Loading...
HomeMy WebLinkAboutNC0081931_Permit (Issuance)_20180928NPDES DOCUMENT SCANNING COVER SHEET NPDES Permit: NC0081931 High Rock Powerhouse Document Type: Permit Issuance Wasteload Allocation Authorization to Construct (AtC) Permit Modification Complete File - Historical Engineering Alternatives (EAA) Technical Correction Instream Assessment (67b) Speculative Limits Environmental Assessment (EA) Document Date: September 28, 2018 Thus document its printed on reuse paper - ignore any content an the reYerse side ROY COOPER coverhor MICHAEL S. RECAN Secretary LINDA CULPEPPER Interim Director Mark Gross, OPS Cube Yadkin Generation LLC Highway 740 PO Box 575 Badin, North Carolina 28009-0575 NORTH CAROLINA Environmental Quality September 28, 2018 Subject: Issuance of Permit Modification NPDES Permit NC0081931 High Rock Powerhouse, Class PC-1 3344 Bringle Ferry Road, Denton Davidson County Dear Mr. Gross: The Division of Water Resources (DWR of the Division) has approved your application to renew the subject permit. Accordingly, we are forwarding the attached NPDES discharge permit. This permit is issued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between North Carolina and the U.S. Environmental Protection Agency dated October 15, 2007 (or as subsequently amended). Issuance.-- Changes from the Permit Draft — Per your request we have modified this permit to include your proposed discharge from a new Outfall 005. As discussed with your representatives on 27Sep2018, we have identified this complex wastestream as a "low volume waste" [40 CFR 423.11] and have therefore permitted this outfall in accord with 40 CFR 423.15 (c), New source performance standards (NSPS). It follows that Outfall 005 requires monitoring and limits for the additional parameters Total Suspended solids (TSS) and Oil & Grease [see section A. (4.)]. Lastly, please note that we have edited the permit outline for clarity. Concerning Stormwater - Future Permitting for Outfall 004 — DWR is currently transferring stormwater permitting statewide, to be newly regulated by the Division of Energy, Minerals and Land Resources (DEMLR). Please note that Cube Yadkin Generation LLC shall apply to DEMLR for stormwater coverage at Outfall 004 within 90 days of the effective date of this Permit. If there are other wastes in addition to stormwater known to drain to this outfall, it shall remain in this permit, redefined and monitored as a complex waste -stream. For the interim, this DWR permit will cover Outfall 004's stormwater, subject to existing permit conditions until an individual stormwater permit is issued by DEMLR, at which time all DWR monitoring and compliance will expire. We have retained stormwater monitoring best management practices (BMPs) reflecting current requirements, now included in section A. (2.)]. CrI) North Carolina Department of Environmental Quality I Division of Water Resources 512 North Salisbury Street 11617 Mail Service Center I Raleigh, North Carolina 27699-1617 — 919.707.9000 Mark Gross, OPS Cube Yadkin Generation LLC Permit MOD Issuance, Page 2 September 26, 2018 If any parts, measurement frequencies or sampling requirements contained in this permit are unacceptable, you have the right to an adjudicatory hearing upon written request within thirty (30) days following receipt of this letter. This request must take the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings (6714 Mail Service Center, Raleigh, North Carolina 27699-6714). Unless such demand is made, this decision shall be final and binding. Please note that this permit is not transferable except after notice to the Division. The Division may modify or revoke and reissue this permit. This permit does not affect your legal requirements to obtain other permits required by the Division of Water Resources, the Division of Land Resources, the Coastal Area Management Act or any other federal or local government. If you have questions concerning this permit modification, please contact Joe R. Corporon P.G. [joe.corporon@ncdenr.gov] or