Loading...
HomeMy WebLinkAbout20221060 Ver 1_3 Drawings 2200559 11 2022-06-10_20220713Town o SUBAQUEOUS SANITARY SEWER HORIZONTAL DIRECTIONAL DRILL PIPELINES INSTALLATION PROJECT LAKE LURE, NC est. 1927 North Carolina Lutelow P,;racr LL 444,1 *rarrn I baq —i%, . 0. Wiai'Num 're U 7rjj yr,krah h T on C44(.118,_ r —.,1k1L• Ficrarrl Wee 1 Slk1 Prpii r'9-01 E 4 kif LAKE LURE 1 ROMS x 61 EE Drive L j1 Q\ .1 / I Sls�klls LAKE LURE DAM LOCATION MAP N.T.S. TOWN OF LAKE LURE 2948 MEMORIAL HIGHWAY PO BOX 225 LAKE LURE, NC 28746 PROJECT N0: 2200559 6/10/2022 FINAL DESIGN - NOT FOR CONSTRUCTION LaBella Powered by partnership. 400 S. Tryon Street, Suite 1300 Charlotte, NC 28285 704-376-6423 labellapc.com IIi]►►►I IDISI I I U11 ' R IN IMIINIF,4'I'I'144 J ai U C7 0 U U a, � U c 0 'p = O O UP O U o 0- m= WS � U a = O C) CO CD 0 C N aD O - co N J O Lf) COLf) U O E N i QJ L (a d 1 nom swim 1 HDD D APPROX. 3,900 LF 8-INCH DR11 HDPE FORCE MAIN HDD5 HDD9 EXISTING SEWER MAIN —\ HDD8 HDD7 HDD4 HDD C APPROX. 1,680 LF 8-INCH DR11 HDPE FORCE MAIN SHORELINE PHOTOGRAPHS OF HDD A AND B AREAS, AND THE EASTERN END OF HDD C AND D AREAS, CAN BE VIEWED AT: HTTPS://LAKELUREINTERACTIVE.Z13.WEB.CORE.WINDOWS.NET/ SHORELINE PHOTOGRAPHS OF THE WESTERN ENDS OF HDD C AND D AREAS CAN BE VIEWED AT: TOWNOFLAKELURE.COM/COMMUNITY/PAGE/HORIZONTAL-DIRECTIONAL-DRILLING-PHOTOS-C AND TOWNOFLAKELURE.COM/COMMUNITY/PAGE/HORIZONTAL-DIRECTIONAL-DRILLING-PHOTOS-D ALL OF THE ABOVE PHOTOGRAPHS WERE TAKEN WITH THE LAKE WATER LEVEL DRAWN DOWN 11 TO 12 FEET BELOW NORMAL POOL. aftessissa 1 1 mos EXISTING SEWER MAIN HDD6 SCALE: 1" = 250' I 1 1 HDD B APPROX. 470 LF 6-INCH DR11 HDPE INVERTED SIPHON HDD3 HDD2 SHEET INDEX Sheet Number Sheet Title HDDO COVER HDD1 OVERVIEW AND SHEET INDEX HDD2 HDD A PLAN AND PROFILE HDD3 HDD B PLAN AND PROFILE HDD4 HDD C PLAN AND PROFILE HDD5 HDD C PLAN AND PROFILE HDD6 HDD D PLAN AND PROFILE HDD7 HDD D PLAN AND PROFILE HDD8 HDD D PLAN AND PROFILE HDD9 HDD D PLAN AND PROFILE HDD10 EROSION CONTROL NOTES AND DETAILS HDD11 EROSION CONTROL NOTES AND DETAILS HDD12 EROSION CONTROL NOTES AND DETAILS ed HDD A APPROX. 530 LF 6-INCH DR11 HDPE INVERTED SIPHON 0-1 LaBelia um Powered by partnership. 400 S. Tryon Street, Suite 1300 Charlotte, NC 28285 704-376-6423 labellapc.com � T � \-e -\Q4 Ix" � 4);\\ F� 1 J T S A 3 6/100226 2/202 '•��'GINSt. li ,�(•'� �i�n•%%%,,, T CORPORATE ENGINEERING LICENSE NO. C-0430 GPSSOC/GT 0� c1ECr�Rq FSA 0 CERT. NO. 52904 = TH CARC����. 6. ' LOTTE, © 2020 LaBella Associates Town of Lake Lure 2948 Memorial Highway PO Box 225 Lake Lure, NC 28746 Town of take North Carolina Subaqueous Sanitary Sewer HDD Pipelines installation Project NO: DATE: DESCRIPTION: Revisions PROJECT NUMBER: 2200559 DRAWN BY: REVIEWED BY: HMH BRH ISSUED FOR: REVIEW DATE: 6/10/2022 DRAWING NAME: OVERVIEW AND SHEET INDEX DRAWING NUMBER: HDD1 E&SC CONSTRUCTION SEQUENCE DD : 7 1020 1010 1000 990 980 970 960 950 940 -0+20 0+00 MANHOLES TO BE INSTALLED UNDER SEPARATE CONTRACT MANHOLES TO BE INSTALLED UNDER SEPARATE CONTRACT THE PURPOSE OF THIS HDD IS TO INSTALL A SIPHON TO CONNECT TWO SECTIONS OF GRAVITY SEWER. THE WORK CONSISTS OF INSTALLING APPROXIMATELY 530 LF OF QTY. (2) 6-INCH DR11 HDPE PIPES INSTALLED WITH 5 FEET OF SEPARATION. 1. OBTAIN ALL REQUIRED CONSTRUCTION GRADING PERMITS. 2. PROVIDE STABILIZED CONSTRUCTION ENTRANCES AS REQUIRED. RIG AND ASSOCIATED EQUIPMENT MAY REQUIRE BARGING OR CARNE FROM BUFFALO SHOALS ROAD TO ACCESS ENTRY POINT. 3. INSTALL ALL EROSION CONTROL MEASURES AS SHOWN ON PLAN SHEETS. CONTRACTOR SHALL BE PERMITTED TO OPEN A MINIMUM WIDTH CORRIDOR WITH MINIMUM SURFACE DISTURBANCE AS NEEDED FOR EROSION CONTROL INSTALLATION AND CONSTRUCTION EQUIPMENT AND MATERIALS ACCESS. 4. NOTIFY LAND QUALITY SECTION REGIONAL OFFICE PRIOR TO START OF CONSTRUCTION. 5. MOBILIZE DRILLING EQUIPMENT TO ENTRY POINT. 6. LAYOUT PIPE AT EXIT POINT. 7. COMPLETE EACH HDD TO INSTALL QTY. (2) 6" DR11 HDPE PIPES. 8. CONTRACTOR TO CONTAIN AND PROPERLY DISPOSE OF ALL DRILLING FLUID AND OTHER WASTE MATERIAL GENERATED DURING THE HDD PROCESS 9. MAINTAIN EROSION CONTROL MEASURES. CLEAN AND REPAIR AS NEEDED. 10. NO VEGETATED AREAS ARE EXPECTED TO BE DISTURBED. HOWEVER IF SO, SEED & MULCH DISTURBED AREAS OR EXPOSED SLOPES IN ACCORDANCE WITH THE TIME FRAMES IN TABLE 1. 11. MAINTAIN SOIL EROSION CONTROL MEASURES UNTIL PERMANENT GROUND COVER IS ESTABLISHED. 12. NOTIFY LAND QUALITY SECTION REGIONAL OFFICE FOR INSPECTION AND APPROVAL PRIOR TO REMOVAL OF EROSION CONTROL MEASURES. 13. REMOVE SOIL EROSION EROSION CONTROL MEASURES AND STABILIZE ALL REMAINING DISTURBED AREAS. 14. NOTIFY LAND QUALITY SECTION REGIONAL OFFICE FOR FINAL INSPECTION. 990 50' 97(4.0o 9/0 00' NORMAL WATER LE -12 DRA 20' 00/ W Obinr1 kW DOWN RIM NI- INV- SIN Inn /= VEL S 102 092 50 970 84 -\t g7n_g4 PnINT nF CURVATURE CC W 0 U ROCK OL PO T INT OF ANGENCY UUUk3LE 6- INCH UR 1 HUPE J POINT Ur CURVATU E ICROP MIN 7s nF npF 9 0 NE SW S10. A RIM-q92 0 INV=97a i6 INV-974 6 S103R RIM=9q2 50 NE INV-974 17 SW INV-974 27 1+00 DOCKS MAY BE REMOVED AS NECESSARY FOR HDD INSTALLATION, BUT CONTRACTOR SHALL REPLACE ANY DAMAGED OR REMOVED IN KIND BEFORE FINAL COMPLETION. BUFFALO SHOALS Ro • PROPOSED LIMIT OF DISTURBED AREA IS DEFINED BY PROPERTY LINE AND COIR WADDLES APPROXIMATELY 0.17 ACRES HDD A DDA1+00 HDD A ENTRY POINT Station=0+88.13 Offset=0.00' N:624657.4628 E:1051180.2847 CAP AND PLUG PIPELINES 1 FOOT BELOW GRADE AFTER INSTALLATION. RECORD AND SUMBIT COORDINATES AND ELEVATIONS FOR EACH PIPE END. HDD 2+00 3+00 N +00 --� HDD A 3+00 GEOTECH BORING M-2 LMH:S102 N:624616.8477 E:1051133.6066 SWINV=970.935 (MANHOLES TO BE INSTALLED IN FUTURE PHASE) HDD INSTALLATIONS MUST PASS THROUGH THIS POINT PROPOSED COIR LOG SILT FENCE AND IMIT OF WORK APPROX ELEVATION 980'. SEE DETAIL 2 ON SHEET HDD10. QTY. (2) 6-INCH DR11 HDPE WITH 5' SEPARATION 4+00 ed 5+00 EXISTING PRIVATE WELL AND 25' BUFFER (TYP.) L 10' PERMANENT DEEP PIPE CROSSING EASEMENT CORNETT, MELISSA D TRUSTEE FOR; MOORE, CHLOE CORNETT PARCEL #: 230389 119 BUFFALO SHOALS RD LAKE LURE, NC 28746 HD 6+00 7+00 PROPOSED TEMPORARY CONSTRUCTION ENTRANCE. SEE DETAIL 1 ON SHEET HDD10. PROPOSED TEMPORARY CONSTRUCTION EASEMENT (WIDTH VARIES) GEOTECH BORING M-3 MH:S103A N:624322.3512 E:1050795.1467 NEINV=974.055 (MANHOLES TO BE INSTALLED IN FUTURE PHASE) HDD INSTALLATIONS MUST PASS THROUGH THIS POINT 1020 1010 1000 990 980 970 960 950 940 8+00 8+20 HORIZONTAL SCALE: 1" = 40' VERTICAL SCALE: 1" = 40' PROPOSED LIMIT OF DISTURBED AREA IS DEFINED BY PROPERTY LINE AND COIR WADDLES APPROXIMATLEY 0.03 ACRES A 00' HDD A EXIT POINT Station = 6+39.10 Offset= 0.00' N:624295.7967 E:1050764.6282 CAP AND PLUG PIPELINES 1 FOOT BELOW GRADE AFTER INSTALLATION. RECORD AND SUMBIT COORDINATES AND ELEVATIONS FOR EACH PIPE END. PROPOSED COIR LOG SILT FENCE AND LIMIT OF WORK APPROX ELEVATION 980'. SEE DETAIL 2 ON SHEET HDD10. APPROXIMATE WATER'S EDGE DURING 12' DRAWDOWN (ELEV. 979') 80 160 Feet LaBetia Powered by partnership. 400 S. Tryon Street, Suite 1300 Charlotte, NC 28285 704-376-6423 labellapc.com \*"0\°0%, 40Q4 tl ��. `---%U I I I,,,- • :4 wEs r. i 30226 -- • • 6/10/2022 '6 ••. FNG I NE�� • • * T CORPORATE ENGINEERING LICENSE NO. C-0430 pSSOC/qT'\ iuORq Fs,o CERT. N. 52904 OR7N CARD`-` 4Rl.OTTE, © 2020 LaBella Associates Town of Lake Lure 2948 Memorial Highway PO Box 225 Lake Lure, NC 28746 Town of Zaice Zue North Carolina Subaqueous Sanitary Sewer HDD Pipelines installation Project NO: DATE: DESCRIPTION: Revisions PROJECT NUMBER: 2200559 DRAWN BY: HMH REVIEWED BY: BRH ISSUED FOR: REVIEW DATE: 6/10/2022 DRAWING NAME: HDD A PLAN AND PROFILE DRAWING NUMBER: HDD2 E&SC CONSTRUCTION SEQUENCE HDD B: J N 0 U CD 0 cZ M U U O U 'O = o 0) N O 2 o CL • LCS � U - = O O CO a) N ▪ J C Y O O • J O LC) CO C 0o E N • N o } a) _C � o0_ 1020 1010 1000 990 980 970 960 950 940 -0+20 MANHOLES TO BE INSTALLED UNDER SEPARATE CONTRACT S105 RIM=992.50 S INV W INV NL INV -976 39 =976 49 976 49 MIN. 15' COVER i E INV=979.61 w INV=97c71 99 b0' NORMAL WATE K LEVEL MANHOLES TO BE INSTALLED UNDER SEPARATE CONTRACT S106A S106B RIM=992.50 RIM=9 2.50 IN - 7a72 S INV= 79 82 N INV- 79 82 THE PURPOSE OF THIS HDD IS TO INSTALL A SIPHON TO CONNECT TWO SECTIONS OF GRAVITY SEWER. THE WORK CONSISTS OF INSTALLING APPROXIMATELY 470 LF OF QTY. (2) 6-INCH DR11 HDPE PIPES INSTALLED WITHIN A SINGLE BOREHOLE. 1. OBTAIN ALL REQUIRED CONSTRUCTION GRADING PERMITS. 2. PROVIDE STABILIZED CONSTRUCTION ENTRANCES AS REQUIRED. RIG AND ASSOCIATED EQUIPMENT WILL REQUIRE BARGING TO HDD ENTRY AND EXIT LOCATIONS. 