WATER SYSTEM IMPROVEMENTS
PASOUOTANK COUNTY UTILITIES
LOCATION MAP
SHEET INDEX
GENERAL NOTES
1)WORK WITHIN PUBLIC RIGHT—OF—WAYS OR PRIVATE EASEMENTS
SHALL BE ACCOMPLISHED BY THE CONTRACTOR ACCORDING TO
THE REQUIREMENTS OR CONDITIONS OF THE ENCROACHMENT
AGREEMENT OR OTHER LEGAL DOCUMENTS AS THOUGH
DOCUMENTS WERE ISSUED IN THE CONTRACTORS NAME. THE
TITLE CONTRACTOR SHALL MAINTAIN COPIES OF THESE DOCUMENTS
ON THE SITE AT ALL TIMES. THE CONTRACTOR SHALL BE
HEET
RESPONSIBLE FOR THE MAINTENANCE OF PUBLIC
RIGHT—OF—WAYS DURING CONSTRUCTION OF THE PROJECT AND
TI TLE
UNTIL THE CONTRACTOR OBTAINS AND DELIVERS TO THE OWNER
A WRITTEN SIGH —OFF FROM THE N.C.D.O.T THAT THE PUBLIC
I MAP
AGENCY HAS ACCEPTED THE RIGHT—OF—WAY BACK FOR
MAINTENANCE. FINAL PAYMENT AND RELEASE OF RETAINAGE
TITLE
WILL NOT BE MADE TO THE CONTRACTOR UNTIL WRITTEN
SIGN —OFF HAS BEEN OBTAINED FROM THE APPROPRIATE PUBLIC
AKE 0+00-30+00
AGENCY AND PROVIDED TO THE OWNER.
30+00-60+00
2) PROVISIONS SHALL BE MADE TO PREVENT EROSION AND
51DE 60+00-72+12
SILTATION CAUSED BY CONSTRUCTION. TEMPORARY GRASSING,
0+00-30+00
HAY BALES, SILT FENCES, CHECK DAMS OR OTHER METHODS
30+00-60+00
SHALL BE USED IN ACCORDANCE WITH THE APPROVED EROSION
60+00-90+00
CONTROL PERMIT.
90+00-103+32
+00-15+00
3) DISTANCES SHOWN ON THE PLAN FOR THE DESIGNATED
+00-30+00
LOCATION OF THE PROPOSED LINES WHICH MAY BE FROM THE
)+00-45+00
EDGE OF PAVEMENT OR OTHERWISE SHOWN IS INTENDED ONLY
D+00-52+05
AS A DESIRED LOCATION FOR THESE INSTALLATIONS. HOWEVER,
SHOULD A CONFLICT OCCUR AND/OR DUE TO UNFORESEEN OR
OTHER UTILITIES DISCOVERED THAT ARE IN CONFLICT. IT IS
4RK TANK
THE CONTRACTORS RESPONSIBILITY TO PROVIDE FOR ANY AND
ARK TANK DETAILS
ALL INSTALLATIONS AND DEVIATIONS OF ALIGNMENT NECESSARY
TANK
TO ACHIEVE A CHANGED AND SATISFACTORY LOCATION FOR
�N
THESE INSTALLATIONS. THE INSTALLATION COSTS THAT MAY
c SECTIONS
OCCUR DUE TO ALIGNMENT CHANGES ARE CONSIDERED TO BE A
S
PART OF THE PRICE SUBMITTED FOR PIPE INSTALLATION AND
NO ADDITIONAL COMPENSATION IS ALLOWED. THE FINAL
LOCATION SELECTED FOR INSTALLATION BY THE CONTRACTOR,
OTHER THAN WHAT IS SHOWN ON THE PLANS, SHALL BE FIRST
APPROVED BY THE ENGINEER PRIOR TO PROCEEDING WITH THE
WORK AND ACTUAL INSTALLATION.