call his new direct line (919) 707-3617. Linda Culpepper, Inte Division of Water Resources Enclosure: NPDES Permit Modification NC0081931 (issuance final) hc: NPDES Program Files Central Files ec: DWR/W-SRO, Sherri Knight, SWPS Supervisor OCU, Maureen Kinney Keith McCullock [keith.mccullock@gel.com] ctor Permit NC0081931 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF WATER RESOURCES PERMIT TO DISCHARGE WASTEWATER UNDER THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Cube Yadkin Generation LLC is hereby authorized to discharge wastewater from a facility located at the High Rock Powerhouse 3344 Bringle Ferry Road, Denton Davidson County to receiving waters designated as the Yadkin River in the Yadkin -Pee Dee River Basin in accordance with effluent limitations, monitoring requirements, and other applicable conditions set forth in Parts I, II, III and IV hereof. This permit shall become effective October 1, 2018. This permit and authorization to discharge shall expire at midnight on January 31, 2019. Signed this day September 28, 2018. L. Culpepper, Interim Dir for Division of Water Resources By Authority of the Environmental Management Commission Page 1 of 8 Permit NC0081931 SUPPLEMENT TO PERMIT COVER SHEET All previous NPDES Permits issued to this facility, whether for operation or discharge are hereby revoked. As of this permit issuance, any previously issued permit bearing this number is no longer effective. Therefore, the exclusive authority to operate and discharge from this facility arises under the permit conditions, requirements, terms, and provisions included herein. Cube Yadkin Generation LLC is hereby authorized to: 1. continue to operate a once -through cooling water servicing High Rock Powerhouse, 3344 Bringle Ferry Road, Denton in Davidson County, and 2. to continue to operate a Stormwater Discharge System, including a stormwater conveyance system servicing secondary containment for electric transformers, and 3. to construct and begin operating facilities classified as low -volume wastes including an oil/water separator and treated conveyance system, and 4. discharge cooling water from said treatment works via Outfalls 001, 002 and 003; discharge stormwater via Outfall 004; and discharge low -volume wastes including an oil/water separator via Outfall 005, at locations specified on the attached map, into the Yadkin River [stream segment 12-(136.3)], a waterbody currently classified WS-IV; B within subbasin 03-07-08 [HUC: 03040103] of the Yadkin River Basin. Page 2 of 8 Permit NC0081931 Part I A. (1.) EFFLUENT LIMITATIONS AND MONITORING REQUIREMENTS [15A NCAC 02B.0400 et seq., 15A NCAC 02B.0500 et seq.] During the period beginning on the effective date of the permit and lasting until expiration, the Permittee is authorized to discharge once -through cooling water from Outfalls 001, 002 and 003. Such discharges shall be limited, and monitored and reported 1 by the Permittee as specified below: DISCHARGE LIMITATIONS. Monthly Average Measurement Frequency ample Type Sample Location2 Flow (MGD) 00500 Annual Estimate Effluent Temperature 3 (C°) 00010 Annual Grab Effluent pH (standard units) 00400 Not <6.Oor>9.0 Annual Grab Effluent Footnotes: 1. The permittee shall submit discharge monitoring reports (DMRs) electronically using the Division's eDMR reporting system [see section A. (5.)]. Monitoring results obtained during the calendar year shall be recorded and reported on the annual Discharge Monitoring Report (DMR) form, and postmarked no later than January 30th following the completed reporting period. Samples obtained for monitoring purposes may be collected anytime during the calendar year. 2. The Permittee shall sample effluent, prior to mixing with other waters, at a point feasibly closest to discharge where a representative sample can be obtained. 