Loading...
HomeMy WebLinkAboutNCG050411_Compliance Evaluation Incpsection_20220207ROY :COOPER Cove wr EUZABE M S- BI5ER secretary: BRIAN WRENN Dfr&"r NORTH CAROLINA Emitorl nentaTQuality February 7, 2022 Accuma Corporation Attention: John Klinck, Permit Owner 133 Fanjoy Road Statesville, North Carolina 28625 Subject: Compliance Evaluation Inspection Accumma Corporation NPDES Certificate of Coverage — NCG050411 Iredell County, North Carolina Dear Mr. Klink: Enclosed please find a copy of the Compliance Evaluation Inspection Report for the inspection we conducted at the Accuma Corporation on February 3, 2022. Please note that in the stormwater inspection report summary we ask that all storm drains on site with unknown discharge locations be found. In addition, ensure all employee training is completed on an annual basis and documented. The report should be self-explanatory; however, should you have any questions, please do not hesitate to contact me at (704) 663-1699 or by E-mail at james.moore@,ncdenr.gov. Enclosure c: Laserfiche Sincerely, nesoore Assistant Regional Engineer North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Mooresville Regional Office 1 610 East Center Avenue, Suite 301 1 Mooresville. North Carolina 28US 704.6631699 Compliance Inspection Report Permit: NCG050411 Effective: 06/01/18 Expiration: 05/31/23 Owner: Accuma Corp SOC: Effective: Expiration: Facility: Accuma Corp County: Iredell 133 Fanjoy Rd Region: Mooresville Statesville NC 28625 Contact Person: Howard Henderson Title: Phone: 704-873-1488 Directions to Facility: From 177 take us 70 a/garner bagnal blvd east towards salisbury for 2.3 mi turn left onto fanjoy rd and travel about 400 ft and facility entrance is on the left. System Classifications: SWNC, Primary ORC: Certification: Phone: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 02/03/2022 Entry Time 02:50PM Exit Time: 03:40PM Primary Inspector: Jesse M McDonnell Phone: 704-235-2139 Secondary Inspector(s): Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Apparel/Printing/Paper/Leather/Rubber Stormwater Discharge CDC Facility Status: E Compliant ❑ Not Compliant Question Areas: 0 Storm Water (See attachment summary) Page 1 of 3 E 10 Z abed *pappe eq of spaau Ilegno mou a j! pue a6aeyosip suieip wjo;s asegl aial4m auiwaajap o} papaau si uoile6iIsanui ja4:pnd -96jeuosip swejp ON4 asayl ejet4m umouNun si 11 -6uwplinq 941 loops ises ay; uo panaasgo alarm suieip uuo}s omi -paluawnoop aq of spaau pue 6uissiw si 6uiuml 99Aojdw3 -juaLno si ueld uoiIuanaJd uoilnilod JalennwJOIS ayl :tiewwnS uoi}oadsul augnoa :31slA io) uoseea uogenIen3 aouqjdwoO: edAl uol3aedsul ZZOZ/£0/ZO :e3ep uol3aedsul dioO ewnooy:131110e:1 - jeumO 4ng000N :31wlad i Permit: NCGO50411 Owner - Facility:Accuma Corp Inspection Date: 02/03/2022 Inspection Type: Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? 0 ❑ ❑ ❑ # Does the Plan include a General Location (USGS) map? M ❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? ❑ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? ❑ ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? ❑ ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? 0 ❑ ❑ ❑ # Does the facility provide all necessary secondary containment? N ❑ ❑ ❑ # Does the Plan include a BMP summary? 0 ❑ ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? 0 ❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ❑ ❑ ❑ # Does the facility provide and document Employee Training? ❑0 ❑ ❑ # Does the Plan include a list of Responsible Party(s)? ❑ ❑ ❑ # Is the Plan reviewed and updated annually? 0 ❑ ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? 0 ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? E ❑ ❑ ❑ Comment: The Stormwater Pollution Prevention Plan is current but missing the employee training log. Ensure annual employee training is completed and documented. Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? M ❑ ❑ ❑ Comment: All Qualitative monitoring is current and complete. Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? 1:11:10 ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ ❑ Comment: Analytical Monitoring does not apply to this facilty. Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? 0 ❑ ❑ ❑ # Were all outfalls observed during the inspection? M ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ M ❑ # Has the facility evaluated all illicit (non stormwater) discharges? M 11110 Comment: All outfalls were observed Two additional storm drains were noted during the inspection. The outfall from these two storm drains needs to be determined. Page 3 of 3