Loading...
HomeMy WebLinkAboutNC0028827_Authorization to Construct_20090420NPDES DOCUMENT SCANNING COVER SHEET NPDES Permit: NC0028827 Snug Harbor WWTP Document Type: Permit Issuance Wasteload Allocation ( h Authorization to Construct (AtC) '` Permit Modification Complete File - Historical Other [rating sheet] Speculative Limits Instream Assessment (67b) Environmental Assessment (EA) Permit History Document Date: April 20, 2009 Thies document is printed an reuse paper - iggnore any content on the re z erse side 04/20/2009 11:45 919-467-5327 04.E20/2009 11:11 2 22'cblb'b Snug Harbor Management, LLC A To C No. 02382 7A01 February 18, 2009 DIEHL & PHILLIPS 111-1rrw.AN r, A U.I',.I Engineer's Certification I, T0t4h: F• PHt4.PPf ,asaduly re the State of North Carolina, having been authorized to observe odic . PAGE _04 Professional Engineer in the construction of the modifications and improvements to the Snug I�erbor on Nelson Bay WWTP, located at 272 US Highway 70 in Carteret County for Snug Harbor Management, LLC, hereby state that, to the best of my abilities, due care and diligence was used in the observation of the following construction: b stallation of a a backup tablet chlorinator and dechiorinator, in conformity with the project plans, specifications, and other supporting data subsequently fated and approved by the Department of Environment and Natural Resources. I certify that the construction of the above referenced project was observed to be built within substantial compliance and intent of the approved plans and specifications. Su; eta,+•.+, Signattlre Date /1.. / D9. Send to: Registration No. ! of 1f . Cons/notion Grants & Loans DDNR/DWQ 1633 Mail Service Center Raleigh, NC 27699-1633 PIP';TTIFC 17"I l%i samI,..Lo TAG US D GHVGa. S`tSTtst''t ONLY. DIrtt: Tb Wu, )40hst, 4• O1M10. CON, Ioatube lrws, N ST1e►LL.wT' a ok 0 (4V. SI$Tsc r' 14 Po ST Po1 I i) IN Os: ref NITI:A.'f, AVA NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Dee Freeman Governor Director Secretary February 18, 2009 Mr. Donald Copeland, Jr. Snug Harbor Management, LLC P.O. Box 150 Sea Level, North Carolina 28577 SUBJECT: Authorization to Construct A to C No. 028827A01 Snug Harbor Management, LLC Snug Harbor on Nelson Bay WWTP WWTP Improvement Carteret County Dear Mr. Copeland: A letter of request for an Authorization to Construct was received on October 17, 2008, by the Division of Water Quality (Division), and final plans and specifications for the subject project have been reviewed and found to be satisfactory. Authorization is hereby granted for the construction of modifications to the existing 0.020 MGD Wastewater Treatment Plant, with discharge of treated wastewater into the Salters Creek in the White Oak River Basin. This authorization results in no increase in design or permitted capacity and is awarded for the construction of the following specific modifications: Installation of a UV disinfection system with two banks each rated to treat a peak flow of 50,000 gpd and a backup tablet chlorinator and dechlorinator, in conformity with the project plans, specifications, and other supporting data subsequently filed and approved by the Department of Environment and Natural Resources. This Authorization to Construct is issued in accordance with Part III, Paragraph A of NPDES Permit No. NC0028827 issued August 1, 2007, and shall be subject to revocation unless the wastewater treatment facilities are constructed in accordance with the conditions and limitations specified in Permit No. NC0028827. 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 Phone: 919-807-63001 FAX: 919-807-6492 \ Customer Service: 1-877-623-6748 Internet: www.ncwaterquality.org An Equal opportunity 1 Affirmative Action Employer Nose Caroli[la �tura!ly Mr. Donald Copeland, Jr. February 18, 2009 Page 2 The sludge generated from these treatment facilities must be disposed of in accordance with G.S. 143-215.1 and in a manner approved by the Division. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement wastewater treatment or disposal facilities. The Wilmington Regional Office, telephone number (910) 796-7215, shall be notified at least forty-eight (48) hours in advance of operation of the installed facilities so that an on site inspection can be made. Such notification to the regional supervisor shall be made during the normal office hours from 8:00 a.m. until 5:00 p.m. on Monday through Friday, excluding State Holidays. Upon completion of construction and prior to operation of this permitted facility, a certification must be received from a professional engineer certifying that the permitted facility has been installed in accordance with the NPDES Permit, this Authorization to Construct and the approved plans and specifications. Mail the Certification to: Construction Grants & Loans, DWQ/DENR, 1633 Mail Service Center, Raleigh, NC 27699-1633. Upon classification of the facility by the Certification Commission, the Permittee shall employ a certified wastewater treatment plant operator to be in responsible charge (ORC) of the wastewater treatment facilities. The operator must hold a certificate of the type and grade at least equivalent to or greater than the classification assigned to the wastewater