3. INSTALL ALL LAND -BASED EROSION CONTROL MEASURES AS SHOWN ON PLAN SHEETS. CONTRACTOR SHALL BE PERMITTED TO OPEN A MINIMUM WIDTH CORRIDOR WITH MINIMUM SURFACE DISTURBANCE AS NEEDED FOR EROSION CONTROL INSTALLATION AND CONSTRUCTION EQUIPMENT AND MATERIALS ACCESS. 4. NOTIFY LAND QUALITY SECTION REGIONAL OFFICE PRIOR TO START OF CONSTRUCTION. 5. MOBILIZE DRILLING EQUIPMENT TO ENTRY POINT. INSTALL TURBIDITY CURTAIN BEHIND RIG. 6. LAYOUT PIPE AT EXIT POINT. 7. COMPLETE HDD TO INSTALL QTY. (2) 6-INCH DR11 HDPE PIPES. 8. CONTRACTOR TO CONTAIN AND PROPERLY DISPOSE OF ALL DRILLING FLUID AND OTHER WASTE MATERIAL GENERATED DURING THE HDD PROCESS. 9. MAINTAIN EROSION CONTROL MEASURES. CLEAN AND REPAIR AS NEEDED. 10. NO VEGETATED AREAS ARE EXPECTED TO BE DISTURBED. HOWEVER IF SO, SEED & MULCH DISTURBED AREAS OR EXPOSED SLOPES IN ACCORDANCE WITH THE TIME FRAMES IN TABLE 1. 11. MAINTAIN SOIL EROSION CONTROL MEASURES UNTIL PERMANENT GROUND COVER IS ESTABLISHED. 12. NOTIFY LAND QUALITY SECTION REGIONAL OFFICE FOR INSPECTION AND APPROVAL PRIOR TO REMOVAL OF EROSION CONTROL MEASURES. 13. REMOVE SOIL EROSION EROSION CONTROL MEASURES AND STABILIZE ALL REMAINING DISTURBED AREAS. 14. NOTIFY LAND QUALITY SECTION REGIONAL OFFICE FOR FINAL INSPECTION. 97 97 300'--12 (10' 2 0 ' DRAW D DI LAW DO WN WN 1 POINT OF CURVATURE 0 lY 1 CC P T INT OF ANGENCY DOUB LE 6-INCH R 1 1 HDP POINT 0 CURVAT F URE W 0 MI N 120 OF 0% SI OPE T 0+00 1 +00 APPROXIMATE WATER'S EDGE DURING 12' DRAWDOWN (ELEV. 979') PROPOSED TURBIDITY CURTAIN. SEE DETAIL ON HDD11. HDD B 0+00 GEOTECH BORING M-5 MH:S105 N:624847.4652 HDD INSTALLATIONS MUST E:1049864.7120 PASS THROUGH THIS POINT WINV=976.486 (MANHOLES TO BE INSTALLED IN FUTURE PHASE) CAP AND PLUG PIPELINES 1 FOOT BELOW GRADE AFTER INSTALLATION. RECORD AND SUMBIT COORDINATES AND ELEVATIONS FOR EACH PIPE END. HDD B 1 +00 PROPOSED LIMIT OF DISTURBED AREA IS DEFINED BY PROPERTY LINE AND COIR WADDLES APPROXIMATELY 0.14 ACRES 2+00 PROPOSED COIR LOG SILT FENCE AND LIMIT OF WORK APPROX ELEVATION 980'. SEE DETAIL 2 ON SHEET HDD10. HDD B ENTRY POINT Station =1 +40.12 Offset=0.00' N:624870.0000 \1049877.2038 \ 3+00 EXISTING PRIVATE WELL AND 25' BUFFER (TYP.) ss MCKEE, HN E; MCKEE, BETSY PART L #:232100 228 PI NIC POINT RD LAKE RE, NC 28746 SSBDD 0-3ss DEVINEY, WILLIAM C; DEVINEY, ANN J PARCEL #: 1606860 108 ROCK POINT RD LAKE LURE, NC 28746 N ss Cti O 3SS 4+00 -R-- -R-- 10' PERMANENT DEEP PIPE CROSSING EASEMENT O 5+00 PROPOSED LIMIT OF DISTURBED AREA IS DEFINED BY PROPERTY LINE AND COIR WADDLES APPROXIMATELY 0.05 ACRES MARGULIES, DANIEL REED TRUSTEE; MARGUILES, JODY ELIZABETH TRUSTEE PARCEL #: 226033 227 PICNIC POINT RD LAKE LURE, NC 28746 3SS QTY. (2) 6-INCH DR11 HDPE PIPES PULLED THROUGH SINGLE BORE HOLE WALDREP, CONSTANCE H PARCEL #: 231030 241 PICNIC POINT RD LAKE LURE, NC 28746 s 1 6+00 6+00 7+00 PROPOSED COIR LOG SILT FENCE AND IMIT OF WORK APPROX ELEVATION 980'. SEE DETAIL 2 ON SHEET HDD10. HDD B EXIT POINT Station=6+10.00 Offset=-0.01' LT N:624899.0947 E:1049408.2392 1020 1010 1000 990 980 970 960 950 940 8+00 8+20 HORIZONTAL SCALE: 1" = 40' VERTICAL SCALE: 1" = 40' z- CAP AND PLUG PIPELINES 1 FOOT BELOW GRADE AFTER INSTALLATION. RECORD AND SUMBIT COORDINATES AND ELEVATIONS FOR EACH PIPE END. HDD B 7+00 HDD B 7+50 GEOTECH BORING M-6 MH:S106B (TO BE INSTALLED UNDER SEPARATE CONTRACT) MH:S106A N:624898.0256 E:1049417.7374 EINV=979.606 (MANHOLES TO BE INSTALLED IN FUTURE PHASE) HDD INSTALLATIONS MUST PASS THROUGH THIS POINT APPROXIMATE WATER'S EDGE DURING 12' DRAWDOWN (ELEV. 979') PROPOSED TURBIDITY CURTAIN. SEE DETAIL ON HDD11. 0 T 1 0 80 160 Feet 0-1 LaBetia um Powered by partnership. 400 S. Tryon Street, Suite 1300 Charlotte, NC 28285 704-376-6423 labellapc.com 0# \*"0\°0%, -t1 ,�� ``,,„C,Q "',% • :4 wEs 30226 - 6/10/2022 <P FNGINE�� T CORPORATE ENGINEERING LICENSE NO. C-0430 ��pssOc1,j irc:c'CEH� iRT. E C NTUO.Rq Fs ,o 52904 ITN cAR0```P R4OTTE, © 2020 LaBella Associates Town of Lake Lure 2948 Memorial Highway PO Box 225 Lake Lure, NC 28746 Town of Zaice Zue North Carolina Subaqueous Sanitary Sewer HDD Pipelines installation Project NO: DATE: DESCRIPTION: Revisions PROJECT NUMBER: 2200559 DRAWN BY: REVIEWED BY: HMH BRH ISSUED FOR: REVIEW DATE: 6/10/2022 DRAWING NAME: HDD B PLAN AND PROFILE DRAWING NUMBER: HDD3 -=o ai CQ J 0 0 U CD w M U U 4J U i C 4J 2 U 'p C 0) 0, C/) O CD = o CID CL � U - = c) N J N Y CZ O • J O LS, 0 a0 0 E 0.6 0 L (6 (_ 1040 1040 1030 1030 1020 1020 1010 - _ 1010 _ - 1000 _ 1000 1 ` 090.50' NUHMAL MI Eli LEVEL 990 -�_ / 990 979.00' ---12' DRAW D WN 980 / . __ 980 97 0.00' 970 �_ _ ---20' DRAW DOWN 970 ��� \ 960 �_ e 960 U 950 _ �� \ 950 940 S 940 zZ 930--`Z k -, 930 a - - - - - - - - - - - - - - - 920 POINT ozz - - - - - - 920 ,. 910 -��L 910 c MIN. 75 F 0% SLO E 900 I 1' UI TILLING ANTI F - 900 P01 N � - 890 _ _ TANGENCY POINT OF P INT OF 890 880 = CURVATURE = TANGENCY 880 N O 870 870 860 860 850 850 840 840 830 830 820 820 810 = 810 = 800 0+00 1+00 2+00 3+00 4+00 E&SC CONSTRUCTION SEQUENCE 5+00 6+00 7+00 8+00 9+00 10+00 10+50 800 'DD C: THE PURPOSE OF THIS HDD IS TO INSTALL A FORCE MAIN WHICH WILL SERVE A FUTURE SEWER PUMP STATION. THE WORK CONSISTS OF INSTALLING APPROXIMATELY 1,680 LF OF 8-INCH DR11 HDPE PIPE. 1. OBTAIN ALL REQUIRED CONSTRUCTION GRADING PERMITS. 2. PROVIDE STABILIZED CONSTRUCTION ENTRANCES AS REQUIRED. 3. PROVIDE ALL EROSION CONTROL MEASURES AS SHOWN ON PLAN SHEETS. CONTRACTOR SHALL BE PERMITTED TO OPEN A MINIMUM WIDTH CORRIDOR WITH MINIMUM SURFACE DISTURBANCE AS NEEDED FOR EROSION CONTROL INSTALLATION AND CONSTRUCTION EQUIPMENT AND MATERIALS ACCESS. 4. NOTIFY LAND QUALITY SECTION REGIONAL OFFICE PRIOR TO START OF CONSTRUCTION. 5. MOBILIZE DRILLING EQUIPMENT TO ENTRY POINT. 6. LAYOUT PIPE AT EXIT POINT. 7. COMPLETE THE HDD TO INSTALL THE 8-INCH DR11 HDPE PIPE. 8. CONTRACTOR TO CONTAIN AND PROPERLY DISPOSE OF ALL DRILLING FLUID AND OTHER WASTE MATERIAL GENERATED DURING THE HDD PROCESS. 9. MAINTAIN EROSION CONTROL MEASURES. CLEAN AND REPAIR AS NEEDED. 10. SEED & MULCH DISTURBED AREAS OR EXPOSED SLOPES IN ACCORDANCE WITH THE TIME FRAMES IN TABLE 1. 11. MAINTAIN SOIL EROSION CONTROL MEASURES UNTIL PERMANENT GROUND COVER IS ESTABLISHED. TEMPORARY CONSTRUCTOIN EASEMENT FOR ENTIRE PARCEL. 12. NOTIFY LAND QUALITY SECTION REGIONAL OFFICE FOR INSPECTION AND APPROVAL PRIOR TO REMOVAL OF EROSION CONTROL MEASURES. CONTRACTOR MAY CLEAR ANY PORTION NECESSARY FOR CONDUCTING 13. REMOVE SOIL EROSION EROSION CONTROL MEASURES AND STABILIZE ALL THE WORK. RETURN ALL DISTRUBED AREAS TO ORIGINAL GRADES, SEED REMAINING DISTURBED AREAS. 0 80 HORIZONTAL SCALE: 1" - 40' VERTICAL SCALE: 1" = 40' 160 AND STABILIZE FOLLOWING SUBSTANTIAL COMPLETION. 14. NOTIFY LAND QUALITY SECTION REGIONAL OFFICE FOR FINAL INSPECTION. I I I I Feet "off MERRILL, LUCINDA G TRUSTEE d ', PARCEL #: 216706 \ \ . . �\ d 0 CHARLOTTE DR \\ e\ \ LAKE LURE, NC 28746 , �� \N iii \\ ��� 9� d \ /' \ its eta �p \ v \ ���t�A�tfie F / • Q PROPOSED TEMPORARY CONSTRUCTION \`t, 4��`�iti��' \ \ Q ?N ENTRANCE. SEE DETAIL 1 ON SHEET HDD10. CAP AND PLUG PIPELINES 1 FOOT BELOW GRADE AFTER ''Ai cc '!�' , -it. \:\\ PROPOSED COIR LOG SILT FENCE AND X,& LIMIT OF WORK APPROX ELEVATION 980'. \ SEE DETAIL 2 ON SHEET HDD10. ., /,, ,0 ,- 4 \ /DoFij/ F /L� 0< T'p`A �o� j057, ioe�\o •42.,4 c�0,n gob •00 ' \ APPROXIMATE WATER'S EDGE II II, • 9�� p 9 O INSTALLATION. RECORD AND SUMBIT COORDINATES AND ELEVATIONS FOR PIPE END. MERRILL, LUCINDA G TRUSTEE PARCEL #: 216707 505 CHARLOTTE DR LAKE LURE, NC 28746 10' PERMANENT / CROSS / / o cD co Lu iii DEEP PIPE \ HDD C 8+00 HDD C 9+00 HDD C 10+00 NG EASEMENT HDD C 5+00 HDD C 6+00 HDD C 7+00 I I I � DURING 12 DRAWDOWN (ELEV. 979) 0 ✓ `,� Hnn+n 00 HDD C 4+00 I I I \ • \ HDD C 0+00 oo HDD 1 I I I 1 - 00� / ti• s p - oo j / % 0A, d� - - �\� T�` , Fj '6� x, A oo / / 0�, 6i 1p c9 O/,\ 'MI 9 8 O o �� lam' �06 s6d, •00\ \-_/- •06, 8''° 00 PROPOSED LIMIT OF DISTURBED AREA DILINEATED BY COIR LOGS AND P/L (990.5' ELEVATION) EXCEPT ON PARCEL 216706. APPROXIMATELY 0.71 ACRES do I, + \~ �QOI� /�o �� - �°0l -V�' CAP AND PLUG PIPELINES 1 FOOT BELOW GRADE - \ AFTER INSTALLATION. RECORD AND SUMBIT �,\\\ COORDINATES AND ELEVATIONS FOR PIPE END. 0 y �p 1 \ o �// , ti��q�p. ---:"10F NAPPROXIMATE \ �� / oo j o \v 26 Z' \v.