Loading...
HomeMy WebLinkAboutNCG160217_Monitoring Report_20210916Geological Resources, Inc. September 13, 2021 �FP Ms. Lily Kay jh`9j�`Q Land Quality Division dOoFnk. 1Q MOo Q °sy'°gPys�<p ?, Division of Energy, Mineral, and Land Resources North Carolina Department of Environmental Quality o`a Mooresville Regional Office 610 E. Center Ave. Suite 301 Mooresville, North Carolina 28115 RE: Discharge Monitoring Report— May 2021 (First Semi -Annual Period of 2021) Monroe Asphalt Plant 2318 Concord Highway Monroe, Union County, North Carolina General Permit Number NCG160000 Certificate of Coverage No: NCG160217 GRI No. 2433 Dear Ms. Kay: On behalf of Boggs Materials, Inc. (Boggs), please find attached results of stormwater outfall sampling that was conducted on May 12, 2021 forthe Monroe Asphalt Plantfacility in Monroe, Union County, North Carolina. Water samples were collected from the outfalls SDO-1 through SDO-4 by Boggs personnel on May 12, 2021 in accordance with the SWPPP and sampling requirements of the permit. Please note that per Boggs personnel, there was no discharge from outfall SDO-5 and therefore, no samples could be collected from this outfall. Water samples were analyzed for total suspended solids (TSS) and non -polar oil & grease. The May 2021 sampling results indicated that both TSS levels and oil & grease levels in SDO-1 exceeded permit levels. There were no detectable concentrations of either TSS or oil & grease in any of the other outfall samples (SDO-2 through SDO- 4). The Stormwater Discharge Outfall Monitoring Report is included in Appendix A, the Stormwater Discharge Outfall Qualitative Monitoring Report is included in Appendix B, and a complete laboratory analytical report is included as Appendix C. 3502 Hayes Road • Monroe, North Carolina 28110 113 West Firetower Road, Suite G • Winterville, North Carolina 28590 Phone (704) 845-4010 • (888) 870-4133 • Fax (704) 845-4012 Discharge Monitoring Report — May 2021 (First Semi -Annual Period of 2021) Monroe Asphalt Plant Monroe, Union County, North Carolina Certificate of Coverage No: NCG160217 Page 2 of 2 The next sampling event is scheduled to be conducted between July and December 2021 during a representative rainfall event. Please do not hesitate to contact me at (704) 845-4010, if you have any questions or comments. Sincerely, Rohit Shetty, P.E. Senior Engineer cc: Charles Barrino and Amy Frick, Boggs Materials, Inc./Contractors Management Services Division of Water Resources Central Files, NCDEQ, 1617 Mail Service Center, Raleigh, NC 27699-1617 file enclosures 3502 Hayes Road • Monroe, North Carolina 28110 113 West Firetower Road, Suite G • Winterville, North Carolina 28590 Phone (704) 845-4010 • (888) 870.4133 • Fax (704) 845-4012 53:)ION3ddV MOM JNIIIOIINOVII iivnnO 39HVH:)SIa a31VMVYkIOIS d XIaN3ddd Semi-annual Stormwater Discharge Monitoring Report (DMR) for North Carolina DEMLR General Permit No. NCG160000 - Asphalt Date submitted 0511212021 CERTIFICATE OF COVERAGE NO. NCG160217 FACILITY NAME MONROE ASPHALT PLANT COUNTY UNION PERSON COLLECTING SAMPLES MICHAEL C. RAMIREZ LABORATORYSGS North America Inc. Lab Cert. # 573 2 Comments on sample collection or analysis: 0 d ti TJ N ' o m M RI "oZ l7 M Part A: Stormwater Benchmarks and Monitoring Results a o C 00 m SAMPLE COLLECTION YEAR 2021 SAMPLE PERIOD ❑E Jan -June ❑ July -Dec or ❑ Monthly' (month) DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA ❑Zero -flow ❑Water Supply [:]SA ❑Other PLEASE REMEMBER TO SIGN ON THE REVERSE —> Outfall No. Date Sample Collected, (mo/dd/yr) 24-hour rainfall