HomeMy WebLinkAbout20210499 Ver 2_Shoreline Stabilization_20220810(' DUKE ENERGY June 9, 2022 Jeff C. Ferguson, PE — Mountain Region Engineer North Carolina Wildlife Resources Commission Division of Engineering & Land Management 171 Southern Cross Road Weaverville, NC 28787 Subject: Agent Authorization for Black Bear Access Area Installation of Public Fishing Pier on Lake James Catawba-Wateree Hydroelectric Project (FERC No. 2232) Dear Jeff, REGULATED RENEWABLES REGIONAL SERVICES Duke Energy Corporation 526 South Church Street Charlotte, NC 28202 Mailing Address: EC12Q / PO Box 1006 This letter is provided to serve as the "Agent Authorization Letter" and provide North Carolina Wildlife Resources Commission (NCWRC) signature authority for the owner/applicant, that being Duke Energy Carolinas, LLC, for upgrade work proposed at Black Bear Access Area. The work includes the installation of a new fishing pier in Day Use Area. This construction work is proposed to occur within 2022. The upgrades will improve fishing opportunities for the general public. It is understood this work will take place after all the permits are acquired. This authority is granted to assist the NCWRC in acquisition of necessary permits to satisfy Section 404 and/or Section 10 Nationwide, Regional and General Permits, Section 401 general Water Quality Certifications, and Riparian Buffer and Watershed Buffer Rules. Please keep Duke Energy informed with the progress of this project. Contact me a 703- 935-6271 or ryan.snitker@duke-energy.com if you have any questions. Sincerely, Ryan Snitker, Project Manager II Regulated Renewables Regional Services cc: Ashlie Hood - Duke Energy BLACK BEAR FISHING PIER SITE LOCATION MAP s Rn APPROXIMATE ENTRANCE TO DAY USE AREA (UNDER CONSTRUCTION): N35.74968° W81.97090° DUKE ENERGY CORPORATION EXISTING BLACK BEAR BOATING ACCESS AREA Lake James PROPOSED FISHING PIER SITE: N35.74449° W81.96522° Sources: Esri, HERE, Garmin, USGS, Intermap, INCREMENT P, NRCan, Esri Japan, METI, Esri China (Hong Kong), Esri Korea, Esri (Thailand), NGCC, (c) OpenStreetMap contributors and the GIS User Community, Participating NC Counties, NCCGIA, NC OneMap, US EPA 0 200 400 800 1,200 1,600 Feet NORTH CAROLINA WILDLIFE RESOURCES COMMISSION BLACK BEAR PFA ACCESSIBLE FISHING PIER LAKE JAMES MCDOWELL COUNTY z O 0 U N W U 7 rn O co W • N • w z LL H J - Z J W z U < El O w U z W w o � rnw0 O JZ z• Q= U w 2 w W = z J o • z zw DIRECTIONS TO SITE: From downtown Marion, NC: Head east on E. Court Street — 500 ft, Turn left onto N. Garden St. — 0.2 mi, Turn right onto Flemming St. — 0.3 mi, Slight right onto Yancey Rd. (SR-1501) — 4.1 mi, Continue onto Lake James Rd, (SR-1501) After 1,5 mi, entrance to site will be on the right. DAY USE AREA — ENTRANCE N35.74968' W81.97090' 6.3MI. TO MARION PROJECT SITE ADDRESS: 6196 LAKE JAMES RD. MARION, NC 28752 PROJECT SITE COORDINATES: N 35.74449° W81.96522° BEAR CREEK MARINA BLACK BEAR \\___B_DAT RAMP FISHING PIER SITE: N35.74449°, W81.96522° LAKE JAMES BIG ISLAND 0 2,000 Scale: 1"=2,000' SHEET INDEX CD-0.0 - COVER, SITE LOCATION, SHEET INDEX CD-0.1-0.5 - 2018 APPENDIX B BUILDING CODE SUMMARY CD-0.6 - 2018 APPCNXIX B GCOTCCI INICAL REPORT ATTACI IMCNTS CD-0.7 - MATERIALS SPECIFICATIONS CD-2.0 - PROPOSED SITE PLAN & PROFILE CD-2.1 - BUFFER ZONE, SURFACE WATER, SFHA IMPACTS CD-2.2 - EROSION & SEDIMENT CONTROL CD-7.0 - ISOMETRIC VIEW, CONSTRUCTION SEQUENCE CD-7.1 - ABUTMENT PLAN & DETAILS CD-7.2 - PILL LAYOUT -PLAN, PROrILC & CI IART CD-7.3 - BRACING PLAN- AILS CD-7.4 - DECK FRAMING PLAN & ELEVATIONS CD-7.5 - DECK FRAMING DETAILS CD-7.6 - GUARDRAIL POST LAYOUT & DETAILS CD-7.7 - DECKING PLAN & DETAILS CD-7.8 - GUARDRAIL PLAN & DETAILS CD-7.9 - RAILING CAP PLAN, ELEVATIONS & DETAILS CD-8.0 - GUARDRAIL -TYPICAL SECTIONS CD-8.1 - "T" SECTION BCNCI I PLAN & DETAILS Kam! vities below. Call before you did 0 •.•FESSfp °. /ice% • 037 SEAL 7A PERMIT DRAWING SET_07-29-22 �� J C `: G ' , FER SCO ID# 22-24141-01A CONSTRUCTION DRAWINGS z 0 0 J J W 0 0 < 0 0 W 0 J LAKE JAMES ACCESSIBLE FISHING PIER COVER, SITE LOCATION, SHEET INDEX Date: 29-JUL-2022 File Name: BlackBearPFA(S).dwg Surveyed: Designed: Drawn: Approved: JCF JCF Sheet No. cover NORTH CAROLINA WILDLIFE RESOURCES COMMISSION NORTH ENGINEERING SECTION CAROLINA 1720 MAIL SERVICE CENTER /1//• RALEIGH, NORTH CAROLINA 27699 UU /, RESOURCES Phone: 919.707.0150 COMMISSION Fax: 919.707.0162 www.ncwildlife.org STAIRWAY ACCESS (BY OTHERS) 121 EX. ACCESSIBLE ROUTE (BY OTHERS) IT - ,- , EXISTING ACCASSIBLE ROUTE PATH (BY OTHERS) PROPOSED N35.74449' W81.965265° TOP EL.