\ 7 8-INCH DR11 HDPE ♦ 1 GEOTECH BORING B 3 ♦\ ' a Station=4+25.29 Offset=0.00' v V� N:626240.5711 Loi PROPOSED COIR LOG SILT FENCE AND E:1048864.9705 Si \♦ QI LIMIT OF WORK APPROX ELEVATION 980'. SEE DETAIL 2 ON SHEET HDD10. \\ • V� • GEOTECH BORING B-1 \iiii \♦ w' Station=2+82.69 Offset=74.09'RT ZI N:626285.1878 I �A w1 E:1049019.3594 • a \A U' WATER'S EDGE v V� DURING 12' DRAWDOWN (ELEV. 979') �A QI 1 Si I I ■ I I ■ I I � �Mp\N \ ■ I I ■ I I ai GS�`NE II�II■II 1 �y JS I I ■ I I II \\W Ng I I IN ■ I I I � I i i *// ♦ • �$\\\* 1 0-1 LaBetia um Powered by partnership. 400 S. Tryon Street, Suite 1300 Charlotte, NC 28285 704-376-6423 la bella pc.com 0� 0# 0\° I_p�F�� 1 J , c ES fir. r. • i 30226 - 6/10/2022 ? .6•*.NG INEffl.. e T CORPORATSE S EO /NGIq j NEEsRIN\ G C LICENSE NO. C-0430 • F C' �.... 0 CERT. NO. 52904 Rr„ CAR0`-`��_ 44'4OTTE , © 2020 LaBella Associates Town of Lake Lure 2948 Memorial Highway PO Box 225 Lake Lure, NC 28746 Town of Zaice Zue North Carolina Subaqueous Sanitary Sewer HDD Pipelines installation Project NO: DATE: DESCRIPTION: Revisions PROJECT NUMBER: 2200559 DRAWN BY: REVIEWED BY: HMH BRH ISSUED FOR: REVIEW DATE: 6/10/2022 DRAWING NAME: HDD C PLAN AND PROFILE DRAWING NUMBER: HDD4 0-1 LaBetia um Powered by partnership. 3d\DESIGN - HDD - Cross U U U cp = p C O D L CM V) O O 2 O d OO � U - = ro 1- N J N CD co N J aCO CO� •o E N i N QJ L 6 (oes 990 50' NORMAL WATER LE VEL q7q nn .-17 11RA 1N nf11NN '/U UU' 2U' UK/1 W UUWN zl 0 l ff� --f ss ff� STA 16+50 43 EXIT POINT ELEV 98 1- DR ILLING AN GLE 8-INC �111 HU I'E POINT OF (UKV/ IUHt 10+50 1130 1120 1110 1100 1090 1080 1070 1060 1050 1040 1030 1020 1010 1000 990 980 970 960 950 940 930 920 910 900 890 880 870 860 850 840 830 820 810 800 1 TaILITVE'SRMTOUT__ 1 1 1 1 11+00 12+00 13+00 14+00 15+00 16+00 17+00 \",\S".\\.\\.\ ♦\\♦ APPROXIMATE WATER'S EDGE DURING 12' DRAWDOWN (ELEV. 979') \♦\\ PROPOSED COIR LOG SILT FENCE AND LIMIT OF DISTURBANCE APPROX ELEVATION 980'. ♦\ SEE DETAIL 2 ON SHEET HDD10. \ HDD C 17+00 HDD C 12+00 HDD C 13+00 I HDD C 14+00 HDD C 15+00 HDD C 16+00 p� o� \ FYDDC11+00 8-INCH DR11 HDPE � III■ 1 II■II■II 1 0 GEOTECH BORING B-3 Station =15 + 90.68 Offset= 0.00' N:626469.6290 E:1047722.3198 CAP AND PLUG PIPELINE 1 FOOT BELOW GRADE AFTER INSTALLATION. RECORD AND SUMBIT COORDINATES AND ELEVATIONS FOR PIPE END. 80 HDD C EXIT POINT Station=16+50.43 Offset=0.00' N:626481.3737 E:1047663.7317 160 Feet 19+00 20+00 TEMPORARY CONSTRUCTION EASEMENT FOR ENTIRE PARCEL. TEMPORARY EASEMENT IS FOR ASSEMBLY AND LAYDOWN OF PIPE BEFORE PULL. NO TREE REMOVAL OR CLEARING IS ALLOWED EXCEPT AS MAY BE AGREED TO BY THE PROPERTY OWNER. T/E CAN BE ACCESSED FROM HAWTHORNE DRIVE CUL-DE-SAC. DO NOT OBSTRUCT DRIVEWAY. REPAIR TO PRE -CONSTRUCTION CONDITIONS ANY IMPROVEMENTS ALTERED OR DAMAGED BY CONSTRUCTION ACTIVITIES. --R-- 0 21+00 TANNER, KENNETH S III PARCEL #: 1633723 0 HAWTHORNE DR LAKE LURE, NC 28746 / p0 GO' / �QO PROPOSED TEMPORARY CONSTRUCTION EASEMENT (WIDTH VARIES) 1130 1120 1110 1100 1090 1080 1070 1060 1050 1040 1030 1020 1010 1000 990 980 970 960 950 940 930 920 910 900 890 880 870 860 850 840 830 820 810 800 22+00 HORIZONTAL SCALE: 1" = 40' VERTICAL SCALE: 1" = 40' HAWTHORNE DR. CUL-DE-SAC 0 0 0 18+00 --R-----R-----R-- Hop C 1a-vp0 PROPOSED LIMIT OF DISTURBED AREA APPROXIMATELY 0.012 ACRES --R-- MCCLINTON, RAYMOND TRUSTEE PARCEL #: 1653875 301 HOLMES RD LAKE LURE, NC 28746 1 TANNER, KENNETH S III PARCEL #: 1652346 267 HAWTHORNE DR LAKE LURE, NC 28746 400 S. Tryon Street, Suite 1300 Charlotte, NC 28285 704-376-6423 labellapc.com ofc0 " 4),-&%Ci :',`•Q. R0z,,�' ;fir. ..y t A 30226 - — • 6/10/2022 • 6� ••. FNG INE�� •• T CORPORATE ENGINEERING LICENSE NO. C-0430 pS S O C/q j Q�'��H1iECT FsA c c CERT. N0. P I 52904 c rN caRo�`�� \- R4OTTE, '- © 2020 LaBella Associates Town of Lake Lure 2948 Memorial Highway PO Box 225 Lake Lure, NC 28746 Zue North Carolina Subaqueous Sanitary Sewer HDD Pipelines installation Project NO: DATE: DESCRIPTION: Revisions PROJECT NUMBER: 2200559 DRAWN BY: REVIEWED BY: HMH BRH ISSUED FOR: REVIEW DATE: 6/10/2022 DRAWING NAME: HDD C PLAN AND PROFILE DRAWING NUMBER: HDD5 0-1 LaBetia um Powered by partnership. 3d\DESIGN - HDD - Cross 1000 990 980 970 960 950 940 930 920 910 900 890 880 870 860 850 840 830 820 810 800 T AN 979.0012 DRA DOWN LJ u 1"n 8 NCH DR I I HDPE T.NGENCY 0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 CHARLOTTE DR. PROPOSED 25' TEMPORARY CONSTRUCTION EASEMENT MERRILL, LUCINDA G TRUSTEE PARCEL #: 216706 0 CHARLOTTE DR LAKE LURE, NC 28746 - �. - �ao1 HDD �D D 2+00 PROPOSED TEMPORARY CONSTRUCTION ENTRANCE. SEE DETAIL 1 ON SHEET HDD10. PROPOSED COIR LOG SILT FENCE AND LIMIT OF WORK APPROX ELEVATION 980'. SEE DETAIL 2 ON SHEET HDD10. CAP AND PLUG PIPELINE 1 FOOT BELOW GRADE AFTER INSTALLATION. RECORD AND SUMBIT COORDINATES AND ELEVATIONS FOR PIPE END. APPROXIMATE WATER'S EDGE DURING 12' DRAWDOWN (ELEV. 979') PROPOSED COIR WADDLES AND LIMIT OF WORK APPROX. ELEVATION = 980' HDD C ENTRY POINT Station=0+50.00 Offset=0.00' N:626166.8066 E:1049232.9 x TEMPORARY CONSTRUCTOIN EASEMENT FOR ENTIRE PARCEL. CONTRACTOR MAY CLEAR ANY PORTION NECESSARY FOR CONDUCTING THE WORK. RETURN ALL DISTRUBED AREAS TO ORIGINAL GRADES, SEED AND STABILIZE FOLLOWING SUBSTANTIAL COMPLETION. MERRILL, LUCINDA G TRUSTEE PARCEL #:216707 505 CHARLOTTE DR LAKE LURE, NC 28746 CAP AND PLUG PIPELINE 1 FOOT BELOW GRADE AFTER INSTALLATION. RECORD AND SUMBIT COORDINATES AND ELEVATIONS FOR PIPE END. HDD D 3+00HDD D 4+00 ) HDD D ENTRY POINT Station=3+28.50 Offset=0.00' N:626185.6832 , E:1049205.0680 00 PROPOSED LIMIT OF DISTURBED AREA DILINEATED BY COIR LOGS AND P/L (990.5' ELEVATION) EXCEPT ON PARCEL 216706. APPROXIMATELY 0.71 ACRES ao ed 8-INCH DR11'HDPE YACHT ISLAND DR. E&SC CONSTRUCTION SEQUENCE HDD D: THE PURPOSE OF THIS HDD IS TO INSTALL A FORCE MAIN WHICH WILL SERVE A FUTURE SEWER PUMP STATION. THE WORK CONSISTS OF INSTALLING APPROXIMATELY 3,900 LF OF 8-INCH DR11 HDPE PIPE. 1. OBTAIN ALL REQUIRED CONSTRUCTION GRADING PERMITS. 2. PROVIDE STABILIZED CONSTRUCTION ENTRANCES AS REQUIRED. 3. PROVIDE ALL EROSION CONTROL MEASURES AS SHOWN ON PLAN SHEETS. CONTRACTOR SHALL BE PERMITTED TO OPEN A MINIMUM WIDTH CORRIDOR WITH MINIMUM SURFACE DISTURBANCE AS NEEDED FOR EROSION CONTROL INSTALLATION AND CONSTRUCTION EQUIPMENT AND MATERIALS ACCESS. 4. NOTIFY LAND QUALITY SECTION REGIONAL OFFICE PRIOR TO START OF CONSTRUCTION. 5. MOBILIZE DRILLING EQUIPMENT TO ENTRY POINT. 6. LAYOUT PIPE AT EXIT POINT. 7. COMPLETE THE HDD TO INSTALL THE 8-INCH DR1 1 HDPE PIPE. 8. CONTRACTOR TO CONTAIN AND PROPERLY DISPOSE OF ALL DRILLING FLUID AND OTHER WASTE MATERIAL GENERATED DURING THE HDD PROCESS. 9. MAINTAIN EROSION CONTROL MEASURES. CLEAN AND REPAIR AS NEEDED. 10. SEED & MULCH DISTURBED AREAS OR EXPOSED SLOPES IN ACCORDANCE WITH THE TIME FRAMES IN TABLE 1. 11. MAINTAIN SOIL EROSION CONTROL MEASURES UNTIL PERMANENT GROUND COVER IS ESTABLISHED. 12. NOTIFY LAND QUALITY SECTION REGIONAL OFFICE FOR INSPECTION AND APPROVAL PRIOR TO REMOVAL OF EROSION CONTROL MEASURES. 13. REMOVE SOIL EROSION EROSION CONTROL MEASURES AND STABILIZE ALL REMAINING DISTURBED AREAS. 14. NOTIFY LAND QUALITY SECTION REGIONAL OFFICE FOR FINAL INSPECTION. GEOTECH BORING B-1 Station=5+11.36 Offset=-104.64' LT N:626285.1878 E:1049019.3594 PROPOSED COIR WADDLES AND LIMIT OF WORK APPROX. ELEVATION = 980' co HDD D 6+00 HDD D 7+00 I � 8+00 GEOTECH BORING B-2 Station=7+13.64 Offset= 0.00' N:626512.1743 E:1049000.7646 HDD D 8+00 I 8-INCH DR11 HDPE APPROXIMATE WATER'S EDGE DURING 12' DRAWDOWN (ELEV. 979') 9+00 0 10+00 80 11 +00 HORIZONTAL SCALE: 1" = 40' VERTICAL SCALE: 1" = 40' 160 Feet ♦ HDD D 10+00 HDD D 11+00 11+50 MATCHLINE SHEET HDD7 1000 990 980 970 960 950 940 930 920 910 900 890 880 870 860 850 840 830 820 810 800 400 S. Tryon Street, Suite 1300 Charlotte, NC 28285 704-376-6423 la bella pc.com \fc 0%, � 40Q's • ▪ i 30226 - - • • 6/10/2022 <P ••. FNG I NE�� • • * T CORPORATE ENGINEERING LICENSE NO. C-0430 sOciA FS F>„ v 1eCTURq o ti CERT. NO. P• 52904 T11 CAR0\-\aP 4R4OTTE, © 2020 LaBella Associates Town of Lake Lure 2948 Memorial Highway PO Box 225 Lake Lure, NC 28746 Town of Zaice Zue North Carolina Subaqueous Sanitary Sewer HDD Pipelines installation Project NO: DATE: DESCRIPTION: Revisions PROJECT NUMBER: 2200559 DRAWN BY: REVIEWED BY: HMH BRH ISSUED FOR: REVIEW DATE: 6/10/2022 DRAWING NAME: HDD D PLAN AND PROFILE DRAWING NUMBER: HDD6 0-1 LaBetia mm Powered by partnership. 