Loading...
HomeMy WebLinkAboutNCG180086_Compliance Inspection_202110150' ROY COOPER Governor ELIZABETH S. BISER Secretary BRIAN WRENN Director NORTH CAROLINA EnviroamewW QuaUty October 15, 2021 Hickory White Manufacturing Attention: Kim White, EHS Coordinator 9 Lenoir Rhyne Blvd. Hickory, North Carolina 28602 Subject: Compliance Inspection NPDES Stormwater Certicate of Coverage- NCG 180086 Catawba County, North Carolina Dear Ms. White: Enclosed please find a copy of the Compliance Evaluation Inspection Reports for the inspections we conducted at the Hickory White Manufacturing facility October 13, 2021. The reports should be self-explanatory; however, should you have any questions concerning these reports, please do not hesitate to contact meat james.moo remncdenr.gov 704-235-2138 or Christopher Graybeal at christophen raybeal;a;ncdenr.gov (704) 235-2147. Sincerely, 'tea' � J es Moore ssistant Regional Engineer Land Quality Section Enclosure c: Stormwater Laserfiche NCG180086 North Carolina Department of Environmental Quality! Division of Energy, Mineral and Land Resources Mooresville Regional Office; 610 East Center Avenue, Suite 301 Mooresville, North Carolina 29115 704-663-1699 Compliance Inspection Report Permit: NCG180086 Effective: 04/13/20 Expiration: 05/31/24 Owner: Hws Co Inc SOC: Effective: Expiration: Facility: Hws Co Inc-DBA Hickory White County: Catawba 9 Lenoir Rhyne Blvd Region: Mooresville Hickory NC 28602 Contact Person: William E Smith Title: Phone: 828-322-2640 Directions to Facility: System Classifications: SWNC, Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 10/13/2021 Entry Time 01:30PM Primary Inspector: Christopher Graybeal Secondary Inspector(s): Certification: Phone: Exit Time: 03:30PM Phone: 704-663-1699 Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Furniture and Fixtures Stormwater Discharge COC Facility Status: Compliant M Not Compliant Question Areas: 0 Storm Water (See attachment summary) Page 1 of 3 Permit: NCG180086 Owner - Facility: Hws Co Inc Inspection Date: 10/13/2021 Inspection Type: Compliance Evaluation Reason for Visit: Routine Inspection Summary: It is recommended that representative outfalls be designated with signage or paint. A lock and chain should be installed on the drain line valve connected to the outside bulk chemical storage tank containment. This will ensure the drain valve stays in the closed position. Totes located in the rear of facility near the parking lot should be covered to prevent rainfall from refilling the totes via holes cut in the tops. Page 2 of 3 Permit: NCG180086 Owner - Facility: Hws Co Inc Inspection Date: 10/13/2021 Inspection Type: Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? 0 ❑ ❑ ❑ # Does the Plan include a General Location (USGS) map? 0 ❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? N ❑ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? 0 ❑ ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? ❑ N ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? ❑ N Cl ❑ # Does the facility provide all necessary secondary. containment? 0 ❑ ❑ ❑ # Does the Plan include a BMP summary? N ❑ ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? E ❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? E ❑ ❑ ❑ # Does the facility provide and document Employee Training? N ❑ ❑ ❑ # Does the Plan include a list of Responsible Party(s)? 0 ❑ ❑ ❑ # Is the Plan reviewed and updated annually? ❑ ❑ ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? ❑ ❑ ❑ Comment: It is recommended that copies of the annual facility stormwater-inspection. SWPPP udates or amendments, and employee training be incorporated into the SWPPP notebook. Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? 0 ❑ ❑ ❑ Comment: Qualitative monitoring was reviewed and determined to be current. Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? 0 ❑ ❑ ❑ # Were all outfalls observed during the inspection? 0 ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? 0 ❑ ❑ ❑ # Has the facility evaluated all illicit (non stormwater) discharges? 0 ❑ ❑ ❑ Comment: It is recommended that representative outfalls be labeled with signa a or paint to correspond with the site map. Page 3 of 3