=1202.0o'(NAVD88)=1202.59'(NGVD29)=102.59'(DUKE NORMAL FULL POND EL.=1,200.0 (NGVD29)(100.0' ON DUKE ENERGY DATUM) LAKE JAMES PI ' ABUTMENT (CENTER —FRONT): ENERGY LAKE JAMES LEVEL) S T - Op AZIMUTH OF PIE" 4. FROM FRONT CENTER OF ABUTMENT=125.33' (FROM TRUE NORTH) _ 1 �14 i a �sS4' 14.0' EXISTING FISH ATTRACTOR we,/ } , ofri. BORING POINT Na �♦ oxs� (APPROXIMATE LOCATION) • 13.5'144 4„ 4B25 CLASS—B RIPRAP i • 'i .• '0 r• '0 r• SHORELINE PROTECTION ". ��a,��p�,�t._�'0�.�1 AROUND FACE .• s ' CONCRETE ABU NT .. t (AR e-133SF) , y �, (V% UME=5CY) ' 30 0 30 60 BLACK BEAR PFA LAKE JAMES ACCESSIBLE FISHING PIER PROPOSED SITE PLAN & PROFILE ' i ° Scale: 1" = 30' III 1210 — TOP OF ABUT ENT & ICIER DECK: 1202.53'(NGVD2 )=102.5d' DUKE NERGY LAKE JAMES DATUMJ,1202.00'GNAV88)] $0.9' ROLL PONDI LEVEL: 11200.00GVD29) _I I -� 1205 1200 7(3'O.C. I ARGET SIMMER L/EL: 1198.0'(NGVD9) TYP) 0.0 O.C. `1111 1 195 `r1IORMAL SIMMER M N. LEVEL 1195.0' NGVD29) CLASS—ElRIPRAP SHORELINE PROTECTION II C ` ORMAL /INTER Mt LEVEL: 1192.01GVD29) 1 19 0 2.2 ',Q,,�H CARD` `, Date 29-JUL-2022 1 180 PROPOSED FISHING PIER PROFILE LJ LQ,KEBED _ i � - �O FESS,0 `.4' ' _ :QP 9�°°; SEAL �,�q�� File Name: BlackBearPFA.dwg Surveyed: Designed: JCF Drawn: JCF Approved: Scale: H-1"=10' I — - 037 / Y V-1'=10' I I I I I _ I •0,<�F!V r �.. 1175 I I I I I SCO ID# 22-24141-01A ',,'',,,C. Sheet No. CD-2.0 0+00 0+25 0+50 0+75 CONSTRUCTION DRAWINGS FERG7., 0�� 1 +00 ,,,,,,, ,,,, '411WATMITM. opp PR. TIMBER STEPS (BY OTHERS) 30' .01%AE FLOOD HAZARD LIMIT BASE FLOOD ELEV.=1205.7'(NAVD88) DFIRM MAP# 3710172300J PANEL# 1723 20 20 mir •fl4 EX. ACCESSIBLE ROUTE PATH (BY OTHERS) 8.0' CLASS—B RIPRAP SHORELINE PROTECTION AROUND FACE OF CONCRETE ABUTMENT (AREA=133SF (VOLUME= ) TOP OF BANK CO PIER SITE NORMAL FULL POND EL.=1,200.0'(NGVD29)(100.0' ON DUKE ENERGY DATU ) PROPOSED CONC E ABUTMENT (CENTER —FRONT): N35.74449' W81.965265' � TOP EL. =120.00'(NAVD88)=1202.59'(NGVD29)=102.59'(DUKE \AZIMUTH OF PIER FROM FRONT CENTER OF ABUTMENT=125. ro LIMITS OF DISTURBANCE= 2,753SF (0.06AC.) FOR PILE DRIVING BY TRACKED EQUIPMENT OVER DRY LAKE BED AND BY BARGE OVER OVER SURFACE WATER, CONSTRUCTION OF CONCRETE ABUTMENT AND SHORELINE STABILIZATION (BASED ON NORMAL TARGET WINTER LAKE LEVEL @ EL.-1192.0' NGVD29). 40 Scale: 1" = 20' LAKE JAMES NERGY LAKE JAMES LEVEL) 3° (FROM TRUE NORTH) FOOTPRINT OF PROPOSED PIER STRUCTURE AND CONCRETE ABUTMENT=1,266SF NOTE: DUKE ENERGY PREVIOUSLY OBTAINED APPROVAL FOR ALL TEMPORARY AND PERMANENT IMPACTS WITHIN THE CATAWBA RIVER BUFFER ZONES ASSOCIATED WITH THE DAY —USE AREA DEVELOPMENT PROJECT THROUGH THE PERMITTING AUTHORITY OF MCDOWELL COUNTY. A WATER QUALITY CERTIFICATION FOR SURFACE WATER IMPACTS MAY BE REQUIRED FROM NC DEQ DIVISION OF WATER RESOURCES. SURFACE WATER IMPACTS FROM INSTALLATION OF PIER PILINGS, CONCRETE ABUTMENT AND RIPRAP STABILIZATION AROUND THE ABUTMENT WERE REVIEWED BY US ARMY CORPS OR ENGINEERS, AND WILL BE ALLOWABLE UNDER A RGP 30 WITH NO WRITTEN NOTIFICATION REQUIRED. CONTRACTOR AND AGENTS ARE REQUIRET TO COMPLY WITH THE TERMS AND CONDITIONS OF NC WATER QUALITY GENERAL CERTIFICATCATION NO. 4502 IN THE CONSTRUCTION OR MAINTENANCE OF THIS PROJECT AND SHALL CONDUCT ALL ACTIVITIES IN A MANNER CONSISTENT WITH STATE WATER QUALITY STANDARDS AND ANY OTHER APPROPRIATE REQUIREMENTS OF STATE AND FEDERAL LAW. PERMITTEE SHALL PROVIDE CONTRACTOR WITH A PRINTED COPY OF GC4502 IN ITS ENTIRETY. THE FOLLOWING ARE EXCERPTS OF CONDITION LISTED THAT PERTAIN TO THIS SPECIFIC PROJECT: • NO WASTE, SPOIL, SOLIDS OR FILL OF ANY KIND SHALL OCCUR IN WETLANDS OR WATERS BEYOND THE THRESHOLDS ESTABLISHED FOR USED OF THE GENERAL CERTIFICATION AND REGIONAL GENERAL PERMIT. • ALL PROJECT SHSALL INCORPORATE APPROPRIATE BEST MANAGEMENT PRACTICES FOR SEDIMENT AND EROSION SO THAT NO VIOLATIONS OF STATE WATER QUALITY STANDARDS, STATUTES, OR RULES OCCUR. • SEDIMENT AND EROSION CONTROL MEASURES SHALL NOT BE INSTALLED IN WETLANDS OR WATERS EXCEPT WITHIN THE FOOTPRINT OF TEMPORARY OR PERMANENT IMPACTS OTHERWISE AUTHORIZED BY THIS PERMIT. • EROSION CONTROL MATTING THAT INCORPORATES PLASTIC MESH AND/OR PLASTIC TWINE SHALL NOT BE USED ALONG STREAMBANKS OR WITHIN