Loading...
HomeMy WebLinkAboutNCC222621_Site Plan or Location Map_20220811N 4 . N O I • � 1 N = c+ SEAL N = 022594 G cy � �'�� Fp GRE�;;�``` GREEN ENGINEERING WATER, WASTEWATER, SURVEYING, PLANNING, PROJECT MANAGEMENT NORTH CAROLINA FIRM LICENSE: P-0115 303 GOLDSBORO STREET EAST, P.O. BOX 609 WILSON, N.C. 27893 TEL (252) 237-5365 FAX (252) 243-7489 OFFICE@GREENENG.COM WATER SYSTEM IMPROVEMENTS PASOUOTANK COUNTY UTILITIES LOCATION MAP SHEET INDEX GENERAL NOTES 1)WORK WITHIN PUBLIC RIGHT—OF—WAYS OR PRIVATE EASEMENTS SHALL BE ACCOMPLISHED BY THE CONTRACTOR ACCORDING TO THE REQUIREMENTS OR CONDITIONS OF THE ENCROACHMENT AGREEMENT OR OTHER LEGAL DOCUMENTS AS THOUGH DOCUMENTS WERE ISSUED IN THE CONTRACTORS NAME. THE TITLE CONTRACTOR SHALL MAINTAIN COPIES OF THESE DOCUMENTS ON THE SITE AT ALL TIMES. THE CONTRACTOR SHALL BE HEET RESPONSIBLE FOR THE MAINTENANCE OF PUBLIC RIGHT—OF—WAYS DURING CONSTRUCTION OF THE PROJECT AND TI TLE UNTIL THE CONTRACTOR OBTAINS AND DELIVERS TO THE OWNER A WRITTEN SIGH —OFF FROM THE N.C.D.O.T THAT THE PUBLIC I MAP AGENCY HAS ACCEPTED THE RIGHT—OF—WAY BACK FOR MAINTENANCE. FINAL PAYMENT AND RELEASE OF RETAINAGE TITLE WILL NOT BE MADE TO THE CONTRACTOR UNTIL WRITTEN SIGN —OFF HAS BEEN OBTAINED FROM THE APPROPRIATE PUBLIC AKE 0+00-30+00 AGENCY AND PROVIDED TO THE OWNER. 30+00-60+00 2) PROVISIONS SHALL BE MADE TO PREVENT EROSION AND 51DE 60+00-72+12 SILTATION CAUSED BY CONSTRUCTION. TEMPORARY GRASSING, 0+00-30+00 HAY BALES, SILT FENCES, CHECK DAMS OR OTHER METHODS 30+00-60+00 SHALL BE USED IN ACCORDANCE WITH THE APPROVED EROSION 60+00-90+00 CONTROL PERMIT. 90+00-103+32 +00-15+00 3) DISTANCES SHOWN ON THE PLAN FOR THE DESIGNATED +00-30+00 LOCATION OF THE PROPOSED LINES WHICH MAY BE FROM THE )+00-45+00 EDGE OF PAVEMENT OR OTHERWISE SHOWN IS INTENDED ONLY D+00-52+05 AS A DESIRED LOCATION FOR THESE INSTALLATIONS. HOWEVER, SHOULD A CONFLICT OCCUR AND/OR DUE TO UNFORESEEN OR OTHER UTILITIES DISCOVERED THAT ARE IN CONFLICT. IT IS 4RK TANK THE CONTRACTORS RESPONSIBILITY TO PROVIDE FOR ANY AND ARK TANK DETAILS ALL INSTALLATIONS AND DEVIATIONS OF ALIGNMENT NECESSARY TANK TO ACHIEVE A CHANGED AND SATISFACTORY LOCATION FOR �N THESE INSTALLATIONS. THE INSTALLATION COSTS THAT MAY c SECTIONS OCCUR DUE TO ALIGNMENT CHANGES ARE CONSIDERED TO BE A S PART OF THE PRICE SUBMITTED FOR PIPE INSTALLATION AND NO ADDITIONAL COMPENSATION IS ALLOWED. THE FINAL LOCATION SELECTED FOR INSTALLATION BY THE CONTRACTOR, OTHER THAN WHAT