Loading...
HomeMy WebLinkAboutNC0081949_Permit (Modification)_20000530NPDES DOCUMENT SCANNIN. COVER SHEET NPDES Permit: NC0081949 Tuckertown Powerhouse Document Type: Permit Issuance Wasteload Allocation Authorization to Construct (AtC) (' Permit Modification Complete File - Historical Engineering Alternatives (EAA) Staff Report Instream Assessment (67b) Speculative Limits Environmental Assessment (EA) Document Date: May 30, 2000 This document is printed on reuse paper - igziore any content on the rewerse side State of North Carolina Department of Environment and Natural Resources Division of Water Quality James B. Hunt, Jr., Governor Bill Holman, Secretary Kerr T. Stevens, Director May 30, 2000 Mr. William L. McCaskill c/o Yadkin, Inc. P.O. Box 576 Badin, North Carolina 28009 VA NCDENR Subject: NPDES Permit Issuance Permit No. NC0081949 Tuckertown Powerhouse Montgomery County Dear Mr. McCaskill: The Division has modified the permit in accordance with the May 2, 2000, settlement meeting. The changes include modification of the sampling frequency to require annual monitoring. As discussed at the meeting samples may be obtained anytime during the calendar year, with the Discharge Monitoring Report (DMR) due every year on January 30th for the previous years monitoring. Attached is the NPDES permit No NC0081949 issued May 30, 2000. This permit is issued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between North Carolina and the US Environmental Protection Agency dated December 6, 1983. Please take notice that this permit is not transferable. Part II, E.4. addresses the requirements to be followed in case of change in ownership or control of this discharge. This permit does not affect the legal requirement to obtain other permits which may be required by the Division of Water Quality or permits required by the Division of Land Resources, Coastal Area Management Act or any other Federal or Local government permit that may be required. If you have any questions concerning this permit, please contact Mr. Michael Myers at telephone number (919) 733-5083, extension 508. Sincerely, Original Signed By David A. Goodrich Kerr T. Stevens cc: Mooresville Regional Office - Water Quality Section Central Files NPDES Files it Point Source Compliance/Enforcement Unit 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Telephone (919) 733-5083 FAX (919) 733-0719 An Equal Opportunity Affirmative Action Employer Internet: http://h2o.enr.state.nc.us/ Permit No. NC0081949 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY PERMIT TO DISCHARGE WASTEWATER UNDER THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Yadkin, Inc. is hereby authorized to discharge wastewater from a facility located at Tuckertown Powerhouse on NCSR 1164 Stanly County to receiving waters designated as Yadkin River in the Yadkin -Pee Dee River Basin in accordance with effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, III and IV hereof. This permit shall become effective July 1, 2000. This permit and authorization to discharge shall expire at midnight on January 31, 2004. Signed this day May 30, 2000. Original Signed Byh David A. Goodrich Kerr T. Stevens, Director Division of Water Quality By Authority of the Environmental Management Commission • Permit No. NC0081949 SUPPLEMENT TO PERMIT COVER SHEET Yadkin, Inc. is hereby authorized to: 1. Continue to discharge once -through cooling water from outfalls 001, 002 and 003, and water from a sump drain (Outfall 004) located at Tuckertown Powerhouse, on NCSR 1164, Stanly County, and ?. Discharge from said treatment works at the location specified on the attached map into the Yadkin River which is classified as class WS-IV and B CA waters in the Yadkin -Pee Dee River Basin Facility Information Latitude: LonEit*x e: quad #: Sbeam Class Receiving Stxeanx Permitted Flow: 35°29' oT' Sub -Basin: 80°10'34" F18NW WS-IV and CCA Yadkin River N/A 03-07-08 Yadkin Inc. NC00081949 Tuckertown Powerhouse A (1). EFFLUENT LIMITATIONS AND MONITORING REQUIREMENTS - DRAFT Permit No. NC0081949 During the period beginning on the effective date of the permit and lasting until expiration, the Permittee is authorized to discharge once -through cooling water from outfall(s) serial number 001, 002 and 003. Such discharges shall be limited and monitored by the Permittee as specified below: EFFLUENT CHARACTERISTICS . DISCHARGE LIMITATIONS MONITORING REQUIREMENTS Effluent Measurement Frequency Sample Type Sample Location* Monthly Average Weekly Average Daily Maximum Flow (MGD) I Annual Estimate E Temperature' 1, 1 Annual Grab E pH2 i 2 2 Annual Grab E NOTES: * Sample Location: E — Effluent or at die point closest to discharge where a representative sample of the discharge can feasibly be obtained. 