Loading...
HomeMy WebLinkAboutSW6220201_Plansheet C3.0 - Grading_Drainage Plan_20220510VICINITY MAP NOT TO SCALE NOTIFICATION OF COMBINED SELF -MONITORING AND SELF -INSPECTION FORM: THE SEDIMENTATION POLLUTION CONTROL ACT WAS AMENDED IN 2006 TO REQUIRE THAT PERSONS RESPONSIBLE FOR LAND -DISTURBING ACTIVITIES INSPECT A PROJECT AFTER EACH PHASE OF THE PROJECT TO MAKE SURE THAT THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN IS BEING FOLLOWED. RULES DETAILING THE DOCUMENTATION OF THESE INSPECTIONS TOOK EFFECT OCTOBER 1, 2010. TO SIMPLIFY DOCUMENTATION OF SELF -INSPECTION REPORTS AND NPDES SELF -MONITORING REPORTS, DWQ AND DEMLR DEVELOPED A COMBINED FORM. THE SELF -INSPECTION PROGRAM IS SEPARATE FROM THE WEEKLY SELF -MONITORING PROGRAM OF THE NPDES STORMWATER PERMIT FOR CONSTRUCTION ACTIVITIES. THE FOCUS OF THE SELF -INSPECTION REPORT IS THE INSTALLATION AND MAINTENANCE OF EROSION AND SEDIMENTATION CONTROL MEASURES ACCORDING TO THE APPROVED PLAN. THE INSPECTIONS SHOULD BE CONDUCTED AFTER EACH PHASE OF THE PROJECT, AND CONTINUED UNTIL PERMANENT GROUND COVER IS ESTABLISHED. THE FORM CAN BE ACCESSED AT: HTTP: //PORTAL.NCDENR.ORG/WEB/LR/EROSION IF YOU HAVE QUESTIONS OR CANNOT ACCESS THE FORM, PLEASE CONTACT THE FAYETTEVILLE REGIONAL OFFICE AT (910) 433-3300. LEGEND: PK PK-PK NAIL EIP Oo EIP-EXISTING IRON PIPE EIS O EIS -EXISTING IRON STAKE ENLO ENL-EXISTING NAIL ERBO ERB-EXISTING REBAR N/F - NOW OR FORMERLY R/W - RIGHT OF WAY PVC - POLYVINYL CHLORIDE RCP - REINFORCED CONCRETE PIPE CI - CURB INLET PROPERTY LINE ADJACENT PROPERTY LINE RIGHT-OF-WAY ss SANITARY SEWER LINE Fm FORCE MAIN LINE sD STORM DRAINAGE - - WETLANDS PERMANENT EASEMENT X FENCE LINE TREE LINE x 208.47' SPOT ELEVATION BENCHMARK N WATER VALVE ry 11 FIRE HYDRANT ❑❑ WATER METER ® CATCH BASIN TREE GRAVEL 0 SOIL 0 WETLANDS 330 MAJOR CONTOUR 337 MINOR CONTOUR - Loc- Loc- LIMITS OF CONSTRUCTION - SF - SF - SILT FENCE LINE - JN - JN -JUTE NETTING 0INLET PROTECTION C3.1 C3.2 C3.3 C3.4 SHEET KEY GRADING NOTES 1. ALL 15" AND 18" RCP IS CLASS IV RCP. LARGER PIPES ARE CLASS III RCP UNLESS OTHERWISE NOTED ON THE PLAN. 2. ALL ELEVATIONS SHOWN ARE IN REFERENCE TO THE BENCHMARK AND MUST BE VERIFIED BY THE GENERAL CONTRACTOR.ALL SPOT ELEVATIONS ARE TO THE FINISHED GRADE OF THE CURB, UNLESS OTHERWISE NOTED. 