HomeMy WebLinkAboutDA00500 Precon MinutesRoy COOPER GOVERNOR STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION August 9, 2021 Contract: DA00500 WBS No: 17BP.1.R.92 T.I.P. No.: NONE Description: Replacement of Bridge #13 Over Meherrin River on SR 1339 Mr. Justin Timmons Dellinger Inc. PO Box 929 Monroe, NC 28111 Subject: Preconstruction Conference Minutes Dear Mr. Timmons: J. ERIC BOYETTE SECRETARY A preconstruction conference was held at the Ahoskie District Office on Monday, August 9, 2021, at 10:00 A.M. A list of the attendees is attached. Environmental Issues: Garcy Ward reviewed the 401 Water Quality Certification. Steve Trowell discussed erosion control items and reviewed permit drawings. The contractor will use a commercial site as the borrow source and a commercial site as the waste site if needed. The contractor should notify the Army Corps of Engineers of any endangered species or historical properties that may be encountered. All equipment shall be kept maintained and care should be taken to avoid contamination of stream waters from fluids, fuels, etc. No staging of equipment of any kind is permitted in waters of the U.S. or protected riparian buffers. The contractor will maintain NPDES inspection records and immediately report any violations to the Engineer, who will notify DWR within 24 hrs. of becoming aware of any violations. Mailing Address: Telephone: (252) 332-4514 Location: NC DEPARTMENT OF TRANSPORTATION Fax: (252) 332-3040 230 NC 42 WEST AHOSKIE DISTRICT OFFICE Customer Service: 1-877-368-4968 AHOSKIE, NC 27910 230 NC 42 WEST AHOSKIE, NC 27910 Website: www.ncdot.gov The tentative start date is August 16, 2021. The completion date for this project ICT 1 is January 13, 2022. Direct contact between curing concrete and stream water shall be avoided. Highly visible fencing shall be placed at the outer wetland boundaries before clearing begins, and silt fence should be installed at the toe of slopes. Only coir fiber matting is allowed in riparian areas. The use of matting which contains a nylon mesh grid is prohibited. A turbidity curtain will be required at a height of 10 feet. Concrete washout structures will be required on this project. Rodney Renix requested to be informed when subcontractors were to be onsite as well as SAF forms and copies of Subcontracts. Brooks Braswell discussed contract and plan issues. The date of availability for this project is July 16, 2021, and completion date is January 13, 2022. Liquidated damages are $850.00 per calendar day. ICT1 except for work under Project Special Provisions entitled Planting, Reforestation and Permanent Vegetation Establishment the contract completion date for ICT1 is January 13, 2022. The Liquidated Damages for intermediate contract time are $850.00 per calendar day. Brooks discussed the Major and Specialty items in the contract and the base index price for fuel. Final surface testing is not required on this project. Clearing on this project shall be performed to the limits established by Method "II" shown on Standard Drawing No. 200.02 of the 2018 Roadway Standard Drawings. Temporary Crutch Bent will be used to support the crane on existing bridge deck. Temporary H piles will be driven to support the pile template. The monthly estimate has been set on the 15th of each month. Subcontract approval forms, along with copies of the subcontracts were requested. This completes the minutes of the Preconstruction Conference for Contract DA00500 held on Monday, August 9, 2021. Any discrepancies with the contents of these minutes should be submitted in writing to this office. Failure to do so will be an indication of agreement. Sincerely, Edwin W. Rose Assistant Resident Engineer i CD O �cQ N� l O� � m V 1 Cl C 0 v 3 O n O O Q (Q (D W m v n CD N Ft