treatment facilities by the Certification Commission. The Permittee must also employ a certified back-up operator of the appropriate type and grade to comply with the conditions of T15A:8G.0202. The ORC of the facility must visit each Class I facility at least weekly and each Class II, III and IV facility at least daily, excluding weekends and holidays, must properly manage the facility, must document daily operation and maintenance of the facility, and must comply with all other conditions of T15A:8G.0202. A copy of the approved plans and specifications shall be maintained on file by the Permittee for the life of the facility. During the construction of the proposed additions/modifications, the permittee shall continue to properly maintain and operate the existing wastewater treatment facilities at all times, and in such a manner, as necessary to comply with the effluent limits specified in the NPDES Permit. You are reminded that it is mandatory for the project to be constructed in accordance with the North Carolina Sedimentation Pollution Control Act, and when applicable, the North Carolina Dam Safety Act. In addition, the specifications must clearly state what the contractor's responsibilities shall be in complying with these Acts. Mr. Donald Copeland, Jr. February 18, 2009 Page 3 Prior to entering into any contract(s) for construction, the recipient must have obtained all applicable permits from the State. Failure to abide by the requirements contained in this Authorization to Construct may subject the Permittee to an enforcement action by the Division in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. The issuance of this Authorization to Construct does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. One (1) set of approved plans and specifications is being forwarded to you in a separate transmittal. If you have any questions or need additional information, please contact Seth Robertson, P.E. at telephone number (919) 715-6206. Sincerely, rColeen H. Sullins st:sr cc: John Phillips, P.E. — Diehl & Phillips, P.A., 219 E. Chatham Street, Cary, NC 27511 Carteret County Health Department DWQ Wilmington Regional Office, Surface Water Protection Technical Assistance and Certification Unit Point Source Branch, NPDES Program Steve Tsadwa, E.I. ATC File January 29, 2009 Mr. Rick Shiver Regional Supervisor Wilmington Regional Office 127 Cardinal Drive Extension Wilmington, NC 28405-3845 SUBJECT: Snug Harbor Management, LLC Snug Harbor on Nelson Bay WWTP WWTP Improvement ATC No. A028827A01 Dear Mr. Shiver: p(e;v4 /-29_09 In 2008, we started work on the addition of a UV system for our plant that would not only improve the quality of our discharge waters, but also provide a means of complying with the new chlorine limit imposed in our permit. On October 16, 2008, an Authorization to Construct (ATC) was submitted to the Construction Grants and Loans Section to seek its approval for this system. Recently, contact has been made, via telephone; with several members of the DWQ staff, Kipp Glazier and Dean Hunkele, in regards to our WWTP improvement project here at Snug Harbor. Those conversations have been an attempt to ascertain information pertaining to the status of the ATC since no word had been received on its status from the CG&L Section since October 2008. We did, however, received a letter, dated January 23, 2009 from the CG&L Section on Wednesday January 28, 2009 requesting more information. Conversations with DWQ began in December 2008 questioning the delay of the ATC approval. No answers were made available from any of the Division of Water Quality sections until January 28, 2009 when the letter from the CG&L Section was received. Our intention was to have the project, which entails no more than a simple UV system, in place before the February 1, 2009 deadline set forth in the permit. Our opinion was that the CG&L Section would have plenty of time to review this simple system and grants us an Authorization to Construct quickly. That has not been the case. The CG&L Section has had, in its possession, our ATC package for four months. It was only at the prompting of Mr. Kipp Glazier that the ATC was reviewed in the last few weeks. The 4- month timeframe is simply unacceptable and has now put Snug Harbor in a situation were permit compliance is impossible. We are presently in the process of obtaining a timeframe for the installation and should be able to offer you that information within a week. The CG&L Section has requested more information from our engineer, Mr. John Phillips, and we are unable, at this time, to give you a date when they will be finished reviewing our ATC request. Mr. Phillips is forwarding the additional information to the CG&L Section today. We are requesting that you allow us a permit modification that will move the deadline for compliance with the chlorine limit to a future date. We are also requesting that you contact us so we can begin setting some dates for the new effective date. Sincerely, Donald Copeland, Jr., Director Engineering Department Snug Harbor on Nelson Bay Cc: Pat Ausband, Executive Director, Snug Harbor on Nelson Bay John Phillips, P.E. —Diehl & Phillips, P.A., 219 E. Chatham Street, Cary NC 27511