Loading...
HomeMy WebLinkAboutNCG080185_Compliance Evaluation_20210914ROY COOPER Governor ELIZABETH S. BISER Secretary sa s BRIAN W RENN au Director NORTH CAROLINA EAY(Mmental Quality September 14, 2021 United Parcel Services Inc. Attention: Vincent Mollo 2101 Singleton Industrial Drive Raleigh, North Carolina 27604 Subject: Compliance Evaluation Inspection United Parcel Services Inc. NPDES Certificate of Coverage — NCG080185 Cabarrus County, North Carolina Dear Mr. Mollo, Enclosed please find a copy of the Compliance Evaluation Inspection Report for the inspection we conducted at the Kannapolis facility on September 8, 2021. Please note that in the stormwater inspection report summary we ask that you continue to implement your Stormwater Pollution Prevention Plan(SPPP). - The report should be self-explanatory; however, should you have any questions, please do not hesitate to contact me at (704) 663-1699 or by E-mail at james.moore@ncdenr.gov. Enclosure c: Laserfiche Sincerely, J es Moore ssistant Regional Engineer North Carolina Department of Environmental Quality i Division of Energy, Mineral and Land Resources Mooresville Regional Office 1610 East Center Avenue, Suite 301 i Mooresville, North Carolina 28115 704-663-1699 Compliance Inspection Report Permit: NCG080185 Effective: 07/01/21 Expiration: 06/30/26 Owner: United Parcel Service Inc SOC: Effective: Expiration: Facility: United Parcel Service-Kannapolis County: Cabarrus 2605 N Cannon Blvd Region: Mooresville Kannapolis NC 28081 Contact Person: Vincent Mollo _ Title: Phone: 919-790-7423 Directions to Facility: System Classifications: SWNC, Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 09/08/2021 Primary Inspector: Lily C Kay Secondary Inspector(s): Certification: Phone: Entry Time 10:OOAM Exit Time: 10:30AM Phone: 704-663-1699 Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Transportation wNehicle Maintenance/Petroleum Bulk/Oil Water Separator Stormwater Discharge COC Facility Status: Compliant Not Compliant Question Areas: Storm Water (See attachment summary) Page 1 of 3 £ 10 Z 96ed 'L£ 1,Z-9£Z (170L) le auogd Aq Jo no6'Ju8p3u@n Ae>j-AI!j le aw loeluoo `suoilsonb aneq nog( 11 -6uuoliuow ui sllepno a9jy1 Ile apnloui of spaau lnq pauieluiew pue paleiado Hann pajeadde ftpel aul ' 6ZOZ to 11ey )Sig 941 Jol 6UISSIw seen uopoodsui alis lenuueiwas ay) )nq uogeogpoo lenuue ay} pue `spaooaj 6uuoptiow `spiooai 6uiumil aaAoldwa 6uipnloui alaldwoo sear uoi)e)uawnoop pa)ejai pue (dddMS) ueld uoiluanaad uognIIod Ja)emwJolS ayl :AjewwnS uoiloadsul oui;noa :;lsjA jo; uoseea uopenlen3 aouelldwoC): edf%L uolloedsul LZOZ/80/60 :e;ea uolloedsul oul ooiAMS lowed pown :f4woei - jeumo MOOOJON 31LLuOd Permit: NCG080185 Owner - Facility: United Parcel Service Inc Inspection Date: 09/08/2021 Inspection Type: Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Does the site have a Stormwater Pollution Prevention Plan? # Does the Plan include a General Location (LISGS) map? # Does the Plan include a "Narrative Description of Practices"? # Does the Plan include a detailed site map including outfall locations and drainage areas? # Does the Plan include a list of significant spills occurring during the past 3 years? # Has the facility evaluated feasible alternatives to current practices? # Does the facility provide all necessary secondary containment? # Does the Plan include a BMP summary? # Does the Plan include a Spill Prevention and Response Plan (SPRP)? # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? # Does the facility provide and document Employee Training? # Does the Plan include a list of Responsible Party(s)? # Is the Plan reviewed and updated annually? # Does the Plan include a Stormwater Facility Inspection Program? Has the Stormwater Pollution Prevention Plan been implemented? Yes No NA NE ❑ ❑ ❑ ■❑❑❑ ■❑❑❑ ❑❑❑ ■❑❑❑ ■❑❑❑ ❑❑❑ ■❑❑❑ ■❑❑❑ ■❑❑❑ ■❑❑❑ ■❑❑❑ ■❑❑❑ ■❑❑❑ ❑ ❑❑ Comment: The Stormwater Pollution Prevention Plan (SWPPP) and related documentation was complete including employee training records, monitoring records, and the annual certification, but the semiannual site inspection for the first half of 2021 was missing. Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? 0 ❑ ❑ ❑ Comment: Qualitative monitoring records were available and complete. Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? ❑ ❑ M ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ M ❑ Comment: Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? 0 ❑ ❑ ❑ # Were all outfalls observed during the inspection? 0 ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? 1:1 ❑ ❑ # Has the facility evaluated all illicit (non stormwater) discharges? ❑ ❑ N ❑ Comment: The facility listed 2 outfalls but has at least 3 outfalls. No issues were observed at the time of inspection. Page 3 of 3