WETLANDS. • ALL WORK IN OR ADJACENT TO STREAMS AND OPEN WATERS SHALL BE CONDUCTED SO THAT FLOWING STREAM AND/OR OPEN WATRS ARE ISOLATED FROM THE DISTURBED AREA. TURBIDITY DUE TO ACTIVITIES IN RECEIVING LAKE WATER SHALL NOT EXCEED 25 NTU OR BE EXISTING TURBIDITY LEVELS SHOULD NOT BE INREASED IF NATURAL BACGROUND CONDITIONS EXCEED 25 NTU. • IF ACTIVITIES MUST OCCUR DURING PERIODS OF HIGH BIOLOGICAL ATIVITES (FISH SPAWNING OR BIRD NESTING), THEN BIOLOGICAL MONITORING MAY BE REQUIRED AT THE REQUEST OF OTHER STATE AND FEDERAL AGENCIES AND COORDINATED WITH THESE ACTIVITIES. • IF CONCRETE IS USED DURING CONSTRUCTION, THEN ALL NECESSARY MEASURES SHALL BE TAKEN TO PREVENT DIRECT CONTACT BETWEEN UNCURED OR CURING CONCRETE AND WATERS OF THE STATE. WATER THAT INADVERTENTLY CONTACTS UNCURED CONCRETE SHALL NOT BE DISCHARGED TO WATERS OF THE STATE. • ANY RIPRAP REQUIRED FOR PROPER SHORELINE STABILIZATION OR RESTORATION OR RESTORATION OF TEMPORARILY DISTURBED AREAS SHALL BE RESTRICTED TO THE AREA DIRECTLY IMPACTED BY THE APPROVED CONSTRUCTION ACTIVITY. ALL RIPRAP SHALL BE OF A SIZE AND DENSITY TO PREVENT MOVEMENT BY WAVE, CURRENT ACTION, OR STREAM FLOWS, SHALL CONSITST OF CLEAN ROCK OR MASONRY MATERAIL FREE OF DEBRIS OR TOXIC POLLUTANTS. PLACEMENT OF STABILIZATION MATERIALS SHALL NOT RESULT IN DESTABILIZATON OF SHORELINE UPSTREAM OR DOWNSTREAM OF THE AREA. • ALL MECHANIZED EQUIPMENT OPERATED NEAR SURFACE WATERS SHALL BE INSPECTED AND MAINTAINED REGULARLY TO PREVENT CONTAMINATION OF SURFACE WATERS FROM FUELS, LUBRICANTS, HYDRAULIC FLUIDS OR OTHER TOXIC MATERIALS. CONSTRUCTION SHALL BE STAGED IN ORDER TO MINIMIZE EXPOSURE OF EQUIPMENT TO SURFACE WATERS TO THE MAXIMUM EXTENT PRACTICABLE. FUELING, LUBRICATION AND GENERAL EQUIPMENT MAINTENANCE SHALL BE PERFORMED IN A MANNER TO PREVENT, TO THE MAXIMUM EXTENT PRACTICABLE, CONTAMINATION OF SURFACE WATERS BY FUELS AND OILS. • IN ACCORDANCE WITH G.S. 143-215.85(b), THE PERMITTEE SHALL REPORT ANY PETROLEUM SPILL OF 25 GALLONS OR MORE; ANY SPILL REGARLESS OF AMOUNT THAT CAUSES A SHEEN ON SUFACE WATERS; ANY PETROLEUM SPILL REGARDLESS OF AMOUNT OCCURING WITHIN 100 FEET OF SURFACE WATERS; AND ANY PETROLEUM SPILL LESS THAN 25 GALLONS THAT CANNOT BE CLEANED UP WITHIN 24 HOURS. CONTRACTOR MUST CONTACT PERMITTEE OR OWNER REPRESENTATIVE IMMEDIATELY FOLLOWING ANY SUCH OCCURANCE. o,,,, r 1 t r r r,,,, OPo ESS a6li4/ SEAL7/ f 3 / 0 7 •�.FNv�r tie:•' ,,,���• C r,FERGJoss's Z z 0 0 0 w 0 7 rn 0 w N • wz w z LL Z 0 z - Z 0 < o -1Ow0 `n §1=0= o Z www N.0 ° tnw0 ai 0• Ornz oo-o z = rn — Q 0 di 0 w 2 w rn Z CN o Q 2 w5N.- aw O z BLACK BEAR PFA LAKE JAMES 2 J r Lu 0 O0 0 J LL Z � 2 07 LL 0 J ci- ao 2 LLJ 00 U I— Q Q LLJ Date: 29-JUL-2022 File Name: BlackBearPFA.dwg Surveyed: Designed: Drawn: Approved: JCF JCF A FLOODPLAIN DEVELOPMENT PERMIT APPLICATION HAS BEEN APPROVED BY MCDOWELL COUNTY FOR THOSE IMPACTS BELOW THE BASE FLOOD ELEVATION OF LAKE JAMES. SCO ID# 22-24141-01A CONSTRUCTION DRAWINGS Sheet No. CD-2.1 0 N O 7— NORMAL FULL P ND EL.=1,200.0'(NG D29)(100.0' ON DUKE ENERG TOP OF/BANK IP PIER SITE CLASS-B RIPRAP SHORELINE PROTECTION AROUND FACE OF CONCRETE ABUTMENT (AREA=133SF) (VOLUME=5CY) NNN INSTALL & MAINTAIN SEDIMENT FENCE ALONG LAKEWARD SIDE OF ABUTMENT CONSTRUCTION AREA DURING EXCAVATION, FORMING AND CONCRETE PLACEMENT. REMOVE SEDIMENT FENCE TO INSTALL RIPRAP SHORELINE STABILIZATION AROUND BASE OF FINISHED ABUTMENT. LIMITS OF DISTURBANCE= 2,753SF (0.06AC.) FOR PILE DRIVING BY TRACKED EQUIPMENT OVER DRY LAKE BED AND BY BARGE OVER OVER SURFACE WATER, CONSTRUCTION OF CONCRETE ABUTMENT AND SHORELINE STABILIZATION (BASED ON NORMAL TARGET WINTER LAKE LEVEL @ EL.-1192.0' NGVD29). EROSION & SEDIMENT CONTROL PRACTICES Scale: 1 "=20' DATUM) INSTALL & MAINTAIN SEDIMNENT FENCE ALONG LANDWARD SIDE OF SURFACE WATER LEVEL DURING PILE DRIVING AND EQUIPMENT ACTIVITY ON DRY LAKEBED. 8' MAX. POST SPACING FOR STANDARD STRENGTH FABRIC WITH WIRE FENCE FILTER FABRIC STEEL POST WIRE MESH MWMEMMUMMEMMEMMEMMEMMEMEMM ■.....0..................■ MEMMEMMEMMEMMEMMEMMEMMEMEM ■.....11..................■ MEMMEMMEMMEMMEMMEMMEMMEMEM MEM MEUMMEMMEMMEMMEMMEMMEMEMEM ■.....11..................■ MEMMEMMEMMEMMEMMEMMEMMEMEM swum mmommommomm411 24' I_ I 8" DOWN & 4" FORWARD ALONG THE TRENCH PLASTIC OR WIRE STEEL TIES POST WIRE FENCE BACKFILL TRENCH AND COMPACT THOROUGHLY NATURAL GROUND UPS NATURAL " MIN. GROUND FILTER FABRIC CROSS-SECTION SEDIMENT FENCE SPECIFICATIONS 1. SEDIMENT FENCE FABRIC SHALL BE AT LEAST 95% BY WEIGHT OF POLYOLEFINS OR POLYESTER CERTIFIED BY MANUFACTURER AS CONFORMING TO ASTM 6416. 