3. ALL SIDEWALKS AND PEDESTRIAN WALKING SURFACES SHALL HAVE A CROSS SLOPE NO STEEPER THAN 2% AND LONGITUDINAL SLOPE NO STEEPER THAN 5%. 4. THE CONTRACTOR SHALL ASSUME RESPONSIBILITY FOR ALL LAND DISTURBING ACTIVITIES AND ENSURE COMPLIANCE WITH THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN. THE CONTRACTOR SHALL INSPECT AND MAINTAIN ALL EROSION CONTROL DEVICES AND CLEAR ANY DEBRIS LEAVING THE SITE ON NEIGHBORING ROADS. 5. EXISTING GROUND UPON WHICH FILL OR BASE IS TO BE PLACED SHALL BE CLEARED OF WEEDS, DEBRIS, TOPSOIL, AND ALL OTHER DELETERIOUS MATERIALS; NO FILL SHALL BE PLACED UNTIL PREPARATION OF THE EXISTING GROUND HAS BEEN COMPLETED 6. PROTECTIVE MEASURES SHALL BE TAKEN BY THE CONTRACTOR AND THE OWNER TO PROTECT ADJACENT PROPERTY, THE PUBLIC AND UTILITIES DURING GRADING OPERATIONS. THE CONTRACTOR ASSUMES ALL LIABILITY FOR THE UNDERGROUND UTILITY PIPES, CONDUITS, OR STRUCTURES, WHETHER SHOWN OR NOT ON THE PLAN 7. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO VERIFY THE LOCATION OF ALL UTILITIES OR STRUCTURES ABOVE AND BELOW I INV INV ■ 311.21 312.22 \ ■ INV -_�275.04 INV 24" RCP INV INV I NURSERY ROAD SR 1117 - A A .,,1 �A - - - r 310.05s� -- 313.84�c 3� 24" (PUBLIC) ��// i j ��ii ■ ECS -�� _ ■ LOC LOC LOC LOC LOC LOC LOC- - _ LOC LOC LOC L C LOC LOC _LOC LOC L C L LOC LO ■ - - !�� LOC Un - - - ��\111 lll�llll I - - • - - - - - I \ - - - - - - - - - - - - �c� \�\\\ \1\\\ \ \\ \ I I �� 11 � � � / � �l �.�� , - I\ I ` � I � ♦ � \ 1525 � � I 592 I � \\\ \ \\\\\ \1 I I /�//i / l l! l l i \ \ \ ♦ \\ \ l W z l _ ! ■ 561) \\\� \\\\\\\\\)IIIIII� h " // / I ♦ \\ \\\ I - - - - -� n y 562 \ j � ,.. \\ \\ \\ 1 I I I I I I I I I I \\ t;526 l 591 ! / _ �\ 0 \\\\\\ III III ♦- \\ • CA \IIII I III I ter" • ° ��� > •. / 563,- � \111 II 11111111111111111 ` •\\\\\1 m �_ - `0 ► _- 111 I I I , I Iv/F \ \\ */ I ) 1 1 �527 1 I 59 ` �\ I I I I I WOODSHIRE PARTNERS, LLC �. �_ i I - 1 _ J �� ♦ ,, r I I I I I I DB 3446, PG 969 // ♦ _ _ - - - 1I 1328 000,00 1 - 5s9 • ♦ � \ \ \ \ III 1 \ \ . \ �► I I �' �....� \ 1 1 \\\\\\\ \\ \ \\\\\\ \\\\\\ \\\\ \ \\III(529/ ♦ ,� \ \III 1 i / \\ l� QC51,8�8,)), I • - ' 587 i / / I I ►III III \ I \ 11 \ \ \ \ \h\ �` \ \\ \ \� � ` � /� � `J ♦' �r--1 \\ ` I, \ � 58nt -58 5851 C 41 _ --- �/,�/ / / ///�/ --mot-- � A\ • �32 El IIII III\ 1 \ , \ •� \ ., �P� L 53J N 567,403.47 E 2,008,481.37 / \ / /l • ♦ / NC GRID NAD 83 �Q 7 / Wawa(2011) i \\ �F\ 534 j(\ 10 __00 ERB ERB5/8" , 1\ ERB -. 