Loading...
HomeMy WebLinkAboutNCG080397_Compliance Evaluation_20210913ROY COOPER Governor ELIZABETH S. BISER Secretory BRIAN WRENN Director Town of Maiden Attention: Micah Beal 115 West Main Street Maiden, North Carolina 28650 NORTH CAROLINA Environmental Quality September L3, 2021 Subject: Compliance Evaluation Inspection Town of Maiden Public Works Facility NPDES Certificate of Coverage — NCG080397 Catawba County, North Carolina Dear Mr. Beal, Enclosed please find a copy of the Compliance Evaluation Inspection Report for the inspection we conducted at the Town of Maiden Public Works Facility on September 1, 2021 Please note that in the stormwater inspection report summary we ask that the Stormwater Pollution Prevention Plan (SWPPP) needs to be updated to comply with the current permit cycle and qualitative monitoring needs to be completed prior to flows entering the stone sewer system. The report should be self-explanatory; however, should you have any questions, please do not hesitate to contact me at (704) 663-1699 or by E-mail at james.moore@ncdenr.gov. Enclosure c: Laserfiche Sincerely, q ars M kzs� Assistant Regional Engineer erlft Q :> North Carolina Department of Environmental Quality I Division of Energy. Mineral and Land Resources Mooresville Regional Office 1 610 East Center Avenut Suite 3011 Mooresvilk, North Carolina 28115 704.663.1699 Compliance Inspection Report Permit: NCG080937 Effective: 07/01/21 Expiration: 06/30/26 Owner: Town of Maiden SOC: Effective: Expiration: Facility: Town of Maiden - Public Works 115 VV Main St County: Catawba Region: Mooresville Maiden NC 28650 Contact Person: Micah Beal Title: Phone: 828-234-7010 Directions to Facility: Public works is directly across Main Street from the fire department, beside the police department. System Classifications: SWNC, Primary ORC: Certification: Phone: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 09/01/2021 Entry Time 01:OOPM Exit Time: 02:0013M Primary Inspector: Jesse M McDonnell Phone: 704-235-2139 Secondary Inspector(s): Reason.for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Transportation wNehicle Maintenance/Petroleum Bulk/Oil Water Separator Stormwater Discharge COC Facility Status: ❑ Compliant Not Compliant Question Areas: 0 Storm Water (See attachment summary) Page 1 of 3 £ 10 Z 96ed liodej 6uuoliuow amlelllenb pue dddMS palepdn ayj ao}}p leuol6a�j alllnsajoow ayj of }iwgns o} ' �ZOZ 'g jagweoaa illun sey pa}}iwjad ayl •6ulldwes jol mog palejlueouoo molle ll!m slalui ayl jo weaj;sdn mem a 6ulleajo weaj�s ayl 6ulyoeaj smog of joljd pajoal{oo aq of peau saldwes 6uijOj!UOw anljejilenb •81ls ayj saneal weajIs au} ajaynn auop sl 6wldwes 'Alluajjno -weajls a o;ul Apajlp 96jeyosip jeyl ails uo slalui aajyl sey Aj!jpej ayl -Ilwjad ayl jed palaldwoo uaaq IOU sey 6uu0jluow anlleplent) l,iwjad luajjno ayj of palepdn aq 01 spaau dddMS ayl •Pannalnaj uaaq IOU sey pue pa}ep}no sl ueld slyl 'janaMoH •;sed syl ul (dddMS) ueld uoljuanajd uollnllod ja;emwJOIS a pal<aldwoo sey aa}}lwjad ayl :fuewwnS uol;oodsul aullnoa :llslA col uoseab uo!lenlen3 aoueijdwoO: edAL uolloedsul LZOZ/LO/60 :e1ea uo0oedsul uappW;o umol:Aillloed - aeumo L£608003N :IlulJed permit: NCG080937 owner- Facility: Town of Maiden Inspection Date: 09/01/2021 Inspection Type: Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? 0 ❑ ❑ ❑ # Does the Plan include a General Location (USGS) map? M ❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices'? N ❑ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? ❑ 0 ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? ❑ 0 ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? ❑ ❑ ❑ 0 # Does the facility provide all necessary secondary containment? ❑ ❑ ❑ # Does the Plan include a BMP summary? M ❑ ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? 0 ❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ❑ M ❑ ❑ # Does.the facility provide and document Employee Training? ❑ 0 ❑ ❑ # Does the Plan include a list of Responsible Party(s)? N ❑ ❑ ❑ # Is the Plan reviewed and updated annually? ❑ M ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? 0 ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? ❑ 0 ❑ ❑ Comment: The Stormwater Pollution Prevention Plan (SWPPP) was created in 2015 but has not been fully implemented No documentation for facility inspections, annual certifications or spills were available at the time of the inspection. The SWPPP has not been maintained since it was created. Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? ❑ M 1111 Comment: Qualitative monitoring records for the past three monitoring events were not documented._ The most recent monitoring report is from the spring of 2019. Qualitative monitoring samples need to be collected prior to the flows enter the storm sewer system. Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? ❑ ❑ 0 ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ ❑ Comment: Analytical monitoring is not required. Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? 0 ❑ ❑ ❑ # Were all outfalls observed during the inspection? 0 ❑ 110 # If the facility has representative outfall status, is it properly documented by the Division? ❑ 1:10 ❑ # Has the facility evaluated all illicit (non stormwater) discharges? 0 ❑ ❑ ❑ Comment: All outfalls were observed at the time of this inspection. Monitoring collection needs to be done_ prior to the flows entering the storm sewer to prevent the sample from being contaminated. Page 3 of 3