HomeMy WebLinkAboutWQ0002052_Monitoring - 04-2021_20210513 FORM: NDMR 03-12 NON-DISCHARGE MONITORING REPORT(NDMR) Page / of
Permit No.: W00002052 Facility Name: Golden Valley Plant County: Rutherford Month: April Year: 2021
PPI: 001 Flow Measuring Point: ❑Influent ❑Effluent ❑No flow generated Parameter Monitoring Point: A Influent I Effluent ❑Groundwater Lowering ❑Surface Water
Parameter Code -► 50050 00310 00916 31616 00927 00610 00625 00620 00600 00400 00665 00931 00929 00530
73
m E _ H c v
0 in E £ - c t aa) ay y o` E •° O E in
a' in 3 a c o 0 o `� v rn CO CD = .4 •r a y 7 ,cg m y
m ¢ E U c o O m _ c E o ° S. o 2 a o a =o o m '5 o a o
U r" U LL m a1 LL O C) E H .�a+ Z H += F- O fn 'NO f/) ' j a)
0 o U U Q Y Z Z a
a CO
24-hr hrs GPD mg/L mg/L #/100 mL mg/L mg/L mg/L mg/L mg/L su mg/L Ratio mg/L mg/L
1 13,775
2 11:00 0.5 14,749
3 14,140
4 10,299
5 07:00 2 15,717 7.3
6 07:00 2 15,901 7.1
7 07:00 2 15,497 7
8 17,606
9 07:00 1.5 15,857
10 18,772
11 15,289
12 07:00 2 14,617 7.3
13 07:00 2 16,152 7
14 07:00 1.5 15,634
15 16,480
16 07:00 1.5 16,638
17 17,045
18 14,511
19 07:00 1.5 17,051
20 07:00 2 13,507 9.4
21 07:00 1.5 14,002 r
22 15,187
23 07:00 1.5 15,488 = . 3 2
24 16,720
25 12,906
26 07:00 1.5 13,579 w 0 l 1t 1
•
27 13,882 "1' �
28 07:00 1.5 46,411
29 8,081
30 07:00 1.5 5,877
31
Average: 15,712
Daily Maximum: 46,411 9.40
Daily Minimum: 5,877 7.00
Sampling Type: Recorder Grab Grab Grab Grab Grab Grab Grab Grab Grab Grab Calculated Grab Grab
Monthly Avg.Limit: _
Daily Limit:
Sample Frequency: Continuous 4 x Year 4 x Year 4 x Year 4 x Year 4 x Year 4 x Year 4 x Year 4 x Year Per Event 4 x Year 4 x Year 4 x Year 4 x Year
l
FORM: NDMR 03-12 NON-DISCHARGE MONITORING REPORT(NDMR) Page of
Sampling Person(s) Certified Laboratories
Name: Barbara Warlick • Name: Water Tech Labs, #50
Name: Name:
Does all monitoring data and sampling frequencies meet the requirements in Attachment A of your permit? El Compliant 77.Non-Compliant
If the facility is non-compliant, please explain in the space below the reason(s)the facility was not in compliance. Provide in your explanation the date(s)of the non-compliance and describe the corrective
action(s)taken.Attach additional sheets if necessary.
Operator in Responsible Charge(ORC)Certification Permittee Certification
ORC: Michael Fortenberry Permittee: Milliken and Company, Golden Valley Plant
Certification No.: 27004 Signing Official: J. R. Williams
Grade: SI Phone Number: 828-247-4300 Signing Officials Title: Plant Leader
Has the OR changed since the vious NDMR? ❑Yes n No Phone Number: 828-247-4305 Permit Expiration: 3/31/2022
//r -
;2/
Signs e Date Signature Date
By this signature,I certify that this report is accurrate a d complete the best of my knowledge. I certify,under penalty of law,that this document and all attachments were prepared under my direction or supervision in
accordance with a system designed to assure that all qualified personnel properly gathered and evaluated the information
submitted.Based on my inquiry of the person or persons who manage the system,or those persons directly responsible for
gathering the information,the information submitted is,to the best of my knowledge and belief,true,accurate,and complete.I am
aware that there are significant penalties for submitting false information,including the possibility of fines and imprisonment for
knowing violations.