2. SYNTHETIC FILTER FABRIC SHALL CONTAIN ULTRAVIOLET RAY INHIBITORS AND STABILIZERS TO PROVIDE A MINIMUM EXPECTED USEABLE CONSTRUCTION LIFE OF 6-MONTHS AT A TEMPERATURE RANGE OF 0' - 120T. 3. POSTS FOR SEDIMENT FENCE SHALL BE MIN. 1.25LB/LF STEEL WITH A MINIMUM LENGTH OF 5-FEET AND PROJECTIONS TO FACILITATE FASTENING THE FABRIC. STEEL POSTS SHALL BE DRIVEN A MINIMUM OF 24-INCHES INTO GROUND. 4. FILTER FABRIC SHALL BE REINFORCED BY BACKING WITH MIN. 14GA. WIRE FENCE W/ 6" MAX. OPENINGS_ 5. HEIGHT OF INSTALLED SEDIMENT FENCE SHALL NOT EXCEED 24-INCHES ABOVE GROUND SURFACE. 6. CONSTRUCT SEDIMENT FENCE USING CONTINUOUS ROLL CUT TO AVOID JOINTS. WHERE JOINTS ARE NECESSARY, SECURELY FASTEN FABRIC ONLY AT POST WITH 4-FEET OVERLAP, 7. EXTEND WIRE MESH SUPPORT TO BOTTOM OF TRENCH. 8. FASTEN STEEL FENCE REINFORCEMENT THEN SILT FENCE FABRIC TO UPSLOPE SIDE OF POSTS USING WIRE OR PLASTIC ZIP TIES WITH MIN. 50LBS. OF TENSILE STRENGTH. MAINTENANCE • INSPECT SEDIMENT FENCES AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL. MAKE ANY REQUIRED REPAIRS IMMEDIATELY. • SHOULD THE FABRIC OF A SEDIMENT FENCE COLLAPSE, TEAR, DECOMPOSE OR BECOME INEFFECTIVE, REPLACE IT PROMPTLY. • REMOVE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN AND TO REDUCE PRESSURE ON THE FENCE. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEANOUT. • REMOVE ALL FENCING MATERIALS AND UNSTABLE SEDIMENT DEPOSITS AND BRING THE AREA TO GRADE AND STABILIZE IT AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED. DETAIL - SEDIMENT FENCE NOT TO SCALE 1210 PROPOSED CONCRETE ABUTMENT 1205 ---• 1_0 EX STING GR' DE .- wit, 2' 1 195 N4DOT 24rINCH CLASS-B MIN. RIPRAP: THICKNESS ',War •'4,04 1 a�;�_- �•�.,�, 3' SYNTHETIC FILTER (CLOTH 3' 1190 1185 DETAIL - ROCK RIPRAP SHORELINE STABILIZATON AT PROPOSED PIER ABUTMENT NOT TO SCALE RIPRAP SHORELINE STABILIZATION AROUND ABUTMENT SHALL MEET SPECIFICATIONS IN SECTION 6.15 OF NC EROSION & SEDIMENT CONTROL MANUAL: • REMOVE BRUSH, STUMPS, DEBRIS FROM AREA. EXCAVATE BASE SUCH THAT SURFACE OF RIPRAP WILL COINCIDE WITH THAT OF SURROUNDING UNDISTURBED SOIL. SLOPE SHALL NOT EXCEED 41' OR 1.2H:1V. PLACE FILTER FABRIC OVER BASE WITH MIN. 12" OVERLAP AT SEAMS. FABRIC MAY BE WOVEN OR NONWOVEN MEETING ASTM-D-1682 OR D-177: E.O.S. S U.S. STANDARD SIEVE NO. 70 (0.21 mm) TOTAL OPEN AREA S 10% THICKNESS: 20-60MIL GRAB STRENGTH: 90-120LBS. • TAKE CARE NOT TO DAMAGE FILTER FABRIC WHEN PLACING STONE. REMOVE RIPRAP AND REPLACE ANY DAMAGED SECTIONS. PLACED STONE SHALL BE A DENSE, WELL GRADED MASS WITH MINIMAL VOIDS. •• •• •• .``�;.(H CAg0'1",,, �O FESS%O'•1;•• -7 i QP0 9< •' SEAL- 7/ - 037: / C• FERGJ.``�. ,n,i,r��`` z 0 0 U w U tY rn 7 O N • w z LL z z J W z O < J O w U Zwwo • h w O O O J z Q0 U w 2 w w = z ON J O • z zw BLACK BEAR PFA LAKE JAMES Date: 29-JUL-2022 File Name: BlackBearPFA.dwg Surveyed: Designed: Drawn: Approved: JCF JCF SCO ID# 22-24141-01A CONSTRUCTION DRAWINGS Sheet No. CD-2.2 CONSTRUCTION SEQUENCE & NOTES: 1. CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING 811 AND ORDERING UTILITY LOCATION FOR THE WORK AREA PRIOR TO ANY EXCAVATION. 2. MATERIALS AND EQUIPMENT FOR PIER CONSTRUCTION MAY BE STAGED FROM THE DAY USE OR BOAT RAMP AREA WHERE DESIGNATED BY DUKE ENERGY (OWNER). MATERIALS SHOULD NOT BE STOCKPILED WITHIN THE SHORELINE BUFFER AREA. 3. CONTRACTOR SHALL BE RESPONSIBLE FOR ORDERING ALL BUILDING INSPECTIONS ACCORDING TO THE COUNTY'S SCHEDULE FOR REQUIRED INSPECTIONS. 4. CONTRACTOR SHALL INSTALL AND MAINTAIN EROSION AND SEDIMENT CONTROL PRACTICES AS DETAILED ON SHEET CD-2.2. 5. PILES ARE TO BE MIN. 10'0 AT TIP, AND SHALL BE DRIVEN BY IMPACT OR VIBRATORY HAMMER. PRE -DRILLING IS ALLOWABLE WHERE NECESSARY, BUT JETTING OF PILES IS PROHIBITED. 6. PILES SHALL BE DRIVEN AT LEAST TO THE MINIMUM EMBEDMENT DEPTH LISTED IN THE PILE TABLE ON SHEET CD-7.2. IF REFUSAL OCCURS BEFORE ACHIEVING MIN. EMBEDMENT, CONSULT PROJECT ENGINEER. 7. EQUIPMENT ACCESS TO PILE LOCATIONS WILL BE DICTATED BY WATER LEVELS. DURING LOW LAKE LEVELS, PILES WILL NEED TO BE SET BY EXCAVATOR WITH VIBRATORY HEAD. PILES SET BELOW THE WATER LINE MUST BE DRIVEN FROM BARGES. EXCAVATOR ACCESS WILL BE VIA THE EXISTING, GRAVEL PATH LEADING TO THE PIER SITE AND THROUGH THE LOCATION OF THE PROPOSED PIER ABUTMENT. THE CONCRETE ABUTMENT SHALL NOT BE INSTALLED UNTIL AFTER ALL ACTIVITIES REQUIRE EXCAVATOR ACCESS ARE COMPLETED. 