53� ERB ERB ERB fi �, ') 4�i� - ♦ `� `� ` ��%� �19 418, ik_imp 06, CONSTRUCTION SEQUENCE 417 ;t,53- �\ 1. OBTAIN ALL NECESSARY PERMITS AND APPROVALS AND HOLD PRE CONSTRUCTION CONFERENCE. 2. INSTALL STONE CONSTRUCTION ENTRANCE, TEMPORARY SILT FENCE, SILT FENCE OUTLETS, AND DIVERSION BERMS WHERE SPECIFIED. ` , \) I 53_8 3. CONSTRUCT TEMPORARY SKIMMER BASINS. 4. CLEAR AND GRUB THE SITE AS NEEDED. PROPOSED SEWER LINE II 5. ROUGH GRADE THE SITE AND APPLY TEMPORARY SEEDING TO I AREAS REMAIN GRASSED. / �■ y ■ 6. INSTALL TEMPORARY CHECK DAMS IN SWALES AS SHOWN. / 7. INSTALL UTILITIES. - ■ - ■ ■ ■ �,� �� 8. INSTALL INLET PROTECTION ON ALL NEW STORM WATER INLETS. ■ )� 9. PERFORM FINE GRADING. ■ ■ I I I I 10. INSTALL AND PREPARE BASE COURSE. - ■ ■ ■ I I • 0 ✓' 11. PAVE ROADWAYS. n 12. FERTILIZE, SEED AND MULCH ALL REMAINING DISTURBED AREAS. .I I 540 13. UPON SITE STABILIZATION, SEEK NCDEQ APPROVAL TO REMOVE ' 58i - �• j \ 80 1\ - 79) m I I 578� z Ij 1 � \ 576 � A \, ALL TEMPORARY MEASURES. N/F \ - 14. ALL EROSION CONTROL MEASURES SHALL BE MAINTAINED AS WOODSHIRE PARTNERS, LLC. OUTLINED IN THE DETAILS WITHIN THE PLANS AND ACCORDING DB 2668, PG 901 TO THE NCDEQ EROSION CONTROL MANUAL. 15. TERMINATION OF COVERAGE UNDER THE NPDES GENERAL 11 STORMWATER PERMIT FOR CONSTRUCTION ACTIVITIES MUST BE G REQUESTED BY THE PERMITTEE VIA A NOTICE OF TERMINATION 11 o �541 (NOT). THE NOT IS AVAILABLE AT: HTTPS: //EDOCS.DEQ.NC.GOV/FORMS/NCG01-TERMINATION. PLEASE NOTE THAT THE CLOSE OUT INSPECTION REPORT MUST ((, BE UPLOADED AS PART OF COMPLETING THE NOTICE OF I �\ \ �• TERMINATION PROCESS. CA • EROSION CONTROL NOTES STOCKPILES BY VEGETATIVE COVER, TARPS, OR OTHER MEANS. AND PERFORMANCE OF ANY OTHER PARTIES PERFORMING WORK \\ CONTROL EROSION FROM ALL STOCKPILES BY PLACING SILT ON THIS PROJECT. 1. ALL INLET/OUTLET PROTECTION WILL BE CHECKED FOR BARRIERS AROUND THE PILES. TEMPORARY STOCKPILES 13. ALL EROSION AND SEDIMENT CONTROL PRACTICES WILL BE MAINTENANCE AND FAILURE EACH ACTIVE DAY ON SITE. LOCATED ON PAVED SURFACES MUST BE NO LESS THAN FIVE CHECKED FOR STABILITY AND OPERATION FOLLOWING EVERY 1/2„ \\ SEDIMENT WILL BE REMOVED FROM THE SEDIMENT TRAP AND FEET FROM THE DRAINAGE/GUTTER LINE AND SHALL BE