1 The temperature of the effluent will be regulated so that the temperature of the receiving stream does not increase by more than 2.8 °C above the natural water temperature. In no case should the receiving stream temperature exceed 32 °C due to the facility's operation. Temperature of the effluent may be obtained anywhere downstream of the heat exchanger effluent that is representative of the discharge. 2 The pH of the effluent shall not be less than 6.0 standard units nor greater than 9.0 standard units, unless ambient river conditions prevent compliance with this range. The Permittee shall obtain authorization from the Division prior to the use of any chemical additive in the discharge. the permittee shall notify the Director in writing at least ninety (90) days prior to instituting the use of any additional additive in the discharge which may be toxic to aquatic life (other than additives previously approved by the division). Such notification shall include the completion of a Biocide Worksheet Form 101 (if applicable), a copy of the MSDS for the additive, and a map indicating the discharge point and receiving stream. Monitoring results obtained during the calendar year shall be recorded and reported on a Discharge Monitoring Report (DMR) form and postmarked no later than January 30th following the completed reporting period. The first DMR is due January 30' 2001. Samples obtained for monitoring purposes may be collected anytime during the calendar year. There shall be no discharge of floating solids or visible foam (other than trace amounts) in the effluent, unless ambient river conditions prevent compliance. A (2). EFFLUENT LIMITATIONS AND MONITORING REQUIREMENTS - FINAL Permit No. NC0081949 During the period beginning on the effective date of the permit and lasting until expiration, the Permittee is authorized to discharge from outfall(s) serial number 004 — Sump Drain. Such discharges shall be limited and monitored by the Permittee as specified below: EFFLUENT CHARACTERISTICS • DISCHARGE LIMITATIONS MONITORING REQUIREMENTS Effluent Measurement Frequency Sample Type Sample Location' Monthly Average Weekly Average Daily Maximum Flow Annual Estimate E Oil and Grease' 15 mg/I 20 mg/1 Annual Grab E pH2 Annual Grab E NOTES: * Sample Locations: E — Effluent or at the point closest to discharge where a representative sample of the discharge can feasibly be obtained. 1 The tailrace shall be visually inspected for oil sheen attributed to facility operations on a weekly basis in conjunction with inspections of the floor sump and rope skimmer. Confirmation that a visual inspection was conducted shall be recorded in the operating log for the facility and provided to the Division upon request. 2. The pH of the effluent shall not be less than 6.0 standard units or greater than 9.0 standard units, unless ambient river conditions prevent compliance with this range. Best Management Practices (BMPs) must be employed to ensure that excessive pollutants are not discharged to the surface water of the state. These practices should include as a minimum, routine maintenance of the rope skimmer type oiUwater separator and cleaning accumulated sediment in the bottom of the sump annually. Chemical wheel pit cleaning is permitted on a monthly basis. When wheel pit cleaning occurs, the tailrace shall be inspected visually for foam and oil. Cleaning shall be conducted only with pre -approved solvents. Should the Permittee wish to change solvents, a written request should be made to the Division including the MSDS for the proposed solvent. Mechanical cleaning operations, which do not contribute any wastewater to the discharge are not limited by this permit. Non -discharging cleaning operations may be conducted as often as necessary to ensure safety and proper facility operation. The Permittee shall obtain authorization from the Division prior to the use of any chemical additive (i.e. biocides) in the discharge. The permittee shall notify the Director in writing at least ninety (90) days prior to instituting the use of any additional additive in the discharge, which may be toxic to aquatic life (other than additives previously approved by the division). Such notification shall include the completion of Biocide Worksheet Form 101 (if applicable), a copy of the MSDS for the additive, and a map indicating the discharge point and receiving stream. Monitoring results obtained during the calendar year shall be recorded and reported on a Discharge Monitoring Report (DMR) form and postmarked no later than January 30`h following the completed reporting period. The first DMR is due January 30' 2001-. Samples obtained for monitoring purposes may be collected anytime during the calendar year. There shall be no discharge of floating solids or visible foam (other than trace amounts) in the effluent, unless ambient river conditions prevent compliance.