1000 990 980 970 960 950 940 930 920 910 900 890 880 870 860 850 840 830 820 810 800 11+50 JJU bU' NUKM/\L W 11 Eli LEVEL 979 00' ---12' DRAW DOWN `170 00' - 20' DRAW DOWN 1' U1 IILLING_A NG Ir 8-INC H DR 1 1 HDPE 1° GA NRIF MATCHLINE SHEET HDD6 12+00 HDD D 12+00 13+00 HDD D 13+00 14+00 HDD D 14+00 15+00 HDD D 15+00 I I 8-INCH DR11 HDPE 16+00 HDD D 16+00 17+00 HDD D 17+00 18+00 HDD D 18+00 19+00 HDD D 19+00 20+00 0 80 21+00 160 Feet HDD D 20+00 HDD D 21+00 22+00 HORIZONTAL SCALE: 1" — 40' VERTICAL SCALE: 1" = 40' 1000 990 980 970 960 950 940 930 920 910 900 890 880 870 860 850 840 830 820 810 800 23+00 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 HDD D 23+001 1 1 COI 2 , LL 1 LJJ � 2 , LJJ 1 z1 , 2 , 1 400 S. Tryon Street, Suite 1300 Charlotte, NC 28285 704-376-6423 labellapc.com 0� ° 0%Q0C I_p�F�� 1 J `%%% 1_ A /?oo, ,,,i ? W ES .4 r. • i 30226 -— 6/10/2022 <P FNGIN�� T CORPORATE ENGINEERING LICENSE NO. C-0430 pSSOC/q j, Q,,\-rECT�Rq F\ c e CERT. NO. P 52904 C' CARC `a 4/? OTTE © 2020 LaBella Associates Town of Lake Lure 2948 Memorial Highway PO Box 225 Lake Lure, NC 28746 Town of Zia/cc Zue North Carolina Subaqueous Sanitary Sewer HDD Pipelines installation Project NO: DATE: DESCRIPTION: Revisions PROJECT NUMBER: 2200559 DRAWN BY: REVIEWED BY: HMH BRH ISSUED FOR: REVIEW DATE: 6/10/2022 DRAWING NAME: HDD D PLAN AND PROFILE DRAWING NUMBER: HDD7 0, LaBetia Powered by partnership. Y J cn 0 U cD w Cc) U_ U y 4J U - > up 4J 0 = ° I= • V) o 2 O a � OO � U - = N CO a) C J N u, O Y co N J - O CD10 aSo E N o i O L (6 (a 1000 990 980 970 960 950 940 930 920 910 900 890 880 870 860 850 840 830 820 810 800 'JJUbU'NU IKMAL WA I EH LEVE L 979 00 12' DRAW DOWN 970 00' 20' DRAW DOWN DRILLING ANGLE 8-INCH DH11 HUP L 1' HILL INLi ANGL E MIN 75. OF 0% SLOPE 8-INCH R11 HDPE I'UIN I OF CUR VATl1Rr u I CC 23+00 24+00 25+00 26+00 27+00 28+00 29+00 30+00 31+00 32+00 33+00 34+00 HORIZONTAL SCALE: 1" = 40' VERTICAL SCALE: 1" = 40' 1000 990 980 970 960 950 940 930 920 910 900 890 880 870 860 850 840 830 820 810 800 34+50 1 ♦\ ` " 1 1 \\ 1 \\ 1 P�� \♦ 0-, 1 1 �s�`� \ = . . I D. 1 \\ I— 1 1 w.\\.=\\VD 1 w 1 ® z 1 1 J 1 1 = 1 1- 1 1 < 1 1 I 1 1 1 1 1 HDD D 24+00 HDD D 25+00 HDD D 26+00 HDD D 27+00 HDD D 28+00 HDD D 29+00 HDD D 30+00 HDD D 31+00 HDD D 32+00 HDD D 33+00 HDD D 34+00 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 I I 1 1 1 1 IP 1 8-INCH DR11 HDPE 1 1 1 0 1 M 1 1 F- 1w 1 C= 1 1w I 1 J 1 1 I- 1 < I 0 80 160 Feet ♦ 1 1 1 1 1 1 1 1 1 1 400 S. Tryon Street, Suite 1300 Charlotte, NC 28285 704-376-6423 labellapc.com 0 � � 4),-6S\Ci_L r. i 30226 T.• • 6/10/2022 • <P ••• FNG IN�� •• T CORPORATE ENGINEERING LICENSE NO. C-0430 z.----r-pSSOC/q Fs /F,.0�1eCT0Rq A c La- CERT. NO. ' 52904 06, C 4 /?4OTTE, © 2020 LaBella Associates Town of Lake Lure 2948 Memorial Highway PO Box 225 Lake Lure, NC 28746 Town of Zia/cc Zue North Carolina Subaqueous Sanitary Sewer HDD Pipelines installation Project NO: DATE: DESCRIPTION: Revisions PROJECT NUMBER: 2200559 DRAWN BY: REVIEWED BY: HMH BRH ISSUED FOR: REVIEW DATE: 6/10/2022 DRAWING NAME: HDD D PLAN AND PROFILE DRAWING NUMBER: HDD8 0-1 LaBetia mm Powered by partnership. 3d\DESIGN - HDD - Cross 1000 990 980 970 960 950 940 930 920 910 900 890 880 870 860 850 840 830 820 810 800 99 .50' NORM AL WATER LEVEL 979 00' --12. RAW DOWN 97 00' 20' DRAW n WN • STA 41 +35 93 EXIT P INT LLLV. 9tS4' POINT OF 1 _ 1 POINT OF TANGI-NRY 34+50 35+00 • * CI •s" I co • = I I Lt., •‘," J I = �.�� Cr) Ca I L1Js�\� IJ I= I I— ` I ` I ` I I p r HDD D 35+00 HDD D 36+00 I I I I I I I I i I I I I I I I I I I 36+00 37+00 HDD D 37+00 HDD D 38+00 160 Feet 38+00 39+00 HDD D 39+00 HDD D 40+00 8-INCH DR11 HDPE GEOTECH BORING B-5 Station = 40+68.53 Offset=0.00' N:629356.1436 E:1047221.1370 I - 40+00 HDD D 41 + 41+00 42+00 43+00 HORIZONTAL SCALE: 1" = 40' VERTICAL SCALE: 1" = 40' PROPOSED COIR LOG SILT FENCE AND w LIMIT OF WORK APPROX ELEVATION 980'. SEE DETAIL 2 ON SHEET HDD10. HDD D EXIT POINT Station=41 +35.93 Offset=0.00' N:629413.2819 E:1047185.3824 CAP AND PLUG PIPELINE 1 FOOT BELOW GRADE AFTER INSTALLATION. RECORD AND SUMBIT COORDINATES AND ELEVATIONS FOR PIPE END. PROPOSED LIMIT OF DISTURBED AREA DEFINED BY COIR LOGS AND P/L. APPROXIMATELY 0.31 ACRES MOORE, JOHN HAYWARD PARCEL #: 1637730 0 CARSONS WAY LN LAKE LURE, NC 28746 1000 990 980 970 960 950 940 930 920 910 900 890 880 870 860 850 840 830 820 810 800 0 80 APPROXIMATE WATER'S EDGE DURING 12' DRAWDOWN (ELEV. 979') 400 S. Tryon Street, Suite 1300 Charlotte, NC 28285 704-376-6423 labellapc.com \fc � I_p�F�0%� 1 J 4151.4 _. • ? W ES 30226 - • 6/10/2022 • '.6 p/.•F4'GINEffl• ••'e�• `••...1..• -•�,, ,,,0,,\o�do RT C A O ,,ti11\,,4'4OTTEa T CORPORATE ENGINEERING LICENSE NO. C-0430 FS '� e0�\IEC TURq ti 'f CERT. NO. 52904 © 2020 LaBella Associates Town of Lake Lure 2948 Memorial Highway PO Box 225 Lake Lure, NC 28746 Town of Za/Ce Zue North Carolina Subaqueous Sanitary Sewer HDD Pipelines installation Project NO: DATE: DESCRIPTION: Revisions PROJECT NUMBER: 2200559 DRAWN BY: REVIEWED BY: HMH BRH ISSUED FOR: REVIEW DATE: 6/10/2022 DRAWING NAME: HDD D PLAN AND PROFILE DRAWING NUMBER: HDD9 J F— w N uJ w cs w 5 U U u, a� cz ccs O U QJ i 'O C O O U) O O CP 2 0 d co O � U 0- = N CO N O N N a� O - 0 N O O LC) COLO V O E >- QJ L (6 (_ 6" MIN 2"-3" COARSE AGGREGATE (SURGE STONE) CONSTRUCTION SPECIFICATIONS: AS REQUIRED 12' MIN 1. CLEAR THE ENTRANCE AND EXIT AREA OF ALL VEGETATION, ROOTS, AND OTHER OBJECTIONABLE MATERIAL AND PROPERLY GRADE IT. 2. PLACE THE GRAVEL TO THE SPECIFIC GRADE AND DIMENSIONS SHOWN ON THE PLANS AND SMOOTH IT. 3. PROVIDE DRAINAGE TO CARRY WATER TO A SEDIMENT TRAP OR OTHER SUTIABLE OUTLET. 4. USE NONWOVEN GEOTEXTILE FABRICS BECAUSE THEY IMPROVE STABILITY OF THE FOUNDATION IN LOCATIONS SUBJECT TO SEEPAGE OR HIGH WATER TABLE. MAINTENANCE: MAINTAIN THE GRAVEL PAD IN A CONDITION TO PREVENT MUD OR SEDIMENT FROM LEAVING THE CONSTRUCTION SITE. THIS MAY REQUIRE PERIODIC TOP DRESSING WITH 2-INCH STONE. AFTER EACH RAINFALL, INSPECT ANY STRUCTURE USED TO TRAP SEDIMENT AND CLEAN IT OUT AS NECESSARY. IMMEDIATELY REMOVE ALL OBJECTIONABLE MATERIAL SPILLED, WASHED OR TRACKED ONTO PUBLIC ROADWAYS. 1 TEMPORARY CONSTRUCTION ENTRANCE 3 IN. FLOW 12 IN MIN. Compost Sock AREATO BE PROTECTED 4-2 in x 2 in STAKES SECTION WOOD MULCH OR COMPOST TO 1/2 HEIGHT OF LOG UNTRENCHED INSTALLATION 3 IN. 1/�f7 12 IN MIN. TRENCH INTO GROUND 4 IN. MIN. Compost Sock AREA TO BE PROTECTED --2inx2in STAKES SECTION OR ENTRENCHED INSTALLATION* ISOMETRIC VIEW Mulch or Compost for Untrenched Socks Sheet Flow Work Area PLAN VIEW *THIS APPLICATION MAY NOT BE USED WITH COMPOST SOCKS SMALLER THAN 12 IN. AREA TO BE PROTECTED Compost Sock 2 COIR SEDIMENT LOG SILT FENCE SEEDING SOIL AND VEGETATION PREPARE SEEDBED BY RIPPING, CHISELING, HARROWING OR PLOWING TO DEPTH OF SIX INCHES SO AS TO PRODUCE A LOSE, FRIABLE SURFACE. REMOVE ALL STONES, BOULDERS, STUMPS OR DEBRIS FROM THE SURFACE WHICH WOULD PROHIBIT GERMINATION OR PLANT GROWTH. INCORPORATE INTO THE SOIL 800 TO 1,000 POUNDS OF 10-10-10 FERTILIZER PLUS 500 POUNDS OF TWENTY PERCENT (20%) SUPERPHOSPHATE PER ACRE AND TWO TONS OF DOLOMITIC LIME PER ACRE UNLESS SOIL TESTS INDICATE THAT A LOWER RATE OF LIME CAN BE USED. MULCH AFTER SEEDING WITH 1.5 TONS OF GRAIN STRAW PER ACRE AND EITHER CRIMP STRAW INTO SOIL OR TACK WITH LIQUID ASPHALT AT 400 GALLONS PER ACRE OR EMULSIFIED ASPHALT AT 300 GALLONS PER ACRE. PLANTS MIXTURE TALL FESCUE (LOW MAINTENANCE) TALL FESCUE WATERWAYS AND LAWNS (HIGH MAINT.) BLEND OF TWO TURFTYPE TALL FESCUES (90%) AND TWO OF MORE IMPROVED KENTUCKY BLUEGRASS VARIETIES (10%) (HIGH MAINTENANCE) TALL FESCUE AND KOBE OR KOREAN LESPEDEZA (SEE NOTE 1 BELOW) TALL FESCUE SERICEA LESPEDEZA TALL FESCUE AND GERMAN MILLET 0R SUDANGRASS (SEE NOTE 2 BELOW) TALL FESCUE AND RYEGRAIN (SEE NOTE 2 BELOW) COMMON BERMUDAGRASS AND KOBE OR KOREAN LESPEDEZA (SEE NOTE 1 BELOW) PERMANENT SEEDINGS PLANTING RATE/ACRE 100-150 LBS. 200-250 LBS. 200-250 LBS. 100 LBS. 20-25 LBS. 50 LBS. 60 LBS./ACRE 60 LBS. AND 30 LBS. 70 LBS. AND 25 LBS. 8 LBS. (HULLED) 15-2 LBS. (UNHULLED) PLANTING DATES AUG. 15-OCT. 15 FEB. 15 - MAY 1 AUG. 15-OCT. 15 FEB. 15 - MAY 1 AUG. 15-OCT. 15 FEB. 15 - MAY 1 AUG. 15-OCT. 15 FEB. 15 - MAY 1 NOV. 1-FEB. 1 (UNSCARIFIED) JULY AND AUGUST NOV. 1-JAN.30 APR. 15-JUNE 30 FEB. 1 - MAY 30 (1) FOR SPRING SEEDINGS, USE SCARIFIED LESPEDEZA SEED. FOR LATE FALL AND WINTER SEEDINGS, USE UNSCARIFIED SEEDS. (2) ANNUALS SUCH AS MILLET, SUNDANGRASS AND RYEGRAIN MUST BE KEPT AT 10-12" MAXIMUM HEIGHT. 