Loading...
HomeMy WebLinkAboutSW6220702_Design Calculations (Storm Drainage)_20220810• PROJECT NAME Collier Gate Estates DATE 5-24-2022 PROJECT NO 1279 DESIGN PHASE PRELIM CONSTR REVISION / / / X / LOCATION Cumberland County, North Carolina BY BPB RECORD OTHER CHECKED BY CSB (SPECIFY) n= 9= h= 0.013 226 26 STORM DRAINAGE SCHEDULE CONTINUED AREAS (INLETS) INLET AREA (AC) INLET Cc RUNOFF COEFF. INLET DISCHARGE (CFS) Q (+) UPSTREAM BYPASS (CFS) Q(-) INLET BYPASS (CFS) CAPTURED INLET DISCHARGE (CFS) TOTAL AREAS (AC) INLET TIME (MIN) PIPE TIME (MIN) Tc TIME OF CONC. (MIN) I INTENSITY (IN/HR) Cc RUNOFF COEFF. FROM TO PIPE 1 IN PIPE 1 OUT PIPE 1 IN PIPE 2 IN PIPE 2 OUT PIPE 2 IN PIPE 3 IN PIPE 3 OUT PIPE 3 IN PIPE 4 IN PIPE 4 OUT PIPE 4 IN PIPE 5 IN PIPE 5 OUT PIPE 5 IN 1784-Storm Drainage for Spread(REDO).xls 10-YEAR Date 8110/2022 Time: 1:43 PM Page 1 of 4 • " I " `c PROJECT NAME Collier Gate Estates DATE 5-24-2022 PROJECT NO 1279 DESIGN PHASE PRELIM CONSTR REVISION / / / X / LOCATION Cumberland County, North Carolina BY BPB RECORD OTHER CHECKED BY CSB (SPECIFY) n= 9= h= 0.013 226 26 STORM DRAINAGE SCHEDULE - CONTINUED Q DISCHARGE (CFS) Q SIDE- STREAM (CFS) SLOPE DIA. (IN) CAPACITY (FULL) (CFS) V FULL (FPS) LENGTH (FT) SEGMENT TIME (MIN) UPPER INV. (FT) LOWER INV. (FT) UPSTREAM TOP ELEV. (FT) FROM TO PIPE 1 IN PIPE 1 OUT 23.87 0.00 0.0172 30 53.8 10.9 64 0.10 113.30 112.20 116.75 PIPE 2 IN PIPE 2 OUT 22.63 0.00 0.0057 30 30.9 6.3 44 0.12 112.60 112.35 115.70 PIPE 3 IN PIPE 3 OUT 8.54 0.00 0.0057 18 7.9 4.5 44 0.16 124.50 124.25 127.26 PIPE 4 IN PIPE 4 OUT 4.00 0.00 0.0056 18 7.8 4.4 54 0.20 114.00 113.70 116.70 PIPE 5 IN PIPE 5 OUT 5.04 0.00 0.0057 18 7.9 4.5 44 0.16 110.20 109.95 112.80 1784-Storm Drainage for Spread(REDO).xls 10-YEAR Date 8110/2022 Time: 1:43 PM Page 2 of 4 ill PROJECT NAME Collier Gate Estates ' DATE 5-24-2022 DESIGN PHASE PRELIM CONSTR REVISION / X / PROJECT NO 1279 LOCATION Cumberland County, North Carolina BY BPB RECORD OTHER CHECKED BY CSB (SPECIFY) n= g= h= 0.013 226 26 HYDRAULIC GRADE LINE PIPE HYDRAULIC SIDESTREAM AREA RADIUS SUMMATION (FT) (FT) (CFS) Hf He 90 DEG=0.7 60 DEG=0.55 HEAD LOSS He BEND LOSS Hb K'S 30 DEG=0.28 15 DEG=0.10 Ht BEND LOSS K CONTINUED FRICTION SLOPE (FT/FT) FRICTION VELOCITY (FPS) FROM TO PIPE 1 IN PIPE 1 OUT 4.9087 0.6250 0.00 0.21 0.09 0.13 0.04 0.47 0.10 0.0034 4.83 PIPE 2 IN PIPE 2 OUT 4.9087 0.6250 0.00 0.13 0.08 0.11 0.03 0.36 0.10 0.0030 4.58 PIPE 3 IN PIPE 3 OUT 1.7671 0.3750 0.00 0.29 0.09 0.13 0.04 0.54 0.10 0.0066 4.81 PIPE 4 IN PIPE 4 OUT 1.7671 0.3750 0.00 0.08 0.02 0.03 0.01 0.13 0.10 0.0014 2.25 PIPE 5 IN PIPE 5 OUT 1.7671 0.3750 0.00 0.10 0.03 0.04 0.01 0.19 0.10 0.0023 2.84 1784-Storm Drainage for Spread(REDO).xls 10-YEAR Date 8110/2022 Time: 1:43 PM Page 3 of 4 ECT NAME r Estates !Ii�@"�""Glatel DATE 5-24-2022 DESIGN PHASE PRELIM / / CONSTR / X / REVISION PROJECT NO 1279 LOCATION Cumberland County, North Carolina BY BPB RECORD OTHER CHECKED BY CSB (SPECIFY) n= g= h= 0.013 226 26 HYDRAULIC GRADE LINE - CONTINUED DESIGN CRITERIA: 1. DESIGN FOR THE 10 YR STORM 2. ASSUME TIME OF CONCENTRATION TO AN INDIVIDUAL INLET = 5 MIN. (Unless otherwise noted) 3. INTENSITY = g/(h+T), FOR 10 YR STORM (g and h were derived from Raleigh -Durham Intensity - Duration -Frequency Charts, REF: NC Erosion and Sediment Control Planning and Design Manual) 4. MANNINGS "n" FACTOR= 0.013 5. RUNOFF COEFICIENT Cc=0.50 (Per CR-7107) OUTLET W.S. ELEV (FT) INLET W.S. ELEV. FLOW CONDITION CONTROL FREE- BOARD (FT) COMMENTS FROM TO OUTLET INLET USE CONTOL CONTROL (FT) (FT) (FT) PIPE 1 IN PIPE 1 OUT 114.20 114.67 115.57 115.57 INLET 1.18 OK PIPE 2 IN PIPE 2 OUT 114.35 114.71 114.77 114.77 INLET 0.93 OK PIPE 3 IN PIPE 3 OUT #REF! #REF! 126.26 #REF! #REF! #REF! #REF! PIPE 4 IN PIPE 4 OUT #REF! #REF! 114.97 #REF! #REF! #REF! #REF! PIPE 5 IN PIPE 5 OUT #REF! #REF! 111.30 #REF! #REF! #REF! #REF! 1784-Storm Drainage for Spread(REDO).xls 10-YEAR Date 8110/2022 Time: 1:43 PM Page 4 of 4