amount, Inches; Total Suspended Solids Benchmarks => - - 100 mg/L or 50 mg/L4 SDO-1 05/12/2021 0.08 190 SDO-2 05/12/2021 0.08 <25 SDO-3 05/12/2021 0.08 <25 SDO-4 05/12/2021 0.08 <25 No discharge this periodj2 'Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. ZFor sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a check mark here. }The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge 4requirement. See General Permit text, Table 1, identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Note: Results must be reported in numerical format. For example, do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non - numerical format. When results are below the applicable limits, they must be reported in the format. "<XX me/L". where XX is the numerical value of the detection limit, reporting limit, quantitation limit, etc. in mg/L. Note: If you report a sample value in excess of the benchmark, you must implement tier 1, Tier 2, or Tier 3 responses. See General Permit text. Permit Date: 08/01/2019-05/31/2024 SWU-252, last revised 09/04/2019 Page 1 of 2 Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. ❑ No discharge this period?2 Outfall No. Date Sample Collected' (mo/dd/yr) 24-hour rainfall amount, IncheO Non -polar O&G by EPA 1664 (SGT-HEM) Total Suspended Solids New Motor oil or Hydraulic Oil Usage, Annual average gal/mo Benchmarks > - - 15 mg/L 100 /L or 50 mg/O _ SDO-1 05/12/2021 0.08 18.9 190 SDO-2 05/12/2021 0.08 __T <4.7 <25 SDO-3 05/12/2021 0.08 <5.0 <25 Footnotes from Part A also apply to this Part B SDO-4 05/12/2021 0.08 <4.8 <25 Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, 7ier 2, or Trer 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS: • A SINGLE BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDANCES FOR THE SAME PARAMETER AT ANYONE OUTFALL? YES ❑ NO Q IF YES, HAVE YOU CONTACTED THE DEMLR REGIONAL OFFICE AS REQUIRED BYTHE PERMIT? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: LILY KAY Mail an original and one copy of this DMR, including all "No Discharge" reports, within 30 days of receipt of the lab results for at end of monitoring Period in the case of "No Discharge" reports) to: Division of Water Resources Attn: DWR Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature of P$rrnittee) q - (tS-Zt (Date) Permit Date: 08/01/2019-05/31/2024 SWU-252, last revised 09/04/2019 Page 2 of 2 MUM 9NIU011NOW 3AIlVIlivno livdinO 3quvH:)510 H31VMVMHO1S e XION3ddd Environmental Quality Stormwater Discharge Outfall (SDO) Qualitative Monitoring Report For guidance on filling out this form, please visit https://deg.nc.eov/about/divisions/energy-mineral-land- resources/ener_v-m i neral-land-oerm its/stormwater-Mrni its/n odes-industrial-sw#tab-4 Permit No.: N/C/ 1 / 6 / 0 / 0 / 0 / 0 /_/ or Certificate of Coverage No.: N/C/G/ I / 6 /0 /2 / 1 / 7 / Facility Name: MONROE ASPHALT PLANT County: UNION Ph Inspector: Michael C, Ramirez Date of Inspection: 11/12/2020 Time of Inspection: 1:30PM Total Event Precipitation (inches): 4.1 No. 704-995-9786 o h 9 y MPo esniae e, e 'e9io ark fee All permits require qualitative monitoring to be performed during a "measurable storm event." A "measurable storm event" is a storm event that results in an actual discharge from the permitted site outfall. The previous measurable storm event must have been at least 72 hours prior. The 72-hour storm interval does not apply if the permittee is able to document that a shorter interval is representative for local storm events during the sampling period, and the permittee obtains approval from