THE CONTRACTOR WILL BE RESPONSIBLE FOR VERIFYING THE
LOCATION AND EXISTENCE OF ALL UNDERGROUND UTILITIES
BOTH PRIOR TO THE BID SUBMITTAL AND DURING
CONSTRUCTION.
LOCATION OF UTILITIES AS TENTATIVELY SHOWN ON THE PLANS,
WHETHER FULLY AND CORRECTLY LOCATED OR PARTIALLY
AND/OR INCORRECTORY LOCATED OR OMITTED WILL NOT RELIEVE
THE CONTRACTOR OF THE RESPONSIBILITY OR LIABILITY FOR
PRIOVIDING FOR ANY DEVIATION FROM THE PLANNED LOCATION
AND FOR THE COMPLETE INSTALLATION AND/OR DAMAGE TO
OTHER UTILITIES.
4) WHEN THE CONTRACTOR IS UNABLE TO COMPLETE HIS WORK
AS SHOWN ON THE PLANS BECAUSE OF AN EXISTING UTILITY,
HE SHALL ESTABLISH, ON THE GROUND, THE LOCATION OF THE
UTILITY PRIOR TO PROCEEDING AND CONTACT THE ENGINEER.
5) THE CONTRACTOR SHALL NOTIFY ALL PUBLIC JURISDICTIONS
INVOLVED IN THE PROJECT, THE OWNER, THE ENGINEER AND
ALL OTHER PARTIES WHEN CONSTRUCTION IS TO COMMENCE SO
THAT INSPECTIONS AND OTHER SITE VISITS MAY BE SCHEDULED.
6) DATA REQUIRED FOR PREPARATION OF AS —BUILT DRAWINGS
SHALL BE OBTAINED BY THE CONTRACTOR AT THE TIME OF
INSTALLATION, THIS DATA SHALL BE ACCUMULATED BY THE
CONTRACTOR AND COORDINATED WITH THE PROJECT INSPECTOR
ON A DAILY BASIS DURING THE CONSTRUCTION PERIOD AND BE
SUBMITTED TO THE PROJECT INSPECTOR IN A SATISFACTORY
MANNER WITH EACH PAY REQUEST AND AFTER CMPLETION OF
THE PROEECT.
7) ALL WORK SHALL BE IN ACCORDANCE WITH THE APPLICABLE
FEDERAL, STATE, COUNTY AND LOCAL ORDINANCES,
REGULATIONS, SPECIFICATIONS AND PERMITS.
8) REPLACE IN KIND ALL AREAS WHERE PROPERLY OWNER HAS
DEVELOPED SPECIAL GRASS, TURF, FENCES, SHRUBS OR
LANDSCAPING. ALL DISURBED AREAS ARE TO BE RAKED AND
SEEDED OR TURF REPLACED IN KIND WHERE TURF EXISTS.
ITEMS LISTED HEREIN ARE CONSIDERED TO BE INCLUDED IN THE
BID ITEMS AND NO ADDITIONAL COMPENSATION WILL BE
ALLOWED.
9) FINAL LOCATIONS FOR ALL VALVES AND FIRE HYDRANTS TO BE
APPROVED BY ENGINEER'S REPRESENTATIVE PRIOR TO
INSTALLATION.
10)THE CONTRACTOR IS REQUIRED TO PROVIDE FOR TEMPORARY
EXCAVATIONS TO DETERMINE LINE LOCATIONS, DEPTH, AND TYPE
OF MATERIAL PRIOR TO DETERMINATION OF NEW LINE LOCATION
RELEASED FOR CONSTRUCTION
REVISION DATE BY DATE MAY 2022
GFMPHIC SCALES CLIENT CODE: PASQ
JOB NUMBER: 21-024.2
FIELD BOOK: XXX
CADFILE: 21024.2—CV.dwg
NOT TO SCALE ASCII FILE:
LAST MODIFIED: 1—Jun-22
MODIFIED BY: TKW
PASOUOTANK COUNTY, NORTH CAROLINA
SHEET NO. 1 OF 32