3. Effluent temperature shall not increase receiving -stream temperature by more than 2.8 °C above natural ambient conditions. In no case shall facility operations cause the receiving stream temperature to exceed 32 °C. A representative effluent temperature shall be sampled anywhere downstream of the heat exchanger. Conditions: • The Permittee shall discharge no floating solids or foam visible in other than trace amounts unless documented ambient river conditions prevent compliance. • See Biocide Condition A. (3.). Page 3 of 8 Permit NC0081931 A. (2.) EFFLUENT LIMITATIONS AND MONITORING REQUIREMENTS [15A NCAC 02B.0400 et seq., 15A NCAC 02B.0500 et seq.] During the period beginning on the effective date of the permit and lasting until expiration, the Permittee is authorized to discharge stormwater from Outfall 004. Such discharges shall be limited and monitored by the Pennittee as specified below: i r ° Y PARAMETER.. -' r r 1 > Jr �. L l lsT ONS 1 +, r1 J ;1i a - MONJ 4 . ,;- J r:44' ,.c t..:.se ..:... )} is r. i• :..• . RE�Qi ., . +BENTS 11�Ioht`hly` Y ' Average — Dail ` f ": Maximum ,1-6 iir Mefisurm�`t Frequenncy a7`' 3 `,_' Sampxe�` Type �r Sample Location BMPs Best Management Practices (BMPs) -- The Division authorizes the Permittee to use Best Management Practices for stormwater discharge from secondary containment around transformers under the following conditions: 1. Sumps shall be designed with underflow weirs/devices to prevent discharge of oily stormwater. 2. The Permittee shall perform at minimum weekly transformer inspections as routine maintenance procedures to preventive and detect oil leaks and drips. 3. Inspection of the sump for the presence of oil, as indicated by a visible sheen, shall be conducted prior to any discharge. 4. For each discharge event, the Permittee shall maintain logs documenting time, date, and volume of stormwater discharge. 5. All stormwater discharge events shall be reported/included with the annual Discharge Monitoring Report (DMR). 6. The Permittee shall discharge no floating solids or foam visible in other than trace amounts unless ambient river conditions prevent compliance. A. (3.) BIOCIDE CONDITION P.S. 143-215, 143-215.1] The Permittee shall add no chromium, zinc or copper to the treatment system except as a DWR pre -approved additive to biocidal compounds. The permittee shall obtain approval from the Division's Aquatic Toxicology Unit prior to the use of any biocide (not previously approved by the Division) in the effluent discharged under this permit. The Permittee shall apply for approval and use of any biocide not previously approved at minimum 90 days in advance of any planned usage. For detailed instructions on requesting approval of biocides, contact the Aquatic Toxicology Unit: NC DENR / DWR / Aquatic Toxicology Unit 1621 Mail Service Center Raleigh, North Carolina 27699-1621 Page 4 of 8 Permit NC0081931 A. (4.) EFFLUENT LIMITATIONS AND MONITORING REQUIREMENTS [15A NCAC 02B.0400 et seq., 15A NCAC 02B.0500 et seq.] During the period beginning on the effective date of the permit and lasting until expiration, the Permittee is authorized to discharge low -volume waste [including an oil/water separator] via Outfall 005. Such discharges shall be limited, monitored, and reported 1 by the Permittee as specified below: MONITORING: REQUIREMENTS LIMITATIONS EFFLEUENT CHARACTERISTIC (PARAMETER CODE) Monthly Average Daily Maximum Measurement Frequency Sample Type Sample Location 2 Flow (MGD) 50050 Annual Estimate Effluent Total Suspended Solids C0530 30.0 mg/L 100.0 mg/L Annual Grab Effluent Oil & Grease 3 [EPA 1664 sGT HEM] 00552 15.0 mg/L 20.0 mg/L Annual Grab Effluent pH4 [standard units] 00400 Not < 6.0 or > 9.0 Annual Grab Effluent 1. The permittee shall submit discharge monitoring reports (DMRs) electronically using the Division's eDMR reporting system [see section A. (5.)]. Monitoring results obtained during the calendar year shall be recorded and reported on the annual Discharge Monitoring Report (DMR) form and postmarked no later than January 300 following the completed reporting period. Samples obtained for monitoring purposes may be collected anytime during the calendar year. 2. The Permittee shall sample effluent at the point closest to discharge where a representative sample can feasibly be obtained. 