3 SEEDING SCHEDULE SHEETS HDD10, HDD11 AND HDD12 ADDRESS EROSION AND SEDIMENT CONTROL FOR THE OVERALL SUBAQUEOUS SANITARY SEWER HDD PIPELINES INSTALLATION PROJECT. APPLICABLE DETAILS FOR THIS CONTRACT ARE CALLED OUT ON PLAN/PROFILE SHEETS. GENERAL EROSION CONTROL NOTES: 1. EROSION CONTROL MATTING IS REQUIRED IN ALL DISTURBED DITCH LINES OR OTHER AREAS OF CONCENTRATED FLOW. MATTING IS REQUIRED ON ALL DISTURBED SLOPES STEEPER THAN 3:1 SLOPES. 2. EXCAVATED SOIL SHALL NOT BE PLACED ON STREETS. 3. CONTRACTOR SHALL BE RESPONSIBLE FOR CLEANING THE STREETS DAILY FROM SEDIMENT TRACKED ON TO THEM. DESCRIPTION STABILIZATION TIMEFRAME STABILIZATION TIMEFRAME EXCEPTIONS PERMANENT DIKES, SWALES, DITCHES, & SLOPES 7 DAYS NONE SLOPES STEEPER THAN 3:1 7 DAYS IF SLOPES ARE 10' OR LESS IN LENGTH & ARE NOT STEEPER THAN 2:1, 14 DAYS ALLOWED SLOPES 3:1 OR FLATTER 14 DAYS 7 DAYS FOR SLOPES > 50' IN LENGTH ALL OTHER AREAS WITH SLOPES FLATTER THAN 4:1 14 DAYS NONE TABLE 1 LEGEND TEMP. GRAVEL CONSTRUCTION ENTRANCE TEMPORARY COIR LOG FENCE TEMPORARY TURBIDITY CURTAIN ■ • ■ ■ • 0-1 LaBelia mm Powered by partnership. 400 S. Tryon Street, Suite 1300 Charlotte, NC 28285 704-376-6423 labellapc.com \R" 00•03 CORPORATE ENGINEERING LICENSE NO. C-0430 © 2020 LaBella Associates Town of Lake Lure 2948 Memorial Highway PO Box 225 Lake Lure, NC 28746 Town of take North Carolina Subaqueous Sanitary Sewer HDD Pipelines installation Project NO: DATE: DESCRIPTION: Revisions PROJECT NUMBER: 2200559 DRAWN BY: REVIEWED BY: HMH BRH ISSUED FOR: REVIEW DATE: 6/10/2022 DRAWING NAME: EROSION CONTROL NOTES AND DETAILS DRAWING NUMBER: HDD1O 0-1 LaBelia mm Powered by partnership. 4 J H w uJ 0 c3 w U U = U QJ i cZup 'p C o = co tmcn o 0 =o m= U - NC) M o d' 5 N J N Y oM O J CDLf) wo EN i QJ L c6 (_ FILTER CLOTH SKIRT (DEPTH VARIES) • z FLOATING TURBIDITY CURTAIN FLOATATION SEGMENT WATER SURFACE BALLAST CHAIN —CHANNEL BOTTOM UNIVERSAL CONNECTOR TOP TENSION CABLE FLOATATION SEGMENT FOLD JOINT FOR STORAGE TOP LOAD LINE 0 0 0 0 0 0 0 0 0 0 0 0 • • • • l •• ♦♦♦• • • • • • • ♦�� • • SKIRT CONNECT GROMMETS FILTER CLOTH SKIRT (DEPTH VARIES) BALLAST CHAIN AND LOAD LINE TYPICAL ANCHORING PLAN FOR SHORELINE/RIVER EDGE WORK SHORE ANCHOR SHORELINE DISTURBED GROUND/WORK ZONE SHORE ANCHOR FLOATING TURBIDITY CURTAIN GENERAL NOTES 4:1 FLOATING TURBIDITY CURTAINS (ALSO KNOWN AS TURBIDITY BARRIERS OR 411 THE TURBIDITY CURTAIN AND ADJACENT WORK AREAS SHALL NOT BE SILT CURTAINS) CREATE A BARRIER TO PREVENT TURBID WATER FROM DISTURBED 12 HOURS PRIOR TO REMOVAL FROM WATER BODY. MAINTENANCE ENTERING CLEAR WATER. FLOATING TURBIDITY CURTAINS SHOULD BE USED SHALL BE PERFORMED AS NEEDED. CONTRACTOR SHALL REMOVE THE CURTAIN TO ISOLATE ACTIVE CONSTRUCTION AREAS WITHIN OR ADJACENT TO A BODY AT COMPLETION OF WORK IN A MANNER THAT WILL PREVENT SILTATION OF OF WATER TO MINIMIZE THE MIGRATION OF SILT LADEN WATER OUT OF THE THE WATERWAY. DURING REMOVAL, EXTREME CARE SHOULD BE TAKEN NOT TO CONSTRUCTION ZONE. DISTURB ANY SEDIMENT DEPOSITS. 411 TURBIDITY CURTAINS SHALL NOT BE INSTALLED PERPENDICULAR ACROSS THE 0 MAINTAIN 12" MINIMUM GAP BETWEEN SKIRT BOTTOM AND CHANNEL MAIN FLOW OF A SIGNIFICANT BODY OF MOVING WATER. BOTTOM TO PREVENT ACCUMULATED SEDIMENT FROM PULLING TOP OF CURTAIN BELOW WATER SURFACE. 42, FLOATING TURBIDITY CURTAINS SHALL NOT BE USED WHERE THE ANTICIPATED FLOW VELOCITIES WILL EXCEED 5 FT/SEC. 411 IN WIND OR WAVE ACTION SITUATIONS, THE MAXIMUM DEPTH OF THE CURTAIN SHALL BE 12 FEET. � TURBIDITY CURTAINS SHALL BE ANCHORED TO PREVENT DRIFT SHOREWARD OR DOWNSTREAM. ANCHORAGE SHALL BE INSTALLED ON BOTH SHORE 411 CONCENTRATED FLOWS SHALL NOT DISCHARGE BEYOND FLOATING TURBIDITY AND STREAM SIDE. CURTAINS SHALL BE INSTALLED AS CLOSE TO PROJECT CURTAIN. CURTAINS ARE NOT TO BE INSTALLED ACROSS FLOWING BODY OF SITE AS POSSIBLE. BARRIERS SHOULD BE A BRIGHT COLOR (YELLOW OR WATER. "INTERNATIONAL" ORANGE ARE RECOMMENDED) THAT WILL ATTRACT THE ATTENTION OF NEARBY BOATERS. © WHEN INSTALLED IN A NAVIGABLE WATERWAY, BUOYS SHOULD BE LIT ACCORDING TO REGULATORY AGENCY STANDARDS. 41) SHORE ANCHORS SHALL CONSIST OF A POST WITH DEADMAN OR APPROVED EQUAL. STREAM ANCHORS SHALL BE OF SUFFICIENT SIZE TO WHEN ESTIMATING THE LENGTH OF TURBIDITY CURTAIN, ALLOW 10 TO 20 Q STABILIZE THE BARRIER WITH NUMBER AND SPACING DEPENDENT ON PERCENT VARIANCE IN STRAIGHT LINE MEASUREMENT. WATERWAY VELOCITIES AND MANUFACTURER'S RECOMMENDATIONS. � FLOATING TURBIDITY CURTAIN SHALL BE PAID FOR UNDER THE FOLLOWING (II IN SHALLOW WATER (2 FEET OF DEPTH OR LESS) A TURBIDITY CURTAIN MAY BE INSTALLED ON STAKES DRIVEN INTO THE BED OF THE WATER BODY. ITEM NUMBERS: 209-13.04 TURBIDITY CURTAIN (DESCRIPTION) PER LINEAR FOOT 41) FABRIC SECTIONS SHALL BE CONNECTED END TO END WITH A MINIMUM 5/S INCH DIAMETER POLYPROPYLENE ROPE. FABRIC SHALL BE SEAMED 209-13.05 TURBIDITY CURTAIN (DESCRIPTION) PER LINEAR FOOT 209-13.06 TURBIDITY CURTAIN (DESCRIPTION) PER LINEAR FOOT TOGETHER IN A MANNER THAT RETAINS THE OVERALL TENSILE STRENGTH. 209-13.07 TURBIDITY CURTAIN (DESCRIPTION) PER LINEAR FOOT 209-13.08 TURBIDITY CURTAIN (DESCRIPTION) PER LINEAR FOOT 411 DESIGN OF CURTAIN AND ANCHORAGE SHALL BE IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS. FILTER CLOTH SKIRT SHOULD PAYMENT SHALL INCLUDE ALL MATERIAL AND LABOR NECESSARY FOR BE ABLE TO WITHSTAND THE FORCES IMPARTED ON IT DUE TO THE EXPECTED CONSTRUCTION, MAINTENANCE, AND REMOVAL OF TURBIDITY CURTAINS WIND VELOCITY OR STREAM VELOCITY. FABRIC SHALL BE MADE OF A NON - DETERIORATING MATERIAL, SUCH AS PLASTIC OR NYLON, WHICH WILL ALLOW 411 ONLY FLOATING TURBIDITY CURTAINS LISTED ON THE QUALIFIED PRODUCTS WATER TO PASS THROUGH WHILE STILL RETAINING SEDIMENT. LIST MAY BE USED. ANY PRODUCTS LISTED ON THE QUALIFIED PRODUCTS LIST AS AN APPROVED ALTERNATE IS ALSO ACCEPTABLE. 4 TURBIDITY CURTAIN a PLAN VIEW FLOW CLEAR WATER 0 0 TURBIDITY CURTAIN CHANNEL ANCHOR TYPICAL ANCHORING PLAN FOR MID CHANNEL WORK (BRIDGE PIER, CAISSON. ETC.) FLOATATION DEVICE DISTURBED GROUND/WORK ZONE PLAN VIEW TYPICAL ANCHORING SECTION CONTAINMENT SYSTEMS LIGHT BUOY BOTTOM OF WATER BODY TURBID WATER ATTACH LINES TO SHACKLE SECTION A -A WATER SURFACE FLOATATION DEVICES (BUOY) AUTOMATIC FLASHING LIGHT BUOY (ON AT DUSK -OFF AT DAWN) 100' ON CENTER SHALL BE USED IN NAVIGABLE CHANNELS ONLY EROSION CONTROL PLAN LEGEND: CLEAR WATER FILTER CLOTH SKIRT STREAM ANCHOR • FLOATING TURBIDITY CURTAIN TURBIDITY CURTAIN PHYSICAL PROPERTIES TURBIDITY CURTAIN OF FABRIC PHYSICAL PROPERTY MINIMUREQUIREMENTM THICKNESS, MILS 45 WEIGHT, OZ. / SQ. YD. 18 GRAB TENSILE STRENGTH, LBS. 300 UV INHIBITOR MUST BE INCLUDED APPARENT OPENING SIZE (AOS) FINER THAN OR EQUAL TO U.S. STANDARD SIEVE *70 400 S. Tryon Street, Suite 1300 Charlotte, NC 28285 704-376-6423 labellapc.com 450- „,\0-0 Oece CORPORATE ENGINEERING LICENSE NO. C-0430 © 2020 LaBella Associates Town of Lake Lure 2948 Memorial Highway PO Box 225 Lake Lure, NC 28746 Town of _take North Carolina Subaqueous Sanitary Sewer HDD Pipelines installation Project NO: DATE: DESCRIPTION: Revisions PROJECT NUMBER: 2200559 DRAWN BY: REVIEWED BY: HMH BRH ISSUED FOR: REVIEW DATE: 6/10/2022 DRAWING NAME: EROSION CONTROL NOTES AND DETAILS DRAWING NUMBER: HDD11 GROUND STABILIZATION AND MATERIALS HANDLING PRACTICES FOR COMPLIANCE WITH THE NCGO1 CONSTRUCTION GENERAL PERMIT Implementing the details and specifications on this plan sheet will result in the construction activity being considered compliant with the Ground Stabilization and Materials Handling sections of the NCGO1 Construction General Permit (Sections E and F, respectively). The permittee shall comply with the Erosion and Sediment Control plan approved by the delegated authority having jurisdiction. All details and specifications shown on this sheet may not apply depending on site conditions and the delegated authority having jurisdiction. SECTION E: GROUND STABILIZATION Required Ground Stabilization Timeframes Stabilize within this Site Area Description many calendar Timeframe variations days after ceasing land disturbance (a) Perimeter dikes, swales, ditches, and perimeter slopes 7 None (b)High gh Quality Water 7 None (HQW) Zones (c) Slopes steeper than If slopes are 10' or less in length and are 3:1 7 not steeper than 2:1, 14 days are allowed -7 days for slopes greater than 50' in length and with slopes steeper than 4:1 (d) Slopes 3:1 to 4:1 14 -7 days for perimeter dikes, swales, ditches, perimeter slopes and HQW Zones -10 days for Falls Lake Watershed (e) Areas with slopes -7 days for perimeter dikes, swales, ditches, perimeter slopes and HQW Zones flatter than 4:1 14 -10 days for Falls Lake Watershed unless there