RUNOFF -PRODUCING RAINFALL BUT IN NO CASE LESS THAN ERB INLET PROTECTION DEVICES WHEN THE STORAGE CAPACITY HAS COVERED IF LEFT MORE THAN 24 HOURS. ONCE EVERY WEEK. ANY NEEDED REPAIRS WILL BE MADE BEEN APPROXIMATELY 50% FILLED. GRAVEL WILL BE CLEANED 7. MAINTAIN ALL TEMPORARY EROSION AND SEDIMENT CONTROL IMMEDIATELY TO MAINTAIN ALL PRACTICES AS DESIGNED. r- Q I TBM 4D ECS #181 N 568,836.892 E 2,008,250.099 ELEV 339.17 NC GRID NAD 83 (2011) ECS NAVD 88 I N 568,828.20 E 2,008,278.20 NC GRID NAD 83 (2011) 553 I 0 X 9,51 I o 550 GROUND STABILIZATION CHART SITE AREA STABILIZATION STABILIZATION TIME DESCRIPTION TIME FRAME FRAME EXCEPTIONS PERIMETER DIKES, SWALES, DITHCES 7 DAYS NONE AND SLOPES HIGH QUALITY WATER (HQW) 7 DAYS NONE ZONES IF SLOPES ARE 10' OR SLOPES STEEPER 7 DAYS LESS IN LENGTH AND ARE THAN 3:1 NOT STEEPER THAN 2:1, 14 DAYS ARE ALLOWED SLOPES 3:1 OR 7-DAYS FOR SLOPES FLATTER 14 DAYS GREATER THAN 50 FEET IN LENGTH NONE ALL OTHER AREAS (EXCEPT FOR WITH SLOPES FLATTER 14 DAYS PERIMETERS AND THAN 4:1 HQW ZONES) 0 0 0 N/F HARNETT FORWARD TOGETHER COMMITTEE DB 2193, PG 653 �•�- GROUND, SHOWN OR NOT SHOWN ON THESE PLANS. THEY WILL BE HELD OR REPLACED WHEN THE SEDIMENT POOL NO LONGER DRAINS DEVICES IN PLACE UNTIL THE CONTRIBUTING DRAINAGE AREA 14. PURSUANT TO G.S. 113A-57(2), THE ANGLE FOR GRADED \ a RESPONSIBLE FOR ALL DAMAGE TO ANY UTILITIES OR STRUCTURES PROPERLY. SEDIMENT WILL BE REMOVED FROM BEHIND THE HAS BEEN STABILIZED. INSPECT TEMPORARY EROSION AND SLOPES AND FILLS SHALL BE NO GREATER THAN THE ANGLE \ CAUSED BY HIS OPERATION. SEDIMENT FENCE WHEN IT BECOMES ABOUT 0.5' DEEP AT THE FENCE. THE SEDIMENT FENCE WILL BE REPAIRED AS NEEDED TO SEDIMENT CONTROL DEVICES ON A DAILY BASIS AND REPLACE DETERIORATED, DAMAGED, OR ROTTED EROSION CONTROL THAT CAN BE RETAINED BY VEGETATIVE COVER OR OTHER ADEQUATE EROSION CONTROL DEVICES OR STRUCTURES. IN ANY 8. ALL CUT AND FILL SLOPES SHOULD BE INVESTIGATED BOTH DURING AND AFTER GRADING BY THE CONTRACTOR TO DETERMINE IF ANY SLOPE MAINTAIN A PROPER BARRIER. DEVICES IMMEDIATELY. EVENT, SLOPES LEFT EXPOSED WILL, WITHIN 7 OR 14 CALENDAR / STABILITY PROBLEMS EXIST. IF IT IS DETERMINED THAT THERE IS A 2. TEMPORARY EROSION CONTROL FACILITIES AND/OR PERMANENT 8. TEMPORARILY OR PERMANENTLY STABILIZE ALL DENUDED AREAS DAYS OF COMPLETION OF ANY PHASE OF