Loading...
HomeMy WebLinkAbout20201654 Ver 2_Mulberry_Bio-retention Pond_SHWT_07-12-22_20220714 __________________________________________________________________________________ PO BOX 2155 ASHEVILLE, NORTH CAROLINA 28802 Phone: 828-398-2040 Fax: 828-398-2041 Email: info@alphaenviron.com Page 1 of 1 aLPHA Alpha Environmental Alpha Engineering Services, P.A. July 12, 2022 Mr. Marvin Mercer, Principle MDG ENGINEERING P.O. BOX 1516 WEAVERVILLE, NC 28787 Re: Seasonal High Water Table Report Mulberry Farms Marshall, NC 28753 Dear Mr. Mercer: Alpha has predicted the seasonal high-water table (SHWT) for the above site to be 3.1’ feet below the current undisturbed surface grade at the proposed bio-retention pond location. Based on the sample from the boring at the approximate center of the proposed pond, the infiltration rate for the soils is estimated to be less-than 0.2 in/hr. Discussion: A seasonal high-water table (SHWT) is the shallowest depth to free water that stands in an unlined borehole or where the soil moisture tension is zero for a significant period (more than a few weeks) (Watts and Hurt, 1991). Although the published sources of information such as the Soil Conservation Service generally provide reliable preliminary guidance on the depth to the water table, Alpha conducted a site-specific investigation for comparison to the published data. This consisted of measuring the stabilized groundwater level in a newly opened borehole, or piezometer at a selected location and time; evaluating the soil profile in the test hole (i.e., sand, silty sand, clayey sand, etc.), including its redoximorphic features; and by performing testing of soil samples from the Site. Conclusion: Alpha’s prediction correlates to The Soil Conservation Service (SCS) of the United State s Department of Agriculture mapping for the general area as having moderate depth soil and groundwater table conditions of more than 24 inches. Alpha Environmental greatly appreciates the opportunity to conduct this investigation and provide this study an d looks forward to working with you on the site development for the project. Please contact us for any additional questions regarding this report. Sincerely, Alpha Environmental Mark Von Dollen, PE Engineer Attachments: Soil Laboratory Results Piezometer readings ALPHA Soils and Materials Laboratory Soil Grainsize Distribution ASTM D6913 / D422-63 MV Testing Date:7/13/2022 ML 4 0.00 0.00 0.0 100.0 20 8.80 8.80 6.6 93.4 40 17.34 26.14 19.7 80.3 80 23.51 49.65 37.3 62.7 100 3.32 52.97 39.8 60.2 200 0.91 53.88 40.5 59.5 Passing 200 0.00 132.99 100.0 0.0 0.010.00039 United Soil Classification System 4.76 0.84 0.42 0.21 0.149 0.0740.0029 Weight Retained (g) Cumulative Weight Retained (g) Amount Washed Through #200 (g) Very Fine Sand Fines (Silts/Clays) Sieve Size Number 0.187 0.33 0.0165 0.0083 0.0059 Gravel Grain Size Description Coarse Sand Medium Sand Medium Fine Sand Fine Sand Cumulative % Retained Cumulative % Finer Reported By: Sieve Opening Size (inches) Sieve Opening Size (millimeters) 132.99 53.88 79.11 Percent passing 200 59.49 Sample Amount Post Wash Dry + Pan (g) Weigh of Pan Empty/Clean (g) 188.50 134.62 