is zero slope Note: After the permanent cessation of construction activities, any areas with temporary ground stabilization shall be converted to permanent ground stabilization as soon as practicable but in no case longer than 90 calendar days after the last land disturbing activity. Temporary ground stabilization shall be maintained in a manner to render the surface stable against accelerated erosion until permanent ground stabilization is achieved. GROUND STABILIZATION SPECIFICATION will not dislodge the soil. Use one of the Stabilize the ground sufficiently so that rain techniques in the table below: Temporary Stabilization Permanent Stabilization • Temporary grass seed covered with straw or other mulches and tackifiers • Hydroseeding • Rolled erosion control products with or without temporary grass seed • Appropriately applied straw or other mulch • Plastic sheeting • Permanent grass seed covered with straw or other mulches and tackifiers • Geotextile fabrics such as permanent soil reinforcement matting • Hydroseeding • Shrubs or other permanent plantings covered with mulch • Uniform and evenly distributed ground cover sufficient to restrain erosion • Structural methods such as concrete, asphalt or retaining walls • Rolled erosion control products with grass seed POLYACRYLAMIDES (PAMS) AND FLOCCULANTS 1. Select flocculants that are appropriate for the soils being exposed during construction, selecting from the NC DWR List of Approved PAMS/Flocculants. 2. Apply flocculants at or before the inlets to Erosion and Sediment Control Measures. 3. Apply flocculants at the concentrations specified in the NC DWR List of Approved PAMS/Flocculants and in accordance with the manufacturer's instructions. 4. Provide ponding area for containment of treated Stormwater before discharging offsite. 5. Store flocculants in leak -proof containers that are kept under storm -resistant cover or surrounded by secondary containment structures. EQUIPMENT AND VEHICLE MAINTENANCE 1. Maintain vehicles and equipment to prevent discharge of fluids. 2. Provide drip pans under any stored equipment. 3. Identify leaks and repair as soon as feasible, or remove leaking equipment from the project. 4. Collect all spent fluids, store in separate containers and properly dispose as hazardous waste (recycle when possible). 5. Remove leaking vehicles and construction equipment from service until the problem has been corrected. 6. Bring used fuels, lubricants, coolants, hydraulic fluids and other petroleum products to a recycling or disposal center that handles these materials. LITTER, BUILDING MATERIAL AND LAND CLEARING WASTE 1. Never bury or burn waste. Place litter and debris in approved waste containers. 2. Provide a sufficient number and size of waste containers (e.g dumpster, trash receptacle) on site to contain construction and domestic wastes. 3. Locate waste containers at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 4. Locate waste containers on areas that do not receive substantial amounts of runoff from upland areas and does not drain directly to a storm drain, stream or wetland. 5. Cover waste containers at the end of each workday and before storm events or provide secondary containment. Repair or replace damaged waste containers. 6. Anchor all lightweight items in waste containers during times of high winds. 7. Empty waste containers as needed to prevent overflow. Clean up immediately if containers overflow. 8. Dispose waste off -site at an approved disposal facility. 9. On business days, clean up and dispose of waste in designated waste containers. PAINT AND OTHER LIQUID WASTE 1. Do not dump paint and other liquid waste into storm drains, streams or wetlands. 2. Locate paint washouts at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 3. Contain liquid wastes in a controlled area. 4. Containment must be labeled, sized and placed appropriately for the needs of site. 5. Prevent the discharge of soaps, solvents, detergents and other liquid wastes from construction sites. PORTABLE TOILETS 1. Install portable toilets on level ground, at least 50 feet away from storm drains, streams or wetlands unless there is no alternative reasonably available. If 50 foot offset is not attainable, provide relocation of portable toilet behind silt fence or place on a gravel pad and surround with sand bags. 2. Provide staking or anchoring of portable toilets during periods of high winds or in high foot traffic areas. 3. Monitor portable toilets for leaking and properly dispose of any leaked material. Utilize a licensed sanitary waste hauler to remove leaking portable toilets and replace with properly operating unit. EARTHEN STOCKPILE MANAGEMENT 1. Show stockpile locations on plans. Locate earthen -material stockpile areas at least 50 feet away from storm drain inlets, sediment basins, perimeter sediment controls and surface waters unless it can be shown no other alternatives are reasonably available. 2. Protect stockpile with silt fence installed along toe of slope with a minimum offset of five feet from the toe of stockpile. 3. Provide stable stone access point when feasible. 4. Stabilize stockpile within the timeframes provided on this sheet and in accordance with the approved plan and any additional requirements. Soil stabilization is defined as vegetative, physical or chemical coverage techniques that will restrain accelerated erosion on disturbed soils for temporary or permanent control needs. NORTH CAROLINA Environmental Quality SAI®1!• CYR, OR STORES CLEARLY WANED IMAM MTOIO EVOi (UMW MO I I E ONSITE CONCRETE WASHOUT STRUCTURE WITH LINER MOWN R,.> OR STAPLES FELL TOIISA ETOIOO N eau E M COMTE WART SIRLICIYIES OWL E NWTANO NON M LOCI MOM MD REACHES TO: OF 0[ S1NCICNEi SCNSSTE AIA••OT STRUCTURE PEERS TO E CLEW 100 VIM UMW TOTING &NICE BELOW GRAD Ad H/'LFUT STRUCTURE WOG EWE WNW NOL) ELAN. 10 STAPLER 1. i1C1 AL LRCM= R10000 nI10 Z. M maTE WL•EWT STOC•L E NWOI TL1 00 LMILLWIEN M AUB NOM MUD MOM TO O' M ST01CTli OPACOT TO AOVOE AE•0E IELEO OPACITY VIM A I00SM IL NOO OF n00000L amocNE WORM Sm1COz 00 TO E CLOW NWLO WIO 7. MR MIT.• REVEL ABOVE GRAD rUT STRUCTURE CONCRETE WASHOUTS 1. Do not discharge concrete or cement slurryfrom the site. g 2. Disposeor recycle of, settled, hardened concrete residue in accordance with local and state solid waste regulations and at an approved facility. 3. Manage washout from mortar mixers in accordance with the above item and in addition place the mixer and associated materials on impervious barrier and within lot perimeter silt fence. 4. Install temporary concrete washouts per local requirements, where applicable. If an alternate method or product is to be used, contact your approval authority for review and approval. If local standard details are not available, use one of the two types of temporary concrete washouts provided on this detail. Yp P Y 5. Do not use concrete washouts for dewatering or storing defective curb or sidewalk sections. Stormwater accumulated within the washout may not be pumped into or discharged to the storm drain system or receiving surface waters. Liquid waste must be pumped out and removed from project. 6. Locate washouts at least 50 feet from storm drain inlets and surface waters unless it can be shown that no other alternatives are reasonably available. At a minimum, install protection of storm drain inlet(s) closest to the washout which could receive spills or overflow. 7. Locate washouts in an easily accessible area, on level ground and install a stone entrance pad in front of the washout. Additional controls may be required by the approving authority. 8. Install at least one sign directing concrete trucks to the washout within the project limits. Post signage on the washout itself to identify this location. 9. Remove leavings from the washout when at approximately 75% capacity to limit overflow events. Replace the tarp, sand bags or other temporary structural components when no longer functional. When utilizing alternative or proprietary products, follow manufacturer's instructions. 10. At the completion of the concrete work, remove remaining leavings and dispose of in an approved disposal facility. Fill pit, if applicable, and stabilize any disturbance caused by removal of washout. HERBICIDES, PESTICIDES AND RODENTICIDES 1. Store and apply herbicides, pesticides and rodenticides in accordance with label restrictions. 