GRADING, BE PLANTED �\ SLOPE STABILITY PROBLEM THE ENGINEER OF RECORD SHOULD BE FACILITIES INTENDED TO CONTROL EROSION OF AND EARTH DISTURBANCE OPERATION SHALL BE INSTALLED BEFORE ANY WHICH HAVE BEEN FINISH GRADED, AND ALL DENUDED AREAS IN WHICH GRADING OR SITE BUILDING CONSTRUCTION OPERATIONS OR OTHERWISE PROVIDED WITH TEMPORARY OR PERMANENT GROUND COVER, DEVICES OR STRUCTURES SUFFICIENT TO below. NOTIFIED. Know what's 9. STOCKPILE AREAS THAT WILL EXCEED 10' IN HEIGHT SHOULD BE GRADED EARTH DISTURBANCE OPERATIONS TAKE PLACE OR AT THE EARLIEST POSSIBLE POINT DURING CONSTRUCTION. ARE NOT ACTIVELY UNDERWAY AGAINST EROSION DUE TO RAIN, WIND AND RUNNING WATER WITHIN 14 DAYS. USE SEEDING AND RESTRAIN EROSION. PURSUANT TO G.S. 113A-57(3), PROVISIONS FOR PERMANENT GROUND COVER SUFFICIENT TO RETAIN \ WITH 3:1 SLOPES AND SURROUNDED BY SILT FENCE. \ 111 before you dig. 10. APPROVED COPIES OF THE GRADING AND EROSION CONTROL PLANS 3. TEMPORARY & PERMANENT EROSION CONTROL MEASURES SHALL MULCHING, EROSION CONTROL MATTING, AND/OR SODDING AND EROSION MUST BE ACCOMPLISHED FOR ALL DISTURBED AREAS o � SHALL BE ON THE PERMITTED SITE WHILE WORK IS IN PROGRESS. BE CONSTRUCTED PER THE DETAILS HEREIN, OR SHALL BE STAKING IN GREEN SPACE AREAS AND OTHERWISE APPROPRIATE WITHIN 90 CALENDAR DAYS FOLLOWING COMPLETION OF \ O \ ♦' 11. ALL EXISTING DRAINAGE COURSES THROUGH THIS SITE SHALL REMAIN IN CONSTRUCTED IN ACCORDANCE WITH THE NORTH CAROLINA MEASURES. USE EARLY APPLICATION OF GRAVEL BASE ON CONSTRUCTION OR DEVELOPMENT. 1 2 o I ERB A CONDITION SUCH THAT THEY CAN TRANSPORT THE NATURAL EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN AREAS TO BE PAVED. 15. CONTRACTOR IS RESPONSIBLE FOR INSTALLING ALL EROSION 2�� \\ DRAINAGE UNTIL FACILITIES TO HANDLE THE STORM WATER ARE MANUAL. 9. DO NOT REMOVE ANY EROSION AND SEDIMENT CONTROL CONTROL MEASURES SHOWN AND ANY ADDITIONAL MEASURES CONSTRUCTED. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY 4. THE CONTRACTOR MUST NOTIFY THE APPROPRIATE NCDEQ DEVICES AFTER THE PROTECTED AREA HAS UNDERGONE FINAL REQUIRED TO CONTROL THE SEDIMENT DURING THE COURSE OF ` \\ N/F DAMAGE DUE TO OBSTRUCTING NATURAL DRAINAGE PATTERNS. OFFICE A MINIMUM OF 48 HOURS PRIOR TO BEGINNING ANY STABILIZATION AND PERMANENT VEGETATION HAS BEEN CONSTRUCTION. - WOODSHIRE PROPERTIES,IINC. GRAPHIC SCALE 12. ANY DEVIATION FROM THE APPROVED GRADING PLAN SHOULD BE LAND DISTURBING ACTIVITIES. 