Mail Original and Two Copies to:
Division of Water Resources
Information Processing Unit
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
FORM: NDAR-1 10-13 NON-DISCHARGE APPLICATION REPORT (NDAR-1) Page % of
Permit No.: WQ0002052 I Facility Name: Golden Valley Plant I County: Rutherford Month: April Year: 2021
Field Name: 1 Field Name: Field Name: Field Name: -
Did irrigation occur .
Area(acres): 5.97 Area(acres): Area(acres): Area(acres):
at this facility? Cover Crop: Grass Cover Crop: Cover Crop: Cover Crop:
[A YES NO Hourly Rate(in): Hourly Rate(in): Hourly Rate(in): Hourly Rate(in):
Annual Rate(in): 57.2 Annual Rate(in): Annual Rate(in): Annual Rate(in):
Weather Freeboard Field Irrigated? Lit YES 7 NO Field Irrigated? YES ❑NO Field Irrigated? ❑YESYES
g ❑NO Field Irrigated? ❑ ❑NO
4-m 2., c
>c , v
a a a> E o > cy, E o> (1) 13 a) E > rn d n Cr) E
a
N mI T T
nmU mA a au _a m m 4 E aEa E % t0 o E 5 a E Q m C 4 c E °a m ce �`°,. E a 4p a ' O = o aI •rn O cpa X O O o a •2 p 0 X O tO o a 1- rn 0mx 0 oa F •� OkOot E y o > a > Q a = > Q ... a = J Q g = J > Q I- J i = J0) a to _ _
3I- a°F in ft ft gal min in in gal min in in gal min in in gal min in in
1 0.48
2 2.6
3
4
5 C 48 2.5 59,700 480 0.37 0.05
6 C 52 2.7 31,900 240 0.20 0.05
7 C 50 2.9 50,200 420 0.31 0.04
8
9 0.01 3.1
10
11 0.4
12 C 52 2.9 34.500 300 0.21 0.04
13 C 54 3.1 36.800 300 0.23 0.05
14 3.3
15
16 3.2
17
18
19 3.2
20 C 58 3.3 41,000 360 0.25 0.04
21 3.4
22
23 3.4
24
25 1.12
26 3.2
27
28 3.2
29
30 3.2
31
Monthly Loading: 254,100 1.57 0 0.00 0 0.00 0 0.00
12 Month Floating Total(in):' 19.41 -
•
FORM: NDAR-1 10-13 NON-DISCHARGE APPLICATION REPORT(NDAR-1) Page g of
Did the application rates exceed the limits in Attachment B of your permit? ❑� Compliant ❑Non-Compliant
Were adequate measures taken to prevent effluent ponding in or runoff from the sites? LI Compliant ❑Non-Compliant
Was a suitable vegetative cover maintained on all sites as specified in your permit? ❑✓ Compliant ❑Non-Compliant
Were all setbacks listed in your permit maintained for every application to each permitted site? ❑✓ Compliant ❑Non-Compliant
Were all freeboards maintained in accordance with the specified freeboard heights in your permit? ❑Compliant ❑Non-Compliant
If the facility is non-compliant, please explain in the space below the reason(s)the facility was not in compliance. Provide in your explanation the date(s)of the non-compliance and describe the corrective
action(s)taken.Attach additional sheets if necessary.
Operator in Responsible Charge(ORC)Certification Permittee Certification
ORC: Michael Fortenberry Permittee:
Milliken and Company-Golden Valley Plant
Certification No.: 27004 Signing Official: J. R. Williams
Grade: SI Phone Number: 828-247-4300 Signing Officials Title: Plant Leader
Has the ORC changed since the Fevious NDAR-1? LI No Phone Number: 828-247-4305 Permit Exp.: 3/31/22
/.1?/.
i� -77/
J -i7/ r
Sign: ure Date Signature Date
By this signature,I certify t at this r€port Is accurrate and comp) e to the best of my knowledge. I certify,under penalty of law,that this document and all attachments were prepared under my direction or supervision in accordance
7 with a system designed to assure that all qualified personnel properly gathered and evaluated the information submitted.Based on my
/ inquiry of the person or persons who manage the system,or those persons directly responsible for gathering the information,the
1( information submitted is,to the best of my knowledge and belief,true,accurate,and complete.I am aware that there are significant
penalties for submitting false information,including the possibility of fines and imprisonment for knowing violations.