2. Store herbicides, pesticides and rodenticides in their original containers with the label, which lists directions for use, ingredients and first aid steps in case of accidental poisoning. 3. Do not store herbicides, pesticides and rodenticides in areas where flooding is possible or where they may spill or leak into wells, stormwater drains, ground water or surface water. If a spill occurs, clean area immediately. 4. Do not stockpile these materials onsite. HAZARDOUS AND TOXIC WASTE 1. Create designated hazardous waste collection areas on -site. 2. Place hazardous waste containers under cover or in secondary containment. 3. Do not store hazardous chemicals, drums or bagged materials directly on the ground. NCGO1 GROUND STABILIZATION AND MATERIALS HANDLING EFFECTIVE: 04/01/19 SELF -INSPECTION, SECTION A: SELF -INSPECTION PART III RECORDKEEPING AND REPORTING normal business hours in accordance with the table site conditions would cause the safety of the inspection may be delayed until the next business day on In addition, when a storm event of equal to or of normal business hours, the self -inspection shall be of the next business day. Any time when inspections Inspection Record. Self -inspections are required during below. When adverse weather or personnel to be in jeopardy, the inspection which it is safe to perform the inspection. greater than 1.0 inch occurs outside performed upon the commencement were delayed shall be noted in the Inspect Frequency (during normal business hours) Inspection records must include: (1) Rain gauge maintained in good working order Daily Daily rainfall amounts. If no daily rain gauge observations are made during weekend or holiday periods, and no individual -day rainfall information is available, record the cumulative rain measurement for those un- attended days (anc this will determine if a site inspection is needed). Days on which no rainfall occurred shall be recorded as "zero." The permittee may use another rain -monitoring device approved by the Division. (2) E&SC Measures At least once per 7 calendar days and within 24 hours of a rain event > 1.0 inch in 24 hours 1. Identification of the measures inspected, 2. Date and time of the inspection, 3. Name of the person performing the inspection, 4. Indication of whether the measures were operating properly, 5. Description of maintenance needs for the measure, 6. Description, evidence, and date of corrective actions taken. (3) Stormwater discharge outfalls (SDCs) At least once per 7 calendar days and within 24 hours of a rain event > 1.0 inch in 24 hours 1. Identification of the discharge outfalls inspected, 2. Date and time of the inspection, 3. Name of the person performing the inspection, 4. Evidence of indicators of stormwater pollution such as oil sheen, floating or suspended solids or discoloration, 5. Indication of visible sediment leaving the site, 6. Description, evidence, and date of corrective actions taken. (4) Perimeter of site At least once per 7 calendar days and within 24 hours of a rain event > 1.0 inch in 24 hours If visible sedimentation is found outside site limits, then a record of the following shall be made: 1. Actions taken to clean up or stabilize the sediment that has left the site limits, 2. Description, evidence, and date of corrective actions taken, and 3. An explanation as to the actions taken to control future releases. (5) Streams or wetlands onsite or offsite (where accessible) At least once per 7 calendar days and within 24 hours of a rain event > 1.0 inch in 24 hours If the stream or wetland has increased visible sedimentation or a stream has visible increased turbidity from the construction activity, then a record of the following shall be made: 1. Description, evidence and date of corrective actions taken, and 2. Records of the required reports to the appropriate Division Regional Office per Part III, Section C, Item (2)(a) of this permit. (6) Ground stabilization measures After each phase of grading 1. The phase of grading (installation of perimeter E&SC measures, clearing and grubbing, installation of storm drainage facilities, completion of all land -disturbing activity, construction or redevelopment, permanent ground cover). 2. Documentation that the required ground stabilization measures have been provided within the required timeframe or an assurance that they will be provided as soon as possible. NOTE: The rain inspection resets the required 7 calendar day inspection requirement. SELF -INSPECTION, RECORDKEEPING SECTION B: RECORDKEEPING PART III AND REPORTING deviation shall be kept on the site. The throughout the coverage under this permit. plan shall be kept on site and available for hours. 1. 2. 3. E&SC Plan Documentation The approved E&SC plan as well as any approved approved E&SC plan must be kept up-to-date The following items pertaining to the E&SC inspection at all times during normal business Item to Document Documentation Requirements (a) Each E&SC measure has been installed and does not significantly deviate from the locations, dimensions and relative elevations shown on the approved E&SC plan. Initial and date each E&SC measure on a copy of the approved E&SC plan or complete, date and sign an inspection report that lists each E&SC measure shown on the approved E&SC plan. This documentation is required upon the initial installation of the E&SC measures or if the E&SC measures are modified after initial installation. (b) A phase of grading has been completed. Initial and date a copy of the approved E&SC plan or complete, date and sign an inspection report to indicate completion of the construction phase. (c) Ground cover is located and installed in accordance with the approved E&SC plan. Initial and date a copy of the approved E&SC plan or complete, date and sign an inspection report to indicate compliance with approved ground cover specifications. (d) The maintenance and repair requirements for all E&SC measures have been performed. Complete, date and sign an inspection report. (e) Corrective actions have been taken to E&SC measures. Initial and date a copy of the approved E&SC plan or complete, date and sign an inspection report to indicate the completion of the corrective action. Additional Documentation to be Kept on Site In addition to the E&SC plan documents above, the following items shall be kept on the site and available for inspectors at all times during normal business hours, unless the Division provides a site -specific exemption based on unique site conditions that make this requirement not practical: (a) This General Permit as well as the Certificate of Coverage, after it is received. (b) Records of inspections made during the previous twelve months. The permittee shall record the required observations on the Inspection Record Form provided by the Division or a similar inspection form that includes all the required elements. Use of electronically -available records in lieu of the required paper copies will be allowed if shown to provide equal access and utility as the hard -copy records. Documentation to be Retained for Three Years All data used to complete the e-NOI and all inspection records shall be maintained for a period of three years after project completion and made available upon request. [40 CFR 122.41] PART II, SECTION G, ITEM (4) DRAW DOWN OF SEDIMENT BASINS FOR MAINTENANCE OR CLOSE OUT Sediment basins and traps that receive runoff from drainage areas of one acre or more shall use outlet structures that withdraw water from the surface when these devices need to be drawn down for maintenance or close out unless this is infeasible. The circumstances in which it is not feasible to withdraw water from the surface shall be rare (for example, times with extended cold weather). Non -surface withdrawals from sediment basins shall be allowed only when all of the following criteria have been met: (a) (b) (c) (d) (e) (f) The E&SC plan authority has been provided with documentation of the non -surface withdrawal and the specific time periods or conditions in which it will occur. The non -surface withdrawal shall not commence until the E&SC plan authority has approved these items, The non -surface withdrawal has been reported as an anticipated bypass in accordance with Part III, Section C, Item (2)(c) and (d) of this permit, Dewatering discharges are treated with controls to minimize discharges of pollutants from stormwater that is removed from the sediment basin. Examples of appropriate controls include properly sited, designed