8. INSTALL SHORELINE STABILIZATION (RIPRAP) AROUND BASE OF ABUTMENT PRIOR TO FRAMING OF PIER. 9. PIER SECTIONS MAY BE BUILT IN STAGES OR AFTER ALL PILE BENTS, CAPS AND BRACES ARE INSTALLED AT THE CONTRACTOR'S DISCRETION. TEMPORARY BRACING MAY BE INSTALLED AS NEEDED. BACK END 10. ALL END CUTS AND PRE -DRILLED BOLT HOLES SHALL BE COATED WITH COPPER-NAPHTHENATE OR EQUIVALENT PRESERVATIVE. PRESERVATIVE SHOULD NOT BE APPLIED OVER OPEN WATER IF POSSIBLE. 11. ENSURE THAT ALL FASTENERS AN CONNECTING HARDWARE ARE GALVANIZED OR OTHERWISE COATED TO RESIST CORROSION FROM ELEMENTS AND CONTACT WITH PRESERVATIVE TREATED LUMBER. 12. USE ONLY THOSE FASTENERS AND CONNECTORS SPECIFIED ON SHEET CD-0.7. ANY SUBSTITUTIONS MUST MEET OR EXCEED THE LOAD VALUES FOR THE SPECIFIED HARDWARE AND MUST BE APPROVED BY THE DESIGN ENGINEER. 13. CULL ANY LUMBER THAT IS SPLIT, WARPED, OR DOES NOT APPEAR TO HAVE THE PROPER LEVEL OF PRESERVATIVE TREATMENT. 14. RAILING POST SPACING SHOULD NOT EXCEED 5' ON CENTERS. 15. INSTALL DECK BOARDS WITH 1/8-IN SPACE BETWEEN BOARD EDGES. 12. PRE -DRILL SCREW HOLES AT ENDS OF DECK OR RAILING BOARDS (< 2-IN. THICK) TO PREVENT SPLITTING. 13. ALL RAILING CAPS SHALL BE SLOPED TO DRAIN TOWARD THE PIER DECK AT 15'. 14. IN FORMING CONCRETE ABUTMENT, EITHER INSTALL PLATE DOWELS AS SHOWN ON SHEET CD-7.1 TO THE WIDTH OF THE CONCRETE SIDEWALK AT INTERFACE, OR FORM A 3" LEDGE INTO THE ABUTMENT TO SUPPORT THE WALKWAY AND PREVENT DIFFERENTIAL SETTLEMENT. 15. BASE OF ABUTMENT SHALL EXCAVATED TO IN -SITU SOIL, AND SHALL BE MIN. 2-FEET BELOW ADJACENT FINISHED GRADE. 16. CONCRETE ABUTMENT SHALL HAVE A BROOM FINISHED SURFACE. 17. INSTALL FILTER FABRIC AND RIPRAP PROTECTION AROUND SIDES AND FACE OF ABUTMENT BETWEEN ELEV. 1202.0'(NGVD29) AND 1997.0'(NGVD29) AS SHOWN IN PROFILE ON SHEET CD-2.0. 18. CONTRACTOR SHALL REMOVE ALL LUMBER TAGS FROM FINISHED PIER STRUCTURE AND REMOVE ALL WASTE OR OTHER RUBBISH FROM THE WORK AREA. LEFT SIDE FRONT END SCO ID# 22-24141-01A CONSTRUCTION DRAWINGS oPo ESS o 1/2, SEAL7/ f 3 / 0 7 ...... r,FE,R�`os 0 o N oar' o N. o d rn 0 7 0 U o o >< aLs_ z 0 0 U w U 7 • rn O W N • wz w z LL z z J W z O < J O w U Z W tY tY • W w 0 O J z O W 2 w w = Z J O • z zw ACCESSIBLE FISHING PIER LAKE JAMES ISOMETRIC VIEW, CONSTRUCTION SEQUENCE Date: 29-JUL-2022 File Name: BlackBearPFA(S).dwg Surveyed: Designed: Drawn: Approved: JCF JCF Sheet No. C D-7.0 L: t ; _.:: ' • 4 {'� .M, �W, fi ,f� 5`• �. St � !tnfSI ` .S- . ,�by �F � t� nWSY Aitt i 1 •. ' }$' {��• �.i 4 a1: ': �: r. -ACR ' is # l'� • _ - - - _ ... i•r +lam' .. .. - • _. • • • • • .r ,.Y 'd' I,i ,.. - - - s - McDowell County Planning Department 60 East Court Street Marion, NC 28752 Telephone (828).652.7121 rrww.mcdlorr-clI{2ov.com Major Shoreline Permit Start Work Letter March 26, 2021 Duke Energy of the Carolinas, LLC 526 South Church Street -EC 12Q Charlotte, NC 28202 Re: Black Bear Access Area/ Recreation The letter serves as notification of the issuance of a McDowell County Major Shoreline Protection Permit Start Work Letter. In accordance with the 2020 Lake James Protection Ordinance, this permit is issued for building, land disturbance, and allowed vegetation removal only. Development standards as submitted by lot owner: • 164 acres per construction drawings • Temporary/Current Disturbance Area: 21.7 Ac • Project is part of FERC relicensing agreement • Sediment and Erosion control plan in place • All other required permits obtained and/or in place It is the responsibility of the contractor to notify McDowell County Planning should any changes be made to the plan regarding placement of structures, vegetation removal other than that for the home, septic, driveway, and accessory structures, or any additional land disturbing or vegetation removal not noted in the submitted plans. Those found doing work not noted on the site plan or not notifying McDowell County Planning of scope of work change, with be in violation of Section 205 of the 2020 Lake James Protection Ordinance. The offender will be subject to a fine of not more than $500.00. The removal of each protected tree will be considered a sperate violation. Working without a permit or the wrong permit will not be tolerated. McDowell County