the local DEMLR Regional Office. By this signature, I certify that this report is accurate and complete to the best of my knowledge: (Signature of Permittee or Designee) 1. Outfall Description: Outfall No. 1 Structure (pipe, ditch, etc.): Receiving Stream: Stewarts Creek Describe the industrial activities that occur within the outfall drainage area: Water and foliage Pagel oft SWU-242, Last modified 0728/2017 2. Color: Describe the color of the discharge using basic colors (red, brown, blue, etc.) and tint (light, medium, dark) as descriptors: brown medium 3. Odor: Describe any distinct odors that the discharge may have (i.e., smells strongly of oil, weak chlorine odor, etc.): earth/dirt odor 4. Clarity: Choose the number which best describes the clarity of the discharge, where 1 is clear and 5 is very cloudy: 1 m 3 4 5 5. Floating Solids: Choose the number which best describes the amount of floating solids in the stormwater discharge, where 1 is no solids and 5 is the surface covered with floating solids: CD 2 3 4 5 6. Suspended Solids: Choose the number which best describes the amount of suspended solids in the stormwater discharge, where 1 is no solids and 5 is extremely muddy: 0 2 3 4 5 7. Is there any foam in the stormwater discharge? Q Yes ® No. 8. 9. Is there an oil sheen in the stormwater discharge? QYes O No. Is there evidence of erosion or deposition at the outfall? O Yes Q No. 10. Other Obvious Indicators of Stormwater Pollution: List and describe N/A Note: Low clarity, high solids, and/or the presence of foam, oil sheen, or erosion/deposition may be indicative of pollutant exposure. These conditions warrant further investigation. Page 2 of 2 SWU-242, Last modified 07/28/2017 1� Environmental Quality Stormwater Discharge Outfall (SDO) Qualitative Monitoring Report For guidance onfil/ing out thisform, please visit https:,'deo.nc.eov,'about'divisions'ener�!�-mineral-land- resources/energy-in ineral-land-oermits/storm water-oennits Inodes-industrial-s\% `tab-4 Permit No.: N/C/ 1 / 6 /0 /0 /0 /0 /_/ or Certificate of Coverage No.: N/C/G/ 1 / 6 /0 /2 / 1 / 7 / Facility Name: County: UNION MONROE ASPHALT PLANT Inspector: Michael C, Ramirez Date of Inspection: 11/12/2020 Time of Inspection: 1:40PM Total Event Precipitation (inches): 4.1 No. 704-995-9786 5 All permits require qualitative monitoring to be performed during a "measurable storm event." A "measurable storm event" is a storm event that results in an actual discharge from the permitted site outfall. The previous measurable storm event must have been at least 72 hours prior. The 72-hour storm interval does not apply if the permittee is able to document that a shorter interval is representative for local storm events during the sampling period, and the permittee obtains approval from the local DEMLR Regional Office. By this signature, I certify that this report is accurate and complete to the best of my knowledge: y/L..fF Ck (Signature of Permittee or Designee) 1. Outfall Description: Outfall No. 2 Structure (pipe, ditch, etc.): Creek Receiving Stream: Structure Prohibited Runoff Describe the industrial activities that occur within the outfall drainage area: Water drainage through rip rap and foliage Pagel of2 SWU-242, Last modified 0728/20I7 2. Color: Describe the color of the discharge using basic colors (red, brown, blue, etc.) and tint (light, medium, dark) as descriptors: Brown Light 3. Odor: Describe any distinct odors that the discharge may have (i.e., smells strongly of oil, weak chlorine odor, etc.): earth dirt odor 4. Clarity: Choose the number