IS SHOWN ON THE PLANS, SHALL BE FIRST APPROVED BY THE ENGINEER PRIOR TO PROCEEDING WITH THE WORK AND ACTUAL INSTALLATION. THE CONTRACTOR WILL BE RESPONSIBLE FOR VERIFYING THE LOCATION AND EXISTENCE OF ALL UNDERGROUND UTILITIES BOTH PRIOR TO THE BID SUBMITTAL AND DURING CONSTRUCTION. LOCATION OF UTILITIES AS TENTATIVELY SHOWN ON THE PLANS, WHETHER FULLY AND CORRECTLY LOCATED OR PARTIALLY AND/OR INCORRECTORY LOCATED OR OMITTED WILL NOT RELIEVE THE CONTRACTOR OF THE RESPONSIBILITY OR LIABILITY FOR PRIOVIDING FOR ANY DEVIATION FROM THE PLANNED LOCATION AND FOR THE COMPLETE INSTALLATION AND/OR DAMAGE TO OTHER UTILITIES. 4) WHEN THE CONTRACTOR IS UNABLE TO COMPLETE HIS WORK AS SHOWN ON THE PLANS BECAUSE OF AN EXISTING UTILITY, HE SHALL ESTABLISH, ON THE GROUND, THE LOCATION OF THE UTILITY PRIOR TO PROCEEDING AND CONTACT THE ENGINEER. 5) THE CONTRACTOR SHALL NOTIFY ALL PUBLIC JURISDICTIONS INVOLVED IN THE PROJECT, THE OWNER, THE ENGINEER AND ALL OTHER PARTIES WHEN CONSTRUCTION IS TO COMMENCE SO THAT INSPECTIONS AND OTHER SITE VISITS MAY BE SCHEDULED. 6) DATA REQUIRED FOR PREPARATION OF AS —BUILT DRAWINGS SHALL BE OBTAINED BY THE CONTRACTOR AT THE TIME OF INSTALLATION, THIS DATA SHALL BE ACCUMULATED BY THE CONTRACTOR AND COORDINATED WITH THE PROJECT INSPECTOR ON A DAILY BASIS DURING THE CONSTRUCTION PERIOD AND BE SUBMITTED TO THE PROJECT INSPECTOR IN A SATISFACTORY MANNER WITH EACH PAY REQUEST AND AFTER CMPLETION OF THE PROEECT. 7) ALL WORK SHALL BE IN ACCORDANCE WITH THE APPLICABLE FEDERAL, STATE, COUNTY AND LOCAL ORDINANCES, REGULATIONS, SPECIFICATIONS AND PERMITS. 8) REPLACE IN KIND ALL AREAS WHERE PROPERLY OWNER HAS DEVELOPED SPECIAL GRASS, TURF, FENCES, SHRUBS OR LANDSCAPING. ALL DISURBED AREAS ARE TO BE RAKED AND SEEDED OR TURF REPLACED IN KIND WHERE TURF EXISTS. ITEMS LISTED HEREIN ARE CONSIDERED TO BE INCLUDED IN THE BID ITEMS AND NO ADDITIONAL COMPENSATION WILL BE ALLOWED. 9) FINAL LOCATIONS FOR ALL VALVES AND FIRE HYDRANTS TO BE APPROVED BY ENGINEER'S REPRESENTATIVE PRIOR TO INSTALLATION. 10)THE CONTRACTOR IS REQUIRED TO PROVIDE FOR TEMPORARY EXCAVATIONS TO DETERMINE LINE LOCATIONS, DEPTH, AND TYPE OF MATERIAL PRIOR TO DETERMINATION OF NEW LINE LOCATION RELEASED FOR CONSTRUCTION REVISION DATE BY DATE MAY 2022 GFMPHIC SCALES CLIENT CODE: PASQ JOB NUMBER: 21-024.2 FIELD BOOK: XXX CADFILE: 21024.2—CV.dwg NOT TO SCALE ASCII FILE: LAST MODIFIED: 1—Jun-22 MODIFIED BY: TKW PASOUOTANK COUNTY, NORTH CAROLINA SHEET NO. 1 OF 32