Loading...
HomeMy WebLinkAboutNCG160040_Compliance Evaluation_20211122ROY COOPER Governor EUZABETH S. BISER Secretary BRIAN WRENN Director Blythe Construction Inc. Attention: Fredrick Jr. O'Dea 2911 N Graham Street Charlotte, NC 28206 NORTH CAROLINA Environmental Quality November 22, 2021 Subject: Compliance Evaluation Inspection Blythe Construction Inc. -East Plant NPDES Certificate of Coverage — NC160040 Mecklenburg, North Carolina Dear Mr. O'Dea, Enclosed please find a copy of the Compliance Evaluation Inspection Report for the inspection we conducted at the Blythe Construction Inc. -East Plant on December 15, 2021. The report should be self-explanatory; however, should you have any questions, please do not hesitate to contact me at (704) 235-2138 or by E-mail at james.moore@ncdenr.gov. Enclosure c: Laserfiche Sincerely, �e� s Moore Assistant Regional Engineer 0.0 ! Q�� "'orb North Carolina Department of Environmental Quality I Diviston of Energy, Mineral and land Resources MooresvWe Regtonal Office 1 610 East Center Avenue, Suite 3011 Mooresville, North Carolina 28115 704.663.1699 Compliance Inspection Report Permit: NCG160040 Effective: 08/01/19 Expiration: 05/31/24 Owner: Blythe Construction Inc SOC: Effective: Expiration: Facility: Blythe Construction, Inc. -East Plant County: Mecklenburg 1021 Sam Newell Rd Region: Mooresville Matthews NC 28106 Contact Person: Steve Nearhood Title: Phone: 704-375-8474 Directions to Facility: System Classifications: SWNC, Primary ORC: Certification: Phone: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 12/15/2021 Entry Time 04:OOPM Exit Time: 04:30PM Primary Inspector: Jeffrey A Chandler Phone: 704-663-1699 Secondary Inspector(s): Lily C Kay Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Asphalt Paving Mixture Stormwater Discharge COC Facility Status: Compliant ❑ Not Compliant Question Areas: Storm Water (See attachment summary) Page 1 of 3 £ 10 Z 96ed -L£ 6Z 9£Z (,OL) }e auogd Aq Jo Ao6*Ju9p3u@AeN,Al!-i le aw peluoo `suogsanb aney noA 11 -papiAwd uaaq sey uoile;uawnoop tiessooeu Ile pue paluawa{dwi uaaq sey (dddMS) ue1d uoiluaAaJd uoilnIlod 1918MMOIS OU Pauielwew pue paIeJado Ilam pajeadde A4!1!3el aql pue aoueildwoo uw si axis siul :tiewwnS uoiloodsul suilnoa :3IsiA Jol uossaa uogenIeA3 soueildwoO : ��l uol3aadsul I ZOZ/q �/Z I :e3e0 uorloodsul oul uoilorulsuoo 9Wjs:fQ10ed - JeumO 0V009 SON ::Puuad Permit: NCG160040 Owner - Facility: Blythe Construction Inc Inspection Date: 12/15/2021 Inspection Type: Compliance Evaluation Reason for visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? M ❑ ❑ ❑ # Does the Plan include a General Location (USGS) map? N ❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? 0 ❑ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? N ❑ ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? N ❑ ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? 0 ❑ ❑ ❑ # Does the facility provide all necessary secondary containment? 0 ❑ ❑ ❑ # Does the Plan include a BMP summary? 0 ❑ ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? 0 ❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? 0 ❑ ❑ ❑ # Does the facility provide and document Employee Training? E ❑ ❑ ❑ # Does the Plan include a list of Responsible Party(s)? 0 ❑ ❑ ❑ # Is the Plan reviewed and updated annually? N ❑ ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? 0 ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? E ❑ ❑ ❑ Comment: No significant spills reported in the last 3 years (documentation needs to be provided). Qualitative Monitorinq Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? 0 ❑ ❑ ❑ Comment: Qualitative monitoring reports were provided during this inspection No flow was recorded between July 2021 & December 2021. Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? 0 ❑ ❑ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ 110 ❑ Comment: Analytical monioring reports were provided during this inspection. Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? 0 ❑ ❑ ❑ # Were all outfalls observed during the inspection? 0 ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ 110 ❑ # Has the facility evaluated all illicit (non stormwater) discharges? ❑0 ❑ ❑ Comment: Page 3 of 3