Mail Original and Two Copies to:
Division of Water Resources
Information Processing Unit
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
Method SM 20 Ed 4500-H-2011
pH WORKSHEET
Analysis Collection
Date Time Sample ID Date Time Results SU's Analyst
`-t=S Z/ 07 vi Buffer 4.00 ***** ***** tt„Gb
ait.
0 7 4 L Buffer 10.00 ***** _ ***** ��-�
D704 Buffer7.00 QC ***** ***** 7 fib***** Slope Efficiency ***** *****
S MILLIKEN
VI; ;-L/ Q i'Si) 7_ 3
O 9- " "Duplicate N -7. 3 �s
09S Buffer 7.00 QC 7 .o/ ��s'
7
7- 2/ 66,st) Buffer 4.00 ***** ***** Y'. Ul> Ca�--1/
a 6,j 2 Buffer 10.00 ***** ***** O,
/ o Gs y Buffer 7.00 QC ***** ***** 7
***** Slope Efficiency ***** ***** ,/
O 9 J� MILLIKEN �-7-Z/ 9 ?�� 7.
0 9�-/ " "Duplicate .. H 7. D
o S�Z Buffer 7.00 QC 7. d ! Sid
tf:-fZ'Zr 06 U Buffer 4.00 ***** ***** C 4
a 6S L Buffer 10.00 *****
*****
***** �o�o� _-
0 6 5 yBuffer 7.00 QC *****
*****
'7„rD
7 3
***** Slope Efficiency *****
/ a S- MILLIKEN v-f2_aL /OZ11
(vd� "Duplicate y 7- 3 IYs
C 69 Buffer 7.00 QC 7- d / !� �--�_�
�=!3 Z/ 0 7 Buffer 4.00 ***** ***** (I.. co C
O-7 62 _ Buffer 10.00 ***** ***** t 1p_ cp
�)7 p 'f Buffer 7.00 QC ***** ***** -7.
***** Slope Efficiency ***** ***** ,/
I 3 MILLIKEN !3--' f /( 3 7-_o
�i 3 G. " "Duplicate - << .r _ O (Jis
-
t/3 7 Buffer 7.00 QC ,. �f '� t r
"0.0-7-1 07 Buffer 4.00 ***** *****
0702- Buffer 10.00 ***** ***** (p , vts
1 O?0`-f Buffer7.00 QC ***** ***** 7. w
***** Slope Efficiency ***** ***** ✓
�(3 MILLIKEN �� ,�Z l! 3(� ci. y
II 3 "Duplicate i- `I f sfs
I f f3 7 C Buffer 7.00 QC 7.o f S- r.
BUFFERS:
4.00 LOT# 8010228 EXP OCT 2022 WATER TECH LABS
7.00 LOT# 8011123 EXP NOV 2022 NC050
10.00 LOT# 8009500 EXP OCT 2022
Method SM 20 Ed 4500-H-2011
pH WORKSHEET
Analysis Collection
Date Time Sample ID Date Time Results SU's Analyst
t(-Z/ D8'up Buffer4.00 ***** ***** (Ie- 6 b
D Er-02_ Buffer 10.00 ***** ***** dp
p O 0 y Buffer 7.00 QC ***** ***** 7
***** Slope Efficiency ***** ***** ,/
/aoS' f(ri//top--- NJ g `f-4-2./ /0131) 7, 4
1oza - Mkk) 7__ — r, /o /s' 4.S
/os:f �- /Kik/ / 5 G�7 /*-1/1-)
//30 E _ of //Z-
/� 7.
1(3 2 _ 2—5- 7, r
/ is 3 )4- cae;# QC 7 ob 7. o f
i
BUFFERS:
4.00 LOT# 8010228 EXP OCT 2022
7.00 LOT# 8011123 EXP NOV 2022
10.00 LOT# 8009500 EXP OCT 2022
* NON REPORTABLE
. FOR NPDES
COMPLIANCE MONTTORING DUPLICATFJS±0.1 SU'S t/