Sample Amount Pre Wash Dry (g) Sample Amount Post Wash Dry (g) Sample Field Description (From Bore Logs): Grey sandy silt (ML) Sample Amount Pre Wash Wet + Pan (g) Sample Amount Pre Wash Dry + Pan (g) 228.22 267.61 S1 Bio-Retention Pond 5' t 10' 7/1/2022 Client : Contact: Mercer Design Group Marvin Mercer Sample ID: Sampled From: Sample Depth Sample Date: Project : Project Number: Mulberry Farms 20263.5 0 10 20 30 40 50 60 70 80 90 100 0.010.1110Percent Finer By WeightGrain Size in Millimeters Grain Size Distribution ALPHA Proctor Test ASTM D698 Project _______Mulberry Farms_______ Project Number:__20263.50___________ Comments: Method: 5.5 4 ft³ 3 Tin ID # 24 1 2 3 4 5 6 6124.9 6231.7 6318.4 6280.1 6235.7 4325.1 4325.1 4325.1 4325.1 4325.1 1799.8 1906.6 1993.3 1955 1910.6 118.9295 125.9868 131.7159 129.185 126.2511 16 18 20 22 24 102.5254 106.7685 109.7632 105.8894 101.8154 Q7 7 3 6 P22 30 30.32 30.07 30.87 30.4 61.22 84.51 64.77 109.57 75.54 58.4 78.81 60.57 98.58 68.6 9.929577 11.755 13.77049 16.23099 18.16754 108.187 112.7348 115.7733 111.1451 106.8408 Field Data Maximum Dry Density:115.8pcf Optimum Moisture :__13.8% Tested By: MV Date: 07-13-22 Weight of Hammer: A 25 Initial Moisture Content (%) Calculation inchespoundsMold Diameter Mold Volume: [A] Mold Volume Factor: 101.07 313.7 346.6 15.5 Sample Number: S-1 Proctor Number: Pond -1 Sampled By: ASD Date: 07-01-22 Tin Weight (g.) Tin+Dry Soil (g.) Tin+Wet Soil (g.) Initial Moisture Content (%) Number of Layers (Lifts): Number of Blows Per Lift: 301/30 Sample Location Bio-Rentention Pond Actual Dry Density Test Number: [B] Soil + Mold Weight (g) [C] Mold Weight (g) [B-C=D] Net Soil Weight (g) [(D/454)/A]=E Wet Density [F] Assumed Water Content (%) Proctor Test Laboratory Worksheet Actual Moisture Content (%) Moisture Tin ID [(E/(1+(F/100))] Assumed Dry Density [G] Weight of Moisture Tin (g) [H] Moisture Tin + Wet Soil (g) [J] Moisture Tin + Dry Soil Description Including Unified Soil Classification ID: Grey sandy silt In-Situ Water Content ( % - Moisture ):15.50% 106 108 110 112 114 116 9.8 10.8 11.8 12.8 13.8 14.8 15.8 16.8 17.8 Proctor Test Results Project No:20263.5 Project Name: Project Location: Tested By: MV Date Tested: 7/13/2022 Date Weighed: 7/13/2022 Sample ID. 1 Sample Date 7/1/2022 Sample Description (From Bore Log)Grey sandy silt (ML) Boring No. 1 Container No. (cup) 24 Mass of Cup + Wet Soil (A)346.6 Mass of Cup + Dry Soil (B)313.7 Mass of Cup (C)101.07 Mass of Dry Soil (B-C)212.63 Mass of Water (A-B)32.9 Water Content% (A-B/D) x 100 15.5 ALPHA Materials Engineering Division Water Content Laboratory Analysis Mulberry Farms Marshall SHWT Water Content Well ID Date Installed (m/dd/yy) Date Water Level Measured (m/dd/yy) Well Casing Depth (ft. BGS) Screened Interval (x to y ft. BGS) Bottom of Well (ft. BGS) Top of Casing Elevation (ft.) Depth to Water from ground surface (ft.) Free Product Thickness (ft.) Groundwater Elevation (ft.)Comments MW-1 7/1/2022 7/1/2022 6.80 MW-1 7/1/2022 7/7/2022 5.10 GROUNDWATER MONITORING REPORT Project No.: Mulberry Farms Marshall, NC 20363.5 Site Name: City/Sate: aLPHA Alpha Environmental Alpha Engineering Services, P.A.