which best describes the clarity of the discharge, where 1 is clear and 5 is very cloudy: 0 2 3 4 5 5. Floating Solids: Choose the number which best describes the amount of floating solids in the stormwater discharge, where 1 is no solids and 5 is the surface covered with floating solids: Q 2 3 4 5 6. Suspended Solids: Choose the number which best describes the amount of suspended solids in the stormwater discharge, where 1 is no solids and 5 is extremely muddy: CD 2 3 4 5 7. Is there any foam in the stormwater discharge? o Yes ® No. 8. 9. Is there an oil sheen in the stormwater discharge? oYes 0 No. Is there evidence of erosion or deposition at the outfall? O Yes o No. 10. Other Obvious Indicators of Stormwater Pollution: List and describe NIA Note: Low clarity, high solids, and/or the presence of foam, oil sheen, or erosion/deposition may be indicative of pollutant exposure. These conditions warrant further investigation. Page 2 of 2 SWU-242, Last modified 0728/2017 Environmental Quality Stormwater Discharge Outfall (SDO) Qualitative Monitoring Report For guidance onftlling out thisform, please visit httns:Hdeg.iic.gov/abotit/divisions/energy-mineral-land- resources/enemy-m i neral-1 and -perm its/storm water -perm its/nodes-i nd ustrial-swiltab-4 Permit No.: N/C/ 1 / 6 / 0 / 0 / 0 /0 /_/ or Certificate of Coverage No.: N/C/G/ 1 / 6 /0 /2 / 1 / 7 / Facility Name: MONROE ASPHALT PLANT County: UNION Inspector: Michael C, Ramirez Date of Inspection: 11/12/2020 Time of Inspection: 1:45PM Total Event Precipitation (inches): 4.1 Phone No. 704-995-9786 All permits require qualitative monitoring to be performed during a "measurable storm event." SPA A "measurable storm event" is a storm event that results in an actual discharge from the permitted site otttfall. The previous measurable storm event must have been at least 72 hours prior. The 72-hour storm interval does not apply if the permittee is able to document that a shorter interval is representative for local storm events during the sampling period, and the permittee obtains approval from the local DEMLR Regional Office. By this signature, I certify that this report is accurate and complete to the best of my knowledge: ytwP C4. 7, (Signature of Permittee or Designee) 1. Outfall Description: Outfall No. 3 Structure (pipe, ditch, etc.): ditch Receiving Stream: Structure Prohibited Runoff Describe the industrial activities that occur within the outfall drainage area: Water drainage through rip rap and foliage Page I of SWU-242, Lwt modified 0728/2017 2. Color: Describe the color of the discharge using basic colors (red, brown, blue, etc.) and tint (light, medium, dark) as descriptors: Brown Light 3. Odor: Describe any distinct odors that the discharge may have (i.e., smells strongly of oil, weak chlorine odor, etc.): earth / dirt odor 4. Clarity: Choose the number which best describes the clarity of the discharge, where 1 is clear and 5 is very cloudy: Q 2 3 4 5 5. Floating Solids: Choose the number which best describes the amount of floating solids in the stormwater discharge, where 1 is no solids and 5 is the surface covered with floating solids: Q 2 3 4 5 6. Suspended Solids: Choose the number which best describes the amount of suspended solids in the stormwater discharge, where 1 is no solids and 5 is extremely muddy: Q 2 3 4 5 7. Is there any foam in the stormwater discharge? O Yes ® No. S. 9. Is there an oil sheen in the stormwater discharge? QYes © No. Is there evidence of erosion or deposition at the outfall? o Yes ® No. 10. Other Obvious Indicators of