3. Limits and monitoring defined as low volume wastes [40 CFR 423.11] in accord with 40 CFR 423.15 (c), New source performance standards (NSPS). 4. Effluent pH shall not fall below 6.0 nor exceed 9.0 standard units, unless documented ambient river conditions prevent compliance. Page 5 of 8 . Permit NC0081931 A. (5.) ELECTRONIC REPORTING OF DISCHARGE MONITORING REPORTS [NCGS 143-215.1 (b)] Federal regulations require electronic submittal of all discharge monitoring reports (DMRs) and program reports. The final NPDES Electronic Reporting Rule was adopted and became effective on December 21, 2015. NOTE: This special condition supplements or supersedes the following sections within Part II of this permit (Standard Conditions for NPDES Permits): • Section B. (11.) • Section D. (2.) • Section D. (6.) • Section E. (5.) Signatory Requirements Reporting Records Retention Monitoring Reports 1. Reportinff Requirements (Supersedes Section D. (2.) and Section E. (5.) (a)j The permittee shall report discharge monitoring data electronically using the NC DWR's Electronic Discharge Monitoring Report (eDMR) internet application. Monitoring results obtained during the previous month(s) shall be summarized for each month and submitted electronically using eDMR. The eDMR system allows permitted facilities to enter monitoring data and submit DMRs electronically using the internet. Until such time that the state's eDMR application is compliant with EPA's Cross -Media Electronic Reporting Regulation (CROMERR), permittees will be required to submit all discharge monitoring data to the state electronically using eDMR and will be required to complete the eDMR submission by printing, signing, and submitting one signed original and a copy of the computer printed eDMR to the following address: NC DENR / Division of Water Resources / Water Quality Permitting Section ATTENTION: Central Files 1617 Mail Service Center Raleigh North Carolina 27699-1617 If a permittee is unable to use the eDMR system due to a demonstrated hardship or due to the facility being physically located in an area where less than 10 percent of the households have broadband access, then a temporary waiver from the NPDES electronic reporting requirements maybe granted and discharge monitoring data may be submitted on paper DMR forms (MR 1, 1.1, 2, 3) or alternative forms approved by the Director. Duplicate signed copies shall be submitted to the mailing address above. See "How to Request a Waiver from Electronic Reporting" section below. Regardless of the submission method, the first DMR is due on the last day of the month following the issuance of the permit or in the case of a new facility, on the last day of the month following the commencement of discharge. Starting on December 21, 2020, the permittee must electronically report the following compliance monitoring data and reports, when applicable: • Sewer Overflow/Bypass Event Reports; • Pretreatment Program Annual Reports; and • Clean Water Act (CWA) Section 316(b) Annual Reports. The permittee may seek an electronic reporting waiver from the Division (see "How to Request a Waiver from Electronic Reporting" section below). Page 6 of 8 Permit NC0081931 2. Electronic Submissions In accordance with 40 CFR 122.41(1)(9), the permittee must identify the initial recipient at the time of each electronic submission. The permittee should use the EPA's website resources to identify the initial recipient for the electronic submission. Initial recipient of electronic NPDES information from NPDES-regulated facilities means the entity (EPA or the state authorized by EPA to implement the NPDES program) that is the designated entity for receiving electronic NPDES data [see 40 CFR 127.2(b)]. EPA plans to establish a website that will also link to the appropriate electronic reporting tool for each type of electronic submission and for each state. Instructions on how to access and use the appropriate electronic reporting tool will be available as well. Information on EPA's NPDES Electronic Reporting Rule is found at: http: //www2. epa. gov/compliance/final-national-pollutant-discharge-elimination-system-npdes-electronic- reporting-rule. Electronic submissions must start by the dates listed in the "Reporting Requirements" section above. 