Major Shoreline Protection Permit Permit PIN # Application # Location of Use or Parcel & Lot # 1713-89-6460 Owner / Agent Duke Energy Corporation Address 526 S. Church St. — EC12Q, Charlotte, NC 28202 Phone 980-373-3974 Email ashlie.hood@,duke-energy.com Type of Use Recreation Before a Shoreline Protection Permit will be issued the following information must be submitted to Planning Staff for any work occurring with 250 feet of the Duke Energy Project Boundary. Property Owners/Agents are responsible for evaluation of their respective parcels, thereby placing the burden on the homeowner/agent to comply with the Ordinance. (x) Name and address of person who prepared the plan (x) Date of the plan and an accurate record of any later revisions (x) North arrow (x) Property boundaries (x) Approximate contour lines at 10' intervals (x) Location and dimensions of existing and/or proposed structures (x) Location and dimensions of proposed roads, driveways, walks, paths and any other proposed access corridor (x) The Reference Line AND 50' setback line (x) Location of any trees proposed for removal and the location of replacement trees and other proposed plantings. Protected Trees are 2 inches in diameter and greater. (x) Sedimentation and erosion control plan. (x) Location of the proposed area of disturbance for any shoreline stabilization and description or plan of proposed stabilization measures 1 (x) Home site, septic system, and any accessory buildings must be staked prior to staff making a site visit. (x) Total parcel coverage by impervious surfaces - including building footprint, impervious roads, or other impervious cover shall not exceed twenty-four (24) percent of the parcel. This coverage % of the property covered must be certified by a land surveyor. (x) A description of the scope of work to be done on the lot under this permit. Examples: clearing of home site, shoreline stabilization, dock, pathway to water's edge, driveway, etc. If the scope of work changes during the process it is the responsibility of the owner/contractor to update this permit and allow staff to check for compliance. Any work that is found to be done and not part of the permitted scope will be subject to a fine. *Failure to complete/provide the items on this check list will result in the application being rejected. *A Shoreline Protection Permit shall expire if a Building Permit or Certificate of Occupancy is not obtained within 12 months from the date of issuance. Expired Permits will require new application and fee. *A Start Work Letter will be issued once staff makes a site visit to determine if all rules and regulations of the Ordinance have been met. *No work may begin within 250 feet of the water prior to issuance of a Start Work Letter. This application does not grant permission to begin work. (WORK THAT BEGINS WITHIN 250 FEET OF THE WATER PRIOR TO ISSUANCE OF A START WORK LETTER WILL RESULT IN FINES AS LEVIED BY THE BOARD OF COMMISSIONERS, AS WELL AS A STOP WORK ORDER.) Owner/Agent Certification: The undersigned owner/agent does hereby agree and certify that the information given is true. The owner/agent further agrees to abide with all the terms of the Lake James Protection Ordinance. Failure to comply will result in fines and/or revocation of Shoreline Protection Permit. Signature of Owner/Agent: Date: Authorized by: Date: 2 *This permit expires one (1) year from the date of issuance if appropriate action has not been taken to ensure its continuance. Description of work: The Black Bear Access project includes a campground and day use area. This is a recreation project funded by Duke with the anticipation of turning the park over to McDowell County once the project is complete. (See sheet L3.0 of plan set for reference) Campground: There are no disturbances or site elements from the campground planned within the 50' buffer. There are some natural surface trails planned within the 100' buffer. Day Use Are: The day use area consists of a picnic area, natural surface trails, a path to a proposed fishing pier and a pavilion and parking area. Items within the 50' buffer include: - Fishing pier access path (concrete) - Picnic table and pad - Split rail fence for safety - Natural surface path Items within the 100' buffer include the above items plus: - Portions of an open-air pavilion - Stormwater discharge and inlets - Vault