Stormwater Pollution: List and describe NIA Note: Low clarity, high solids, and/or the presence of foam, oil sheen, or erosion/deposition may be indicative of pollutant exposure. These conditions warrant further investigation. Page 2 of 2 SWU-242, Last modified 0728/2017 Environmental Quality Stormwater Discharge Outfall (SDO) Qualitative Monitoring Report For guidance onfilling oul thisform, please visit https://deg.iic.Pov/about/divisions/enerev-mineral-land- resources/ener"v-ni i neraHand-perm its/stormwater-pen nits/npdes-i ndustrial-sw4tab-4 Permit No.: N/C/ 1 / 6 / 0 / 0 / 0 /0 /_/ or Certificate of Coverage No.: N/C/G/ 1 / 6 /0 /2 / 1 / 7 / Facility Name: County: UNION MONROE ASPHALT PLANT No. 704-995-9786 Inspector: Michael C, Ramirez Date of Inspection: 11/12/2020 n Time of Inspection: 1:30PM M�ld'aFN 1� Total Event Precipitation (inches): 4.1 aso; Q�a,4F 1�IJ All permits require qualitative monitoring to be performed during a "measurable storm event." A "measurable storm event" is a storm event that results in an actual discharge from the permitted site outfall. The previous measurable storm event must have been at least 72 hours prior. The 72-hour storm interval does not apply if the permittee is able to document that a shorter interval is representative for local storm events during the sampling period, and the permittee obtains approval from the local DEMLR Reeional Office. By this signature, I certify that this report is accurate and complete to the best of my knowledge: (Signature of Permittee or Designee) 1. Outfall Description: OutfalI No. 4 Structure (pipe, ditch, etc.): ditch Receiving Stream: Structure Prohibited Runoff Describe the industrial activities that occur within the outfall drainage area: Water drainage through rip rap and foliage Page I oft SWU-242, Last modified 0728/2017 2. Color: Describe the color of the discharge using basic colors (red, brown, blue, etc.) and tint (light, medium, dark) as descriptors: brown light 3. Odor: Describe any distinct odors that the discharge may have (i.e., smells strongly of oil, weak chlorine odor, etc.): earth / dirt odor 4. Clarity: Choose the number which best describes the clarity of the discharge, where 1 is clear and 5 is very cloudy: CD 2 3 4 5 5. Floating Solids: Choose the number which best describes the amount of floating solids in the stormwater discharge, where 1 is no solids and 5 is the surface covered with floating solids: Q 2 3 4 5 6. Suspended Solids: Choose the number which best describes the amount of suspended solids in the stormwater discharge, where 1 is no solids and 5 is extremely muddy: 2 3 4 5 7. Is there any foam in the stormwater discharge? O Yes © No. E:1 J Is there an oil sheen in the stormwater discharge? QYes ® No. Is there evidence of erosion or deposition at the outfall? O Yes 0 No. 10. Other Obvious Indicators of Stormwater Pollution: List and describe NIA Note: Low clarity, high solids, and/or the presence of foam, oil sheen, or erosion/deposition may be indicative of pollutant exposure. These conditions warrant further investigation. Page 2 of 2 SWU-242, Last modified 0728/2017 :) XION3ddV Orlando, FL The results set forth herein are provided by SGS North America Inc. e-HRrdcopy 2.0 Automated Report Technical Report for GRI (Geological Resources Inc.) Monroe Asphalt Plant; 2318 Concord Hwy, Monroe, NC 2433 SGS Job Number: FA85567 Sampling Date: 05/12/21 Report to: com ATTN: Distribution6 Total number of pages in report: 16 2iooPs� �R4' i ' oF2 1- RP LS 90 io Dot, r� N r_ . WWA Test results contained within this data