Loading...
HomeMy WebLinkAboutNCG160173_Compliance Evaluation_20211006ROY.COOPER Govemor EUZABETH S. BISER secretary K AN WRENN D[rawr Ferebee Asphalt Corporation Attention: Chris Ferebee PO Box 480066 Charlotte, North Carolina 28269 NORTH CAROLINA EnvhmnenkdQuality October 6, 2021 Subject: Compliance Evaluation Inspection Ferebee Asphalt Corporation NPDES Certificate of Coverage — NCG160173 Mecklenburg County, North Carolina Dear Mr. Ferebee, Enclosed please find a copy of the Compliance Evaluation Inspection Report for the inspection we conducted at the Jeff Adams Drive facility in Charlotte on September 28, 2021. Please note that in the stormwater inspection report summary we ask that you continue to implement the Stormwater Pollution Prevention Plan (SPPP). The report should be self-explanatory; however, should you have any questions, please do not hesitate to contact me at (704) 663-1699 or by E-mail at james.moore@ncdenr.gov. Sincerely, les Moore Assistant Regional Engineer Enclosure c: Laserfiche DNorth Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources EMooresville Regional Office 1 610 East Center Avenue, Suite 3011 Mooresville, North Carolina 28115 704.663.1699 Compliance Inspection Report Permit: NCG160173 Effective: 08/01/19 Expiration: 05/31/24 Owner: FerebeeAsphalt Corporation SOC: Effective: Expiration: Facility: Ferebee Asphalt Corporation County: Mecklenburg 3030 Jeff Adams Dr Region: Mooresville Charlotte NC 28206 Contact Person: Chris Ferebee Title: Phone: 704-509-2586 Directions to Facility: System Classifications: SWNC, Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 09/28/2021 Primary Inspector: Lily C Kay Secondary Inspector(s): Certification: Phone: Entry Time 04:OOPM Exit Time: 04:30PM Phone: 704-663-1699 Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Asphalt Paving Mixture Stormwater Discharge COC Facility Status: Compliant ❑ Not Compliant Question Areas: Storm Water (See attachment summary) Page 1 of 3 £ 10 Z 96ed 'L£LZ-g£Z (VOL)1e euogd Aq Jo n06-.luapou@/(e>i-Al!-1 }e aw;oe}uoo 'suoilsenb aney noA 11 -sAep 09 Iseal le Aq pa}eiedes aq Isnw sJuana 6uildwes 6uu0liuow 9Age;ijenC) -silegno aql le pa/uasgo ajam sanssi ou pue pouieluiew pue paje lado Ilem pajeadde A!I!oe4 ayl -uoi}eoUpoo lenuue ayl pue 'spjooai 6uuoliuow 'spaooaj 6ululeil aaAoldwe 6ucpnloui ajaldwoo seen uoi}eluawnoop pa}ejaj pue (dddMS) ue1d uoiuanaJd uoljnjlod Ja)ennuuo;S aul :tiewwnS uoijoedsul oulino8 msi jol uoseea uo enlen3 aouelldwoO ed�Il uol;oedsul 6ZOZ/8Z/60 :eiea uogoadsul uopeiodlooIleydsbaagaja=j:f4llloed-JGUmO ELL0MOON :�IWJed Permit: NCG160173 Owner - Facility: Ferebee Asphalt Corporation Inspection Data: 09/28/2021 Inspection Type: Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? 0 ❑ ❑ ❑ # Does the Plan include a General Location (USGS) map? ■ ❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? 0 ❑ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? 0 ❑ ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? 0 ❑ ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? 0 ❑ ❑ ❑ # Does the facility provide all necessary secondary containment? ❑ ❑ ❑ # Does the Plan include a BMP summary? ❑ ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? 0 ❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ❑ ❑ ❑ # Does the facility provide and document Employee Training? ❑ ❑ ❑ # Does the Plan include a list of Responsible Party(s)? ❑ ❑ ❑ # Is the Plan reviewed and updated annually? 0 ❑ ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? N ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan- been implemented? 0 ❑ ❑ ❑ Comment: The Stormwater Pollution Prevention Plan (SWPPP) and related documentation was complete including employee training records, monitoring records, and the annual certification. Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? 0 ❑ ❑ ❑ Comment: Qualitative monitoring records were available and complete. Qualitative monitoring sampling events must be separated by at least 60 days. Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? , ❑ ❑ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ ❑ Comment: Analytical monitoring records were available, and all parameters were within the benchmark limitations. Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? N ❑ ❑ ❑ # Were all outfalls observed during the inspection? 013013 # If the facility has representative outfall status, is it properly documented by the Division? ❑ 110 ❑ # Has the facility evaluated all illicit (non stormwater) discharges? ❑ ❑ 0 ❑ Comment: The facility appeared well operated and maintained and no issues were observed at the outfalls. Page 3 of 3