and maintained dewatering tanks, weir tanks, and filtration systems, Vegetated, upland areas of the sites or a properly designed stone pad is used to the extent feasible at the outlet of the dewatering treatment devices described in Item (c) above, Velocity dissipation devices such as check dams, sediment traps, and riprap are provided at the discharge points of all dewatering devices, and Sediment removed from the dewatering treatment devices described in Item (c) above is disposed of in a manner that does not cause deposition of sediment into waters of the United States. PART III SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION C: REPORTING 1. Occurrences that Must be Reported Permittees shall report the following occurrences: (a) Visible sediment deposition in a stream or wetland. (b) Oil spills if: • They are 25 gallons or more, • They are less than 25 gallons but cannot be cleaned up within 24 hours, • They cause sheen on surface waters (regardless of volume), or • They are within 100 feet of surface waters (regardless of volume). (c) Releases of hazardous substances in excess of reportable quantities under Section 311 of the Clean Water Act (Ref: 40 CFR 110.3 and 40 CFR 117.3) or Section 102 of CERCLA (Ref: 40 CFR 302.4) or G.S. 143-215.85. (d) Anticipated bypasses and unanticipated bypasses. (e) Noncompliance with the conditions of this permit that may endanger health or the environment. 2. Reporting Timeframes and Other Requirements After a permittee becomes aware of an occurrence that must be reported, he shall contact the appropriate Division regional office within the timeframes and in accordance with the other requirements listed below. Occurrences outside normal business hours may also be reported to the Department's Environmental Emergency Center personnel at (800) 858-0368. Occurrence Reporting Timeframes (After Discovery) and Other Requirements (a) Visible sediment deposition in a stream or wetland • Within 24 hours, an oral or electronic notification. • Within 7 calendar days, a report that contains a description of the sediment and actions taken to address the cause of the deposition. Division staff may waive the requirement for a written report on a case -by -case basis. • If the stream is named on the NC 303(d) list as impaired for sediment - related causes, the permittee may be required to perform additional monitoring, inspections or apply more stringent practices if staff determine that additional requirements are needed to assure compliance with the federal or state impaired -waters conditions. (b) Oil spills and release of hazardous substances per Item 1(b)-(c) above • Within 24 hours, an oral or electronic notification. The notification shall include information about the date, time, nature, volume and location of the spill cr release. (c) Anticipated bypasses [40 CFR 122.41(m)(3)] • A report at least ten days before the date of the bypass, if possible. The report shall include an evaluation of the anticipated quality and effect of the bypass. (d) Unanticipated bypasses [40 CFR 122.41(m)(3)] • Within 24 hours, an oral or electronic notification. • Within 7 calendar days, a report that includes an evaluation of the quality and effect of the bypass. (e) Noncompliance with the conditions of this permit that may endanger health or the environment[40 CFR 122.41(I)(7)] • Within24hours, an oral or electronic notification. • Within 7 calendar days, a report that contains a description of the noncompliance, and its causes; the period of noncompliance, including exact dates and times, and if the noncompliance has not been corrected, the anticipated time noncompliance is expected to continue; and steps taken or planned to reduce, eliminate, and prevent reoccurrence of the noncompliance. [40 CFR 122.41(1)(6). • Division staff may waive the requirement for a written report on a case -by -case basis. NORTH CAROLINA Environmental Quality GENERAL NOTES 1. ALL WORK IS TO BE PERFORMED WITHIN THE PUBLIC RIGHT-OF-WAY, TOWN CONTROLLED LAKE BOUNDARY BELOW ELEVATION 990.5, LEGALLY OBTAINED EASEMENTS, AND/OR LEGALLY OBTAINED PROPERTY. THE CONTRACTOR ASSUMES ALL PERTINENT LIABILITIES WITHIN THESE AREAS. THE LIMITS OF DISTURBANCE SHALL BE CONFINED TO THESE AREAS, UNLESS OTHERWISE AND MORE RESTRICTIVELY INDICATED. 2. ALL CHANGES MADE DURING THE CONSTRUCTION PHASE SHALL BE APPROVED BY THE ENGINEER PRIOR TO CONSTRUCTION. 3. THE CONTRACTOR SHALL COORDINATE ALL CONNECTION AND TESTING ACTIVITIES WITH THE TOWN OF LAKE LURE. 4. EXISTING UTILITY LOCATIONS SHOWN ON THE CONSTRUCTION PLANS WERE COMPILED BASED ON INFORMATION AVAILABLE TO THE ENGINEER. THESE LOCATIONS ARE NOT INTENDED TO BE EXACT OR COMPLETE. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING ALL EXISTING UTILITY LOCATIONS AND ELEVATIONS WITH THE APPROPRIATE UTILITY COMPANIES. THE CONTRACTOR AGREES TO TAKE FULL RESPONSIBILITY FOR ANY AND ALL DAMAGES TO UTILITIES THAT MAY OCCUR DUE TO FAILURE TO EXACTLY LOCATE AND PROTECT ALL EXISTING UTILITIES. THE CONTRACTOR SHALL VERIFY LOCATIONS AND ELEVATIONS OF ALL EXISTING UTILITIES PRIOR TO CONSTRUCTION BY CONTACTING NORTH CAROLINA ONE -CALL (1-800-632-4949) OR THE APPROPRIATE UTILITY AUTHORITY AT LEAST FORTY-EIGHT (48) HOURS PRIOR TO PERFORMING ANY EXCAVATION. 5. THE CONTRACTOR SHALL RESTORE TO THEIR ORIGINAL STATE ALL CULVERTS, WALLS, GATES, FENCES, HEDGES, SHRUBS, MAIL BOXES, DRIVEWAYS, LIGHT POLES, POWER POLES, GUY WIRES, SIGNS, WATER LINES, GAS LINES, GAS VALVES, TELEPHONE PEDESTALS, WATER METERS, WATER VALVES, SANITARY SEWERS, SANITARY SERVICE LATERALS, LAWNS AND ANY OTHER EXISTING ITEMS DISTURBED OR MOVED DUE TO CONSTRUCTION. FINISHED AREAS CONTIGUOUS TO RESIDENTIAL LAWNS SHALL BE LANDSCAPED IN A MANNER SUCH THAT SOIL PARTICLES SHALL NOT EXCEED 1 4 INCHES IN DIAMETER. 6. ALL WORK MUST BE PERFORMED WITHOUT DISRUPTING THE OPERATION OF ANY EXISTING SANITARY SEWER OR WATER SERVICE. 7. THE CONTRACTOR SHALL USE CAUTION WHEN WORKING AROUND EXISTING GAS, SEWER, WATER, TELEPHONE, FIBER OPTIC, OR CATV SERVICE LINES AND LATERALS, AND OTHER UTILITIES. ANY EXISTING UTILITY DAMAGE DURING CONSTRUCTION MUST BE REPLACED OR REPAIRED IMMEDIATELY. THE CONTRACTOR SHALL COORDINATE ANY NECESSARY UTILITY REPLACEMENT OR REPAIR OF THE UTILITY ONLY AFTER RECEIVING APPROVAL TO DO THE WORK FROM THE UTILITY OWNER. ANY AUTHORIZED REPAIRS ARE TO BE PER THE UTILITY OWNER'S APPROVED SPECIFICATIONS AND MATERIALS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL ASSOCIATED REPAIR COSTS. 8. THE CONTRACTOR SHALL COMPLY WITH ALL APPLICABLE OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION REGULATIONS. 9. DISTURBED PAVEMENT IN ROADWAYS SHALL BE TEMPORARILY OR PERMANENTLY REPAIRED/REPLACED WITH ASPHALT THE SAME WORKING DAY. 10. ACCESS TO PRIVATE PROPERTY AND BUSINESSES FROM THE PROJECT AREA SHALL BE MAINTAINED AT ALL TIMES. 11. TRAFFIC CONTROL IS REQUIRED FOR ALL CONSTRUCTION ACTIVITIES WITH 15' OF THE EDGE OF ANY ROADWAY. TRAFFIC CONTROL DEVICES, PRACTICES, AND PROCEDURES SHALL BE IN ACCORDANCE WITH THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD) MILLENNIUM EDITION BY THE FEDERAL HIGHWAY ADMINISTRATION AND THE REFERENCED CITY STANDARDS. 12. TREES AND SHRUBS WITHIN THE WORK LIMITS THAT ARE TO REMAIN, AND THOSE BEYOND THE RIGHT-OF-WAY OR LEGALLY OBTAINED EASEMENTS ADJACENT THE CONSTRUCTION, SHALL BE PROTECTED AS REQUIRED TO PREVENT DAMAGE. LIMBS THAT ARE BROKEN OR DAMAGED SHALL BE NEATLY TRIMMED AND REMOVED AT THE TREE TRUNK OR NEXT LARGEST BRANCH AS DIRECTED. WHEN ROOT PRUNING IS NECESSARY, CUT ROOTS CLEANLY USING A DISC TRENCHER ROOTS AND LIMBS TRIMMED THAT ARE LARGER THAN TWO INCHES IN DIAMETER SHALL HAVE IMMEDIATELY APPLIED AT THE BASE OF THE CUT A WOUND DRESSING SPECIFICALLY DESIGNED FOR TREE CUTS. INSTALLATION OF TREE WOUND DRESSING SHALL PER IN ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS. 0-1 LaBelia mm Powered by partnership. 400 S. Tryon Street, Suite 1300 Charlotte, NC 28285 704-376-6423 labellapc.com \•\,c)00' 00•03 CORPORATE ENGINEERING LICENSE NO. C-0430 © 2020 LaBella Associates Town of Lake Lure 2948 Memorial Highway PO Box 225 Lake Lure, NC 28746 4ZNorth Carolina Subaqueous Sanitary Sewer HDD Pipelines installation Project NO: DATE: DESCRIPTION: Revisions PROJECT NUMBER: 2200559 DRAWN BY: REVIEWED BY: HMH BRH ISSUED FOR: REVIEW DATE: 6/10/2022 DRAWING NAME: EROSION CONTROL NOTES AND DETAILS DRAWING NUMBER: NCGO1 SELF -INSPECTION, RECORDKEEPING AND REPORTING EFFECTIVE: 04/01/19 HDD12