package meet the requirements Norm Farmer or the National Environmental laboratory Accreditation Program Technical Director and/or state specific certification programs as applicable. Client Service contact: Mona Mohammed 407-425-6700 Certifications: FL(E83510), LA(03051), KS(E-10327), NC(573), NJ(FL002), NY(12022), SC(96038001) DoD ELAP(ANAB L2229), AZ(AZ0806), CA(2937), TX(T104704404), PA(68-03573), VA(460177). AL, AK, AR, CT, IA, KY, MA, MI. MS, ND, NH, NV, OR, OR, UT, VT. WA. WV This report shall not be reproduced, except in Its entirely, without the written approval or SGS. Test results relate only to samples analyzed. SGS North America Inc. • 4405 Vineland Road • Suite C-15 • Orlando, FL 32811 • tel: 407-425-6700 • fax: 407-425-0707 SGS is the sole authotiN for authurizme edits or modifications to this document. Please share your ideas about Unauthorized modification of this n:puri is strictly prohibited. how we can serve you better at: - SGS.- 1 of 16 Review standard terms at: http: liwwwsgsxom�enncrms-and-conditions EHS.US.CustomerC-are6t'gs.cont FAa5567 Sections: Table of Contents -1- Section1: Sample Summary................................................................................................... 3 Section2: Summary of Hits.................................................................................................... 4 Section3: Sample Results........................................................................................................ 5 3.1: FA85567-1: SDO-1....................................................................................................... 6 3.2: FA85567-2: SDO-2....................................................................................................... 7 3.3: FA85567-3: SDO-3....................................................................................................... 3.4: FA85567-4: SDO-4....................................................................................................... 8 9 Section4: Misc. Forms............................................................................................................ 10 4.1: Chain of Custody........................................................................................................... 11 Section 5: General Chemistry - QC Data Summaries.......................................................... 13 5.1: Method Blank and Spike Results Summary.................................................................. 14 5.2: Duplicate Results Summary.......................................................................................... 15 5.3: Matrix Spike Results Summary..................................................................................... 16 fflt ' 2of16 __ bu_ ` FA85567 SGS LabLink@17:48 21-May-2021 Sample Summary GRI (Geological Resources Inc.) Job No: FA85567 Monroe Asphalt Plant; 2318 Concord Hwy, Monroe, NC Project No: 2433 Sample Collected Matrix Client Number Date Time By Received Code Type Sample ID FA85567-1 05/ 12/21 11:40 MR 05/ 14/21 AQ Water FA85567-2 05/ 12/21 12:00 MR 05/ 14/21 AQ Water FA85567-3 05/ 12/21 12:20 MR 05/ 14/21 AQ Water FA85567-4 05/ 12/21 12:40 MR 05/ 14/21 AQ Water J 3 of 16 FA85567 Summary of Hits Job Number: FA85567 Account: GRI (Geological Resources Inc.) Project: Monroe Asphalt Plant; 2318 Concord Hwy, Monroe, NC Collected: 05/ 12/21 Lab Sample ID Client Sample ID Result/ Analyte Qual RL MDL Units Method FA85567-1 SDO-1 HEM Oil and Grease Solids, Total Suspended FA85567-2 SDO-2 No hits reported in this sample. FA85567-3 SDO-3 No hits reported in this sample. FA855674 SD04 No hits reported in this sample. 