well completion per the following: For multiple wells list all.depihs if different(example-3Q100'and 2@100) 10.Static water level below top of casing: 60 (ft) 24a. For All Wells: Original form to Division of Water Resources (DWR), /fwater level is above casing,use"+^ Information Processing Unit,1617jMSC,Raleigh,NC 27699-1617 6.25 246.For Infection Wells:Copy tjo DWR,Underground Injection Control(IUC) 11.Borehole diameter: (in.) Program,1636 MSC,Raleigh,NC 27699-1636 12,Well construction method: Air Drilled 24c.For Water Supply and Open-Loop Geothermal Return Wells:Copy to the (i.e.auger,rotary,cable,direct push,etc.) county environmental health department of the county where installed FOR WATER SUPPLY WELLS ONLY: 24d.For Water Wells producing over 100,000 GPD:Copy to DWR,CCPCUA 13a.Yield(gpm) Method of test:Air Permit Program,1611 MSC,Raleigh,NC 27699-1611 i, 13b.Disinfection type: HTH Amount: 1 cup I� f Form GW-I North Carolina Department of Environmental Quality-Division of Water Resources Revised 6-6-2018