3. How to Request a Waiver from Electronic Reporting The permittee may seek a temporary electronic reporting waiver from the Division. To obtain an electronic reporting waiver, a permittee must first submit an electronic reporting waiver request to the Division. Requests for temporary electronic reporting waivers must be submitted in writing to the Division for written approval at least sixty (60) days prior to the date the facility would be required under this permit to begin submitting monitoring data and reports. The duration of a temporary waiver shall not exceed 5 years and shall thereupon expire. At such time, monitoring data and reports shall be submitted electronically to the Division unless the permittee re -applies for and is granted a new temporary electronic reporting waiver by the Division. Approved electronic reporting waivers are not transferrable. Only permittees with an approved reporting waiver request may submit monitoring data and reports on paper to the Division for the period that the approved reporting waiver request is effective. Information on eDMR and the application for a temporary electronic reporting waiver are found on the following web page: http://deq.nc.gov/about/divisions/water-resources/edmr 4. Signatory Requirements [Supplements Section B. (11.) (b) and Supersedes Section B. (11.) (d)1 All eDMRs submitted to the permit issuing authority shall be signed by a person described in Part II, Section B. (11.)(a) or by a duly authorized representative of that person as described in Part II, Section B. (11.)(b). A person, and not a position, must be delegated signatory authority for eDMR reporting purposes. For eDMR submissions, the person signing and submitting the DMR must obtain an eDMR user account and login credentials to access the eDMR system. For more information on North Carolina's eDMR system, registering for eDMR and obtaining an eDMR user account, please visit the following web page: http://deq.nc.gov/about/divisions/water-resources/edmr Page 7 of 8 Permit NC0081931 Certification. Any person submitting an electronic DMR using the state's eDMR system shall make the following certification [40 CFR 122.22]. NO OTHER STATEMENTS OF CERTIFICATION WILL BE ACCEPTED: "I cert jy, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief true, accurate, and complete. 1 am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." 5. Records Retention (Supplements Section D. (6.)1 The permittee shall retain records of all Discharge Monitoring Reports, including eDMR submissions. These records or copies shall be maintained for a period of at least 3 years from the date of the report. This period may be extended by request of the Director at any time [40 CFR 122.41]. Page 8 of 8 Cube Yadkin Generating LLC High Rock Powerhouse Latitude: 35°36'03" Sub -Basin: 03-07-08 Longitude: 80°14'03" Receiving Stream: Yadkin River Quad #: EI8SW Stream Class: WS-IV & B Stream Segment: 12-(136.3) HUC: 03040103 Facility Location (not to scale) North ARP NPDES Permit NC0081931 Davidson County SalisburyPost Publisher's Affidavit Of Publication STATE OF NORTH CAROLINA ROWAN COUNTY Before the undersigned, a Notary Public of said county and state, duly commissioned, qualified, and authorized by law to administer oaths, personally appeared WINFRED MEN- TION, who being first duly sworn, deposes and says that he is ADVERTISING OPERATIONS MANAGER of the SALIS- BURY POST, published, issued and entered as second class mail in the city of Salisbury, in Rowan County, North Caro- lina, that he is authorized to make this affidavit and sworn statement, that the notice or other legal advertisement, a true copy of which was attached hereto, was published in the SALISBURY POST, on the following dates: E07/12/18 and that the said newspaper in which such notice, paper document or legal advertisement was published at the time of each and every such publication, a newspaper meeting all the requirements and qualifications of Section 1-597 of the General Statutes of North Carolina, and was a qualified newspaper within the meaning of Section 1-597 of the Gen- eral Statutes of North Carolina, At a cost of Account #: Tagline: Purchase Order #: S112.98 23483 No. 557908 PUBLIC NO (signature of person making affidavit) Sworn and subscribed before me on 07/12/18. Notary Public My commission expires 05/02/2021 No. 557908 PUBLIC NOTICE STATE OF NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION 1617 MAIL SERVICE CENTER RALEIGH, NORTH CAROLINA 27699-1617 NOTIFICATION OF CONSIDERATION TO ISSUE A NPDES Wastewater Permit The North Carolina Environmen- tal Management Commission proposes to issue a NPDES wastewater discharge permit to the person(s) listed below. Written comments regarding the proposed permit will be accepted until 30 days atter the publish date of this notice. The Direc- tor of the NC Division of Water Resources (DWR) may hold a public hearing should there be a significant degree of public inter- est. Please mail comments and/ or information requests to DWR at the above address. Interested persons may visit the DWR at 512 N. Salisbury Street, Raleigh, NC to review information on file. Additional information on NPDES permits and this notice may be found on our website: htto://dea. nc,gov/about/divisions/water-re- sources/wate r-resources-permits/ wastewater-b ranch/nodes-waste- water/public-notices,or by calling (919) 807-6397. The Alcoa Power Generating, Inc requested re- newal of permit NC0081931 for High Rock Powerhouse in Rowan County; this facility discharge is once -through cooling water and stormwater to Yadkin River, Yadkin River Basin. Publish Date: 07/12 Corporon, Joe From: Sent: To: Cc: Subject: Keith McCullock <keith.mccullock@gel.com> Thursday, June 07, 2018 3:28 PM Corporon, Joe Matthew Wike FW: [External] Status of NPDES Permit Application - High Rock Powerhouse Application No. NC0081931 CAUTION: External email. Do not click links or open attachments unless verified. Send all suspicious email as an attachment to Joe: Per Mr. Hennessy's email, you were assigned the referenced application. Cube Hydro received an invoice in the amount of $1,030 (which they have paid). Based on NCDEQ's website, the $1,030 fee is for a major modification of a major individual NPDES Permit. The High Rock Powerhouse operates under a Minor Individual NPDES Permit. The NCDEQ website and a previous email (4/30/18) from Mr. Sergei Chernikov indicates that the fee should have been $260. Can you address why an invoice was issued for the higher fee? Thanks for your help. Keith Keith D. McCullock, P.E. Director/Principal GEL Engineering of NC INC 2700 Sumner Boulevard, Suite 106, Raleigh, NC 27616 Office: 919.323.8830 I Cell: 919.323.9398 Environmental I Engineering I Surveying gelengineering.com Follow GEL Engineering of NC on Linkedln From: Hennessy, John <john.hennessy@ncdenr.gov> Sent: Friday, June 1, 2018 3:03 PM To: Keith McCullock <keith.mccullock@gel.com> Cc: Corporon, Joe <joe.corporon@ncdenr.gov> Subject: RE: [External] Status of NPDES Permit Application - High Rock Powerhouse Application No. NC0081931 Keith, 1 My unit just got this application. I have just assigned it to Joe Corporon on my staff. I have asked him to make it a priority. John Hennessy Supervisor, Compliance and Expedited Permitting Unit Division of Water Resources Department of Environmental Quality 919-807-6377 office lohn.hennessy a(�ncdenr.gov 1617 Mail Service Center Raleigh, NC 27669-1617 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Keith McCullock[mailto:keith.mccullock@gel.com] Sent: Tuesday, May 29, 2018 3:36 PM To: Hennessy, John <john.hennessy@ncdenr.gov> Subject: [External] Status of NPDES Permit Application - High Rock Powerhouse Application No. NC0O81931 CAUTION: External email. Do not click links or