18.9 5.0 mg/1 EPA 1664A 190 25 mg/1 SM2540 D- I I Page 1 of 1 TSGS. 4 of 16 FA85567 LDSSSVd CC C 9�Ws _VDS _ sisXleuy 3o poda-1 sllnsag aldmeS SGS LabLink@17:48 21-May-2021 Report of Analysis Client Sample ID: SDO-1 Lab Sample ID: FA85567-1 Date Sampled: 05/ 12/21 Matrix: AQ - Water Date Received: 05/ 14/21 Percent Solids: n/a Project: Monroe Asphalt Plant; 2318 Concord Hwy, Monroe, NC Page 1 of l General Chemistry Analyte Result RL Units DF Analyzed By Method HEM Oil and Grease 1$,9 5.0 mg/1 1 05/21/21 08:24 KSA EPA 1664A Solids, Total Suspended 190 25 mg/1 1 05/ 17/21 10:30 KSA SM2540 D-11 RL = Reporting Limit 6 of 16 --SGa-. FA85567 SGS LabLink@17:48 21-May-2021 Report of Analysis Client Sample ID: SDO-2 Lab Sample ID: FA85567-2 Date Sampled: 05/ 12/21 Matrix: AQ - Water Date Received: 05/ 14/21 Percent Solids: n/a Project: Monroe Asphalt Plant; 2318 Concord Hwy, Monroe, NC Page 1 of 1 General Chemistry Analyte Result RL Units DF Analyzed By Method HEM Oil and Grease < 4.7 . 4.7 mg/l 1 05/21/21 08:24 KSA EPA 1664A Solids, Total Suspended < 25 25 mg/l 1 05/ 17/21 10:30 KSA SN12540 D-11 RL = Reporting Limit 7of16 FA86"7 SGS LabLink a 17:48 21-May-2021 Report of Analysis Client Sample ID: SDO-3 Lab Sample ID: FA85567-3 Date Sampled: 05/ 12/21 Matrix: AQ - Water Date Received: 05/ 14/21 Percent Solids: n/a Project: Monroe Asphalt Plant; 2318 Concord Hwy, Monroe, NC General Chemistry Analyte HEM Oil and Grease Solids, Total Suspended RL = Reporting Limit Page Iof1 W Result RL Units DF Analyzed By Method <5.0 5.0 mg/1 1 05/21/21 08:24 KSA EPA 1664A < '25 25 mg/1 1 05/ 17/21 10:30 KSA SN12540 D-1 I III `GS- 8 of 16 FA855b7 SGS LabLink@17:48 21-May-2021 Report of Analysis Client Sample ID: SDO4 Lab Sample ID: FA85567-4 Date Sampled: 05/12/21 Matrix: AQ - Water Date Received: 05/ 14/2 l Percent Solids: n/a Project: Monroe Asphalt Plant; 2318 Concord Hwy, Monroe, NC Page 1 of 1 A General Chemistry Analyte Result RL Units DF Analyzed By Method HEM Oil and Grease < 4..8 4.8 mg/l 1 05/21/21 08:24 KSA EPA 1664A Solids, Total Suspended < 25 25 mg/l 1 05/ 17/21 10:30 KSA SN12540 D-11 RL = Reporting Limit 9of16 FA85567 Orlando, FL Misc. Forms Custody Documents and Other Forms Includes the following where applicable: Chain of Custody Section 4 _SGS '° °t,s FA65567 SGS North America Inc - Orlando Q^� Chain of Custody SGS-ORLANOOJOB #: PAGEOF_ uPs viww ww Winds r.ma- n 12,' ...... as ii..i. �lnformation SGS- ORLANDO Coots SKIFF# Client/W tll I ...,Jon Q > AC pro Proletl Neme: kVj f0 I.a' P fl 0 G 1Anal #al irtforma[lon. MatO[Codes Web GW e. War^ SW-sn�mr WMm Bo -Sea SL Sludge DI -Du LID-CfWLfIW AIR -Air L.,B WE ONLT Cumpury Name: O i crepe: 231 nD✓. hxya 51rnt at, D slam:ILLZIP: 281 O ' Prgoct Em.II: m; a.An ft oro)an# 2433 w PM1enal: p ( Fa.# SmXPmrb)N.m.01(vrmratll aem bH; Bam brL cX.nt Punh... Ortlm# SGB Se Mp FeId ID l Pmnl ar CoftIoaan � tl1 I S o 1 11 fR W✓ 2� 1 1 111 1 1 -Ix s fj O Z R 1 BX I176A lw 2 111 1 11 N D o rn l fzv y+xh wry z 1 I x x S WN Z I I K% -, ..�--- Tumaroune Time uenw Dae _-----'-- Oata DO Nelabb rmatlon ^" ammenls m i / 10 Day (Bu.ir"s) aapprao.J 91'IOale: )Day S Day Dy RUSH 3 on RUSH 1 Day RUSH ON.r RUMTIA D.m And". VIAEmallor IAWink LJCChWENCIAL W(RESULTS ONLY) ❑COMMERCIAL'B'(RESULTS PLUS QC) OREOTI (EPA LEVELS) QFULLTI (EPA LEVEL4) QEDD9 Nff tASMI N LABEL VIVIFICATION R.IhqublW hY .rlglBlleXon DN TYne: m le a mu.