Loading...
HomeMy WebLinkAboutNCG080841_Compliance Evaluation_20210921ROY COOPER Governor ,4 ELIZABETH S. BISER Secretary t BRIAN WRENN qUW Director NORTH CAROLINA Envtronmenta/ Quality September 21, 2021 Colonial Pipeline Company Attention: Gerald Beck 1185 Sanctuary Parkway, Suite 100 Alpharetta, Georgia 300009 Subject: Compliance Evaluation Inspection Colonial Pipeline Company NPDES Certificate of Coverage — NCG080841 Cabarrus County, North Carolina Dear Mr. Beck, Enclosed please find a copy of the Compliance Evaluation Inspection Report for the inspection we conducted at the Kannapolis facility on September 16, 2021. Please note that in the stormwater inspection report summary we ask that you submit an updated Stormwater Pollution Prevention Plan (SPPP), a qualitative monitoring report and an analytical monitoring report by December 17, 2021. The report should be self-explanatory; however, should you have any questions, please do not hesitate to contact me at (704) 663-1699 or by E-mail at james.rnoore@nedenr.gov. Enclosure c: Laserfiche Sincerely, M�- es Moore Assistant Regional Engineer North Carolina Department of Environmental Quality E Division of Energy, Mineral and Land Resources Mooresville Regional Office 1 610 East Center Avenue, Suite 301 Mooresville, North Carolina 28115 704-663-1699 Compliance Inspection Report Permit: NCG080841 Effective: 07/01/21 Expiration: 06/30/26 Owner: Colonial Pipeline Company SOC: Effective: Expiration: Facility: Kannapolis Booster Station County: Cabarrus 9301 Mooresville Rd Region: Mooresville Concord NC 28027 Contact Person: John W. Culbreath Title: Phone: 704-399-9525 Directions to Facility: System Classifications: SWNC, Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 09/16/2021 Primary Inspector: Lily C Kay Secondary Inspector(s): Certification: Phone: Entry Time 11:30AM Exit Time: 12:30PM Phone: 704-663-1699 Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Transportation wNehicle Maintenance/Petroleum Bulk/Oil Water Separator Stormwater Discharge COC Facility Status: ❑ Compliant Not Compliant Question Areas: Storm Water (See attachment summary) Page 1 of 3 £ 10 Z 86ed -L£ 2-5£Z (VOL) le euogd Aq Jo n06-Juapou@n Ae>l-Al!l le ew joeluoo 'suollsenb aneq nog(1l -ueNe} aq Aew uoijoe )ueweojolue jo LZOZ 'L L aagweoaQ Aq pe:p!wgns eq o} spaau podaj 6uuol!uow leoil(leue ue pue ':podaa 6uia0liuow anilelllenb a '(dddS) veld uol)uanaad uoinllod jalemwjo}S palepdn ayl •sliwaad aalemwiols leulsnpui eqj aol;uellnsuoo wed-pjiyl mou a paIoealuoo sey aa:}luuad ayl :AjewwnS uoi}oodsul eul;noa :;lslp jo; uoseab uo!;en!en3 aouet!dwo0 : adAjL uo!;oadsu! 2OZ19L/60 :a;ep uol;aadsu! Auedwo0 eu!!adld leiuo!o0:►4!!!3e:J - JGUmO Lb808000N :;!Wad I Permit: NCG080841 Inspection Date: 09/16/2021 Owner - Facility: Colonial Pipeline Company Inspection Type: Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Does the site have a Stormwater Pollution Prevention Plan? # Does the Plan include a General Location (USGS) map? # Does the Plan include a "Narrative Description of Practices"? # Does the Plan include a detailed site map including outfall locations and drainage areas? # Does the Plan include a list of significant spills occurring during the past 3 years? # Has the facility evaluated feasible alternatives to current practices? # Does the facility provide all necessary secondary containment? # Does the Plan include a BMP summary? # Does the Plan include a Spill Prevention and Response Plan (SPRP)? # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? # Does the facility provide and document Employee Training? # Does the Plan include a list of Responsible Party(s)? # Is the Plan reviewed and updated annually? # Does the Plan include a Stormwater Facility Inspection Program? Has the Stormwater Pollution Prevention Plan been implemented? Yes No NA NE ❑■D❑ ■❑❑❑ ■❑❑❑ ■❑❑❑ ❑■❑❑ ■❑❑❑ ■❑❑❑ Comment: The Stormwater Pollution Prevention Plan (SPPP) has been developed and implemented but has not been updated in years. The facility needs to update the SPPP. Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? ❑ ■ ❑ ❑ Comment: Qualitative monitoring reports were not produced at this inspection. Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? 110 ❑ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ ■ ❑ Comment: Analytical monitoring reports were not produced at this inspection. Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? ■ ❑ ❑ ❑ # Were all outfalls observed during the inspection? ❑ ■ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ ■ ❑ # Has the facility evaluated all illicit (non stormwater) discharges? ❑ ❑ ■ ❑ Comment: The facility has a stormwater pond with a valve release and the outfall was beyond the locked gate. Page 3 of 3