open attachments unless verified. Send all suspicious email as an attachment to Mr. Hennessy: Cube Yadkin Generation LLC (Cube) submitted a NPDES permit application to NCDEQ in January 2018 to add an outfall associated a proposed oil/water separator at their High Rock Powerhouse. Cube has indicated they would like to install the proposed oil/water separator in July or August 2018. Based on a May 23, 2018 email from Sergei Chernikov, I understand that the permit modification was reassigned to a permit engineer in your unit. Could you provide an update on the processing of the referenced application? Thanks Keith Keith D. McCullock, P.E. Director/Principal GEL Engineering of NC INC 2700 Sumner Boulevard, Suite 106, Raleigh, NC 27616 Office: 919.323.8830 I Cell: 919.323.9398 Environmental I Engineering I Surveying gelengineering.com 2 Grzyb, Julie From: Thedford, Wren Sent: Wednesday, May 23, 2018 12:30 PM To: ehopson@cubehydro.com Subject: NC0081931 Major Modification Fee Mr. Hopson, Per our phone conversation, please mail the Major Modification Fee of $1030 to: NCDEQ/DWR/NPDES Water Quality Permitting Section Attn: Ms. Wren Thedford 1617 Mail Service Center Raleigh, NC 27699-1617 If you would like to overnight the payment use the following address: NCDEQ/DWR/NPDES Water Quality Permitting Section Attn: Ms. Wren Thedford 512 N. Salisbury Street-RM 942B Raleigh, NC 27604 https://deq.nc.gov/about/divisions/water-resources/water-resources-permits/wastewater-branch/npdes- wastewater/fees Wren Thedford-t\clmiuisttativc Specialist II NCDEQ-DWR-N PDES \\'atcr Quality Permitting Section 1617 Mail Service Center Raleigh, NC 27699-1617 Phone: 919-807-6397 Fax: 919-807-6189 1 CUBE HYDRO' CAROLINAS December 18, 2017 Mr. Sergei Chernikov, Ph.D. North Carolina Department of Environmental Quality Division of Water Resources WQ Permitting Section 1617 Mail Service Center Raleigh, NC 27699-1617 RE: NPDES Permit Application — Minor Industrial Cube Yadkin Generation LLC High Rock Powerhouse - NC0081931 Dear Mr. Chernikov: Cube Hydro Carolinas LLC Highway 740 PO Box 575 Baden, NC 28009-0575 RECEIVED%gatitil DEC 21.2017 Water Resources Permitting Section Cube Yadkin Generation LLC (Cube) is submitting the enclosed National Pollutant Discharge Elimination System (NPDES) — Minor Industrial Permit Application for a new Outfall 005 which will include discharge to the Yadkin River from the station separation tank / skimmer located on the turbine floor at Unit 3. As you discussed with GEL Engineering of NC, Inc. (GEL) on a conference call on October 11, 2017, no engineering alternatives analysis is required for this project. Additionally, as noted in North Carolina Session Law 2011-394, an Authorization to Construct (ATC) permit is no longer required for construction work at power generation facilities with an NPDES permit. Since Cube's High Rock Powerhouse is a power generation operation, no ATC permit is needed. If you have any questions regarding this submittal, please don't hesitate to contact Keith McCullock of GEL at (919) 554-1100 or Paul Tran with Cube at (704) 422-5715. Very Truly Yours M. toss OP ` ► anger Attachments GEL Enc heehnc of \C IN an affiliate of The GEL Group INC NPDES PERMIT No. NC0081931 MODIFICATION ADDITION OF OUTFALL 005 - UNIT Nos. 1-3 SUMP DISCHARGE High Rock Powerhouse Cube Yadkin Generation LLC Davidson County, North Carolina Prepared by: GEL Engineering of NC, Inc. 2700 Sumner Boulevard, Suite 106 Raleigh, North Carolina 27616 NC Corporate Engineering License No. C-1938 DECEMBER 2017 NPDES PERMIT No. NC0081931 MODIFICATION ADDITION OF OUTFALL 005 - UNIT Nos. 1-3 SUMP DISCHARGE HIGH ROCK POWERHOUSE CUBE YADKIN GENERATION LLC DAVIDSON COUNTY, SOUTH CAROLINA Table of Contents Section Subject Page Summary 10 Overview of Permit Application 1 2.0 Project Description 1 NPDES Permit Application — Short Form C — Minor Industrial Figures 1 2 Appendix Site Location Map Process Flow Diagram for High Rock Powerhouse Manufacturer Information for Separation Tank / Skimmer NPDES PERMIT