HomeMy WebLinkAboutNCG080669_Compliance Evaluation_20210810ROY COOPER
Governor
ELIZABETH S. BISER
Secretary
BRIAN WRENN
Director
City of Newton
Attention: Todd Clark, City Manager
201 W 4th St
PO Box 550
Newton, North Carolina 28658
a�vw
NORTH CAROLINA
Environmenwi Qua ty
August 10, 2021
Subject: Compliance Evaluation Inspection
City of Newton — Public Works Complex
NPDES Certificate of Coverage — NCG080669
Catawba County, North Carolina
Dear Mr. Clark,
Enclosed please find a copy of the Compliance Evaluation Inspection Report for the
inspection we conducted at the Newton Public Works Complex on August 5, 2021. Please note
that in the stormwater inspection report summary we ask that you completely implement the
Stormwater Pollution Prevention Plan with qualitative monitoring and change the sampling
method for the analytical monitoring to only sampling water coming from the site.
The report should be self-explanatory; however, should you have any questions, please do
not hesitate to contact me at (704) 663-1699 or by E-mail at james.moore@ncdenr.gov.
Enclosure
c: Laserfiche
Sincerely,
J s Moore
istant Regional Engineer
North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
Mooresville Regional Office 1 610 East Center Avenue, Suite 301 Mooresville, North Carolina 28115
704-663-1699
1)
Compliance Inspection Report
Permit: NCGO80669 Effective: 07/01/21 Expiration: 06/30/26 Owner: Cityof Newton
SOC: Effective: Expiration: Facility: Newton City - Public Works Complex
County: Catawba 201 W 4th St
Region: Mooresville
Newton NC 28658
Contact Person: Pam McMoran Title: Support Specialist Phone: 828-695-4310
Directions to Facility:
System Classifications: SWNC,
Primary ORC:
Secondary ORC(s):
On -Site Representative(s):
Related Permits:
Inspection Date: 08/05/2021
Primary Inspector: Lily C Kay
Secondary Inspector(s):
Certification: Phone:
Entry Time 11:30AM Exit Time: 12: 30PM
Phone: 704-663-1699
Reason for Inspection: Routine Inspection Type: Compliance Evaluation
Permit Inspection Type: Transportation w/Vehicle Maintenance/Petroleum Bulk/Oil Water Separator Stormwater Discharge COC
Facility Status: ❑ Compliant Not Compliant
Question Areas:
Storm Water
(See attachment summary)
Page 1 of 4
V 10 Z 96ed
L£ 6Z 9EZ (t�01) �e auoyd �q ao nob luapau�n �(eyl �(I!� �e aw �oe�uoo `suogsanb aney no/(�I -slepajew 10 aftio;s op!s;no
jo jol a sey Inq pou!eju!ew pue pejeaado llann sieedde f4!1!oej ayl -a}!s uo su!eip wiols oml 841 sia}ue ia}emwlols ay) se
uaNe} aq pinoys seldwes leo!jtleue ayl •6u!jol!uow anqej!Ienb pue uo!jeogpoo lenuue y}!nn paluawaldwl AIa191dwoo uaaq
}ou sey Inq sluawaimbei pwiad aqj jo Ile UR!M 6 60Z ui padolanap seen (dddS) veld uo!;uanaJd uognllod Jalennw'OIS ayl
tiewwnS uo!joadsul
au1lnoa :3lsl/11oi uoseaa uoilenlen3 aouelldwO : edk uolloadsul IZOZ/90/90 :a=ea uolloadsul
uOVAON Jo 40:4113ed - iaumO 699090DON :;lwJad
Permit: NCG080669 Owner - Facility: City of Newton
Inspection Date: 08/05/2021 Inspection Type: Compliance Evaluation Reason for Visit: Routine
Stormwater Pollution Prevention Plan
Does the site have a Stormwater Pollution Prevention Plan?
# Does the Plan include a General Location (USGS) map?
# Does the Plan include a "Narrative Description of Practices"?
# Does the Plan include a detailed site map including outfall locations and drainage areas?
# Does the Plan include a list of significant spills occurring during the past 3 years?
# Has the facility evaluated feasible alternatives to current practices?
# Does the facility provide all necessary secondary containment?
# Does the Plan include a BMP summary?
# Does the Plan include a Spill Prevention and Response Plan (SPRP)?
# Does the Plan include a Preventative Maintenance and Good Housekeeping Plan?
# Does the facility provide and document Employee Training?
# Does the Plan include a list of Responsible Party(s)?
# Is the Plan reviewed and updated annually?
# Does the Plan include a Stormwater Facility Inspection Program?
Has the Stormwater Pollution Prevention Plan been implemented?
Yes No NA NE
E ❑ ❑ ❑
■ ❑ ❑❑
❑❑❑
■❑❑❑
■ ❑ ❑❑
■❑❑❑
■❑❑❑
❑❑❑
❑❑❑
❑ ❑❑
❑■❑❑
❑❑❑
❑❑❑
Comment: The Stormwater Pollution Prevention Plan (SPPP) was developed in 2019 with all of the permit
requirements but has not been compietely implemented with annual certification and qualitative
monitoring.
Qualitative Monitoring Yes No NA NE
Has the facility conducted its Qualitative Monitoring semi-annually? ❑ ❑ ❑
Comment: Qualitative monitoring has not been conducted.
Analytical Monitoring
Has the facility conducted its Analytical monitoring?
Yes No NA NE
■❑❑❑
# Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? E ❑ ❑ ❑
Comment: Analytical monitoring has been conducted but the samples were pulled from inside the storm
drain inlet were comingling often occurs. The analytical samples should be taken as the
stormwater enters the two storm drains on site.
Permit and Outfalls Yes No NA NE
# is a copy of the Permit and the Certificate of Coverage available at the site? N ❑ ❑ ❑
# Were all outfalls observed during the inspection? 0 ❑ ❑ ❑
# If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ 0 ❑
# Has the facility evaluated all illicit (non stormwater) discharges? ❑ ❑ 0 ❑
Comment: Only one outfall was listed on the drainage map and samples should be taken from both of the
parking lot storm drain inlet on site as the stormwater enters the storm drain. One storm drain
is directly below the fueling station and should be monitored du ring storm events for a sheen.
The facility appears well operated and maintained but has a lot of outside storage of materials.
Page 3 of 4
V }O V SBBd
au!;noa :l!s!A COI uoseaa uo!3en!en3 eoue!!dwo:o : edRj, uo!loodsu! 4ZOZ/90/90 :ele(3 uo!loodsu!
uOlm,9N 10 i()VAI!!!0e:1 - JeumO 699090JON :l!uuad