Loading...
HomeMy WebLinkAboutNCG140241_Compliance Evaluation Inspection_20210908ROY COOPER dsVA Q. Governor ELIZABETH S. BISER Secretary BRIAN WRENN Director NORTH CAROLINA Ent+lronmenta! QuaUty September 8, 2021 Concrete Supply Attention: Johnie Alexander PO Box 5247 Charlotte, North Carolina Subject: Compliance Evaluation Inspection Concrete Supply NPDES Certificate of Coverage — NCG 140241 Union County, North Carolina Dear Mr. Alexander, Enclosed please find a copy of the Compliance Evaluation Inspection Report for the inspection we conducted at the Monroe plant on September 1, 2021. Please note that in the stormwater inspection report summary we ask that you continue to implement you Stormwater Pollution Prevention Plan. The report should be self-explanatory; however, should you have any questions, please do not hesitate to contact me at (704) 663-1699 or by E-mail at james.moore@ncdenr.gov. Enclosure c: Laserfiche Sincerely, James Moore Assistant Regional Engineer North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Mooresville Regional Office 1610 East Center Avenue, Suite 3011 Mooresville, North Carolina 28115 704-663-1699 Compliance Inspection Report Permit: NCG140241 Effective: 08/01/17 Expiration: 06/30/22 Owner: Concrete Supply Co LLC SOC: Effective: Expiration: Facility: Concrete Supply Co- Monroe County: Union 1109 N Sutherland Ave Region: Mooresville Monroe NC 28110 Contact Person: Johnie Alexander Title: Phone: 704-372-2930 Directions to Facility: System Classifications: SWNC, Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 09/01/2021 Primary Inspector: Lily C Kay Secondary Inspector(s): Certification: Phone: Entry Time 12:OOPM Exit Time: 01:OOPM Phone: 704-663-1699 Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Ready Mix Concrete Stormwater/Wastewater Discharge COC Facility Status: Compliant ❑ Not Compliant Question Areas: Storm Water (See attachment summary) Page 1 of 3 g 10 Z 96ed "L£ LZ-g£Z (VOL)1e auogd Aq ao no6'Juapouc7n Ae>i-Al!-1 le aw joeluoo 'suoilsenb aney noA ll -pauieluiew pue pa}eiado llann pajeadde f4i1ioej ayl -uoileog!:pao lenuue aul pue 'spjooaa 6uuoliuow 'spaooaj 6uiuieal aaAoldwe 6uipnioui ajaldwoo seen uoijejuawnoop pajejai pue (dddMS) veld uoiJuanaJd uoilnilod JalemwJOIS ayl :/jewwnS uoiloadsul aui;noa msm joi uoseea uoilenien3 aouelldwoo : adA.L uolloodsul LZOZ/LO/60 :oleo uolloedsul 0-1l oo AjddnS a;arouoC)=f4Illoe j - 1eumo LVZOKOON :lluued Permit: NCG140241 Owner - Facility: Concrete Supply Co LLC Inspection Date: 09/01/2021 Inspection Type: Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? ❑ ❑ ❑ # Does the Plan include a General Location (USGS) map? ❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? ■ ❑ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? E ❑ ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? 0 ❑ ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? M ❑ ❑ ❑ # Does the facility provide all necessary secondary containment? 0 ❑ ❑ ❑ # Does the Plan include a BMP summary? ■ ❑ ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? 0 ❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ❑ ❑ ❑ # Does the facility provide and document Employee Training? ❑ ❑ ❑ # Does the Plan include a list of Responsible Party(s)? ❑ ❑ ❑ # Is the Plan reviewed and updated annually? 0 ❑ ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? 0 ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? E ❑ ❑ ❑ Comment: The Stormwater Pollution Prevention Plan (SWPPP) and related documentation was complete includingemployee mployee training records, monitoring records, and the annual certification. Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? 0 ❑ ❑ ❑ Comment: Qualitative monitoring records were available and complete. Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? E ❑ ❑ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? 0 ❑ ❑ ❑ Comment: The facility does not typically have flow, but samples when there is a discharge from the outfall. Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? 0 ❑ ❑ ❑ # Were all outfalls observed during the inspection? ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ ❑ # Has the facility evaluated all illicit (non stormwater) discharges? ❑ ❑ 0 ❑ Comment: The facility appeared well operated and maintained and uses rock BMPs to filter the water before discharging to the pond. Page 3 of 3