910-433-3300 ESTABLISHED, IT IS RECOMMENDED THAT NCDEQ APPROVE THE 16. ALL SEEDED AREAS WILL BE FERTILIZED, RESEEDED AS ♦ \\ DB 1899, PG 868 \ REPORTED TO THE ENGINEER OF RECORD PRIOR TO IMPLEMENTATION OF 5. REMOVE ALL SOILS AND SEDIMENTS TRACKED OR OTHERWISE ACTION PRIOR TO REMOVAL. NECESSARY, AND MULCHED ACCORDING TO THE DETAILS HEREIN. � � � 100 0 50 100 200 400 THE CHANGE. DEPOSITED ONTO PUBLIC AND PRIVATE PAVEMENT AREAS. 10. THE CONSTRUCTION ENTRANCE SHALL BE INSTALLED 17. THE CONTACT PERSON FOR EROSION CONTROL ISSUES THAT ♦ \\ I„ 13. ALL SLOPES 3:1 OR STEEPER THAT EXTEND TEN FEET OR MORE SHALL REMOVAL SHALL BE ON A DAILY BASIS WHEN TRACKING CONCURRENTLY WITH THE INITIATION OF CONSTRUCTION ARISE ON SITE IS WATSON CAVINESS. CONTACT 910-481-0503. ` ♦ r✓ BE LINED WITH NORTH AMERICAN GREEN S75 TEMPORARY EROSION OCCURS. ACTIVITY. ♦ \ �/ 0000 CONTROL BLANKET OR EQUAL SUBSTITUTE. 6. LOCATE SOIL STOCKPILES NO LESS THAN FIFTY (50) FEET FROM 11. THE INSTALLATION OF EROSION CONTROL MEASURES SHALL II 14. STORM PIPE DISTANCES SHOWN ARE TO THE CENTER OF THE BOX FOR ANY PUBLIC OR PRIVATE ROADWAY OR DRAINAGE CHANNEL. IF TAKE PRECEDENCE OVER ALL OTHER CONSTRUCTION ACTIVITIES. �, ( IN FEET ) ALL STRUCTURES UNLESS OTHERWISE NOTED. REMAINING FOR MORE THAN SEVEN DAYS, STABILIZE THE 12. THE PERMITTEE SHALL BE HELD RESPONSIBLE FOR THE ACTIONS 1 inch = 100 ft. 15. ALL STORM PIPE TO BE CLASS III RCP UNLESS OTHERWISE NOTED. \\ 4Dsite solutions 04 civil engineering I land surveying 409 Chicago Drive, Suite.U2, Fayetteville, NC 28306 office 1 910-426-6777 fax 1910-426-5777 license number I C-2354 www.4Dsitesotutions.com `r,1CARO,���'' SEA 02 •• G IN ••: ja�`� U3-30-22 REVISIONS PROJECT NAME WOODSHIRE SUBDIVISION PHASE 8 GRADING AND EROSION CONTROL PLAN CLIENT WOODSHIRE HUFF, LLC 2919 Breezewood Avenue - Suite 100 Fayetteville, North Carolina 28303 Phone: (910) 486-4864 PROJECT INFORMATION DESIGNED BY: BRETT DRAWN BY: BRETT CHECKED BY: SCOTT PROJECT NUMBER: 1775 DRAWING SCALE HORIZONTAL: 1 "=100' DATE RELEASED MARCH 30, 2022 SHEET NUMBER C-3nO THE CONTRACTOR MUST CONTACT NORTH CAROLINA ONE CALL CENTER AT 1-800-632-4949 A MINIMUM OF 72 HOURS PRIOR TO DIGGING IN ORDER TO HAVE THE EXISTING UTILITIES LOCATED