No. NC0081931 MODIFICATION ADDITION OF OUTFALL 005 - UNIT Nos. 1-3 SUMP DISCHARGE HIGH ROCK POWERHOUSE CUBE YADKIN GENERATION LLC ROWAN COUNTY, SOUTH CAROLINA 1.0 OVERVIEW OF PERMIT APPLICATION Cube Hydro Generation LLC (Cube Hydro) operates the High Rock Powerhouse located on the Yadkin River in Davidson County, North Carolina. Cube Hydro currently operates under NPDES Permit No. NC0081931 issued by the North Carolina Department of Environmental Quality (NCDEQ) Division of Water Resources on February 22, 2017. The High Rock Powerhouse currently has four permitted outfalls. Outfalls 001, 002 and 003 discharge once -through cooling water. Outfall 004 discharges stormwater (periodically) from the secondary containment for transformers. Cube Hydro intends to add Outfall 005 which will discharge treated wastewater from the Unit Nos. 1-3 sumps. A project description is included in Section 2.0. The location of the Cube Hydro facility is shown on the site location map included as Figure 1. 2.0 PROJECT DESCRIPTION For this proposed project, Cube Hydro plans to install a cooling water rotary strainer and two turbine guide bearing filtration packages. Back flush from the cooling water rotary strainer and two turbine guide bearing filtration packages will be discharged to the Yadkin River. As noted in Title 15A of the North Carolina Administrative Code 2H .0106 (f), filter backwash from raw water intake screening devices do not require a NPDES permit. Therefore, the backflush discharges from the cooling water rotary strainer and two turbine guide bearing filtration packages do not need to be included in the High Rock Powerhouse's NPDES's permit. Cube Hydro plans to install Outfall 005 which will include discharge to the Yadkin River from the station separation tank / skimmer located on the turbine floor at Unit 3. The separation tank will have a total capacity of 350 gallons. The separation tank will have a rope skimmer, oil baffle and discharge oil monitor which can shut down the system if oil is detected in the discharge. Total separator discharge flow is dependent on unit leakage. Two new 25 gallon per minute (gpm) sump pumps will be installed in each wheelpit for a total unit discharge capacity of 50 gpm. Since the unit head cover sump flows are variable dependent upon unit seal wear the station sump tank / skimmer system will be designed for a constant flow of 50 gpm for all three units. However, daily flow will not exceed 10,000 gallons per day. All equipment will be located on the turbine floor inside the powerhouse. Outfall 005 will be core drilled through the floor into the existing trash chute. A sample connection tap will be provided. cube00117 A K E i pI\ il.tpils\.: A-9 OK - h`�o i 76 1 } P • • i •' 1. I17/ APPROXIMATE SCALE 1"= 1600' ISM 0' II' GEL BOO' 1600' • \I,' L A KE - �d{�'`, • t,r' ti Ile it � •,- `'- \ fir Jr ►' 1 `I ; • 1 ! f• •• A j • / FZS ■ ,{..r /'i!•/ ,. 3200' / h"DRAWING TAKEN FROM USGS 7.5 MINUTE TOPOGRAPHIC MAP (HIGH ROCK, NC QUADRANGLE)" i • • • 0.11 Jo! Jr Engineering of NC INC en atfivate of THE GEL GROUP INC ENVIRONMENTAL ■ ENGINEERING ■ SURVEYING problem solved .•• • I r ' ,.� ;, I , 6541 Me4aon UAW. Sub 101 Raleigh, NC 27616 919.544.1100 www.g•I om PROJECT: cube00217 CUBE YADKIN GENERATION LLC HIGH ROCK POWERHOUSE BRINGLE FERRY ROAD ROWAN COUNTY. NC SITE LOCATION MAP FIGURE 1 DATE: November 21. 2017 DRAWN BY:TJP IAPPRV. BY:KDM FLOW DIAGRAM FOR HIGH ROCK POWERHOUSE NPDES PERMIT NO. NC0081931 High Rock Unit One Scroll Case Yadkin River High Rock Unit Two Scroll Case High Rock Unit Three Scroll Case Unit One Thrust Bearing Cooling Water Outfall 001 Into Yadkin River (17,280 gal/day) Unit Two Thrust Bearing Cooling Water Outfall 002 Into Yadkin River (17,280 gal/day) Unit Three Thrust Bearing Cooling Water Outfall 003 Into Yadkin River (17,280 gal/day) Stormwater Secondary Containment for Transformers Outfall 004 Into Yadkin River (Flow Varies) Unit Nos. 1-3 Wheelpits Discharges Oil Separator Tank & Skimmer Oil to Drum Outfall 005 Into Yadkin River (10,000 gal/day)