Loading...
HomeMy WebLinkAboutNCG140187_Compliance Evaluation_20211102ROY COOPER Governor ELIMETH'.S. BISER Sea etary MAN WRENN Dimctor NORTH CAROLINA Enykan nentrrlQuaRty November 2, 2021 Southern Equipment Company Inc. Attention: Pete Scavone 3601 Bush Street Raleigh, North Carolina 27609 Subject: Compliance Evaluation Inspection Southern Equipment Company Inc. NPDES Certificate of Coverage — NCG140187 Union County, North Carolina Dear Mr. Scavone, Enclosed please find a copy of the Compliance Evaluation Inspection Report for the inspection we conducted at the Indian Trail facility on October 28, 2021. Please note that in the stormwater inspection report summary we ask that you submit an updated SPPP with an annual certification and documentation of employee training, quarterly facility inspection, annual facility inspection, and no flow to the Mooresville regional office by January 7, 2022, or enforcement action may be taken. The report should be self-explanatory; however, should you have any questions, please do not hesitate to contact me at (704) 663-1699 or by E-mail at james.moore@,ncdenr.gov. Enclosure c: Laserfiche Sincerely, es Moore Assistant Regional Engineer North Carolina Department of Environmental -Quality I Division of Energy, Mineraland Land Resources Mooresville Regional Office 1 610 East Center Avenue, Suite 3011 Mooresville, North Carolina 28U5 704.663.1699 Compliance Inspection Report Permit: NCG140187 Effective: 08/01/17 Expiration: 06/30/22 Owner: Southern Equipment Company Inc SOC: Effective: Expiration: Facility: Ready Mixed Concrete Co. - Indian Trail, Plant County: Union 1316 Indian Trl Waxhaw Rd Region: Mooresville Matthews NC 28105 Contact Person: Pete Scavone Title: Phone: 704-821-7645 Directions to Facility: System Classifications: SWNC, Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 10/28/2021 Primary Inspector: Lily C Kay Secondary Inspector(s): Certification: Phone: Entry Time 01:45PM Exit Time: 02:30PM Phone: 704-663-1699 Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Ready Mix Concrete Stormwater/Wastewater Discharge COC Facility Status: ❑ Compliant Not Compliant Question Areas: Storm Water (See attachment summary) Page 1 of 3 permit: NCG140187 Owner - Facility: Southern Equipment Company Inc Inspection Date: 10/28/2021 Inspection Type : Compliance Evaluation Reason for Visit: Routine Inspection Summary: The Stormwater Pollution Prevention Plan (SPPP) has been developed, but documentation was missing for the employee training, annual certification, and visual inspections. The facility has one concrete basin at the low area on site and no discharge was observed at the time of inspection. However, the Permittee must document no flow during a measurable rain event. An updated SPPP with an annual certification and documentation of employee training, quarterly facility inspection, annual facility inspection, and no flow must be submitted to the Mooresville regional office by January 7, 2022, or enforcement action may be taken. If you have questions, contact me at Lily. Kay@ncdenr.gov or by phone at (704) 235-2137. Page 2 of 3 permit: NCG140187 Owner - Facility: Southern Equipment Company Inc Inspection Date: 10/28/2021 Inspection Type: Compliance Evaluation Reason for visit: Routine Stormwater Pollution Prevention Plan Does the site have a Stormwater Pollution Prevention Plan? # Does the Plan include a General Location (USGS) map? # Does the Plan include a "Narrative Description of Practices"? # Does the Plan include a detailed site map including outfall locations and drainage areas? # Does the Plan include a list of significant spills occurring during the past 3 years? # Has the facility evaluated feasible alternatives to current practices? # Does the facility provide all necessary secondary containment? # Does the Plan include a BMP summary? # Does the Plan include a Spill Prevention and Response Plan (SPRP)? # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? # Does the facility provide and document Employee Training? # Does the Plan include a list of Responsible Party(s)? # Is the Plan reviewed and updated annually? # Does the Plan include a Stormwater Facility Inspection Program? Has the Stormwater Pollution Prevention Plan been implemented? Yes No NA NE E ❑ ❑ ❑ ■ ❑ ❑❑ ■❑❑❑ ■❑❑❑ ❑■D❑ ■❑❑❑ ■❑❑❑ ■❑❑❑ ■❑❑❑ ■❑❑D D■❑❑ ■❑❑❑ ❑❑❑ Comment: The Stormwater Pollution Prevention Plan has been developed, but documentation was missing for the employee training, annual certification and visual inspections. Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? ❑ N ❑ ❑ Comment: The facility does not have a discharge, but needs to provide documentation during a measurable rain event of no discharge. Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? ❑ N ❑ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? 11110 ❑ Comment: The facility does not have a discharge, but needs to provide documentation during a measurable rain event of no discharge. Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? ■ ❑ ❑ ❑ # Were all outfalls observed during the inspection? ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ ❑ # Has the facility evaluated all illicit (non stormwater) discharges? ❑ ❑ 0 ❑ Comment: The facility has one concrete basin at the low area on site and no discharge was observed at the time of inspection. However, the Permittee must document no flow during a measurable rain event. Page 3 of 3