HomeMy WebLinkAboutNCG080923_Compliance Evaluation_20211026ROY COOPER
Governor
EUZABETH S. BISER
secretary
MAN WRENN
Director
NORTH CAROLINA
EnvlrontnentaT Quality
October 26, 2021
Safety-Kleen Systems Inc.
Attention: Robin Bumgardner
12040 Goodrich Drive
Charlotte, North Carolina 28273
Subject: Compliance Evaluation Inspection
Safety-I(leen Systems Inc.
NPDES Certificate of Coverage - NCG080923
Mecklenburg County, North Carolina
Dear Mr. Bumgardner,
Enclosed please find a copy of the Compliance Evaluation Inspection
Report for the inspection we conducted at the Goodrich Drive facility in
Charlotte on October 19, 2021. Please note that in the stormwater inspection
report summary we ask that you continue to implement the Stormwater
Pollution Prevention Plan (SPPP).
The report should be self-explanatory; however, should you have any
questions, please do not hesitate to contact me at (704) 663-1699 or by E-mail
at james.moore@ncdenr.gov.
Enclosure
c: Laserfiche
Sincerely,
es Moore
Assistant Regional Engineer
,9;P...EQ 41A
North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
Mooresville Regional Office 1 610 East Center Avenue, Suite 3011 Mooresville, North Carolina 28115
704.663.1699
Compliance Inspection Report
Permit: NCG080923 Effective: 07/01/21 Expiration: 06/30/26 Owner: Safety-Kleen Systems Inc
SOC: Effective: Expiration: Facility: Safety Kleen Systems, Inc (Goodrich Dr)
County: Mecklenburg 12040 Goodrich Dr
Region: Mooresville
Charlotte NC 28273
Contact Person: Robin D Bumgardner Title: Phone: 704-583-1756
Directions to Facility:
System Classifications: SWNC,
Primary ORC: Certification: Phone:
Secondary ORC(s):
On -Site Representative(s):
Related Permits:
NCG130030 Safety-Kleen Systems Inc - Safety Kleen Systems, Inc (Goodrich Dr)
Inspection Date: 10/19/2021 Entry Time 03:OOPM Exit Time: 04:00PM
Primary Inspector: Lily C Kay Phone: 704-663-1699
Secondary Inspector(s):
Reason for Inspection: Routine Inspection Type: Compliance Evaluation
Permit Inspection Type: Transportation wNehicle Maintenance/Petroleum Bulk/Oil Water Separator Stormwater Discharge COC
Facility Status: Compliant Not Compliant
Question Areas:
Storm Water
(See attachment summary)
Page 1 of 3
£ 10 Z 96ed
'LUZI£Z (VOL)1e auogd Aq jo no6-.juepou@o Ae>i-Al!l }e aw joe}uoo 'suoijsanb aneq noA ll -silepno aql le panaasgo alarm
sonssi ou pue pouieluiew pue pajelado pane pajeadde A4i1ioel ayl -uo4eoyi:pao lenuue ay} pue 'spaooai 6uijoliuow 'spjooaj
6ujuieil aaAoldwa 6uipnioui ajaldwoo seM uoi�e�uawnoop pa�e�a� pue (dddMS) veld uoiuanaJd uoi;nilod JalemwJo;S ayl
tiewwnS uoiloodsul
au!;noa :t!s!Ajo} uoseea uo!;en!en3 aoue!!dwoo: add uo!loedsui LZOMWOL :e3e(3 uogoedsul
oul swa)sAs u99!>j-Ajajes:A111!3E:j - Jeumo £Z608090N :I!UUed
Permit: NCGO80923 Owner - Facility: Safety-Kleen Systems Inc
Inspection Date: 10/19/2021 Inspection Type: Compliance Evaluation Reason for Visit: Routine
Stormwater Pollution Prevention Plan
Does the site have a Stormwater Pollution Prevention Plan?
# Does the Plan include a General Location (USGS) map?
# Does the Plan include a "Narrative Description of Practices"?
# Does the Plan include a detailed site map including outfall locations and drainage areas?
# Does the Plan include a list of significant spills occurring during the past 3 years?
# Has the facility evaluated feasible alternatives to current practices?
# Does the facility provide all necessary secondary containment?
# Does the Plan include a BMP summary?
# Does the Plan include a Spill Prevention and Response Plan (SPRP)?
# Does the Plan include a Preventative Maintenance and Good Housekeeping Plan?
# Does the facility provide and document Employee Training?
# Does the Plan include a list of Responsible Party(s)?
# Is the Plan reviewed and updated annually?
# Does the Plan include a Stormwater Facility Inspection Program?
Has the Stormwater Pollution Prevention Plan been implemented?
Yes No NA NE
■❑❑❑
■❑❑D
■❑❑❑
■❑❑❑
■ ❑ ❑ ❑
■ ❑ ❑❑
■❑❑❑
■❑❑❑
Comment: The Stormwater Pollution Prevention Plan (SWPPP) and related documentation was complete
including employee training records, monitoring records, and the annual certification.
Qualitative Monitoring Yes No NA NE
Has the facility conducted its Qualitative Monitoring semi-annually? ■ ❑ ❑ ❑
Comment: Qualitative monitoring records were available and complete.
Analytical Monitorinq Yes No NA NE
Has the facility conducted its Analytical monitoring? ❑ ❑ ■ ❑
# Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ ■ ❑
Comment: Analytical monitoring is not required because there is no vehicle maintenance on site.
Permit and Outfalls Yes No NA NE
# Is a copy of the Permit and the Certificate of Coverage available at the site? ■ ❑ ❑ ❑
# Were all outfalls observed during the inspection? ■ ❑ ❑ ❑
# If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ ■ ❑
# Has the facility evaluated all illicit (non stormwater) discharges? ❑ ❑ ■ ❑
Comment: The facility appeared well operated and maintained and no issues were observed at the
outfalls. The SPPP states there are 6 outfalls, but only 3 were observed at the inspection.
One outfall is from the oil/water separator.
Page 3 of 3