toilet and concrete pad - Access stairs (See EC sheets in plan set for Erosion Control Plan) (See sheet L1.0 in plan set for site Preparation and tree removal) 3 Please be advised that all the tenets of the Lake James Protection Ordinance will need to be adhered to. If you have any questions please contact the Planning Department 828-652-7121 or rharnion nze.doe119,0%_corn. This permit will expire after 1 year, if action has not been taken to ensure continuance. Deputy County Manager for Community Development Cc: McDowell County Building Inspections Shoreline Stabilization Application Form NORTH CAROLINA Environmental Quality 15A NCAC 02H .0500 — Water Quality Certification, Shoreline Stabilization FORM: SSGP 10-2013 DRAFT -NOT FOR USE AT THIS TIME Submission Form I. Applicant Information [15A NCAC 02H .0502(a)] Please note: fields marked with a red asterisk * below are required. You will not be able to submit the form until all mandatory questions are answered. Primary Contact Email * jeffierguson@ncwildlife.org Please provide an email address for payment and requests for more information here. Pre -Filing Meeting Date Request was 6/2/2022 submitted on: * Owner Information: Name: * Email: * Phone Number: Mailing Address: * Duke Energy Corporation ryan.snitker@duke-energy.com (703)935-6271 (xxx)xxx-xxxx Street Address 526 South Church Street Address Line 2 City Charlotte Postal / Zip Code 28202-1802 State / Province / Region NC Country US Is there an agent working on the project?* Yes No Agent/Consultant Information Name: * Jeff C. Ferguson, PE Company Affiliation: * North Carolina Wildlife Resources Commisison Email: * jeff.ferguson@ncwildlife.org Phone Number:* (828)231-3517 (xxx)xxx-xxxx Mailing Address:* Street Address 171 Southern Cross Road Address Line 2 City State / Province / Region Weaverville NC Postal / Zip Code Country 28787 USA A signed and dated copy of the Agent Authorization letter: * NCWRC Authorization to Act as Agent - 91.34KB Black Bear 060922.pdf Link to: Sample Agent Authorization Form Project Information [15A NCAC 02H .0502(a) & (b)] Project Name: * Black Bear Public Fishing Pier If your project has a formal name please use this. If your project does not have a formal name, please identify your project by the owner name and proposed activity (Jones Property Access Road, Smith Guest House, etc.) List in parentheses any other names that have been used to identify the project in the past. 1. Provide a vicinity map (i.e. street map) clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. * Upload File Look up address Upload Map: BlackBearPFA-SITE LOCATION MAP.pdf 1.55MB Latitude:* 35.744490 Longitude: *-81.965220 2. Provide a detailed site plan showing property boundaries and proposed locations of vegetation clearing, structures (buildings, retaining walls, docks, impervious surfaces, etc.), rip rap, excavation or dredging below Full Pond/ Normal Water Level elevations, and construction access corridors. You may use the diagram under section 12.normal pool lake level/normal water level* Black Bear Fishing Pier_Permit Drawings072922.pdf Please use the diagram at the link below: 3.54MB https://edocs.deq.nc.gov/WaterResources/0/edoc/616616/Shoreline%20Layout.docx 3. Attach a photograph of the shoreline/ buffer proposed to be stabilized. (Include a scale of some sort- a yard stick, shovel handle, etc.) Black Bear Pier Site Photo 07-27-22 8-foot long rod for scale.pdf 190.92KB 4. Location of the property (where work is to be conducted) Nearest Town: * Marion County:* McDowell Lake/ river/ ocean adjacent to Lake James property: Subdivisions name or site address: * Directions to site: * From downtown Marion, NC: 6196 Lake James Road, Marion, NC (Duke Energy day use area) Include phase/lot number Head east on E. Court Street - 500 ft, Turn left onto N. Garden St. - 0.2 mi, Turn right onto Flemming St. - 0.3 mi, Slight right onto Yancey Rd. (SR-1501) - 4.1 mi, Continue onto Lake James Rd, (SR-1501) After 1,5 mi, entrance to site will be on the right. Please include road names and numbers, landmarks etc. 5. Describe the existing land use or condition of the site at the time of this application: * Day use recreation area currently in construction. Road and parking facilites have been graded in along with the accessible route pathway to the fishing pier site. Residential, undeveloped, etc. 