[ha hMOb eaelrUm. ai 0.acelmtl Byl Ilellon Wn Rallrpul.had BflMia.am � a �` Db ma: > 6 0.rteivotl By' illatlan R.Ilnqui.bd S yrInqu 6 Y1 Mad By/AIM.na DM Tm.: R... iw BIAvowdo, B Lab Ilse ONv: Ca.mr T.mwnnn bl Gl.ms laamcbN: _ -. ry Z __ ___ _ _ MIB/AYW]FgA (4),rAa Rev D31310 FA85567: Chain of Custody Page 1 of 2 0 11 of 16 FASS567 SGS Sample Receipt Summary Job Number: FA85567 Client: BOGGS MATERIALS INC. Project: MONROE ASPHALT Date / Time Received: 5/14/2021 9:25:00 AM Delivery Method: FX Airbill Ws: Therm ID: IR 1; Therm CF: -1.8; # of Coolers: 1 :ooler Temps (Raw Measured) °C: Cooler 1: (2.2); Cooler Temps (Corrected) °C: Cooler 1: (0.4); Cooler Information 1. Custody Seals Present Y or N Sample Information 1. Sample labels present on bottles Y or N ❑ NIA ® ❑ ® 2. Custody Seals Intact ® ❑ 2. Samples preserved properly ® ❑ 3. Temp criteria achieved 0 ❑ 3. Sufficient volumelcontainers mcvd for analysis: ® ❑ 4. Cooler temp verification IR Gun 4. Condition of sample IJl�Gl 5. Cooler media Ice (Bag) 5. Sample recvd within HT ® ❑ 6. Dates[TimesADs on COC match Sample Label ® ❑ Trip Blank Information Y or N N/A 7. VOCs have headspace ❑ ❑ 1. Trip Blank present / cooler ❑ ❑ ® 8. Bottles received for unspecified tests ❑ 2. Trip Blank listed on COC ❑ ❑ ® 9. Compositing instructions dear ❑ ❑ W or S NIA 10. Voa Soil Kits/Jars received past 48hrs? ❑ ❑ 11. % Solids Jar received? ❑ ❑ 3. Type Of TB Received ❑ ❑ [a 12. Residual Chlorine Present? ❑ ❑ Misc. Information Number of Encores: 25-Gram 5-Gram Number of 5035 Field Kits: Number of Lab Filtered Metals: Test Strip Lot #s: pH 0-3 230315 pH 10-12 219813A Other: (Specify) Residual Chlorine Test Strip Lot #: ;omments RTechnician: PETERH Date: 5/14/2021 9:25:00 AM Reev.v. Date 05J24/17 D Reviewer: Date: FA85567: Chain of Custody Page 2 of 2 12 of 16 FA85567 { Orlando, FL Section 5 General Chemistry QC Data Summaries Includes the following where applicable: • Method Blank and Blank Spike Summaries • Duplicate Summaries • Matrix Spike Summaries -VYV 13 of 16 FA65567 METHOD BLANK AND SPIKE RESULTS SUMMARY GENERAL CHEMISTRY Login Number: FAS5567 Account: GRINCC -- GRI (Geological Resources Inc.) Project: Monroe Asphalt Plant; 2318 Concord Hwy, Monroe, NC MB Spike. BSP BSP QC Analyte Batch ID RL Result Units Am6unt Result %Recon Limits HEM Oil and Grease GP36344/GN88188 5.0 i.Q 0 ", mg/1 40 Solids, Total Suspended GN88148 2.5 d 0 mg/1 Associated Samples: Batch GN88148: FA85567-1, FA85567-2, FA85567-3, FA85567-4 Batch GP36344: FA85567-1, FA85567-2, FA85567-3, FA85567-4 (+) Outside of QC limits Page 1 38.2 95 5 t 78-114% (A G,�; 14 of 16 S�' FA85567 L9SSSt:l , 9tido9� si 1 aBea -suoT4ealuaouoo *Tdumes pue a;eoTTdnp MOT 01 *np aTgejdaoae ad2i (e) S2TWTT 00 30 aprSIno (,) b-L9SSn'd3 '£-L9SS8E'3 'Z-L9SS8�T� 'T-L9998K3 :S8TSSND gOUS :saTdweS p91STDOGSV N ui %S-0 '"481£` � 010 010 T/bu: i-995S8tt3 86i88N9 papuadsns ie,4oy +sptToS saTmT*1 aau -4Tnsau ITneau sliun oldwuS ai 4oas6 02ATeUV �a ana Teu;bTzp ob ON 'aosuoLl IAKH paonuoo 8i£Z =;UeTd 1Te4dsV aosuoW :joaloaa (•oui saoanosag ieoTboioagl IuD - oJNiuJ uno*oV L9SS8l{.3 :xaq=N uTSoj x7HISIRSHo IvIdEN30 ATIMMS SS'InSSW SNOT Tdna MATRIX SPIKE RESULTS SUMMARY GENERAL CHEMISTRY Login Number: FA85567 Account: GRINCC - GRI (Geological Resources Inc.) Project: Monroe Asphalt Plant; 2318 Concord Hwy, Monroe, NC QC Original Spike- MS QC Analyte Hatch ID Sample Units Result Amount Result %Rec Limits HEM Oil and Grease GP36344/GN88188 FA85561-IA mg/l 0.0 40 37.3 1'?_: .' <`' 78-114% 0 W Associated Samples: Hatch GP36344: FA85567-1, FA85567-2, FA85567-3, FA85567-4 (*) Outside of QC limits (N) Matrix Spike Rec. outside of QC limits Page I ,�„ 16 of 16 �' FA85567