6. Property Size 164 Acres 7. Describe proposed work (include discussion as to how hardening of shoreline has been avoided, or why it is necessary): The NC Wildlife component of day use area development is limited to construction of a fixed, universally accessible fishing pier. The pier will extend approximately 90' over the lake from the shoreline to reach fishable water depth at year-round target lake levels. The pier will be supported by driven timber piles. An 8'x8' concrete abutment will be installed just above the full pond level (1200' MSL NGVD29) to connect the pier to the shoreline and is a component of the water dependent fishing pier structure. Geotextile and rock riprap will be installed along the front face (lakeward) and sides of the proposed abutment to protect the abutment base from being eroded by wave action. The attached permit drawings show details of the overall site plan, extents of the impact area and proposed shoreline stabilization at the pier abutment. Construction of the pier, abutment and shoreline stabilization at the abutment will be done during the fall -winter season when lake levels are at their lowest. The sites of the abutment and near shore pilings will be above the lake level at the time of construction and will be installed from land. Piling locations near the end of the proposed pier will be below the lake level and will be driven from a water -based barge. Sediment fence is to be installed along and above the surface water level across the width of the proposed area of disturbance for equipment activities associated with pile driving on the lakebed. An accessible route path and steps connecting the proposed parking area and the pier abutment are components of Duke Energy Corporation's day use area development project. Design and construction of these features are by Duke Energy contractors. These, and all other buffer impacts excluding the fishing pier, pier abutment and shoreline stabilization at the abutment, have already been approved under a McDowell County Major Shoreline Protection Permit (attached). 8. How will the work be done?* [s, From Land (� From Water 9. Total amount of disturbance below the normal pool lake level/ normal water level: * (including all clearing, back fill, excavation, rip rap, retaining walls, etc.) 2647 square feet 10. Total amount of disturbance above the normal pool lake level/ normal water level and 50 feet land- ward: * (including all clearing, back fill, excavation, rip rap, retaining walls, etc.) 106 square feet 11. Please describe the vegetation above the normal pool lake level/ normal water level and 50 feet landward to be impacted:* (number of trees, for instance) The area of buffer impact for construction of the accessible route path has been cleared, graded an stabilized with seeding & RECP by Duke Energy's contractor as permitted under the McDowell County Major Shoreline Stabilization Permit. A copy of this permit has been uploaded in lieu of a sketch. Sketch: McDowell County Shoreline Permit.pdf 841.59KB Application Fee: Once the application has been accepted. You will need to send a corresponding fee in with the appropriate DWR#. The application fee is as follows (pursuant to G.S. 143-215.3D): a $240.00 for impacts to lake (below normal water level) of less than 1 acre a $570.00 for impacts to lake (below normal water level) of greater or equal to 1 acre By digitally signing below, I certify that: a I, the project proponent, hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief a I, the project proponent, hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. a I agree that submission of this Shoreline Stabilization online form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); a I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); a I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND a I intend to electronically sign and submit the Shoreline Stabilization online form. Full Name:* Signature: Jeff C. Ferguson, PE Submittal Date: 7/29/2022 Initial Review Is this accepted into the review process?* Yes No Project Number:* 20210499 Version:* 2 Select Reviewer: * Mitchell Anderson:eads\mlanderson Select Reviewing Office: Asheville Regional Office - (828) 296-4500 Has payment been received?* ( No Payment Needed C Fee Received C• Need Fee - send electronic notification What amount is owed?* C• $240.00 C $570.00